HomeMy WebLinkAboutSW6130403_HISTORICAL FILE_20140324STORMWATER DIVISION CODING SHEET
POST -CONSTRUCTION PERMITS
PERMIT NO.
DOC TYPE
❑ CURRENT PERMIT
❑ APPROVED PLANS
HISTORICAL FILE
❑ COMPLIANCE EVALUATION INSPECTION
DOC DATE
YYYYMMDD
DESIGN TECHNOLOGIES, INC.
1705 ENTERPRISE WAY, SUITE 200, MARIETTA, GEORGIA 30067
PHONE 770/988-0400 OR 877/728-1724 (TOLL FREE) 6 I-Ax 770/988-0300
LETTER OF TRANSMITTAL
Name:
Bill Diuguid
Company:
NCDENR
Address:
Division of Land Quaility
Address:
1612 Mail Service Center
City, State, & Zip:
Raleigh, NC 27699-1612
Phone Number:
919-807-6369
We transmit Via:
Date: 10/3 1/ 13
Project Name: Fort Bragg SOF Grp HQ
Project #: 12E-01-10500
Project #: Stormwater Permit SW6130403
Contract #:
❑
Herewith
❑
Under separate cover MAR 2 1 2014
❑
U.S. Mail
®
Overnight Service (specify) Fed Ex
❑
Hand Delivery
❑
Courier (specify) Apple
The following:
❑
shop drawings
❑
samples ❑ drawings ❑ specifications ❑ diskette/file
❑
correspondence
❑
submittals ❑ RFI's ® other
Copies Date ,Description
I Plans
Transmitted as indicated:
❑ for approval ❑ as requested ® for review/comments
❑ for distribution ❑ for your use ❑ for file ❑ on loan (please return)
Comments
1 am not sure if I included the revised profiles before so I sent two sheets.
OR /< E✓ LS �o icovece I z/z/i3 l� , ` N0V 0 1 2013
4 .,—RW H
am 00 s4)i Amit
Sent By: Derek Westfall, P. E. Date: 10/31/13
Q:\2012\12E-01-XXXXX Ft. Bragg SOF HQ\PFI. Correspondence\h. Transmittals\transmittal Bill Diuguid
E ENGINEERING DESIGN TECHNOLOGIES, INC.
1705 ENTERPRISE WAY, SUITE 200, MARIETTA, GEORGIA 30067
D T PHONE 770/988-0400 OR 877/728-1724 (TOLL FREE) a FAx 770/988-0300
LETTER OF TRANSMITTAL
Name:
Bill Diuguid
Company:
NCDENR
Address:
Division of Land Quaility
Address:
1612 Mail Service Center
City, State, & Zip: Raleigh', NC 27699-1612
Phone Number:
919-807-6369
We transmit Via:
❑ Herewith
❑ U.S. Mail
❑ Hand Delivery
The following:
❑ shop drawings
❑ correspondence
Date: 10/24/13
Project Name: Fort Bragg SOF Grp HQ
Project#: 12E-01-10500
Project #: Stormwater Permit SW6130403
Contract #:
❑ Under separate cover
® Overnight Service (specify) Fed Ex MAR 2 1 2014
❑ Courier (specify) Apple
❑ samples ❑ drawings ❑ specifications ❑ diskette/file
❑ submittals ❑ RFFs ® other
Copies
Date
Description
I
Supplement forms and O&M
1
Calculations
1
Plans
Transmitted as indicated:
❑ for approval ❑ as requested
❑ for distribution ❑ for your use
® for review/comments
❑ for file ❑ on loan (please return)
'Comments`.
/Z 7eev,s—IaAl
Sent By: Derck Westfall, P. E.
Date: 10/24/ 13
Q:A2012\12E-01-XXXXX Ft. Bragg SOF HQ\PFl. CorrespondenceAh. Transmittals\transmittal Bill Diuguid
'w
Paid
cable Rules: ❑ Coastal SW - 7995 ❑ Coastal SW - 2008 ❑ Ph 11 Post o Construction
.ect all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan
❑ Other WQ M mt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form pray be photocopied for use as an original
I. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
SOF Group Headquarters
2. Location of Project (street address):
City:Fort Bragg County:Cumberland
Zip:28310-5000
3. Directions to project (from nearest major intersection):
Enter off of Murchson Road Routes 87 210 onto Bragg Boulavard. Go south on Bragg Blvd. 2.5 miles to
site 0.25 miles on the left
4. Latimde:350 07' 13" N Longitude:780 59' 38" W of the main entrance to the project.
IL PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New
❑Modification
b.If this application is being submitted as the result of a modification to an existing permit, list the existing
permit number its issue date (if known)
construction: and the status of
❑Not Started ❑Partially Completed' ❑ Completed* "provide a designer's certification
2. Specify the type of project (check one):
[]Low Densit
y ®High Density ❑Drains to an Offsite Stormwater System ❑Othei
3. If this application is being submitted as the result of a previously returned application or a letter from DWQ
requesting a state stormwater management permit application, list the stormwater project number, if
assigned, and the previous name of the project, if different than currently
proposed,
4.a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-6Z`3-6748):
❑CAMA Major ®Sedimentation/Erosion Control: 9.99 ac of Disturbed Area
❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:_
Fonn SWU-101 Version 07Jun2010 Page I of 6
III. CONTACT INFORMATION
1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the nroiect):
.i .
