HomeMy WebLinkAbout20070295 Ver 1_Riparian Buffer Authorization Request_20220707Buffer Authorization Application Form
15A NCAC 02B .0233 (8)(b), .0243 (8)(b), .0250 (11)(b), .0259 (8)(b), .0267 (11)(c), .0607 (e)(2) Buffer Authorization Online Form -
Update 10/23/2018
Water Reources
ENVIRONMENTAL QUALITY
Original Submittal 7/7/2022
A. Owner/Applicant Information
General Information
Primary Contact Email:*
Who is submitting the application?*
1. Property Owner Information:
la. Name on Recorded Deed: *
1b. Responsible Party:
lc. Mailing Address:*
burdette@nrconsultnc.com
Please list the contact person's email for questions or payment on this project if needed.
Owner
Applicant other than Owner
Agent
Tri Pointe Homes Holdings, Inc.
Kristi Dillard
(for Corporations)
Street Address
1330 Sunday Dr, Ste 101
Address Line 2
City State / Province / Region
Raleigh NC
Postal / Zip Code Country
27607 US
le. Email Address:* Kristi.Dillard@tripointehomes.c
Id. Telephone:* 919-300-4914 om
3. Agent Information:
3a. Name:
3b. Company Affiliation:
3c. Mailing Address: Street Address
Address Line 2
City
Postal / Zip Code
3d. Telephone:
3e. Email Address:
State / Province / Region
Country
3f. Attach a signed and dated copy of the agent Click the upload button or drag and drop files here to attach document
authorization form. PDF Only
B. Project Information and Prior Project History
1. Project Information
la. Name of Project: *
Holding Village - Phase 10 - HV NC98 MEWS
(Subdivision, facility, or establishment name)
1b. Is this a publicly -funded transportation project?*
Yes
No
Id. Subdivision Name: Holding Village at North Lake
le. Nearest Municipality: Wake Forest
If. Property Size: 21.00
acres
1g. County (or Counties) where the project is located:*
Wake
1h. Property ID#
1840369255
Tax PIN or Parcel id
1 i. Deed Information
Date of Purchase
1/14/2022
Type of Book
Book#
Page#
Deed
018883
00354
Map
2022
951
1 j. Attach a copy of the recorded map that indicates when the lot was last platted.
Click the upload button or drag and drop files here to attach document
PDF only
1k. How would you like to provide the Latitude and Longitude information?*
Address Lookup
Manually
Latitude * 35.962914
Longitude* -78.512462
11. Is the project located in any of North Carolina's twenty coastal counties?*
Yes
O No
2. Surface Waters
2a. Name of the nearest body of water to proposed project:*
Smith Creek
2b. Water Quality Classification of nearest receiving water:
C; NSW
2c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property:
546
(linear feet only)
3. Project Description:
3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:
The overall property contains approximately 47 acres of agricultural crop fields; the
remaining area consists primarily of mature mixed pine -hardwood forest. There are
several existing structures on the property, including four abandoned buildings and
three silos. This last phase of the project was previously an agricultural field.
Successional vegetation is now present across most of this area. The subject
property vicinity contains forested land and residential, commercial, and office
developments. Please refer to the attached USGS Location Map (Figure 1) and Wake
County Soil Survey Map (Figure 2) for more information on the project setting of this
phase.
3b. Attach an 8 1/2 x 11 excerpt from the most recent version of the USGS topographic map indicating the location of the site.
Click the upload button or drag and drop files here to attach document
21034-Holding-Fig 1 USGS V2.pdf 823.32KB
PDF only
3c. Attach an 8'/: x 11 excerpt from the most recent version of the published County NRCS Soil Survey Map depicting the project site.
Click the upload button or drag and drop files here to attach document
21034-Holding-Fig 2 Buffer Subj SS V2.pdf 2.51MB
PDF only
4. Proposed Activity
Provide a detailed description of the proposed activity including its purpose and include the type of equipment to be used:*
Holding Village North Lake is a mixed -use development situated between Holding
Lake and NC Highway 98. This phase is within the second half of the Holding Village
overall development and consists of multi -family residential development. The
proposed development plan includes two road connections to the existing
development and a stormwater control measure. One road connection crosses a
stream channel. It will be constructed with an arch culvert to avoid impacting the
stream. The attached Construction Drawings depict the overall project plan view and
locations of insets that show details of the proposed impact areas.
