Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW8050547_Historical File_20121129 (2)
ME IAi, ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director November 29, 2012 Mr. Jon W. Rosborough, Airport Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Stormwater Permit No. SW8 050547 Mod. Wilmington International Airport High Density Dry Detention Basin Project New Hanover County Dear Mr. Rosborough: Dee Freeman Secretary The Wilmington Regional Office received a complete, modified Stormwater Management Permit Application for Wilmington International Airport on November 29, 2012. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding modified Permit No. SW8 050547 dated November 29, 2012, for the construction, operation and maintenance of the permitted BMP's and BUA associated with the subject project. This permit is for the treatment of stormwater runoff within a designated pocket of high density consisting of 322.34 acres in accordance with Permit No. SW8 040836, the Airport Master Stormwater Plan. This permit modification includes the following: 1. A portion of the existing airport previously included in the drainage area of the permitted dry detention basin is being removed. This existing area will be submitted in the future, either for a separate BM or to be "deemed permitted" under Session Law 2012-200. 2. The drainage area boundary of the "Overall" permitted dry basin is being shifted to exclude a previously covered area (the existing area referenced above) and is slightly increased to bring in new drainage area. 3. Two new grassed swales are being added to provide pre-treatment for the runoff from the added drainage area for the "Overall" condition. 4. The grassed swale plans and new drainage area plans are added to the previously approved plans. 5. The project name is changed to remove the Phase I, II and III designation. The phases refer to the construction of the dry detention basin, not to any particular stage of BUA development within the airport. This permit contains design information for the "Phase I and II" dry detention basin serving a 287.63 acre drainage area and for the °Overall" built -out dry detention basin serving a 322.34 acre drainage area. On August 5, 2009, the Governor signed Session Law 2009-406. This law impacts any development approval issued by the Division of Water Quality under Article 21 of Chapter 143 of the General Statutes, which is current and valid at any point between January 1, 2008, and December 31, 2010. The law extends the effective period of any stormwater permit that is set to expire during this time frame to three (3) years from its current expiration date. On August 2, 2010, the Governor signed Session Law 20.10-177, which grants an extra year for a total of four (4) years extension. Please note that the expiration date of this permit has been adjusted to reflect this four year extension. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 Phone: 910-796-72151 FAX 910-350-20041 DENR Assistance:1-877-623-6748 Internet www.ncwaterquality.org N a Carolina dund An Fmial Onnnh mllu 1 Affirmntim Arlin Fmnlnvar State Stormwater Managemrent Qystems Permit No. SW8 050547Mod. This permit shall be effective from the date of issuance until June 15, 2019, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), certification of the BMP's, procedures for changing ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). Per NCGS 143-215(e), the written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty (30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee (if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699- 6714, or via telephone at 919-431-3000, or visit their website at www.ncoah.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Linda Lewis at (910) 796-7215. Sincerely, �7*s Charles Wakild, P.E., Director Division of Water Quality GDS/arl: S:\WQS\Stormwater\Permits & Projects\2005\050547 HD\2012 11 permit 050547 cc: Tim Clinkscales, P.E., Paramounte Engineering New Hanover County Building Inspections City of Wilmington Public Services Beth Wetherill, New Hanover County Engineering Wilmington Regional Office Stormwater File Page 2 of 9 State Stormwater Management Systems Permit No. SW8 050547Mod. STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO New Hanover County Airport Authority Wilmington Intemational Airport 1740 Airport Boulevard, Wilmington, New Hanover County FOR THE construction, operation and maintenance of an extended dry detention basin in compliance with the provisions of 15A NCAC 2H .1000 (hereafter collectively referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until June 15, 2019, and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.7 of this permit. The "Phase I and 11" stormwater control is an extended dry detention basin that has been designed to handle the runoff from 8,520,835 square feet of impervious area within a drainage area of 287.63 acres (12,529,107 square feet). The "Overall" condition of the dry detention basin has been designed to handle the runoff from 9,751,185 square feet of impervious area within a drainage area of 322.34 acres (14,041,075 so. 3. The tract will be limited to the amount of built -upon area indicated in Section 1.7 of this permit, and per the application, the approved plans, calculations and other supporting documentation. 4. Where an individual project within the drainage area is being leased or sold, the stormwater collection system for that project must be located in either dedicated common areas or easements and the final plats will be recorded showing all such required easements. 5. The runoff from all built -upon area within the permitted drainage area of this project must be directed into the permitted stormwater control system. Page 3of9 State Stormwater Management Systems Permit No. SW8 050547Mod. 6. All development projects within the permitted contributing drainage area of the extended dry detention basin BMP must submit plans to the Division for review and approval prior to construction. Depending on ownership, a permit modification may or may not be required. 7. That portion of the existing airport previously included in the drainage area of the permitted dry detention basin that is being removed, must be submitted in a future permit application as a modification or under Session Law 2012-200. 8. The following design criteria have been provided and must be maintained in the "Phase I and II" extended dry detention basin and in the "Overall" extended dry detention basin. Phase I & II Overall a. Drainage Area, acres: Onsite, ft2: Offsite, ft2: b. Total Imperious Surfaces, ft2: C. Design Storm, inches: d. Basin Bottom Elevation, feet: e. TSS removal efficiency: f. Storage Elevation, FMSL: g. Storage Surface Area, ft2: h. Permitted Detention Volume, ft3: i. Seasonal High Water Table, FMSL: j. Controlling Orifice: k. Drawdown Time for 12.0"0 orifice, hours: I. Receiving Stream/River Basin: M. Stream Index Number: n. Classification of Water Body: 287.63 322.38 12, 529,107 14,041, 075 0 0 8,520,835 9,751,185 4,552,087 @1" 4,552,087 @1" 3,968,748 @1.5" 5,199,098 @1.5" 7.0 7.0 50% 50% 13.0 13.3 506,082 602,325 1,058,112 1,274,829 6.0 6.0 12.0" 0 12.0"0 57 64 Smith Creek / Cape Fear 18-74-63 "C; Sw" 9. Tributary projects outside of the drainage area of the 2 "for -credit" grassed swales, but inside the drainage area of the dry detention basin, must provide an additional BMP with a sufficient TSS removal efficiency such that the total TSS removal, including the extended dry detention basin, is at least 85%. 