E
ti
Applicant/Organization: Directorate of Public Works (DPW) -
Signing Official & Title:Mr. David Heins Environmental Division Chief (DPW)
b.Contact information for person listed in item la above:
Street Address:2175 Reilly Road Stop A
City:Fort Bragg State:NC Zip:28310-5000
Mailing Address (if applicable):2175 Reilly Road Stop A
City:Fort Bragg State: NC Zip:28310-5000
Phone: (910 ) 396-8207 Fax: (910 ) 907-2420
Email:david.a.heins.civ@maii.mil
or
c. Please check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/ Orgamzatmn:
Signing Official & Title:
b.Contact information for person listed in item 2a above:
Street Address:
City:
Mailing Address (if
City:
Phone:
State:
Fax: ( )
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organization: Mr. Lee Ward
Signing Official & Title:DPW/ Water Management Branch
b.Contact information for person listed in item 3a above:
Mailing Address:Bld 0-9125 McKellars Road
Cilr:Fort Bragg State:NC Zip:28310-5000
Phone: (910 ) 396-2301
Email:lee p ward civ@mail mil
4. Local jurisdiction for building permits:
Point of
Fax: ( 910 ) 907-2420
Phone fi:
Fonn S WU-101 Version 07Jun2010 Page 2 of 7
IV. PROJECT INFORMATION
i 1. iA the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater runoff will be treated in two infiltration basins Grass swales will be utilized in areas around the
site within parking areas to convey runoff to the pipe systems that outlet into these proposed treatment
systems. The pretreatment will also be handled in sumps located in the drop inlets and catch basins
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW -1995 ❑ Ph II - Post Construction
3. Stormwater runoff from this project drains to the Cape Fear River basin.
4. Total Property Area: 9.99 acres
5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area: 0 acres
7. Total Property Area (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project
Aree:2.99 acres
Total project area shall be calculated to exclude thefollowing: the normal pvol of imppounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water (NM line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line nlay
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 57.3 %
9. How many drainage areas does the project have? 2 (For high density, count I for each proposed engineered
stormwater BMP. For low density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
FormSWU-101 Version 07Jun2010
Page 3 of 7
Basin`bdormation i.; < ; 7 :
Drairia d Area'Pl
Draidd e'Area P2
'Draina` a Area"''
Drairia a Arear
Receiving Stream Name
unnamed trib of
Big Branch
unnamed trib of
Big Branch
Stream Class *
C
C
Stream Index Number *
18-31-24-5-1
18-31-24-5-1
Total Drainage Area (so
205,168
233,917
On -site Drainage Area (sf)
142,006
233,917
Off -site Drainage Area (sf)
63,162
0
Pro osed Impervious Area** (so
96703
152,896
% Impervious Area** total
47.13
65.36
Ini rvrous ::Surface A'rea+r #, -:
., .,. _
Drama' e''Area'Pl
'Drairia a Area-`P2
....,_.,.,
Drama a Areari_r..Drairia'a
w.
Area�!_?t
On -site Buildings/Lots (so
0
21,540
On -site Streets (so
5,400
15,820
On -site Parkin (so
71,724
71,670
On -site Sidewalks (sf)
5,640
8,148
Other on -site (so
0
35,718
Future (so
0
0
Off -site (so
13,939
0
Existing BUA*** (so
0
0
Total (so:
96,703
152,896
Stream Class and Index Number cart be determined at: Iota —aortal ttcdetrr org/web/wq&slcsu/classifications
Irupervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Report only that amount ofexisting BUA that will retrain after development. Do not report any existing BUA that
is to be removed and which will be replaced by new BUA.
11. How was the off -site impervious area listed above determined? Provide documentation. From field survey
information include within design documents
Projects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance'(O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. A detailed application instruction sheet and BMP
checklists are available from http'/ /portal ncdenr org/web/wq/ws/su/statesw/forms does. The complete
application package should be submitted to the appropriate DWQ Office. (The appropriate office may be
found by locating project on the interactive online map at http'//portal ncdenr.org/web/wq/ws/su/maps.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from littp://portal.ncdejir.org/web/wq/ws/su/statesw/forms dots.
1. Original and one copy of the Stormwater Management Permit Application Form.
2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants
Form. (if required as per Part V11 below) prn
3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M oLJ /jl/
agreenrent(s) for each BMP.n
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to 4jt
http://www.envhelp.org/pages/onestopexpress.htnil for information on the Express program
Form S WU-101 Version 07Jun2010 Page 4 of 7
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional informatign and to schedule the required application meeting.)
= 5. A' detailed narrative (one to two pages) describing the stormwater treatment/management
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the'/z
mile radius on the map.
7. Sealed, signed and dated calculations.
[1
for DIV
Zrw
Two sets of plans folded to 8.5" x 14" (sealed,' signed, & dated), including:
a. Development/Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
I. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished Floor elevations. .
1. Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements; pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
9. Copy of any applicable soils report with the associated SHWT'elevations (Please identify
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verifij the SHWT prior
to submittal, (910) 796-7378.) A� /��
A copy of the most current property deed. Deed book: Page No:
For corporations and limited liability corporations (LLC): Provide documentation from the NC
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The
corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
http://www.secretary.sta nc us/Corporations/CSearchpx
VIL DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be
provided as an attachment to the completed and notarized deed restriction form. The appropriate deed
restrictions and protective covenants forms can be downloaded from
htto://oortal.ncdenr.org web/ w4 Z ws/su /statesw/ forms does. Download the latest versions for each
submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DWQ and that they will be recorded prior to the sale of any lot.
Form S WU-101 Version 07Jun2010 Page 5 of 7
VIIL CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:Derek Westfall
Consulting Firm: Engineering Design Technologies Inc
Mailing Address:1705 Enterprise Way
City:Marietta State:GA Zip:30067
Phone: (770 1 988-0400 Fax: (770 ) 988-0300
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this
section)
I, (print or type name of person listed in Contact Information, item 2a) certify that I
own the property identified in this permit application, and thus give permission to (print or hjpe nanne of person
listed in Contact Information, itenn la) with (print or type name of organization listed in
Contact Information, item la) to develop the project as currently proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to
me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a
completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment
facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including
the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
a Notary Public for the State of County of
do hereby certify that personally appeared
before me this _ day of
and acknowledge the due execution of the application for
a stormwater permit. Witness.my hand and official seal,
SEAL
My commission
Form SWU-101 Version 07Jun2010 Page 6 of 7
X. APPLICANT'S CERTIFICATION
I, (print or hype name ofperson listed in Contact Information, item la) Mr. David Heins
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be recorded, and that the proposed project complies with the requirements of the
applicable stOrmwater rffje� ur# 15A NCAC 21-1.1000, SL 2006-246 (Ph. II - Post Construction) or SL 2008-211.
a Notary Public for the State of
do hereby certify that
before me this _ day of
Date:
County of
personally appeared
and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,
SEAL
My commission
Form S WU-101 Version 07Jun2010 Page 7 of 7
0L1) , .S4 wee mEi7'crp,
DWQ USE ONLY
Date Received
Fee Paid
Permit Number
Applicable Rules: ❑ Coastal SW —1995 ❑ Coastal SW — 2008 ❑ Ph 11- Post Construction
(select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Storm water Management Plan.
❑ Other WQ M mt Plan:
State of North Carolina
Department of Environment and Natural Resources
Division of Water Quality
STORMWATER MANAGEMENT PERMIT APPLICATION FORM
This form may be photocopied for use as an original
1. GENERAL INFORMATION
1. Project Name (subdivision, facility, or establishment name -should be consistent with project name on plans,
specifications, letters, operation and maintenance agreements, etc.):
SOF GrouD Headouarters
2. Location of Project (street address)
City:Fort Bragg County:Cumberland Zip:28310-5000
3. Directions to project (from nearest major intersection):
Enter off of Murchson Road (Routes 87, 210) onto Bragg Boulavard Go south on Bragg Blvd 2.5 miles to
Gruber Drive. Tom right on Gruber Drive and go 2.2 miles to Reilly Street Tom left on Reilly Street and the
4. Latitude:35° 07' 13" N Longitude:78° 59' 38" W of the main entrance to the project.
11. PERMIT INFORMATION:
1. a. Specify whether project is (check one): ®New ❑Modification
b.lf this application is being submitted as the result of a modification to an existing permit, list the existing
permit number , its issue date (if known) and the status of
construction: ❑Not Started ❑Partially Completed" ❑ Completed" "provide a designer's certification
2. Specify the type of project (check one):
[]Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other
3. if this application is being submitted as the result of a previously returned application or a letter from DWQ
requesting a state stormwater management permit application, list the stormwater project number, if
assigned, and the previous name of the project, if different than currently
proposed,
4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be
obtained by contacting the Customer Service Center at 1-877-623-6748):
❑CAMA Major
❑NPDES Industrial Stormwater
NSedimentation/Erosion Control: 9.99 ac of Disturbed Area
❑404/401 Permit: Proposed Impacts
b.If any of these permits have already been acquired please provide the Project Name, Project/Permit Number,
issue date and the type of each permit:
FormSWU-101 Version07Jun2010 Pagel of6
III. CONTACT INFORMATION
1. a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee,
designated government official, individual, etc. who owns the oroiect):
Applicant/Organization: Directorate of Public Works (DPW)
Signing Official & Title:Mr. David Heins, Environmental Division Chief (DPW)
b.Contact information for person listed in item 1a above:
Street Address:2175 Reilly Road Stop A
City:Fort Bragg State:NC Zip:28310-5000
Mailing Address (if applicable):2175 Reilly Road Stop A
City:Fort Bragg State: NC Zip:28310-5000
Phone: (910 ) 396-8207
Email:david.a.heins.civ®mail.mil
Fax: ( 910 ) 907-2420
c. Please check the appropriate box. The applicant listed above is:
® The property owner (Skip to Contact Information, item 3a)
❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below)
❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and
2b below)
❑ Developer* (Complete Contact Information, item 2a and 2b below.)
