Loading...
HomeMy WebLinkAboutNCC222451_Site Plan or Location Map_20220708DocuSign Envelope ID: BDB28A14-4F8E-4464-97F6-AO5DF150502D TEMPORARY SEEDING SCHEDULE (TO TEMPORARILY STABILIZE DENUDED AREAS THAT WILL NOT BE BROUGHT TO FINAL GRADE FOR A PERIOD OF 15 WORKING DAYS) SEEDING DATES: DECEMBER 1 THRU APRIL 15 SEEDING MIXTURE: SPECIES RATE RATE (LBS/AC) RYE (GRAIN) 120 ANNUAL LESPEDEZA (KOBE) 50 OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT TO EXTEND BEYOND JUNE SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY: 2,000 LBS/AC LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER MULCH: 4,000 LBS/AC - ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SEEDING DATES: APRIL 15 - AUGUST 15 SEEDING MIXTURE: SPECIES RATE (LBS/AC) GERMAN MILLET 40 SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY: 2,000 LBS/AC LIMESTONE AND 750 LB/AC 10-10-10 FERTILIZER MULCH: 4,000 LBS/AC - ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OF A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE. SEEDING DATES: AUGUST 15 THRU DECEMBER 15 SEEDING MIXTURE: SPECIES RATE (LBS/AC) RYE (GRAIN) 120 SOIL AMENDMENTS: FOLLOW SOIL TESTS OR APPLY: 2,000 LBS/AC LIMESTONE AND 1,000 LB/AC 10-10-10 FERTILIZER MULCH: 4,000 LBS/AC - ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OF A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL MAINTENANCE: REPAIR AND REFERTLIZE DAMAGED AREAS IMMEDIATELY. TOPDRESS WITH 50 LBS/AC OF NITROGEN IN MARCH.IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LBS/AC KOBE IN LATE FEBRUARY OR EARLY MARCH TEMPORARY SEEDBED PREPARATION 1. A GOOD SEEDBED IS WELL PULVERIZED, LOOSE, AND UNIFORM. 2.UMING - APPLY LIME ACCORDING TO SOIL TEST RECOMMENDATIONS. IF THE PH (ACIDITY) OF THE SOIL IS NOT KNOW, AN APPLICATION OF GROUND AGRICULTURAL LIMESTONE AT THE RATE OF 1 - 1.5 TONS/ACRE ON FINE TEXTURED SOILS AND 2-3 TONS/ACRE ON COARSE TEXTURED SOILS IS USUALLY SUFFICIENT. APPLY LIMESTONE UNIFORMLY AND INCORPORATE INTO THE TOP 4-6 INCHES OF THE SOIL. SOILS WITH A PH OF 6 OR HIGHER NEED NOT BE LIMED. 3.FERTILIZER - BASE APPLICATION RATES ON SOIL TESTS. WHEN THESE ARE NOT POSSIBLE APPLY A 10-10-10 GRADE FERTILIZER AT 70D - 1000 LB/ACRE. BOTH FERTILIZER AND LIME SHOULD BE INCORPORATED INTO THE TOP 4-6 INCHES OF IF A HYDRAULIC SEEDER IS USED, DO NOT MIX SEED AND FERTILIZER MORE THAN 30 MINUTES BEFORE APPLICATION. 4.SURFACE ROUGHENING - IF RECENT TILLAGE OPERATIONS HAVE RESULTED IN A LOOSE SURFACE, ADDITIONAL ROUGHENING MAY NOT BE REQUIRED, EXCEPT TO BREAK UP LARGE CLODS. IF RAINFALL CAUSES THE SURFACE TO BECOME SEALED OR CRUSTED, LOOSEN IT JUST PRIOR TO SEEDING BY DISKING, RAKING, HARROWING, OR OTHER SUITABLE METHODS. GROOVE OR FURROW SLOPES STEEPER THAN 3:1 ON THE CONTOUR BEFORE SEEDING. SEE OTHER REQUIREMENTS FOR SURFACE ROUGHENING ON THIS SHEET. EROSION CONTROL CONSTRUCTION SEQUENCE AND NOTES 1. OBTAIN A LAND DISTURBING PERMIT FROM SCOTT REAMS AT 919-868-4986. 