10. FAA requirements prohibit standing water (i.e., permanent pools) and stipulate that the design storm must be fully drained within 48 hours. The approved BMP design includes a low flow device but does not include a permanent pool at the low flow outlet or sediment storage below the low flow outlet. 11. The "Phase I and II" condition will be the "permitted condition" until such time as a project within the drainage area is proposed which shall cause the permitted maximum amounts of drainage area and/or BUA for the Phase I & II condition to be exceeded. Prior to construction of that project, the "Overall" condition must be constructed and will become the permittecondition. II. SCHEDULE OF COMPLIANCE 1. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built -upon surface. The Phase I & II condition 2. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 3. The facilities shall be constructed accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. Page 4 of 9 State Stormwater Management Systems Permit No. SW8 050547Mod. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. A modification may be required for those deviations. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater system functions at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. C. Mowing and revegetation of slopes and the vegetated filter. d. Immediate repair of eroded areas. e. Maintenance of all slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of outlet structure, orifice device, flow spreader, catch basins and piping. g. Access to the outlet structure must be available at all times. 6. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 7. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 8. Access to the pemitted stormwater facilities shall be maintained via appropriate easements (as required) at all times. 9. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to any item shown on the approved plans, including the stormwater management measures, built -upon area, details, etc. b. Redesign or addition to the approved amount of built -upon area or to the drainage area. C. Further subdivision, acquisition, lease or sale of all or part of the project area. d. Construction of any future built -upon area within the drainage area. e. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 10. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide =een of revised plans and certification in writing to the Director that the changes made. III. GENERAL CONDITIONS 1. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal) having jurisdiction. Page 5 of 9 State Stormwater Management Systems Permit No. SW8 050547Mod. 2. This permit is not transferable to any person or entity except after notice to and approval by the Director. At least 60 days prior to a change of ownership, or a name change of the owner or of the project, or a mailing address change, the permittee must submit a completed and signed Name/Ownership Change Form to the Division of Water Quality, accompanied by the documentation listed on the form. The approval of this request will be considered on its merits and may or may not be approved. The project must be inspected by the Division and must be determined to be in compliance with the permit conditions prior to the Division approving the transfer request. 3. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 4. In the event that the facilities fail to perform satisfactorily the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permittee grants DENR Staff permission to enter the property during normal business hours for the purpose of inspecting all components of the permitted stormwater management facility. 6. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. 7. Unless specified elsewhere, permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 8. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. A copy of the approved plans and specifications shall be maintained on file by the Permittee at all times. 9. The permittee shall submit a permit renewal application and fee at least 180 days prior to the expiration date of this permit. Permit modified and reissued this the 29th day of November 2012 NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Division of Water Quality By Authority of the Environmental Management Commission Page 6 of 9 State Stormwater Management Systems Permit No. SW8 050547Mod. Wilmington International Airport Stormwater Permit No. SW8 050547Mod New Hanover County Designer's Certification 1, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/ weekly/ full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is included in the Certification. Noted deviations from approved plans and specification: Signature Registration Number Date SEAL Page 7 of 9 State Stormwater Management Systems' Permit No. SW8 050547Mod. Certification Requirements: .1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built -upon area. .3. All the built -upon area associated with the project is graded such that the runoff drains to the system. 4. All drainage within the permitted contributing drainage area is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. A trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown device is correctly located and sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as pretreatment devices, outlet structure and/or forebay. 15. The required system dimensions are provided per the approved plans. 16. The maximum drainage area and/or built -upon area have not been exceeded for the "Phase I & II" condition. cc: NCDENR-DWQ Regional Office New Hanover County Building Inspections Page 8 of 9 State Stormwater Management Systems Permit No. SW8 050547Mod. The master permit tables for Phase I and II were added to the permit on September 20, 2010, as part of the review for the modification to SW8 060515. Phase III was added on October 26, 2011. A modification to the tables was added on November 27, 2012. Phasing refers to the dry basin, not to the airport BUA. Master Permit No. SW8 050547 Phase I & II Basin Startina New BUA balance = 8,520,835-4,552 087 = 3,968,748 Mod/Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA SW8 050801 General Aviation Apron Expansion 151,589 3,817,159 SW8 060326 Air Wilmington FBO Building 196,725 3,620,434 SW8 060515 Credit Card Parking Lot 225,722 3,394,712 SW8 050547 10/28/2009 ILM Phase I and Phase 11 for gravel roads 15,843 3,378,869 SW8 050547 11/27/2012 Delineate a new overall DA, increase the max BUA allowed. 