2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the
person who owns the property that the project is located on):
Property Owner/1
Signing Official &
b.Contact information for person listed in item 2a above:
Street Address:
City:
Mailing Address (if
Phone:
State:
Fax:
3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other
person who can answer questions about the project:
Other Contact Person/Organization: Mr. Lee Ward
Signing Official & Tltle:DPW/Water Management Branch
b.Contact information for person listed in item 3a above:
Mailing Address:Bldg 0-9125. McKellars Road
City:Fort Bragg State:NC Zip:28310-5000
Phone: (910 ) 396-2301
Email:lee.p.ward.civ@rnail.mil
4. Local jurisdiction for building permits:
Fax: ( 910 ) 907-2420
Point of Contact: Phone #:
Form SWU-101 Version 07Jun2010 Page 2 of 6
IV. PROJECT INFORMATION
1. In the space provided below, briefly summarize how the stormwater runoff will be treated.
Stormwater runoff will be treated in two infiltration basins. Grass swales will be utilized in areas around the
site within parking areas to convey runoff to the pipe systems that outlet into these proposed treatment
systems. The pretreatment will also be handled in sumps located in the drop inlets and catch basins.
2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved:
❑ Approval of a Site Specific Development Plan or PUD Approval Date:
❑ Valid Building Permit Issued Date:
❑ Other: Date:
b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with:
❑ Coastal SW —1995 ❑ Ph 11— Post Construction
3. Stormwater runoff from this project drains to the Cape Fear River basin.
4. Total Property Area: 9.99 acres
5. Total Coastal Wetlands Area: 0 acres
6. Total Surface Water Area:0 acres
7. Total Property Area (4) —Total Coastal Wetlands Area (5) —Total Surface Water Area (6) = Total Project Area':
9.99 acres
Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area
between the banks of streams and rivers, the area below the Normal High Water (NHW) line or Mean High Water
(MHW) line, and coastal wetlands landward from the NHW (or MHW) line. The resultant project area is used to
calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or MHW) line may
be included in the total project area.
8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 =
9. How many drainage areas does the project have? 2 (For high density, count ]for each proposed engineered
stormwater BMP. For Ioiu density and other projects, use 1 for the whole property area)
10. Complete the following information for each drainage area identified in Project Information item 9. If there
are more than four drainage areas in the project, attach an additional sheet with the information for each area
provided in the same format as below.
Basin Information
Drainage Area PI
Drainage Area P2
Drainage Area _
Drainage. Area _
Receiving Stream Name
unnamed trib of
Big Branch
unnamed Crib of
Big Branch
Stream Class '
C
C
Stream Index Number
18-31-24-5-1
18-31-24-5-1
Total Drainage Area (so
205,168
233,917
On -site Drainage Area (so
142,006
233,917
Off -site Drainage Area (so
63,162
0
Pro osed Impervious Area" (so
96703
152,896
%Impervious Area" (total)
47.13
65.36
Impervious" Surface Area
Drainage Area El
Drainage Area P2
Drainage Area
Drainage Area
On -site Buildings/Lots (so
0
21,540
On -site Streets (so
5,400
15,820
On -site Parking (so
71,724
71,670
On -site Sidewalks (so
5,640
i 8,148
Other on -site (so
0
35,718
Future (sf)
0
0
Off -site (so
13,939
0
Existing BUA""" (so
0
0
Total (so:
96,703
152,896
Stream Class and Index Number can be determined at: littp-j42orttil.ttcdeiir.org/Ttebht,qlps/Cst4/classifications
Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas,
sidewalks, gravel areas, etc.
Form SWU-101 Version 07Jun2010 Page 3 of 6
'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that
is to be removed and which will be replaced by neo BUA.
11. How was the off -site impervious area listed above determined? Provide documentation. From field survey
information include within design documents
Proieets in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened &
Endangered Species watershed that may be subject to more stringent stormwater requirements as per NCAC 02B .0600.
V. SUPPLEMENT AND O&M FORMS
The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms
must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded
from http://portal.ncdem-.orghveb/wq/-ws/su/bmp-manual.
VI. SUBMITTAL REQUIREMENTS
Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ).
A complete package includes all of the items listed below. A detailed application instruction sheet and BMP
checklists are available from littp_/Zportal.ncdenr.org/web/wq/ws/su/statesw/fornis does. The complete
application package should be submitted to the appropriate DWQ Office. (The appropriate office may be
found by locating project on the interactive online map at ham_//portal.ncdenr.org/web wq/ws/su/maps.)
Please indicate that the following required information have been provided by initialing in the space provided
for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions
for each submitted application package from htto://oortal.ncdenr.org/weber/ws/su/statesw/formsttiddocss..
