Loading...
HomeMy WebLinkAbout20151065 Ver 2_Mitigation Information_20220630Strickland, Bev From: Nancy Oberle <nancy.oberle@threeoaksengineering.com> Sent: Thursday, June 30, 2022 1:35 PM To: Conchilla, Ryan Cc: Jim Mason Subject: [External] HE-0005 PTI Airport Project Attachments: HE-0005_HYD_Buffer_Impact_Drawings.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. H i Ryan, We are preparing to submit a buffer authorization for NCDOT's roadway project at PTI Airport for the Boom manufacturing site (HE-0005). The project is expected to have no impacts to streams or wetlands, but there will be some impacts to riparian buffers (see permit drawings attached). The project is located in the Jordan Lake watershed. We are wondering whether DWR will categorize these impacts as either roadway or parallel impacts. Depending on how it is categorized will tell us whether mitigation will be required. If you can help us determine how to proceed, it would be much appreciated. Thanks, Nancy Nancy Scott Oberle Three Oaks Engineering 324 Blackwell Street, Suite 1200 Durham, NC 27701 919-732-1300 - office 919-900-6535 - direct nancy.oberle@threeoaksengineering.com www.threeoaksengineering.com i 09/08/99 gs\Boom_hyd_permit_buffers_tsh.dgn PROJECT: HE-0005 See Sheet I For Index of Sheets See Sheet 18 For Conventional Pion Sheet Symbols L OA1C,RIDGE POP.'7,488 Piedmont Triad International Airport BEGIN PROJEC END - PRO ECT GREENSBORO , CITY LIMITS Guilford N VICINITY MAP BEGIN TIP PROJECT HE-0005 -LRT- STA. 11+ 85.00 ATE OF NORTH CAROLINA DIVISION OF HIGHWAYS GUILFORD COUNTY —LRT— SR 1695 REGIONAL RD. A PORTION OF THIS PROJECT IS WITHIN THE GREENSBORO MUNICIPAL BOUNDARIES LOCATION: ACCESS IMPROVEMENTS FOR BOOM FACILITY ALONG INTERSTATE 73 ON THE NORTH SIDE OF PIEDMONT TRIAD INTERNATIONAL AIRPORT TYPE OF WORK: GRADING, PAVING, DRAINAGE, STRUCTURES, SIGNING, CULVERTS, AND RETAINING WALLS CLEARING ON THIS PROJECT WILL BE PERFORMED TO THE LIMITS ESTABLISHED BY METHOD BUFFER IMPACTS PERMIT BEGIN BRIDGE -Y1- STA.11+54.44 GREENSBORO CITY LIMITS--, -Y1- STA. 13+40.13 END BRIDGE -LRT- STA. 35+17.03 BEGIN BRIDGE -LRT- STA. 33 + 76.97 THIS IS A PARTIAL CONTROLLED —ACCESS PROJECT WITH ACCESS BEING LIMITED TO POINTS SHOWN ON THE PLANS END TIP PROJECT HE-0005 -LRT- STA. 86 + 41.93 STATE STATE PROJECT REFERENCE NO. SHEET NO. TOTAL SHEETS N.C. HE-0005 1 STATE PROI.NO F.A.PROLNO. DEBCRPTION 50338.1.1 PE 50338.2.1 RN/ 50338.2.2 UTIL 50338.3.1 CONST BUFFER DRAWING SHEET 1 OF 6 AidritViv PRELIMIINARY PLANS DO NOT USE FOR CONSTRUCTION DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED J GRAPHIC SCALES 50 100 PLANS 50 25 0 50 100 PROFILE (HORIZONTAL) 10 5 0 10 20 11I11 \� PROFILE (VERTICAL) DESIGN DATA ADT 2022 ADT 2042 K D T V = X X X % = X % X % * 40 MPH * TTST =X DUAL X FUNC CLASS = MINOR COLLECTOR REGIONAL TIER PROJECT LENGTH LENGTH ROADWAY TIP PROJECT HE-0005 = 1.385 MILES LENGTH STRUCTURES TIP PROJECT HE-0005 = 0.027 MILES TOTAL LENGTH OF TIP PROJECT HE-0005 = 1.412 MILES PROJECT LENGTHS BASED ON -LRT- ALIGNMENT. M MOTT M MACDONALD Prepared in the Office of: 3621 Purley Rd., Suite 115 Fuquoy-Varine, NC 22526 (919) 552-2253 (919) 552-2254 (Fax) License No.F-0669 www moumac.coMamencas 2018 STANDARD SPECIFICATIONS RIGHT OF WAY DATE: XX XX, XXXX LETTING DATE: xx xx, xxxx DAVID C. WALLER, PE PROJECT ENGINEER JEFFREY R. COOKE, PE PROJECT DESIGN ENGINEER BRIAN KETNER NCDOT CONTACT - DIVISION 7 HYDRAULICS ENGINEER P.E. SIGNATURE: ROADWAY DESIGN ENGINEER P.E. SIGNATURE: LCI z N RETAIN RETAIN TOE PROTECTION ji/ \,, i pWT 0- - - - SEE -DITCH -DETAIL /j _----a------- 2• oN -1 ' EARTH BERM, SEE // / - DITCH DETAIL _ ,FG- ////////-- /-/ // / NOU_ i POT Sto. 10+00.00 lEGIN CONSTRUCTION POT Sta. 10+25.00 -DRI- PC PIEDMONT TRIAD AIRPORT AUTHORITY ' DB 7857 PG 945 -DRI- PT Sta. 11+93.76 SPEC. LAT ' l ITCH SEE DITCH . TAIL Sta. /1+5/.36 PIEDMONT TRIAD AIRPORT AUTHORITY DB 8067 PG 717 RCP -IV \5i2, TIME WARNER CABLE SOUTHEAST LLC DB 7403 PG 2638 - PB 133 PG 34 RETAIN -. ii c7 30" RCP -IV 2G ���/'73 NB( I I �� 0 L 1 bIF 00 � � __ -'y M BRY,a/y BLVD - BL 13+00 _ono E 14+10 o'BA RETAIN _ +0 co16 �ETBI� -� Yy�PPSRM. TOE PROTECTION '^ ���. ��••� v : TOE PROTECTLOFY WRSRIA_ -_-SB ✓os=py y �B qo, BST SEE DITCH DETAIL �gr1 ftit feao6�-���ai� ��-n�•-"� .. WiCL B RIP RAION ��-� SEE DITCH DETAIL 1:411r).47- ` L.� t wc;8 a, ENDWALL � CHANNEL IMPROVEMENT SEE DETAIL JURISDICTI. AL STREAM -LRT- PCC Sta. 23+38.08 - DRI- POT Sto. /2+17,98 - LRT- POC Sta. I7+77.45 CLASS 'B' RIP RAP EST. 3 TONS 10 SY GEOTEXTILE 2' LAT BASE DITCH SEE DITCH DETAIL PIEDMONT TRIAD AIRPORT AUTHORITY DB 7857 PG 945 -LRT- PCC Sto. 15+04.1� -LRT- PC Sta.13+49.12 -LRT- PT Sta. 24+93.07 SITE 1 - SEE ENLARGED AREA SHEET 4A PIEDMONT TRIAD AIRPORT AUTHORITY DB 5042 PG 1643 BEGIN PROJECT HE-0005 -LRT- PC Sta. 11 + 85.00 GRAPHIC SCALE PLAN VIEW 18" W2 ELBOWS CLASS 'B' RIP RAP EST. 3 TONS 10 SY FILTER FABRIC PC Sta. 27+67.72 PI Sto 14+26.68 PI Sto 22+63.23 A = 5' 55' 12.4' (RT) A = /27' 25' 18.4" (RT) D = 3' 49' 11.0" D = /5' /6' 43.9° L = /54.99' L = 833.97' T = 77.56' T = 759.12' R = 1,500.00' R = 375.00' -LRT- PIPl Sto 29+34.32 Sto 33+50.69 A = /3° //' 54.5" (RT) A = l9' 47' 41.7" (LT) D = 3° 58' 43.9" D = 3 58' 43.9" L = 331.7/' L = 497.50' T = 166.59' T = 25/25' R = 1,440.00' R = 1,440.00' Pls Sto /5+72.67 es = 731'21.9" Ls = 250.09' LT = 166.73' ST = 83.37' PI Sta 11+73.93 = 48' 35' 02.0" (RT) D = 114° 35' 29.6" L = 42.40' T = 22.57' R = 50.00' PROJECT REFERENCE NO. HE-0005 kW SHEET NO. ROADWAY DESIGN ENGINEER SHEET NO. HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION MOTT MACDONALD 8 E, LLC LICENSE NO F-0669 "TT MACDONALD 8 E, LLC LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the OR of: IVI 76 1 PurfoY Rd. Su to 1,5 M F u. o„moc. NC 27526 M6CODN6LD ma. oMom",iws BUFFER DRAWING SHEET 2 OF 6 PROP.2'-6" C&G -LRT- PRC Sta. 30+99.44 P/ Sto 24+15.65 = 5° 55' 12.4" (RT D = 3° 49' 11.0" L = 154.99' T = 77.56' R = 1,500.00' LEGEND ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 FOR -LRT- PROFILE SEE SHEET 11 FOR DITCH DETAILS, SEE SHEETS ? THRU ? 0 01 0 U m a POT -Sto. /0+OOL00 IEGIN COA1ST,Q6CTION - POT Sta'\ l0`t25.00 DF I PC; .Std. /1+5/.36 -q45' \PIEDMON'I-IRIAD `I AIRPORT AUTHORITY 613 8067 PG 717 SPEC/LAP 'V' DITCH 'SE'DITy'H DETAIL 1 I I PIED ON11 TRIAD edIRPORT AUTHORITY \ DB'7853 PG 945 I , Sto:7/+^3.7.' TIME WARNER CABLE „'SDUTHEASLtt DB7403 B6 2638 PB113$PG 34 RETAIN. \ ' \ I I ;-LRT-: PC Sta. �3+49°l2 I \\ \\\\ ,. \ \ \ \ \\� COLTAR-�-FSCTEND �'�� L TS S d lFfiilS"QfQ ���- Pam\ \ --__-- 1 -LRT - Pi, ›%� PI Sto 14+26.68 PI Sto 22+63.23 PI Sto 24+15.65 ' `, A = 5' 55' 12.4" (RT) A = 127' 25' 18.4" (RT) P = 5° 55' /2.4" (RTI D = 3' 49' 11.0" D = /5' /6' 43.9° D = 3° 49' 11.0" L = 154.99' L = 833.97' L = 154.99' T = 77.56' T = 759.12' T = 77.56' • R = 1,500.00' R = 375.00' R = 1,500.00' -LRT- INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION MOTT MACDONALD & 69 E, LLC LICENSE NO. F-06 "TT MACDONALD 8 E, LLC LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED -- IOE PRO1fbN Prepared in the W,CL B RIP RAC--- <Q of: y SEE DITCIi DETjL __-- 5 -FI11 4 %�%. BUFFER 18" W/2 - F ELBOWS - \ s" CLASS-'B' RIP RAP `EST. 3 TONS \ 10 SY FILTER FABRIC \`Isz Q I------",n'� -- 53U4' PG' 2780 -LRT- PRC Sta.,30+99.44 M M 7621 PorkyaRd, NC Suie 115, MOTTF V99m nno`, 27526 MACDONALD o ma sombm"riws _____-925-.'