Heavy equipment typical for road construction, utility installation and grading will be
used to construct the proposed project such as track hoes, bulldozers, dump trucks
and graders.
Attach a site plan as applicable to the project:
Click the upload button or drag and drop files here to attach document
TPH21002 Combined Impact Maps.pdf 3.15MB
PDF only
5. Jurisdictional Determinations
5a. Have jurisdictional wetlands or stream determinations by the Corps or State been requested or obtained for this property/project
(including all prior phases) in the past?*
5b. Who did the determination on the jurisdictional areas?
Who did the determination? i
List name if known
Date
Attach
Corps
April Norton
(Name if known)
10/27/2022
Wake, PJD,
North Lake HV
Drained Pond
PJD EM 2021-
10-27. pdf
368....
pdf only
State
Alys Hannum
(Name if known)
11/15/2021
*** Please include the date of the determination and upload a copy of the determination.
Comments:
6. Project History
2021-11-15
Holding_Villa...
1.65...
pdf only
6a. Have permits or certifications been requested or obtained for this project (including all prior phases) in the past?*
- Yes
No
6b. List any permits/approvals that have been requested or obtained for this project in the past.
Application Date
12/17/2019
12/17/2019
Date Issued
5/8/2020
4/14/2020
Permit Type
NWP 29
401
6c. Please explain and detail according to "help file" instructions.
The overall Holding Village development's permit history began in February 2007 with
a request for an express review from DWR (#07-0295 V1), which was abandoned. In
September of that same year, DWR issued a buffer authorization (#07-0295 V2
attached) to impact the riparian buffer with one road span, a pedestrian bridge and
sanitary sewer alignments. Due to the economic recession, the project was
abandoned, and impacts were not completed. This permit application includes the
same road crossing (#2) location and a portion of the sanitary sewer alignment
previously approved. Because a Conditional Use Permit based on the Master Plan
for this project was approved in 2007 and construction on the South Lake phase of
the project has commenced, the Town of Wake Forest has determined the Master
Plan is vested in the 50-foot buffer and Phase I Stormwater rules that were in place at
the time of approval.
In 2012, a Nationwide Permit (NWP) 3 was utilized and written approval (#07-0295
V3) was obtained by DWR for the rehabilitation of Holding Lake's dam. This work
permanently impacted 73 If of stream (emergency spillway listed as
intermittent/perennial depending on flows from the lake) and 0.02 ac of wetlands and
temporarily impacted 0.08 ac of wetlands. As part of the rehabilitation, the spillway
was designed for the 100-year storm and will dissipate most every storm event that
occurs within the drainage basin of Holding Lake before it reaches downstream
waters.
In 2014, DWR issued a buffer authorization (#07-0295 V4) for riparian buffer impacts
from level spreader bypass outlets and a greenway around Holding Lake as part of
the South Lake at Holding Village residential development that generally occupies the
southern half of the property. This authorization was replaced in early 2015 to slightly
revise the greenway alignment and accommodate three access piers on the lake
(#07-0295 V5).
The attached NWP 29 was issued for the second half of the Holding Village overall
development on May 8, 2020 to authorize 779 linear feet of stream channel impacts,
0.12 acre of temporary wetland impacts, and 0.07 acre of permanent open water
impacts. DWR issued the corresponding 401 approval on April 14, 2020 (#07-0295
V6).
7. Future Project Plans
7a. Is this project a phased project?*
• Yes
No
7b. If yes, explain*
Aside from a few upland pockets of future development, this is the last phase of the
project.
C. Proposed Impacts Inventory
Buffer Impacts
Project is in which protected Basin?*
Neuse River Basin (15A NCAC 02B.0233)
Catawba River Basin (15A NCAC 02B.0243)
Randleman Lake Watershed (15A NCAC 02B.0250)
Tar -Pamlico River Basin (15A NCAC 02B.0259)
Jordan Lake Watershed (15A NCAC 02B.0267)
Goose Creek Watershed (15A NCAC 02B.0606 & 15A NCAC 026.0607)
Individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form.