1. Original and one copy of the Stormwater Management Permit Application Form. 1 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants
Form. (if required as per Part VII beloro)
3. Original of the applicable Supplement Form(s) (sealed. signed and dated) and O&M
agreement(s) for each BMP.
4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to
hn://www.envhelp.org/pages/onestopexpress.htmI for information on the Express program
and the associated fees. Contact the appropriate regional office Express Permit Coordinator for
additional information and to schedule the required application meeting.)
5. A detailed narrative (one to two pages) describing the stormwater treatment/management
6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the
receiving stream drains to class SA waters within 'h mile of the site boundary, include the'fz
mile radius on the map.
7. Sealed, signed and dated calculations.
8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including:
a. Development/Project name.
b. Engineer and firm.
c. Location map with named streets and NCSR numbers.
d. Legend.
e. North arrow.
f. Scale.
g. Revision number and dates.
h. Identify all surface waters on the plans by delineating the normal pool elevation of
impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal
waters, and any coastal wetlands landward of the MHW or NHW lines.
• Delineate the vegetated buffer landward from the normal pool elevation of impounded
structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters.
i. Dimensioned property/project boundary with bearings & distances.
j. Site Layout with all BUA identified and dimensioned.
k. Existing contours, proposed contours, spot elevations, finished Floor elevations.
I. Details of roads, drainage features, collection systems, and stormwater control measures.
m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a
qualified person. Provide documentation of qualifications and identify the person who
made the determination on the plans.
n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations.
o. Drainage areas delineated (included in the main set of plans, not as a separate document).
p. Vegetated buffers (where required).
•y ._TA
fov;r V•V
Form SWU-101 Version 07Jun2010 Page 4 of 6
9. Copy of any applicable soils report with the associated SFIWT elevations (Please identifv
elevations in addition to depths) as well as a map of the boring locations with the existing
elevations and boring logs. Include an 8.5"xl I" copy of the NRCS County Soils map with the
project area clearly delineated. For projects with infiltration BMPs, the report should also
include the soil type, expected infiltration rate, and the method of determining the infiltration rate.
(Infiltration Devices submitted to WiRO: Schedule a site Visit for DWQ to verily the SHWT prior
to submittal, (910) 796-7378.) • //�
10. A copy of the most current property deed. Deed book: Page No:
11. For corporations and limited liability corporations (LLC): Provide documentation from the NC
Secretary of State or other official documentation, which supports the titles and positions held
by the persons listed in Contact Information, item la, 2a, and/or 3a pej NCAC 21-1.1003(e). The
corporation or LLC must be listed as an active corporation in good standing with the NC
Secretary of State, otherwise the application will be returned.
http://www.secretary.state.nc.us/Corporations/CSearch.aspx
VI1. DEED RESTRICTIONS AND PROTECTIVE COVENANTS
For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective
covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed
BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be
provided as an attachment to the completed and notarized deed restriction form. The appropriate deed
restrictions and protective covenants forms can be downloaded from
ht_pt ://portal.ncdenr.org/web/wq/we/su/statesw/forms dots. Download the latest versions for each
submittal.
In the instances where the applicant is different than the property owner, it is the responsibility of the property
owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring
that the deed restrictions are recorded.
By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and
protective covenants for this project, if required, shall include all the items required in the permit and listed
on the forms available on the website, that the covenants will be binding on all parties and persons claiming
under them, that they will run with the land, that the required covenants cannot be changed or deleted
without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot.
Vlll. CONSULTANT INFORMATION AND AUTHORIZATION
Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a
consulting engineer and/or firm) so that they may provide information on ,your behalf for this project (such as
addressing requests for additional information).
Consulting Engineer:Derek Westfall
Consulting Firm: Engineering Design Technologies Inc.
Mailing Address:1705 Enterprise Way
City:Marietta State:GA Zip:30067
Phone: (770 ) 988-0400 Fax: (770 ) 988-0300
IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this
section)
1, (print or type name of person listed in Contact Information, item 2a) certify that 1
own the property identified in this permit application, and thus give permission to (print or type name of person
listed in Contact Information, item la) with (print or type name o%organization listed in
Contact Information, item 1a) to develop the project as currentlly Proposed. A copy of
the lease agreement or pending property sales contract has been provided with the submittal, which indicates the
party responsible for the operation and maintenance of the stormwater system.
Form SWU-101 Version 07Jun2010 Page 5 of 6
As the legal property owner I acknowledge, understand, and agree by my signature below, that if my designated
agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their
lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to
me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a
completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment
facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid
permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including
the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6.
Signature:
a Notary Public for the State of . County of
do hereby certify that
before me this _ day of
personally appeared
and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,
SEAL
My commission
X. APPLICANT'S CERTIFICATION
I, (print or type name of person listed in Contact Information, item la) Mr. David Heins
certify that the information included on this permit application form is, to the best of my knowledge, correct and
that the project will be constructed in conformance with the approved plans, that the required deed restrictions
and protective covenants will be rec ded, and that the proposed project complies with the requirements of the
applicable ater ru Gr A NCAC 2H .1000, SL 2006-246 (Ph. 11 - Post Construction) or SL 2008-211.
li/ c /
Signature: Date:
a Notary Public for the State of , County of
do hereby certify that
before me this _ day of
personally appeared
and acknowledge the due execution of the application for
a stormwater permit. Witness my hand and official seal,
SEAL
My commission
Form SWU-101 Version 07Jun2010 Page 6 of 6
ENGINEERING DESIGN TECHNOLOGIES, INC.