0 3,378,869 Master Permit No. SW8 050547 Overall Basin Offsite Permit No. Date Issued Offsite Project Name Proposed BUA Remaining BUA i i i I I I Page 9 of 9 DWQ USE ONLY Date Received Fee Paid Zermit Number 10100. -3a 1 _sA DAD Applicable Rules: ❑ Coastal SW -1 5 ❑ Coastal SW - 2008 ❑ Ph II - Post Construction (select all that apply) ❑ Non -Coastal SW- HQW/ORW Waters ❑ Universal Stormwater Management Plan ❑ Other WQ M mt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): Wilmington International Airport 2. Location of Project (street address): 1740 Airport Boulevard City:Wilmington County:New Hanover Zip:28405 3. Directions to project (from nearest major intersection): South of the intersection of Gardner Drive and Airport Blvd at the Wilmington International Airport 4. Latitude:34° 15' 50" N Longitude:770 54' 51" W of the main entrance to the project. II. PERMIT INFORMATION: 1. a. Specify whether project is (check one): ❑New ®Modification b. If this application is being submitted as the result of a modification to an existing permit, list the existing permit numberSW8 050547 , its issue date (if known) and the status of construction: ❑Not Started ❑Partially Completed* ® Completed* *provide a designer's certification 2. Specify the type of project (check one): =- Z(V Z0I I ❑Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application, list the stormwater project number, if assigned, and the previous name of the project, if different than currently proposed, 4. a. Additional Project Requirements (check applicable blanks; information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): ❑CAMA Major Sedimentation/Erosion Control: _ ❑NPDES Industrial Stormwater ❑404/401 Permit: Proposed Impacts ac of Disturbed Area b. If any of these permits have already been acquired please provide the Project Name, Project./Permit Number, issue date and the type of each permit: OCT U .9 Z012 BY: Form SWU-101 Version 07Jun2010 Page 1 of 6 III. CONTACT INFORMATION 1: a. Print Applicant / Signing Official's name and title (specifically the developer, property owner, lessee, designated government official, individual, etc. who owns the Project): Ar)nlicant/OrLranization-New HannvPr C'nnnty Airnnrf Ai,+hnrifix .. Signing Official & b. Contact information for person listed in item 1a above: Street Address:1740 Airport Boulevard City:Wilmingion State:NC Zip:28405 Mailing Address (if applicable): City: State: Zi Phone: 910 ) 341-4333 Fax: (910 ) 341' 5 Emailirosborough@flvilm.com c. Please check the appropriate box. The applicant listed above is: ® The property owner (Skip to Contact Information, item 3a) ❑ Lessee* (Attach a copy of the lease agreement and complete Contact Information, item 2a and 2b below) ❑ Purchaser* (Attach a copy of the pending sales agreement and complete Contact Information, item 2a and 2b below) ❑ Developer* (Complete Contact Information, item 2a and 2b below.) 2. a. Print Property Owner's name and title below, if you are the lessee, purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official & b. Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address (if applicable City: Phone: ( ) Email: State: Zip: _. Fax: ( 1 3. a. (Optional) Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official & Title: b. Contact information for person listed in item 3a above: Mailing Address: City: State: Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits: New Hanover Court Point of Contact:lay Graham Phone #: (910 ) 798-7175 OCTvFil o s zo�z Form SWU-101 Version 07Jun2010 Page 2 of 6 IV. PROJECT INFORMATION 1. In the space provided below, briefly summarize how the stormwater runoff will be treated. The extended dry basin will used to treat stormwater. 2. a. If claiming vested rights, identify the supporting documents provided and the date they were approved: ❑ Approval of a Site Specific Development Plan or PUD Approval Date: ❑ Valid Building Permit Issued Date: ❑ Other: Date: b.If claiming vested rights, identify the regulation(s) the project has been designed in accordance with: ® Coastal SW -1995 ❑ Ph II - Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area: 1620.8 acres 5. Total Coastal Wetlands Area: acres 6. Total Surface Water Area: acres 7. Total Property 2Ara (4) - Total Coastal Wetlands Area (5) - Total Surface Water Area (6) = Total Project Area+: 22• / acres + Total project area shall be calculated to exclude the following the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water (NHM line or Mean High Water (MHW) line, and coastal wetlands landward from the NHW (or MHM line. The resultant project area is used to calculate overall percent built upon area (BUA). Non -coastal wetlands landward of the NHW (or AlW line may be included in the total project area. 8. Project percent of impervious area: (Total Impervious Area / Total Project Area) X 100 = 69.4 % 9. How many drainage areas does the project have?1 (For high density, count 1 for each proposed engineered stormwater BMP. For low density and other projects, use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area Receiving Stream Name Smith Creek _ Stream Class * C,Sw Stream Index Number * see attachment Total Drainage Area (sf) On -site Drainage Area (sf) Off -site Drainage Area (sf) 0 Proposed Impervious Area** s % Impervious Area** total Impervious" Surface Area Drainage Area 1 Drainage Area _ Drainage Area _ Drainage Area On -site Buildings/Lots (sf) -° LOV _ On -site Streets (sf) tea. MUIA On -site Parking (sf) 44La, tv On -site Sidewalks (sf) Other on -site (so r Future (sf) Off -site (so Existing BUA*** (sf) Total (sf): Stream Class and Index Number can be determined at: littp.aortal.itcdenr.org/web/wq&s/csu/classifications Im ervious area is defined as the built upon area including, but not limited to, buildings, road-., p parking areas, sidewalks, gravel areas, etc. OCT 0.9 2012 Form SWU-101 Version 07]un2010 Page 3 of 6 PV. 'Report only that amount of existing BUA that will remain after development. Do not report any existing BUA that is to be removed and which will be replaced by new BUA. 11. How was the off -site impervious area listed above determined? Provide documentation. Tributary area is entirely on -site Proiects in Union County: Contact DWQ Central Ojfce staff to check if the project is located within a Threatened & Endangered Species watershed that may be subject to more stringent stormwater requirements as per NC,4C 02B . 0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance (O&M) forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmj2-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms dots. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http:/ /12ortal.ncdei-Lr.org/web/wq./ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item. All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from ht!2://portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Initials 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions & Protective Covenants A4 Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed, signed and dated) and O&M r�G agreement(s) for each BMP. S 4. Permit application processing fee of $505 payable to NCDENR. (For an Express review, refer to C- http:/ /www.envhel�org/pages/onestol2express.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) 5. A detailed narrative (one to two pages) describing the stormwater treatment/management forC 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the TG. e-- receiving stream drains to class SA waters within 1/2 mile of the site boundary, include the 1/2 mile radius on the map. 7. Sealed, signed and dated calculations. etr- C— 8. Two sets of plans folded to 8.5" x 14" (sealed, signed, & dated), including: a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures, the banks of streams and rivers, the MHW or NHW line of tidal waters, and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures, the banks of streams or rivers, and the MHW (or NHW) of tidal waters. i. Dimensioned property/project boundary with bearings & distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours, proposed contours, spot elevations, finished floor elevations. 