Site# - Reason
Stream Name
Buffer Impact*
Impact Type
Zone 1
Zone 2
Impact Area 1 -
SW Outlet
Map label (e.g. Road
Crossing 1)
Hatters
Branch
Permanent
(P)
Perm or Temp
Exempt
388.00
Square
Feet
331.00
Square
Feet
Impact Area 2 -
Road Crossing
Map label (e.g. Road
Crossing 1)
Hatters
Branch
Permanent
(P)
Perm or Temp
Allowable
w/
mitigation
7,861.
00
Square
Feet
4,943.
00
Square
Feet
Total Zone 1 Impacts: 8,249.00
Total Zone 2 Impacts: 5,274.00
Total Buffer Impacts: 13,523.00
Comments:
D. Impact Justification and Mitigation
1. Avoidance and Minimization
la. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project.
The road crossing is unavoidable because the stream channel bisects this area from
the existing development and a second entrance is required due to the number of
residences in this section of the development. The crossing was aligned to cross the
channel perpendicularily to minimize the impact to the buffer. An arch culvert was
utilized to avoid impacting the stream. A geotechnical report for the arch culvert
design was submitted to April Norton, USACE and Colleen Cohen, DWR on May 24,
2022.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
A Sediment and Erosion Control Plan will be developed and approved by the Town of
Wake Forest, and the project will comply with the supplementary NPDES
Construction Stormwater Permit (NCG010000).
2. Buffer Mitigation
2a. The table below identifies the square footage of impact to each zone of the riparian buffer and the required mitigation.
Zone 1
Total Impact
r- Multiplier
Required Mitigation
7,861.00
Square Feet
3
23,583
Square Feet
Zone 2
Total Impact
Multiplier
Required Mitigation
4,943.00 i
Square Feet
1.50
7,414.50
Square Feet
2b. What is the mitigation plan proposed for this Payment to private mitigation bank
Payment to Division of Mitigation (DMS)
Permittee responsible mitigation
project?*
2e. Attach statement of availability from mitigation provider. *
Click the upload button or drag and drop files here to attach document
North Lake Holding Village - Phase 10 - Buffer SOA
07-06-2022.pdf
PDF only
2g. Comments:
E. Diffuse Flow Plan
567.75KB
la. What type of SCM are you providing?*
Level Spreader
Vegetated Conveyance (lower SHWT)
Wetland Swale (higher SHWT)
Proposed project will not create concentrated stormwater flow through the buffer
Other SCM that removed minimum of 30% nitrogen
1 b. Describe how diffuse flow will be maintained: *
A stormwater management plan that includes a wet detention pond will be reviewed
and approved by the Town of Wake Forest.
lc. Diffuse Flow Documentation
F. Supplementary Information
Environmental Documentation
Click the upload button or drag and drop files here to attach document
N Lake Ph 10 SCM.pdf 612.45KB
PDF only
la. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?
Yes
• No
Violations
2a. Is the site in violation of DWR Wetland Rules (15A NCAC 02H .0500), Isolated Wetland Rules (15A NCAC 02H .1300), DWR Surface
Water or Wetland Standards, or Riparian Buffer Rules (15A NCAC 02B .0200)?
2b. Is this an after -the -fact buffer authorization application?
Yes
O No
G. Additional Information
Please upload any additional information you would like the Division to consider during application review.
Additional Attachments:
Additional Comments:
H. Sign and Submit
By digitally signing below, I certify that:
Click the upload button or drag and drop files here to attach document
RAP19000-NWP Issued-2020-05-08-Corrected.pdf 24.04MB
RAP19000-Revised 401 Approval-2020-04-14.pdf 198.48KB
PDF only
• I have given true, accurate, and complete information on this form;
o I agree that submission of this form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions
Act")
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic
Transactions Act");
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND
o I intend to electronically sign and submit the application form."
Print Name:* Jennifer Burdette
Signature
Submission Date: (Auto populated field)
Initial Review
Is this accepted into the review process?* • Yes No
Yes
• No
ID#* 20070295
Version:* 1
Select Reviewer: * Colleen Cohn:eads\cmcohn
Select Reviewing Office* Raleigh Regional Office - (919) 791-4200
Is this project a public transportation project?*
Has payment been received?* • No Payment Needed
Fee Received
Need Fee - send electronic notification