1705 ENTERPRISE WAY, SUITE 200, MARIETTA, GEORGIA 30067
FnONE 770/988-0400 OR 877/728-1724 (IbLL FREE) a FAx 770/988-0300
LETTER OF TRANSMITTAL
Name:
State of North Carolina
Date: 4/9/1
Company:
Dept of Environment and Natural Res
Project Name: Fort Bragg SOF Grp HQ
Address:
Division of Water Quality
Project #: 12E-01-10500
Address:
1617 Mail Service Center
Project #:
City, State, & 'Lip:
Fort Bragg, NC 27699-1617
Contract #:
Phone Number:
919-807-6300
We transmit Via:
❑
Herewith
❑
Under separate cover
❑
U.S. Mail
®
Overnight Service (specify) Fed Ex
❑
Hand Delivery
❑
Courier (specify) Apple
The following:
❑
shop drawings
❑
samples ❑ drawings ❑ specifications ❑ diskette/file
❑
correspondence
❑
submittals ❑ RFI's ® other
Copies
'Date
Description
2
Permit Application
I
Supplement forms and O&M
I
Permit fee
I
Narrative, USGS Maps, and calculations, soils report
I
Plans
Transmitted as indicated:
❑ for approval ❑ as requested ❑ for review/comments
❑ for distribution ® for your use ® for file ❑ on loan (please return)
Sent By: Derck Westfall, P. E.
Date: 4/9/13
Q:A2012\12E-01-XXXXX Ft. Bragg SOP HQ\PFI. CorrespondenceAh. Transill ittals\transmittal North Carolina
! 4
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pat McCrory Charles Wakild, P.E.
Governor Director
March 7, 2013
Mr. Derek Westfall, P.E.
Engineering Design Technologies, Inc.
1705 Enterprise Way
Marietta, Georgia 30067
Subject: Phase II Post -Construction Stormwater Permit Application Return
SOF Group Headquarters MISOC (A) —Fort Bragg
Fort Bragg, Cumberland County
Dear Mr. Westfall:
John E. Skvarla, III
Secretary
The Division of Water Quality (DWQ) Central Office, Raleigh, reviewed your Stormwater
Management Permit Application for the SOF Group Headquarters —Fort Bragg project the
week of March 5, 2013. After a preliminary review, the submittal was found to be
incomplete. Per DWQ requirements and policies, this Office is hereby returning the subject
application package as incomplete.
The application is incomplete based on the following items:
• An infiltration basin design cannot be used on this site based on the information you
provided in the geotech report.
• Additionally, the infiltration rate numbers listed in the Infiltration Basin Supplement do
not match the numbers in the geotech report.
• Also, it does not appear that you have taken credit for the redevelopment portion of
this site.
Until a State Stormwater Permit is issued for this project, the construction of any impervious
surfaces, other than a construction entrance under an approved Sedimentation Erosion
Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant
to NCGS 143-215.6A.
Please prepare the missing information and return the revised, entire package to me at the
DWQ Central Office, Raleigh, 1617 Mail Service Center, 27699-1617.
If you have any questions, please contact Robert Patterson, P.E., at (919) 807-6375, or
email: robert.pattersonCcbncdenr.gov. Mr. Patterson has been given a copy of your site plan if
you wish to discuss your proposed changes with him.
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX: 919-807-6494
Internet w .ncvvalerqualily.org
An Equal Opportunity 1 Affirmative Action Employer
NorthCarolina
Naturally
Mr. Derek Westfall, P.E.
Engineering Design Technologies, Inc.
SOF Group Headquarters —Fort Bragg
March 7, 2013
Derek: I suggest that you talk with Robert Patterson, P.E. before resubmitting a plan.
Feel free to call me at 919-807-6369, if you cannot reach Robert Patterson.
Sincerely,
William H. Diugui , AICP
Staff Planner
DWQ Stormwater Permitting Unit
Wetlands and Stormwater Branch
CC: Stormwater Files: SOF Group Headquarters MISOC (A) —Fort Bragg SW Permit Application
Lee Ward, Fort Bragg
Page 2 of 2
w
NC®ENR
North Carolina Department of Environment and Natural Resources
Division of Water Quality
Pal McCrory Charles Wakild, P.E.
Governor Director
March 7, 2013
Mr. Derek Westfall, P.E.
Engineering Design Technologies, Inc.
1705 Enterprise Way
Marietta, Georgia 30067
Subject: Phase II Post -Construction Stormwater Permit Application Return
SOF Group Headquarters MISOC (A) —Fort Bragg
Fort Bragg, Cumberland County
Dear Mr. Westfall:
John E. Skvarla, III
Secretary
The Division of Water Quality (DWQ) Central Office, Raleigh, reviewed your Stormwater
Management Permit Application for the SOF Group Headquarters —Fort Bragg project the
week of March 5, 2013. After a preliminary review, the submittal was found to be
incomplete. Per DWQ requirements and policies, this Office is hereby returning the subject
application package as incomplete.