________ --. `I 13 4IIN,' PR©JEri, If4 o0i ;—LRT-11 RC, $ta. 1 + 85.OQ I I I 1 \`\ \ 1 \1 I I 1 I, I , I 100' 1 • 0' GRAPHIC SCALE PI Sto 29+34.32 = /3° //' 54.5" (RT) D = 3° 58' 43.9" L = 331.7/' T = 166.59' R = 1,440.00' -EL- Pls Sto /5+72.67 es = P3/'2/.9" Ls = 250.09' LT = /66.73' ST = 83.37' 1 I 1 ` \1 I ' 100' P1 Sto 33+50.69 A = /9' 47' 41.7" (LT) D = 3° 58' 43.9" L = 497.50' T = 25/25' R = 1,440.00' -DRI - P1 Ste 11 +73.93 ' 975 A = 48' 35' 02.0" (RT) D = 114' 35' 29.6" L = 42.40' T = 22.57' R = 50.00' 910' 200' - a�4 E \ Za'oo, LEGEND Xoto ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 FOR —LRT— PROFILE SEE SHEET 11 FOR DITCH DETAILS, SEE SHEETS ? THRU ? PROJECT REFERENCE NO. SHEET NO. HE-0005 4A TOE PROTECTION W'PSRM- SEE DITCH- DETAIL EARTH BERM, SEE DITCH DETAIL 2GI(A) 30" RCP -IV - 1' 66" RCP -IV% T FO TOE PROTECTION CB --A ENLARGED PLAN SITE 1 GREU TL-2 ENDWALL CHANNEL IMPROVEMENT SEE DETAIL BEGIN LEGEND \\\\\\\` \�\\\\\' ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 RAY SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/W ACQUISITION MOTT MACDONALD & 9' LLC MOTT MACDONALD 8 9' LLC LICENSE NO. F-0669 LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M M 76 1 Purloy Rd, Suite 115 66 TrFoquay-Varina, NC 27526 MACDONALD ww.v.monmac.coMamericos BUFFER DRAWING SHEET 4 OF 6 40' 0' 40' 80' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ GRAPHIC SCALE PROJECT REFERENCE NO. HE -0005 SHEET NO. 4A _ 1:-- TOE- PROTECTLON_- _S&A__-_-F.-------- — — [�ITCI DST, IL _____=________ T-E-_------EC_TC0-------------------------- -- -T -- -EARTH-8E18h, SEE :_ �c I� >�; _ _ - _ ,y ,eda _.1. .cr.: ��e. aa..e<e°°.e.°03�� ° °°eke e e � � �� ' ems. swo .. � -. `2GiA ENLARGED PLAN SITE 1 NDWAL II CHANNEL IMPROVEMENT SEE; DETAIL II LEGEND 40' 0' ■ ■ ■ ■ ■ ■ ■ ■ ■ ■ GRAPHIC SCALE ALLOWABLE IMPACTS ZONE 1 ALLOWABLE IMPACTS ZONE 2 RMI SHEET NO. ROADWAY DESIGN ENGINEER HYDRAULICS ENGINEER INCOMPLETE PLANS DO NOT USE FOR R/ W ACQUISITION MO, MACDONALD 18 E LLC MO, MACDONALD 1 & E, LLC LICENSE NO. F-0669 LICENSE NO. F-0669 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED Prepared in the Office of: M MOTTM7621 Purim, Rd, Suite 115 Fu9uay-Varian, NC 27526 MACDONALD www.moXmac.conVamerimz BUFFER DRAWING SHEET 5 OF 6 80' Revised RIPARIAN BUFFER IMPACTS SUMMARY IMPACTS BUFFER REPLACEMENT Site No. Station (From/To) Structure Size /Type TYPE ALLOWABLE MITIGABLE ROAD CROSSING BRIDGE PARALLEL IMPACT ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) TOTAL (ft2) ZONE 1 (ft2) ZONE 2 (ft2) I 1 -LRT- 21+62 TO 23+28 RT 54" RCP to 66" RCP Outlet x 2301 3186 5487 I TOTALS*: 2301 3186 5487 0 0 0 0 0 NOTES: 2018 Feb NC DEPARTMENT OF TRANSPORTATION DIVISION OF HIGHWAYS June 6, 2022 GUILFORD COUNTY HE-0005 WBS # 50338.1.1 SHEET 6 OF 6