1. Details of roads, drainage features, collection systems, and stormwater control measures. m. Wetlands delineated, or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans.'��,%�;�. n. Existing drainage (including off -site), drainage easements, pipe sizes, runoff calculations. o. Drainage areas delineated (included in the main set of plans, not as a separate document). 0 C T 0 9 2012 p. Vegetated buffers (where required). Form SWU-101 Version 07Jun2010 Page 4 of 6 j LAY' . 9. Copy of any applicable soils report with the associated SHWT elevations (Please identify 1 elevations in addition to depths) as well as a map of the boring locations with the existing elevations and boring logs. Include an 8.5"xll" copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs, the report should also include the soil type, expected infiltration rate, and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO: Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed. Deed book: see attached Page No: 11. For corporations and limited liability corporations (LLC): Provide documentation from the NC !ram F+ Secretary of State or other official documentation, which supports the titles and positions held by the persons listed in Contact Information, item la, 2a, and/or 3a per NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State, otherwise the application will be returned. httg://www.secretary.state.nc.us/Corporations/CSearch.asl2x VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions, outparcels, and future development, the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary, a table listing each lot number, lot size, and the allowable built -upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http: / /portal.ncdenr.org/web/wq/ws/su/statesw/forms does. Download the latest versions for each submittal. In the instances where the applicant is different than the property owner, it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s) below, the permit holder(s) certify that the recorded property restrictions and protective covenants for this project, if required, shall include all the items required in the permit and listed on the forms available on the website, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the NC DWQ, and that they will be recorded prior to the sale of any lot. VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm (such as a consulting engineer and/or firm) so that they may provide information on your behalf for this project (such as addressing requests for additional information). Consulting Engineer:Tim Clinkscales Consulting Firm: Paramounte Engineering rr'' � Mailing Address:5911 Oleander Drive CY�j iT&, [ 0 City:Wilrnington Phone: (910 ) 791-6707 Email: State:NC Zip:28403 Fax: (910 ) 791-6760 IX. PROPERTY OWNER AUTHORIZATION (if Contact Information, item 2 has been filled out, complete this section) I, (print or type name of person listed in Contact Information, item 2a) . certify that I own the property identified in this permit application, and thus give permission to (print or type name of person listed in Contact Information, item 1a) with (print or type name of organization listed in Contact Information, item 1a) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal, which indicates the party responsible for the operation and maintenance of the stormwater system. Form SWU-101 Version 07Jun2010 Page 5 of 6 r R-1 C I IVE 03CT 2012 Y': As the legal p.operiy, owner I acknowledge, understand, and agree by my signature below, that if my designated agent (entity listed in Contact Information, item 1) dissolves their company and/or cancels or defaults on their lease agreement, or pending sale, responsibility for compliance with the DWQ Stormwater permit reverts back to me, the property owner. As the property owner, it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days; otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to $25,000 per day, pursuant to NCGS 143-215.6. Signature: Date: I, a Notary Public for the State of County of do hereby certify that personally appeared before me this _ day of and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information, item 1a) Iulie Wilsey certify that the information included on this permit application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of the applicable s mJ:lr ru (u'nder 15A NCAC 2H .1000, SL 2006-246 (Ph. II — Post Construction) or SL 2008-211. Signature: W (� � Date: �� � t � ! I, "RU S� / ► Ls 1f1 S a Notary Public for the State_ of No, -CA res V,, County of ��// rW '�I 1Y �' � ''� � , do hereby certify that �i�.t i i' f't • w i• I Se y personally appeared before me this day of DC41 6t- and ac wledge th due execution of the application for a n� o stormwater permit. Witness my hand and official seal, 1 V A4A4 Z9�bo&B 00 ER C �/MNIINIlO SEAL My commission expires�I OCT 0;9 201Z Form SWU-101 Version 07Jun2010 Page 6 of 6 Permit Name: _5 5�j,,3(e (to be provided by DWQ) -Drainages.-Area Number:_ Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application. Sediment covers the grass at Remove sediment and dispose in an the bottom of the swale. area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. OCT 0 9 2012 'BY: Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 Permit Number: ` (y '? OSU 5¢7 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wilmington International Airport - Pretreatment Swales BMP drainage area number:Pre Treatment Swale #1 Print name:Julie Wilsey Title:Douty Director - New Hanover County Airport Authority Address:1740 Airport Blvd Wilmington NC 28405 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, '_R0 X M 1 F� ayl S , a Notary Public for the State of Ner`l-k lacryI Irv, , County of KkQ h.n0,- , do hereby certify that cl A. personally appeared before me this b day of Oc4b bee , Soo I a- , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, ,�NNIIIIIIINyfff/' ara"c�E M. 41 ,PTAMM ,2 = }mot Z, S` yNoJ13 SEAL My commission expires taliq Form SW401-Grassed Swale O&M-Rev.3 ft"' M f�3a4na OCT 0 9 2012 Page 2 of 2 - - Permit Name: SW2k (to be provided DWQ) •Drainage-Area Number: ;2 Grassed Swale Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the removal efficiency of the BMP. Important maintenance procedures: — The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. — After the first-time fertilization to establish the grass in the swale, fertilizer will not be applied to the grassed swale. The grassed swale will be inspected once a quarter. Records of operation and maintenance will be kept in a known set location and will be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potentialproblem: How I will remediate theproblem: The entire length of the Trash/debris is present. Remove the trash/debris. swale Areas of bare soil and/or Regrade the soil if necessary to erosive gullies have formed. remove the gully, and then re -sod (or plant with other appropriate species) and water until established. Provide lime and a one-time fertilizer application Sediment covers the grass at the bottom of the swale. Remove sediment and dispose in an area that will not impact streams or BMPs. Re -sod if necessary. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. OCT 0 9 2012 Form SW401-Grassed Swale O&M-Rev.3 Page 1 of 2 Permit Number: 5v 10 So S -2 (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Wilmington International Airport - Pretreatment Swales BMP drainage area number:Pre Treatment Swale #2 Print name:Julie Wilsey Title:Depuuty Director - New Hanover County Airport Authority Address:1740 Airport Blvd Wilmington NC 28405 Note: The legally responsible party should not be a homeowners association unless more than 50% of the lots have been sold and a resident of the subdivision has been named the president. I, Tyst W I IJ'tV, , a Notary Public for the State of f 1 dY4) Lra )In&, , County of f4-unDve4 , do hereby certify that J �J.'►,- A. 0 ,15e u personally appeared before me this day of DCio ja e r - , �1 a , and acknowledge the due execution of the forgoing grassed swale maintenance requirements. Witness my hand and official seal, N�WENIINp%VArO". Ap O�• � a �v �rr "EBR��G C� O%•- 11II11I�I - SEAL My commission expires y hn Iig OCT 0 9 Z012 Form SW401-Grassed Swale O&M-Rev.3 Page 2 of 2 Permit Number: (to be provided by DWQ) WDEHR STORMWATER MANAGEMENT PERMIT APPLICATION FORM Y 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must also be filled out, printed and submitted along with all of the required information. L PROJECT INFORMATION Project name Contact name Phone number Date Drainage area number (I. DESIGN INFORMATION Site Characteristics ILM - Business Park Master 5torrnwater Chris Millis, PE 910-791-6707 October 5, 2012 PRE-TREATMENT AREA #1 Iropw a l Drainage area 5,032,157,00 ftz Impervious area 3,270,484.00 fe Percent impervious 65.0% % Design rainfall depth n/a inch Peak Flow Calculations 10-yr storm runoff depth 7.00 in 10-yr storm intensity 2.38 in/hr Post -development 10-yr storm peak flow 184.00 felsec Velocity Maximum non -erosive velocity (peak 10-year storm) 5.00 ft/sec Soil characteristics (enter "x" below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter "x" below) 66tmuda ��rfifli4 `i�ff x Tall fescue Bahiagrass Kentucky bluegrass _ Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Convevance Swale, Seeking Pollutant Credit: Y (Y or N) Maximum velocity for 10-yr storm 1.00 ft/sec OK Side slopes 5.00 :1 OK Swale length 150.00 ft OK NOV 0 2 2012 Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number. (to be provided by DWG) Swale Characteristics Swale Shape: Enter an "x" in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the swale 22.00 ft Width of the top of the swale 152.00 ft Additional Information Is the swale sized for all runoff from ultimate build -out? Y (Y or N) OK Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? Y (Y or N) OK What is the distance from the bottom of the swale to the SHWT? 5.00 ft OK What is the ground level elevation? 24.00 fmsl What is the elevation of the bottom of the swale? 11.00 fmsl What is the SHWT elevation? 6.00 fmsl What is the longitudinal slope of the swale? 0.02 % OK What is the depth of freeboard? 5-06 ft OK NOV p 2 2Oi2 Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 2 of 2 Permit No: (to be assigned by DWQ) !!X REQUIRE© ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Initials Pagel Plan Sheet No. C w�1n 1. Plans (1" = 50' or larger) of the entire site showing: Design at ultimate build -out, Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Swale dimensions (width, length, depth), - Maintenance access, - Proposed drainage easement and public right of way (ROW), - Grass species, and - Boundaries of drainage easement. �— 2. Plan details (1" = 50' or larger) for the grassed swale showing: - Swale dimensions (width, length, depth), - Maintenance access, Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, - Grass species, - Off -site drainage (if applicable),and - Boundaries of drainage easement. rw vy\ C— �0 3. Section view of the grassed swale (1" = 20' or larger) showing: Side slopes, Longitudinal slope, Freeboard - Swale dimensions, and - SHWT level(s) Chi ( 4. Supporting calculations (including maximum velocity calculations for applicable storms) yttiry' 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. N� 6. A copy of the deed restrictions (if required). OCT u 9 2012 SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 Permit Number: ?0M54% (to be provided by DWQ) MCDENR Y STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM GRASSED SWALE SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must also be filled out, printed and submitted along with all of the required information. 1. PROJECT INFORMATION Project name Contact name Phone number Date Drainage area number IL DESIGN INFORMATION Site Characteristics ILM - Business Park Master Stormwater Chris Millis, PE 910-791-6707 October 5, 2012 PRE-TREATMENT AREA #2 Drainage area 5,095,6480 fe Impervious area 3;833,280.00 fe Percent impervious 75.2% % Design rainfall depth n/a inch Peak Flow Calculations 10-yr storm runoff depth 7.00 in 10-yr storm intensity 1.96 in/hr Post -development 10-yr storm peak flow 17200 fe/sec Velocity Maximum non -erosive velocity (peak 10-year storm) 5.00 ft/sec Soil characteristics (enter 'Y' below) Sand/silt (easily erodible) X Clay mix (erosion resistant) Grass Type (enter Y below) Bermuda {� W""Af x Tall fescue Bahiagrass Kentucky bluegrass Grass -legume mixture Swale type: Fill out one of the options below: Option 1: Curb Outlet Swale: N (Y or N) Maximum velocity Side slopes :1 Swale length ft Option 2: Convevance Swale, Seekinq Pollutant Credit: Y (Y or N) Maximum velocity for 10-yr storm 0,98 ft/sec OK Side slopes 500 :1 OK Swale length 150.00 ft OK JECEIVE� NOV 0 2 2012 HY: _ Form SW401-Grassed Swale-Rev.3 Parts I and II. Project Design Summary, Page 1 of 2 Permit Number.5(A) t?0-50 57 (to be provided by DWQ) Smie` Characteristics Swale Shape: Enter an Y in the appropriate cell below: Trapezoidal Parabolic V-shaped Width of the bottom of the swale 2200.tt Width of the top of the Swale 152.00 ft Additional Information Is the swale sized for all runoff from ultimate build -out? Y (Y or N) OK Is the BMP located in a proposed drainage easement with a recorded access easement to a public Right of Way (ROW)? Y (Y or N) OK What is the distance from the bottom of the swale to the SHWT? 5.00 ft OK What is the ground level elevation? 24 00 fmsl What is the elevation of the bottom of the swale? 11.00 fmsl What is the SHWT elevation? 6.00 fmsf What is the longitudinal slope of the swale? 0.02 % OK What is the depth of freeboard? 5 00 ft OK NOV 0 2 202 Form SW401-Grassed Swale-Rev.3 Parts i and II. Project Design Summary, Page 2 of 2 Permit No: _ (to be assigned by DWQ) 14111. gQUIRED ITEMS CHECKLIST Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification, Initials Pagel Plan Sheet No. (ftm C—�M 0 1. Plans (1" = 50' or larger) of the entire site showing: Design at ultimate build -out, - Off -site drainage (if applicable), - Delineated drainage basins (include Rational C coefficient per basin), - Swale dimensions (width, length, depth), - Maintenance access, Proposed drainage easement and public right of way (ROW), - Grass species, and - Boundaries of drainage easement. 2. Plan details (1" = 50' or larger) for the grassed swale showing: Swale dimensions (width, length, depth), Maintenance access, Proposed drainage easement and public right of way (ROW), Design at ultimate build -out, Grass species, - Off -site drainage (if applicable),and Boundaries of drainage easement. 