The application is incomplete based on the following items:
• An infiltration basin design cannot be used on this site based on the information you
provided in the geotech report.
• Additionally, the infiltration rate numbers listed in the Infiltration Basin Supplement do
not match the numbers in the geotech report.
• Also, it does not appear that you have taken credit for the redevelopment portion of
this site.
Until a State Stormwater Permit is issued for this project, the construction of any impervious
surfaces, other than a construction entrance under an approved Sedimentation Erosion
Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant
to NCGS 143-215.6A.
Please prepare the missing information and return the revised, entire package to me at the
DWQ Central Office, Raleigh, 1617 Mail Service Center, 27699-1617.
If you have any questions, please contact Robert Patterson, P.E., at (919) 807-6375, or
email: robert.pattersonCa ncdenr.gov. Mr. Patterson has been given a copy of your site plan if
you wish to discuss your proposed changes with him.
Wetlands and Stormwater Branch
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Location: 512 N. Salisbury St. Raleigh, North Carolina 27604
Phone: 919-807-63001 FAX, 919-807-6494
Internet: w .ncwaterquality.org
An Equal Opporlunity \ Atfrmative Action Employer
NorthCarolina
Naturally
Mr. Derek Westfall, P.E.
Engineering Design Technologies, Inc.
SOF Group Headquarters —Fort Bragg
March 7, 2013
Derek: I suggest that you talk with Robert Patterson, P.E. before resubmitting a plan.
Feel free to call me at 919-807-6369, if you cannot reach Robert Patterson.
Sincerely,
William H. Diuguid, AICP
Staff Planner
DWQ Stormwater Permitting Unit
Wetlands and Stormwater Branch
cc: Stormwater Files: SOF Group Headquarters MISOC (A) —Fort Bragg SW Permit Application
Lee Ward, Fort Bragg
Page 2 of 2
Nolman Cubas
From: Jennifer Savage
Sent: Thursday, January 28, 2016 12:16 PM
To: Nolman Cubas
Subject: FW: [Non-DoD Source] FW: GRP HQ - erosion permit
This address... sorry it went to just Derek not you
Jennifer Savage
Office Manager/ Submittal Clerk
Engineering Design Technologies, Inc.
1705 Enterprise Way I Suite 200
Marietta, GA 30067
Site Location:
5305 New Dawn Road and H-1806 Son Tay Road Fort Bragg, NC 28310
Cell: (406) 951-0081
jennifer.savaee @edtinc.net
NOTICE - This communication may contain confidential and privileged information that is for the sole use of the
intended recipient. Any viewing, copying or distribution of, or reliance on this message by unintended
recipients is strictly prohibited. If you have received this message in error, please notify us immediately by
replying to the message and deleting it from your computer.
-----Original Message -----
From: Ward, Lee P CIV USARMY IMCOM ATLANTIC (US) [mailto:lee.p.ward.civ@mail.mil]
Sent: Wednesday, January 27, 2016 10:32 AM
To: Jennifer Savage; Derek Westfall
Subject: RE: [Non-DoD Source] FW: GRP HQ - erosion permit
Jennifer & Derek,
Just got a message back from Mike Lawyer with NC DEQ. He would like the original, stamped hard copy sent to
his office.
DECEIVED
The address:
FEB -1 2016
NC DEQ/DEMLR
Attn: Mike Lawyer
225 Green Street, Suite 714
Fayetteville, NC 28301
Thanks,
DEQ-FAYETTE iLLE REGIONAL OFFICE
i'
Lee Ward
Chief, Water Management Section
Directorate of Public Works
Fort Bragg, North Carolina
Office: (910) 396-2301
Direct: (910) 908-5286
lee.p.ward.civ@mail.mil
-----Original Message -----
From: Jennifer Savage [mailto:Jennifer.Savage@edtinc.net]
Sent: Wednesday, January 27, 2016 9:15 AM
To: Ward, Lee P CIV USARMY IMCOM ATLANTIC (US) <lee.p.ward.civ@mail.mil>
Subject: [Non -DOD Source] FW: GRP HQ - erosion permit
All active links contained in this email were disabled. Please verify the identity of the sender, and confirm the
authenticity of all links contained within the message prior to copying and pasting the address to a Web
browser.
Lee- I apologize on the delay getting this form to you but there was amiscommunication on this end. I thought
that it was an example that I needed tolook at and Derek told me the other day that you are waiting on this
paperworkfor SOF Group HQ.
Wouldyou like me to print it and bring it to your office or will this email work?
Pleaselet me know and again I am sorry for the miscommunication.
Jennifer Savage
Office Manager / Submittal Clerk
Engineering Design Technologies, Inc.