2.INSTALL GRAVEL CONSTRUCTION PAD, TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS OR OTHER MEASURES AS SHOWN ON THE APPROVED PLAN. CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. SEED TEMPORARY DIVERSIONS, BERMS AND BASINS IMMEDIATELY AFTER CONSTRUCTION. 3. CALL ENVIRONMENTAL CONSULTANT, SCOTT REAMS AT 919-868-4986, FOR AN ONSITE INSPECTION BY THE ENVIRONMENTAL CONSULTANT TO OBTAIN A CERTIFICATE OF COMPLIANCE. 4. BEGIN CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE. 5.INSTALL STORM SEWER, IF SHOWN, AND PROTECT INLETS WITH BLOCK AND GRAVEL INLET CONTROLS, SEDIMENT TRAPS OR OTHER APPROVED MEASURES AS SHOWN ON THE PLAN. BEGIN CONSTRUCTION, BUILDING, ETC. 6.STABILIZE SITE AS AREAS ARE BROUGHT UP TO FINISH GRADE WITH VEGETATION, PAVING, DITCH LININGS, ETC. SEED AND MULCH DENUDED AREAS PER GROUND STABILIZATION TIME FRAMES. 7.WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE STABILIZED COMPLETELY, CALL ENVIRONMENTAL CONSULTANT, SCOTT REAMS AT 919-868-4986 FOR AN INSPECTION. 8.I1' SITE IS APPROVED, REMOVE TEMPORARY DIVERSIONS, SILT FENCE, SEDIMENT BASINS, ETC., AND SEED OUT OR STABILIZE ANY RESULTING BARE AREAS. ALL REMAINING PERMANENT EROSION CONTROL DEVICES, SUCH AS VELOCITY DISSIPATERS, SHOULD NOW BE INSTALLED. 9. WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR A FINAL SITE INSPECTION BY THE ENVIRONMENTAL CONSULTANT, SCOTT REAMS AT 919-868-4986. OBTAIN A CERTIFICATE OF COMPLETION. EROSION CONTROL MEASURES SELF INSPECTION 1. THE FINANCIALLY RESPONSIBLE PARTY, LANDOWNER, OR THEIR AGENT SHALL CONDUCT INSPECTIONS OF ALL EROSION CONTROL DEVICES AND PRACTICES IN ACCORDANCE WITH NCDENR DIVISION OF LAND RESOURCES REQUIREMENTS FOR SELF INSPECTION. 2. A SELF INSPECTION SHALL BE PERFORMED AFTER EACH PHASE OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN IS COMPLETE. THIS SHALL INCLUDE BUT SHALL NOT BE LIMITED TO THE FOLLOWING: 2.1. INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2.2. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 2.3, COMPLETION OF ANY PHASE OF GRADING OF SLOPES OR FILLS. 2.4.INSTALLA11ON OF STORM DRAINAGE FACILITIES. 2.5. COMPLETION OF CONSTRUCTION OR DEVELOPMENT 2.6. ESTABLISHMENT OF PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION. 3. PERSON PERFORMING INSPECTION MAY USE THE STANDARD FORM PROVIDED BY NCDENR DIVISION OF LAND RESOURCES OR MAY MARK UP A SINGLE COPY OF THE APPROVED SEDIMENT AND EROSION CONTROL PLAN. ANY DOCUMENTATION OF THE SELF INSPECTIONS SHALL BE MAINTAINED ON -SITE AND MADE AVAILABLE TO THE EROSION CONTROL INSPECTOR. 4. THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. AS OF AUGUST 1, 2013 THE SELF -INSPECTION PROGRAM WAS COMBINED WITH THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS MUST BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED IN ACCORDANCE WITH NCGS 113A-54.1 AND 15A NCAC 46.0131. A COMBINED SELF -INSPECTION / SELF -MONITORING FORM IS AVAILABLE AT THE FOLLOWING WEB ADDRESS: HTTP: //PORTAL. N CDENR. ORG/WEB/LR/EROSION .IF YOU HAVE ANY QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE LAND QUALITY SECTION AT (910) 433-3300. N f EROISON PLAN LOTS 89 109 119 139 Mid F,,/ kqoA I T BARTON'S CREEK TOWNSHIP WAKE COUNTY, NORTH CAROLINA ivplP CAWTHORNE, MOSS & PANCIERA, P.C. PROFESSIONAL LAND SURVEYORS, C-1525, 333 S. WHITE STREET, P.O. BOX 1253, WAKE FOREST, N.C., 27587, (919) 556-3148 VICINITY MAP EROSION AND SEDIMENT CONTROL APPROVED PLAN DATE PERMIT NO. S- Wake County Environmental Services Sedimentation & Erosion Control 919-856-7400 our rM ENVIRONMENTAL CONSULTANT SIGNATURE FFFFCTRT ( 11, 17 ,%%0"11111111/1///", �N CARD -,,,0 10 2ooFEss �o�.►'tiy'= SEAL s< L-3794 �a _ DocuSign111111111"" oo _IM,4i.d a. -Mon 6/29/2022 83D193173200411... SOIL AND EROSION PLAN FOR LOTS 8, 10, I f, 13, 16, & 17 NORWOOD RIDGE SUBDIVISION OWNER: BLUE HERON HOMES NORWOOD RIDGE DRIVE CANYON CREST COURT D.B. 18575, PAGE 1986 B.M. 2022, PAGE 608 BARTON'S CREEK TOWNSHIP WAKE COUNTY, NORTH CAROLINA APRIL 9, 2022 REVISED JUNE 29, 2022 60 30 0 60 120 SCALE 1 0=60' SHEET 1 OF 3 DocuSign Envelope ID: BDB28A14-4F8E-4464-97F6-AO5DF150502D CONSTRUCTION SEQUENCE 1.OBTAIN A LAND DISTURBING PERMIT. 2.SUBMIT DOCUMENTATION REQUIRED UNDER THE SITE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITY (NCG010000) TO STORMWATER INSPECTIONS THROUGHOUT THE PROJECT. Q Az /. �' I` 1' / 3.INSTALL ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES. LIMIT CLEARING AND LAND DISTURBING ACTIVITY TO THE AREA NECESSARY TO INSTALL THE PERMITTED MEASURES. 4. CONSTRUCTION ENTRANCES SHALL BE LOCATED WHERE DRIVEWAYS WILL BE LOCATED. SILT FENCE SHALL BE INSTALLED ALONG PERIMETER OF EACH INDIVIDUAL LOT AS SHOWN ON PLAN, ENSURING TO REMAIN OUTSIDE OF WETLANDS AND BUFFERS. 5. UPON APPROVAL OF THE STORMWATER SITE INSPECTION, COMMENCE PERMITTED LAND DISTURBING ACTIVITY. �X \ \ \ 6. GROUND COVER SHALL BE PROVIDED AS FOLLOWS: 6.1 STABILIZE ANY AND ALL BASINS WITH GROUND COVER IMMEDIATELY AFTER INSTALLATION. \� O O a�O / \ 1 % a \ \ 6.2 STABILIZE ANY AND ALL DIVERSION DITCHES INTENDED TO BE IN SERVICE FOR 30 DAYS OR MORE WITH TEMPORARY SEEDING AND EROSION CONTROL NETTING. V' ' `� \\L —\ V FOR ALL AREAS OF MODERATE AND/OR STEEP SLOPES, PROVIDE TEMPORARY GROUND COVER IF THE SLOPE HAS NOT BEEN DISTURBED FOR A PERIOD OF FOURTEEN (14) DAYS. !