3. Section view of the grassed swale (1" = 20' or larger) showing: Side slopes, - Longitudinal slope, Freeboard - Swale dimensions, and - SHWT level(s) _ 4. Supporting calculations (including maximum velocity calculations for applicable storms) 5. A copy of the signed and notarized operation and maintenance (0&M) agreement. �wr/1 6. A copy of the deed restrictions (if required) OCT U 9 2012 SW401-Grassed Swale-Rev.3 Part III, Page 1 of 1 Permit No. (tent he provided by DWfy AWSTORMWATER MANAGEMENT PERMIT APPLICATION FORM WDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Wilmington International Airport Contact person Jon W Rosborough, Airport Director Phone number 910-431-4333 ext 1001 Data 11/29/2012 Drainage area number 1(Phase I & II Condition) II. DESIGN INFORMATION Site Characteristics Drainage area 12,529,106.00 fe Impervious area 8,520,834.00 fe % Impervious 0.68 Design rainfall depth 1.23 in 4,552,087 (111 3,968,747 (1-5") Peak Flow Calculations 1-yr, 24-hr rainfall depth 3.83 in Rational C, pre -development 72.00 (unitless) Rational C, post -development 88.00 (unitless) Rainfall intensity: 1-yr, 24-hr storm 0.76 in/hr Pre -development 1-yr, 24-hr peak flow �- 75.00 ielsec Post -development 1-yr, 24-hr peak flow 173.00 Osec Pre/Post 1-yr, 24-hr peak control 98.00 fOlsec Storage Volume: Non -SA Waters Minimum required volume 1,041,133.00 ft Provided volume 1,058,l i2.00 fe OK Sediment storage volume provided 206,459.00 fe Increase to at least 25% of volume provided Storage Volume: SA Waters 1.5" runoff volume nla Pre -development 1-yr, 24-hr runoff volume _ nla _fl3 fl3 Post -development 1-yr, 24-hr runoff volume nla fe Minimum required volume #VALUE! fe Provided volume We fl3 #VALUE! Sediment storage volume provided nla ft #VALUE! Basin Design Parameters Drawdown time 2.37 days OK SHWT elevation 6.00 fmsl Basin bottom elevation 7.00 fmsi Raise basin bottom, Must be at least 2-ft above SHWT Storage elevation 13.00 fmsl Basin side slopes 4.0 :1 OK Top elevation 20.00 fmsl Too deep, maximum depth of 10-feet allowed Freeboard provided 7.00 ft OK Basin Bottom Dimensions Basin length 1,350.00 ft RECEIVED Basin width 450.00 ft Length to width ratio 3.00 :1 OK N O V 2 9 2012 BY: Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & It. Design Summary, Page 1 of 2 Additional Information Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Does basin capture all runoff at ultimate build -out? Is a sediment depth indicator included? Does the basin include'a drain? 291.49 ac-in Forebay Is required y (Y or N) y (Y or N) OK y (Y or N) OK y (Y or N) OK y (Y or N) OK Permit No. (to be provided by DWQ) Additional Information per comment letter dated October 6, 2009: a. Orifice Size: 1211 b. Orifice Invert Elevation: 7.00' c. Orifice Flowrate, cfs: 5.12 cfs d. Sediment Cleanout Elevation: Forebay = 11.00', Main Basin = 10.63' e. Average Head: 1.83' See supporting calculations pages 4 and 5 for detailed evaluation for c,d,& e. gEC IVED Nov 2 9 2012 BY: Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 BMP element: Potential problem How I will remediate the roblem: The embankment Shrubs or trees have started Remove shrubs or trees to grow on the embankment. immediately, Grass cover is unhealthy or Restore the health of the grass cover eroding. - consult a professional if necessary, Signs of seepage on the Consult a professional. downstream face. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off -site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the NC Division of Water damage have occurred at the Quality 401 Oversight Unit at 919- outlet. 733-1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the basin depth reads 9.37 feet in the main pond, the sediment shall be removed. When the basin depth reads 9.00 feet in the forebay, the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Temporary Pool Elevation 13.00 Sediment Removal E 11.00 T por Pool Lem-------------olume Sediment Removal Elevation 10.63 Bottom Elevati ..25 25%------------------------------------------- Sediment Bottom Elevation 7.00 Storage FOREBAY MAIN POM RECEIVED de led-evaluabon. OCT 2 2 2009 PROa # SGv 2OSG 5 ¢i Form SW401-Dry Detention O&M-Rev.3 Page 3 of 4 JCI` L �Y �l1UJ _ Permit No. 0 So wwl� (to be provided by DWQ) fif. rt Rus a ITWS CF FcKLISr Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. If the applicant has designated an agent, the agent may initial below. If a requirement has not been met, attach justification. Nvap—P2 -9 Pagel Plan Sheet No. L-1, P-2 Exhibits F M M W SW Narrative & Computation V Plans (1" - 50' or larger) of the entire site showing: - Design at ultimate build -out, - Off -site drainage (if applicable), Delineated drainage basins (include Rational C coefficient per basin), Basin dimensions, Pretreatment system, Maintenance access, - Proposed drainage easement and public right of way (ROW), - Overflow device, and - Boundaries of drainage easement. 2. Plan details (1" = 30' or larger) for the bioretention cell showing: - Basin dimensions - Pretreatment system, Maintenance access, - Outlet structure, Overflow device, Flow distribution detail for basin inflow, and Vegetation specifications. 3. Section view of the basin (1" = 20, or larger) showing: - Side slopes, 3:1 or lower, - Pretreatment and treatment areas, and - Inlet and outlet structures. 6. A construction sequence that shows how the dry detention basin will be protected from sediment until the entire drainage area is stabilized. 7. The supporting calculations. 8. A copy of the signed and notarized operation and maintenance (0&M) agreement. 9. A copy of the deed restrictions (if required). 10. A soils report that is based upon an actual field investigation, soil borings, and infiltration tests. County soil maps are not an acceptable source of soils information. Existing SW8 050547 information Form SW401-Dry Extended Detention Basin-Rev.3 Part III. Required Items Checklist, Page 1 of 1 Permit No. (to be provided by DW6y MAA �'�WAtF9 STORMWATER MANAGEMENT PERMIT APPLICATION FORM HCDENR 401 CERTIFICATION APPLICATION FORM DRY EXTENDED DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checklist (Part Ill) must be printed, filled out and submitted along with all the required information. I. PROJECT INFORMATION Project name Wilmington International Airport Stormwater Management - Phase III Contact person Tim Clinkscales Phone number 910-791-6707 Date 11/8/2012 Drainage area number 1CQAAXZ70AJ 111. DESIGN INFORMATION Site Characteristics Drainage area 14,041,075.00 fe Impervious area 9,751,185.00 fe % Impervious 0.69 Design rainfall depth 1.25 in Peak Flow Calule RECEIVED 1-yr, 24-hr rainfall ll depth depth 3.83 in Rational C, pre -development 72.00 �(unitiess) Rational C, post -development _ 88.00 (unitless) N O V 0 9 2012 Rainfall intensity: 1 -yr, 24-hr storm 0.76 irdhr Pre -development 1-yr, 24-hr peak flow 75.00 le/sec BY: Post -development 1-yr, 24-hr peak flow 173.00 �fe/sec Pre/Post 1-yr, 24-hr peak control 98.00 fO/sec Storage Volume: Non -SA Waters Minimum required volume 999,466.00 fO Provided volume 1,274,829.05 ft' OK Sediment storage volume provided 241,135.00 f? Increase to at least 25% of volume provided Storage Volume: SA Waters 1.5" runoff volume n/a ft3 Pre -development 1-yr, 24-hr runoff volume nla f? Post -development 1-yr, 24-hr runoff volume n/a le Minimum required volume #VALUE! fe Provided volume n/a fe #VALUE! Sediment storage volume provided n/a to #VALUE! Basin Design Parameters Drawdown time 2.65 _days OK SHWT elevation 6.00 fmsl Basin bottom elevation 7.00 fmsl Raise basin bottom, Must be at least 2-ft above SHWT Storage elevation 13.30 fmsl Basin side slopes 4.0 • :1 OK Top elevation 20.00 fmsl Too deep, maximum depth of 10-feet allowed Freeboard provided 6.70 ft OK Basin Bottom Dimensions Basin length 2,125.00 ft Basin width 450.00 ft Length to width ratio 4.00 :1 OK Forth SW401-Dry Extended Detention Basin-Rev.3 Parts I. & It. Design Summary, Page 1 of 2 Additional Information Total runoff volume captured by basin Forebay provided Is basin in a recorded drainage easement? Dt;a basin capture all runoff at ultimate build -out? Is a sediment deptn indicator included? Does the basin include a drain? 