Loading...
HomeMy WebLinkAboutNCC222469_ESC Approval Submitted_20220711fZ0Y eooprk J, 17AW EI.97.ABETH S. R15FR. Serroprk: A?rw' m r NQRTH 1CARC�LiN�in. cnrirvasncraor c?wdruy April 26, 2022 LETTER OF APPROVAL WITH MODIFICATIONS Duke Energy Progress, LLC ATTN: Mr. Nuwan Wijesuriya 410 South Wilmington Street Raleigh, NC 27601 RE: Project Name: Craggy - Enka 230kV Transmission Line Upgrade Acres Approved: 137.4 Project ID: BUNCO-2022-011 County: Buncombe City: Asheville Address: Sand Hill Rd River Basin: French Broad Stream Classification: B, C Submitted By: Ms. Elizabeth B. Steffens, P.E. Date Received by LQS: March 31, 2022 Plan Type: Electric Infrastructure Dear Mr. Wijesuriya, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable with modifications and hereby issue this letter of Approval with Modifications. The Modifications Required for Approval are listed on the attached page. This plan approval shall expire three (3) years following the date of approval, if no land - disturbing activity has been undertaken, as is required by Title 15A NCAC 413.0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit, After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eN01 form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. �EQ E Q-2 - Nvr!"iPgorkrr frr L%r•Iri-nrrgrkYQu11—. y i ML ii.I wi 1,fLr-rLl aj r`r,i 0L,:-•JE(-,crtlri3 II}.rh lo-ilrr�I rr 1 ' fir•; .! M.,! 471yr:,��17nlr7 - kr!r.,lh `S- I k!ui.r finril ti? rd I'r : I r 11 `I 1' ia} Letter of Approval Duke Energy Progress, LLC ATTN: Mr. Nuwan Wijesuriya April 26, 2022 Page 2 of 3 Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. This permit allows for a land - disturbance, as called for on the application plan, not to exceed the approved acres. Exceeding the acreage will be a violation of this permit and would require a revised plan and additional application fee. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Your cooperation is appreciated. Si erely, Mi haaeW ith Assi tant Regional Engineer Land Quality Section Letter of Approval Duke Energy Progress, LLC ATTN: Mr. Nuwan Wijesuriya April 26, 2022 Page 3 of 3 Enclosures: Certificate of Approval NPDES NCG01 Fact Sheet Modifications ec: Ms. Elizabeth B. Steffens, P.E. esteffens@Dewberry.com cc: Regional Office file MODIFICATIONS REQUIRED FOR APPROVAL Project Name: Craggy - Enka 230kV Transmission Line Upgrade Project ID: BUNCO-2022-011 County: Buncombe For final plan approval please provide to this office the requested documents listed below. 1. Please change the wording on Note 5 listed under the Erosion and Sediment Control Construction Sequence Notes on plan sheet 13 to notify the Asheville Regional Office at (828) 296-4500. The Raleigh Regional Office is currently listed on the plan note. {G.S. 113A-57 (3)1. Please consider moving the location of the concrete washout further away from intermittent stream CT9 as shown between the stream and EXT STR 96, viewport 713, plan sheet 7 and Inset B, on plan sheet 12. {G.S. 113A-57 (3)). 3. To prevent road -way track out and prevent the possible crossing Intermittent Stream CTS, is an additional construction entrance necessary on the west side of Holly Hill Dr. (SR 1456) to access the worksite, viewport 8B, sheet 8? {G.S. 113A-57 (3)}. 4. Is a wetland crossing (composite mat) or other measure necessary east of CT13 on the access road, viewport 613, sheet 6? {G.S. 113A-57 (3)}. S. While there is a callout for a protective buffer zone surrounding wetland W2, please consider adding additional erosion and sediment controls outside of the buffer to protect the wetland. {G.S. 113A-57 (3)). Ref: G.S. 113A-54.1 through G.S. 113A-57 Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504 General Permit NCG 010000 NPDES for Construction Activities W � o o oCJ CJ caRoij�, �Tl La ,. V � ' 0.4 • �" r7' o N V c.� '� •'�'{ 4-o