- SILT FENCE \ ` 320' �` ,` 6.3 PROVIDE GROUND COVER SUFFICIENT TO RESTRAIN EROSION ON ANY PORTION OF THE SITE UPON WHICH FURTHER LAND -DISTURBING ACTIVITY IS NOT BEING UNDERTAKEN WITHIN FOURTEEN OUTLET WITH - \ 0 \ \ 6.4 (14) CALENDAR DAYS OF TEMPORARILY OR PERMANENTLY SUSPENDING LAND DISTURBING ACTIVITY. / HORSESHOE `\`, PROTECTION `� () 6.5 ESTABLISH PERMANENT GROUND COVER SUFFICIENT TO RESTRAIN EROSION WITHIN FOURTEEN 14 CALENDAR DAYS FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AND/OR \ \ �`,`,`� `� \ \ t.',` PRIOR TO FINAL INSPECTION. q� _ '```` 7.INSTALL ADEQUATE EROSION AND SEDIMENT CONTROL MEASURES AND/OR INCREASE MAINTENANCE FREQUENCY WHERE APPROVED MEASURES FAIL TO PREVENT ACCELERATED EROSION, \, ` , P \ — \.\ \ OFF -SITE SEDIMENTATION, OR REPETITIVE NON-COMPLIANCE ISSUES. J / CONSTRUCTION 0 , , \� \, `SIFT FENC�' v - ENTRANCE , , \OUTLET WITH _ . ` ; \ ` , `, , ; ,` \ \ / 8, MAINTAIN ALL EROSION AND SEDIMENT CONTROL MEASURES IN GOOD WORKING ORDER. SILT FENCE, INLET PROTECTION AND OTHER SIMILAR MEASURES MUST BE CLEANED OUT BEFORE THEY HORSESHOE ARE HALF FULL. CLOGGED STONE FILTERS MUST BE REFRESHED/REPLACED. SILT FENCE CAN NOT HAVE HOLES OR TEARS. PROT CTION ` ,` �, , `, \ .\ OPEN SPACE 1 \, 9. ONCE THE STORMWATER FINAL INSPECTION IS APPROVED, CLOSE THE GRADING PERMIT AND OBTAIN A CERTIFICATE OF COMPLETION. �;; ' ` - 110,077 sq.ft:'.\'•, ' `;,%�;;% %2.527 AC,. 1, \'`; \ V. 1 \ PROPOSED DISTURBED 'AREA S.F. %�` SILT FENCE \1•\ In IN %`, ` • i�r \ �% FENCE SILT �NCE\ ` ` TS ab / �/ / /`20' DRAINAGE \ EASEMENT ` /! OUTLET WITH 12 HORSESHOE , ' ; op " — ` ^ ` PROTECTION , , 11000, \ , ' , , ; �, / `, �4j• 20' DRAINAGE ` & ACQESS,EASEMENT\� ', 11 `, I' w 'SILT EIS E I' ��n�'► \_, ; . /� / / \ N, OUTLET WITH - / `, SILT FENCE , �, HORSESHOE �� _ �.S2 / _/ • i 71,941 sq.ft. w OUTLET WITH ,\ .' I.' PROTECTION. .I''' HORSESHOE s: P` 1,652 , AC. , o. PROTECTION ' w , , �, I,,'S,o� ' //1' ?- - - - - - - OPEN SPACE % \ OONSTRUCDON ` PROPOSED DISTURBED ' ' ` / fi '\ , _ - - - -�\ y ' ENT�tANOE �, AREA S.F. ' �' ' , i4o i / - - - - _ - - - - - - %t��y - ,, `, ', SILT FENCE ' ' ' I, ` ; ' ',', \ , / SETBACK ` OUTLET WITH 4 , II �' ' , �' ' SILT FENCE ` a- HORSESHOE SILT NC `� ' ' , OUTLET WITH _ - - - P�OTECTION `\ OUTLET WITH <o , I y� - - ' \ - SILT FENCE _ HORSESHOE \ ,� HORSESHOE CAN \� PROTECTION , - _ _ -OUTLET WITH oA , `57 PRpTF�CTION_ _� , , /` HORSESHOE 'v CREST URT 5 `167.9b' `` k , \/\' 4' - PROTECTION % VA TE R/w ° ` HQR3E1 WI)H 30 WATER SUPPLY ; �'' ��� ' p� , SILT FENCE ', '\\7 �. S - 1'� PRO HOE ATERSI�ED BUFFER. �� ' g / I OUTLET WITH �CT/pN , `, HORSESHOE , . ` ` , , , i ,1� ' ,' / / , ,, ,' \�,' i N - ( O / /� I I I i•\ N PROTECTION, PROPOSED DISTURBED, , , , - L AREA-35,413 S.F. � , ( f SILT FENCE ,'�`' ok 20X30 �;, ' ' ' , ' , OUTLET WITH �`\'' v % n CONSTRUCTION �� 6'�y g `N' `' �' ' HORSESHOE �\' I \ \ ENTRANCE PROTECTION \ 20X30 , ONSTR�J CTION , 2' , \ t, g ,ENTRANCE i W 1 i i ; \\�%\� `\v\ `, 91,569 sq.ft. i i ` ''�''' s,,' ''�1� ' ' 0, / \ \ I •I\ \ ' I ' I' I ' ' \ \ `` 4 \ 2 102 AC. ' ,'' / / /' ''' ''' '' 20' UTILITY '' ' l ` , \ �, \ SILT FENCE - I \ / ' J 9 9 \ \ <d . .' ' OUTLET WITH w� / �2. \ , / &ACCESS EASEMENT {� 09' \ , i i , ` , / HORSESHOE / , ' ,' ' , ' ' ' ' ' Y PROTECTION io \`% I 43 041 S f,CN I o / SILT FENCE ? ` \ 74 y`' OUTLET WITH 7► `�'I,I`.` ` 0.988 AC.,' 20' UTILITY HORSESHOE ` &ACCESS EASEMENT \, ' ', ' % 3.` ' / ; ! ' ' _ ,ry , PROTECTION LI N \` E�\ `� 1 ,,` / , / / / / Mh ,,/�' /, /\O, `'%,`` SILT FENCE11 ' SILT FENCE PROPOSED DI TURB D OUTLET WITH 'I` OUTLET WITH AREA-'36,00 S.F� ; , ^0 i `\ ` �a,, ; ; ; ; ' , //' 9 \y`%' HORSESHOE J I HORSESHOE' PROTECTION ' I •I sO PROTECTION ; '' \ \ �`'��'�,�' % / OUTLET WITH 6' \� I 30' PERIMETER SILT CE _ , HORSESHOE \y `�G I `BUILDING SETBACK — — — PROTECTION; ��Q ° \ I / \, \ ` ` / ,' / I , , °> I ;r ZVONIMIR ORDANIC & KAREN H. ORDANIC L D.B. 2474, PAGE 698 /' O ill I I ` B.M. 2021, PG. 1088 ' 196. - - — \` ` ` j // I i` l °' I, I Fq PIN# 1709.01-26-5825 76' _ \ "� SILT FENCE �r J`� ` v ; OUTLET WITH '�\ 'I, ` /% N/F BARBARA B. VINSON D.B. 4494, PAGE 559 B.M. 1972, PAGE 346 PIN# 1709.01-16-3576 HORSESHOE PROTECTION ,` I \ 60. I ' ' ' I 25' TREE &VEGETATION 374.97 `� / / N/F PROTECTION ZONE `� 0. FENTON IV WELLS O & JOCELYN G. WELLS I 00 D.B. 15402, PAGE 1311 N/F B.M. 1972, PAGE 346 PIN# 1709.01-16-7533 I / G. THOMAS LOUISE W. WELLS I D.B. 12567, PAGE 237 / PIN# 1709.01-26-4595 N/F I MALCOLM C. ROBERTS / D.B. 3564, PAGE 370 I B.M. 1972, PAGE 346 PIN# 1709.01-26-0499 I I I / / / / SITE DATA TABLE ZONING DISTRICT R-80W RIVER BASIN NEUSE COUNTY WATERSHED HORSE CREEK WATERBODY INDEX 27-16- 1 LOT NUMBER LATITUDE LONGITUDE 8 35.938848-78.657476 10 35.938856-78.656049 11 35.939447-78.656306 13 35.939968-78.656510 16 35.941115-78.654676 17 35.941610-78.654611 N Other Agency Approvals/Enforcement: Wake County's approval of this plan does not supersede any other required approvals or permits. See Wake County Unified Development Ordinance (UDO) 1-18-6 References to Other Regulations and 1-19-1 Conflict with State or Federal Regulations and 10-30-3 (H) 10-20-1 MINIMUM STANDARDS -ALL SOIL EROSION AND