1705 Enterprise Way I Suite 200
Marietta, GA 30067
Site Location:
5305 New Dawn Road and H-1806 Son Tay Road
Fort Bragg, NC 28310
Cell: (406) 951-0081
jennifer.savage@edtinc.net < Caution-mailto:jennifer.savage@edtinc.net >
« ���§� ,�>�«' �
�� �� ���::
� � y� /� �� � �
/k}«�}^�� :w-
-.���}�� a�
2
Geotechnical, Environmental, and Materials Engineers
August 6, 2013
Engineered Design Technologies, Inc.
1705 Enterprise Way, Suite 200
Marietta, Georgia 30067
Attn: Mr. Derek Westfall, PE
Subject: Summary of Observations
SE Storm Water Basin
SOF Group Headquarters
Ft. Bragg, North Carolina
Building & Earth Project Number: RD12-445
MAR 2 1 2014
Derek
Building & Earth Sciences, LLP is providing construction materials testing services for.
this project. The intent of this letter is to provide a summary of our observations with
regard to the drainage of storm water from the SE basin. The basin is currently designed
as a wet basin, and the majority of the site storm water sewer has been installed.
Since March 19, 2013, our representatives have periodically been present at the site to
observe the earthwork construction activities. The storm water basin located at the
southeast corner of the site has been constructed for most of this time period. After
storm events, the basin fills with water, and naturally drains. Typically, within days of a
storm event the basin is dry with no standing water in the floor of the basin. This
representative was present at the site on September 3, 2013, and the basin had no water
retained in it. It was raining at the time of our site visit. There is no evidence of severe
erosion along the embankments (berms) of the basin
Based upon 5 months of "above average" rain fall, the basin appears to functioning as an
infiltration basin. Because the water naturally seeps from the newly constructed basin
and completely empties, it may be more equitable, and a better permanent solution, to
convert this basin to an infiltration basin.
We appreciate the opportunity to provide these services. If you have any questions
regarding the information in this report or need any additional information, please call
US.
Respectfully Submitted,
BUILDING & EARTH SCIENCES, LLP
Kurt A. Miller - Senior Geotechnical Engineer
610 Spring Branch Rd
Dunn, North Carolina 28334
Phone (910) 292-2085 Fax (910) 292-2087
E ENGINEERING DESIGN 'TECHNOLOGIES, INC.
1705 EN I ERPRISE. WAY, SUITE 200, MARIE'rrA, GEORGIA 30067
PHONE:770-988-0400 FAx: 770-988-0300
D
Sign oCCZuality
October 23, 2013
William H. Diugid, AICP
Division of Land Quality
1612 Mail Service Center
Raleigh, NC 27699-1612
RE: Stormwater Permit No. SW6110403
SOF Group Headquarters MISOC (A) PN71224, Fort Bragg
High Density Commercial Infiltration and Bioretention Basin Project
Cumberland County
MAR 2 1 2014
Mr. Diugid,
Per our previous phone conversations, please find the enclosed items listed on the transmittal.
Included in the items is a letter from the project's geotechnical engineer stating that the current
sediment pond for the project is infiltrating the storm water. Based on the included letter and
field observations, we have changed our design for Pond 41 (drainage area PI) from a bio
retention pond to an infiltration pond. I have included the updated operations and maintenance
form, supplement form, plans and calculations. Please review the enclosed and let me know if
you have any comments or need additional information to approve this change in the existing
permit.
Thanks for your assistance.
Sincerely,
Derek Westfall, P.E.
Engineering Manager
i
E ENGINEERING DESIGN TECHNOLOGIES, Inc.
1705 ENTERPRISE WAY, SUITE 200, MAMFi-rA, GEORGIA 30067
D PHONE 770/988-0400 OR 877/728-1724 (TOLL. FREE) a FAx 770/988-0300
Sign of Quality
LETTER OF TRANSMITTAL
Name:
Mike Lawyer
Date:
January 29, 2016
Company:
NC DEQ/DEMLR
Project Name:
SOF Group Hdqtrs Fac #71224
Address:
225 Green Street Suite 714
Project Name:
Ft. Bragg, NC
Address:
Project #:
12C-01-00300
City, State, & Zip:
Fayetteville, NC 28301
Contract #:
W9121-IN-1 I-D-0002, DQ02
Phone Number:
We transmit Via:
❑ Herewith ❑ Under separate cover
❑ U.S. Mail ® Overnight Service (specify) Fed Ex
❑ Hand Delivery ❑ Courier (specify) Apple
The following:
❑ shop drawings ❑ samples ❑ drawings ❑ specifications ❑ diskette/tile
❑ correspondence ® submittals ❑ RFI's ❑ other
`Copies. Date 1)'escripti6n
I As noted EDT Storm Water Permit SW6130403
RECEIVED
2016
Transmitted as indicated:
® for approval ❑ as requested ❑
❑ for distribution ❑ for your use ❑
for review/comment DEO-FAYETTEVILLE REGIONAL OFFICE
for file
❑ on loan (please return)
Comments`
Per request from Lee Ward we are forwarding an original with engineer of record stamp to close out the storm
water pennit for the above referenced project nd permit no. SW6130403
Nolman
Sent By: Nolman Cubas Date: 1/29/16