SEDIMENTATION CONTROL PLANS AND MEASURES MUST CONFORM TO THEM IN I MUM APPLICABLE STANDARDS SPECIFIED IN NORTH CAROLINA'S EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL AND THE WAKE COUNTY SEDIMENTATION AND EROSION CONTROL PLAN REVIEW MANUAL. EROSION CONTROL DEVICES MUST BE INSTALLED TO PREVENT ANY OFFSITE SEDIMENTATION FOR ANY CONSTRUCTION SITE REGARDLESS OF THE SIZE OF THE LAND DISTURBANCE. SENATE BILL 1020; "SECTION 3.(H) ADDITIONAL STANDARDS FOR LAND-DISTURBINGACTIVITIES IN THE WATER SUPPLY WATERSHED": A. EROSION AND SEDIMENTATION CONTROL MEASURES, STRUCTURES, AND DEVICES SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED TO PROVIDE PROTECTION FROM THE RUNOFF OF THE 25-YEAR STORM B. SEDIMENT BASINS SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED SO THAT THE BASIN WILL HAVE A SETTLING EFFICIENCY OF AT LEAST SEVENTY PERCENT (70%) FOR THE 40-MICRON SIZE SOIL PARTICLE TRANSPORTED INTO THE BASIN BY THE RUNOFF OF THE TWO-YEAR STORM THAT PRODUCES THE MAXIMUM PEAK RATE OF RUNOFF C. NEWLY CONSTRUCTED OPEN CHANNELS SHALL BE PLANNED, DESIGNED, AND CONSTRUCTED WITH SIDE SLOPES NO STEEPER THAN TWO HORIZONTAL TO ONE VERTICAL IF A VEGETATIVE COVER IS USED FOR STABILIZATION UNLESS SOIL CONDITIONS PERMIT STEEPER SLOPES OR WHERE THE SLOPES ARE STABILIZED BY USING MECHANICAL DEVICES, STRUCTURAL DEVICES, OR OTHER ACCEPTABLE DITCH LINERS. CAWTHORNE, MOSS & PANCIERA, P.C. 4J l� Q d. Q' Sil / 3 t° O / v ,a OU H C PF Q N / 0 20X30 O CONSTRUCTION / ENTRANCE SILT FENCE O OUTLET WITH HORSESHOE / / V PROTECTION ISILT FENCE OUTLET WITH HORSESHOE PROTECTION OPEN SPACE I , III 11 � 25' TREE & VEGETATION PROTECTION ZONE I ' ' I N/F ROBERT T. SMALLWOOD & LISA J. SMALLWOOD ' , I D.B. 14392, PAGE 468 I'I ' B.M. 1970, PAGE 92 'I I PIN# 1709.01-27-5996 I 'I II„ 30' PERIMETER BUILDING SETBACK N/F ALLEN D. GREENE & JAMIE M. GREENE D.B. 16036, PAGE 1975 B.M. 1970, PAGE 92 PIN# 1709.01-27-5775 SITE NORWOOD kF VICINITY MAP LINE TYPE LEGEND PROPERTY LINE — RIGHT-OF-WAY — — — — — — — DISTURBED AREA SILT FENCE ® SILT FENCE OUTLET TREE PROTECTION _ N/F - PAUL HIBBETT 93 7�j� & PAMELA HIBBETT D.B. 15547, PAGE 2116 B.M. 1970, PAGE 92 PIN# 1709.01-27-5564 I II I I Ij I I o--, SEAL = L-3794 � 9ti forte ;= v� /�o,.„SUR„e 40 DoicouSigned bay".' ,.,.. •CL. A• 00 16�6/202� 2?D 193�1ae 3200411 SOIL AND EROSION PLAN FOR LOTS 8, 10, 11, 13, 16 & 17 NORWOOD RIDGE SUBDIVISION OWNER: EVAN STIEGEL & MANJULA NAGARAJA OWNER: BLUE HERON HOMES OWNER: ARCATERRA LAND LLC NORWOOD RIDGE DRIVE CANYON CREST COURT D.B. 18575, PAGE 1986 B.M. 2022, PAGE 608 BARTON'S CREEK TOWNSHIP WAKE COUNTY, NORTH CAROLINA APRIL 9, 2022 REVISED JUNE 29, 2022 60 30 0 60 120 SCALE 1 "=60' SHEET 2 OF 3