407.00 ac-in Forebay is required y (Y or N) y (Y or N) OK y (Y or N) OK y (Y or N) OK y (Y or N) OK Permit (to be provided by DWfy RECEIVED NOV 0 9 2012 BY: Form SW401-Dry Extended Detention Basin-Rev.3 Parts I. & II. Design Summary, Page 2 of 2 MEMORY TRANSMISSION REPORT TIME :11-30-'12 09:41 FAX N0.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 816 DATE : 11.30 09:39 TO : 9 93414365 DOCUMENT PAGES 10 START TIME 11.30 09:39 END TIME 11.30 09:41 PAGES SENT 10 STATUS OK *** SUCCESSFUL TX NOTICE *** Sfata a! North Carolinas xpepwwti =t of Eavlroaaieat and Nwtarwi lkase+Yra:es Waiaai-60- 8adbiaat OQip y Sa..es Govaraor FAX COVER MR100=1w ,v N Se W e"ry );?sate: �230_ Pages O rC_ To: : f From: JO Crimean Co: Hi �Fs d o Phone: (9101 796-7336_ 1=0: ��c/ i G...v! i a a-� .../ �q TE.e�'�✓ A- �i a-✓-¢L_il�® .� _.` 127 C:a A1na� Y7rly Pbccansion. W31minWft� NC 2840S - (910) 70 7213 + w lequai Opporw»icy A nrwu cj Ac*jv p? p3oyer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX COVER SHEET Dee Freeman, Secretary Date: No. Pages (excl. cover): Zv -;4�- To: O� �D/S �o Z/ From: Jo Casmer Co: � �i �'�Gto fy jo i / Phone: (910) 796-7336 Fax: 2W ���-� / Fax: (910) 350-2004 Re: GT/ i �il/7i �a ,�i //J TES-�+�io .✓� i/Qd .� 74 S�v 8� DsDs 17 r �l/"/ Z- jj7®'-/'--fi�-! /%osd /SS vt-:Y,— .14lt � G� 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer MEMORY TRANSMISSION REPORT TIME :11-30-'12 09:44 FAX NO.1 :910-350-2004 NAME :DENR Wilmington FILE NO. 817 DATE : 11.30 09:42 TO : F 97916760 DOCUMENT PAGES 10 START TIME 11.30 09:42 END TIME : 11.30 09:44 PAGES SENT 10 STATUS OK *** SUCCESSFUL TX NOTICE *** sea** orlvor[6 Carannm Depart—..* o!maviroa®ens Mae Wataral Raroorcas Wilmington Ramloaal OMce aa.+s�{y Eevirs Pests. Governor FAX CO'VwNt Des Fnse> &—m. Mmeretary 14o. Pages (excel. cover): Plwne: [91 O) 796-7336 17 327 Cardinal Urlvo Parteesto:; Wllrsrfsl¢ton, NC 28405 • (910) 796-7215 -.An 3 que1 Oppnm W /tiftirme2lve Action Srnpinyer State of North Carolina Department of Environment and Natural Resources Wilmington Regional Office Beverly Eaves Perdue, Governor FAX C3VER SEEET Dee Freeman, Secretary Date: To: Co: Fax: No. Pages (excl. cover): From: Jo Casmer Phone: (910) 796-7336 Fax: (910) 350-2004 Re: Gam/ f /�!i`.� >� _/� �' iJ .4 ��"e v •;X e-- , ate, '41Z �i�Pr7--5.0-;X7 7-'— . %pal '74- 127 Cardinal Drive Extension, Wilmington, NC 28405 • (910) 796-7215 • An Equal Opportunity Affirmative Action Employer Lewis,Undla From: Lewis, Linda Sent: Wednesday, November 28, 2012 1:19 PM To: 'Tim Clinkscales' Subject: RE: Airport SW8 050547 OK, let's start at the beginning. Per this narrative and the 2009 permit, the "first phase" of the dry basin was sized for an existing drainage area of 150 acres containing BUA of 4,247,100 @a 1" design storm. The "second phase" of the dry basin was sized for a proposed additional drainage area of 114 acres containing 4,220,964 of BUA @a 1.5" design storm. Overall, the 2009 Phase I & II condition had a DA of 264 acres and a BUA of 8,468,064 sf. The storage elevation was 13.0 and the provided volume was 1,058,112 cf. The 2011 permit proposed to add Phase III of the basin to accommodate an additional 57.35 acres of drainage area and a BUA of 1,479,341 sf. The new overall basin with the Phase III expansion, has a total DA of 321.35 acres (150 + 114 + 57.35) and a BUA of 9,947,406. The built -out condition of the basin (the overall condition) has a storage elevation of 13.3 and a provided volume of 1,274,829 cf. At this point, it is now my understanding that the existing dry basin is currently in the 2009 permitted condition, i.e., the 2011 permit modifications to increase the storage elevation and provide additional surface area have NOT been implemented. Therefore, the 2012 DA and BUA changes have to fit within the 2009 parameter of a maximum volume of 1,058,112 cf. I think I have it now. If I understand all this correctly, you have removed some DA within the existing airport that was not required to be treated, and added DA from another location where development is more likely to occur. This added DA is being routed to the proposed pretreatment swales. I finally understand how the BUA was split up for the different design storms to arrive at the Ph I & 11 minimum volume - 4,552,087 sf is at 1", and 3,968,747 is at 1.5". Based on your Oct 9, 2012 calculations, the total minimum volume should be 1,040,576 (561032 Ph 1 + 480,101 Ph 2) for the new Ph I & II DA / BUA condition. You got 1,045,980 from your 11/27/12 calculation, but it appears that the reported sediment storage required volume of 194,373 is too high. The Oct. 9, 2012 calcs have a required sediment storage volume of 189,525. In any case, the main point is that this is still below the 1,058,112 permitted in 2009 at elevation 13.0. What I still need to do is to modify the existing 2009 supplement to reflect the new Ph I & 11 basin conditions: DA = 12,529,107 sf BUA = 8,520,835 sf Percent impervious = 68% Required minimum volume = 1,040,576 cf Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Lewis,Lindla From: Lewis,Linda Sent: Tuesday, November 27, 2012 4:36 PM To: 'Tim Clinkscales' Subject: Airport SW8 050547 Tim - The drainage area and BUA for the "Phase I and II" extended dry detention basin have apparently increased since the 2009 permit condition. I had planned to just use the supplement form from the 2009 permit to reflect the "Phase I and II" condition, but the DA and BUA on that supplement don't match what you put down on the application in the Phase I and II column. The larger volume requirement based on the increased DA and BUA have left a shortage in the provided volume for the 2009 permitted condition. Your submitted calculations are geared toward the final built -out condition of 9,751,185 sf of BUA in a 14,041,075 sf DA. The 2009 permit had a Phase I and II condition DA of 11,499,840 sf and a BUA of 8,468,064 sf. This required a storage volume of 1,047,278 cf. The volume provided in the permitted basin was. 1,058,110 cf. Your 2012 proposed Phase I and II condition is now a DA of 12,529,107 sf and a BUA of 8,520,835 sf, which requires a storage volume of 1,062,740 cf. Obviously, the 1,058,110 cf isn't enough for the new condition. So, we either go back to the 2009 permitted DA and BUA for the Phase I and II condition or I need more calculations and another supplement to reflect the proposed Phase I and II condition. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. Lewis,Unda From: Lewis,Linda Sent: Friday, November 09, 2012 9:39 AM To: 'Tim Clinkscales' Cc: 'Julie Wilsey; Russell, Janet Subject: RE: Dry Detention Supplement SW8 050547 Tim: The provided volume, sediment storage volume and storage elevations listed on the new dry detention supplement you submitted are not what was previously permitted. Per the October, 2Q11 permit, the provided volume is 1,274,829 cf, the sediment storage volume is 241,135 cf, and the temporary storage elevation is 13.3 fmsl. It was my understanding from our express meeting, that you were not changing anything about the previously permitted dry basin except the DA and the BUA. The calculations you provided were intended only to prove that the drainage area and built -upon area changes had no effect on the permitted basin, and did not require the basin to be enlarged. If that is still the case, then the only things that will change on the supplement should be the drainage area, the built -upon area and the minimum required volume. Everything else should be the same. If you are now applying to change the previously permitted basin criteria (perhaps to agree with the as -built condition?) then you will need to make that clear in the application and I will need 2 sets of updated plans (as - built survey of the basin) and new outlet details of the dry basin showing the proposed change to the storage elevation from 13.3 to 13.23. Additionally, if you want to change the permitted basin criteria, then you will need to address the difference between the 13.3 "Temporary Storage Elevation" and the 13.5 "Provided Storage Elevation" as noted in your October 9, 2012 calculations. If the required minimum storage volume is attained at 13.23 or 13.3, but the elevation of the outlet is placed at 13.5, then your temporary storage elevation is indeed 13.5, and not 13.23 or 13.3. Please clarify. According to the current approved dry detention plans and details, the storage elevation is 13.3, not 13.23 or 13.5. Please advise. The 30 day express review window for this project closes today. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Tim Ciinkscales [mailto:tclinkscalesOparamounte-eng com] Sent: Thursday, November 08, 2012 10:15 PM To: Lewis,Linda Subject: RE: Airport SW8 050547 Linda, Enclosed is the updated dry basin supplement Let me know of anything else you need Tim Tim Clinkscales PE, PLS DAR ro rt ro¢ e rs s ro x� INC PARAMOUNTE ENGINEERING, INC 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 OFFICE: (910) 791-6707 CELL: (910) 520-1991 FAX: (910) 791-6760 From: Lewis,Linda [mailto:linda.lewis(a ncdenr.govl Sent: Thursday, November 08, 2012 10:00 AM To: Tim Clinkscales Subject: Airport SW8 050547 Tim- after receiving the new DA columns split out by Phase, I noticed that the overall DA to the dry basin is increasing and the amount of BUA is decreasing. The calculations show that the existing basin can handle this change, but the previously approved dry detention supplement form was not updated to reflect these changes. I can't use the old supplement because it no longer reflects the permitted condition. Please provide a new, updated dry detention supplement showing the changes in DA and BUA. Thanks. Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 910-796-7215 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. PARAMOUNT E N G I N E E F2 I N G, I N C. 9 9 9 1 1 OLEANDER DRIVE, SUITE 2 0 1 W I L M I N G T O N, N C 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) LETTER OF TRANSMITTAL To: NCDENR-Land Quality Section Date 1 11/2/12 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Wilmington International Airport Stormwater MOD & Pre -Treatment Attn: Project No. I 12212.PE e are sen&nd ® Originals ® Prints ❑ Shop Drawings ❑ Calculations ❑ Correspondence ® Plans ❑ Specifications ® Other as listed below he followin items Quantity Date Dwg. No. Description 1 Response Letter 1 Updated SW401 Forms 1 Updated SWU-101 Attachment 1 Additional Calculations Issue Status. -I ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks ction Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Tim Clinkscales )r rI PARAMOUNTE E N G I N E E R 1 N G October 17, 2012 Linda Lewis NC Division of Water Quality 127 Cardinal Drive Ext. Wilmington, NC 28405 RE: Request for Additional Information — Express Review Stormwater Project No. SWS 050547 Wilmington International Airport New Hanover County Dear Ms. Lewis: N C. NOV 0 2 2012 BY: On behalf of Wilmington International Airport, we are submitting a response to your comments received on October 170, 2012. The please find your comments listed below with our response provided in bold. The "for credit" grassed swales must meet two separate velocity criteria: 1) provide a non - erosive velocity for the peak flow of the 10 year stone; and, 2) provide a maximum velocity of 1 fps for the 10 year 24 hour stone. The calculations appear to provide only the 10 year peak flow instead of the 10 year 24 hour storm to demonstrate compliance with the 1 fps velocity limit. Essentially, you need to provide two velocity calculations, one based on the 10 year peak flow (to demonstrate nonerosive flow for the chosen swale lining and slope) and one based on the less intense 10 year 24 hour storm (to demonstrate that the velocity is no more than 1 fps.) We have performed the velocity calculation within the swales by first calculating the flow rate (Q) at different storm events. Flow rate (Q) was achieved by using the Rational Method to determine storm water runoff (Q=CIA). This method is able to give the designer flow rates at different design storms (1 yr., 10 yr. , 25 yr., and so on). The flow rates per design storm are achieved through the corresponding intensity rainfall rate ("I"). "I" is achieved through IDF curves (Intensity Duration Factor) where the intensity varies as the time of concentration ("Tc") varies. Therefore, the Rational Method gives a Peak Flow Rate for the Storm Intensity implemented. Now the language 1110 year 24 hour storm" reflects a different method than the Rational to estimate Stormwater Runoff called the SCS Method (NRCS Method). The SCS Method uses Rainfall Depth (P) instead of Rainfall Intensity (1) in the input to achieve volume and peak flow rate. The SCS Method calculates a peak flow rate along a bell shaped curve (curves differ by Types and Shape Factors); this method is not a simple calculation. We did not use the SCS Method to calculate Flow rate (Q) but rather the Rational Method. In short, there is only one velocity to be calculated (peak velocity), the storm duration ("10 yr. 24 hour") is rhetoric differentiating between different methods. Please find the Peak Velocity calculation submitted 5 9 1 1 ❑ L E A N ❑ E R ❑ R I V E, S T E. 2 ❑ 1, WILMIN G T❑ N. N ❑ 2 E 4 ❑ 3 P H: 1 9 1 0 1 7 9 1 - 6 7 ❑ 7 F A X: ( 9 1 ❑ ) 7 9 1 - 6 7 6 ❑ as meeting the requirement to provide peak velocity calculations for the 10 year storm event (10 year 24 hour storm event language would be applicable if we used the SCS Method). Using the rational method for the peak intensity for the 10-yr — 24 hour storm with an intensity of 0.301 in/hr per NOAA website For Swale #1, a C-value of 0.67 and area of 115.52, the Q(peak) = 23.3 cfs For Swale #2, a C-value of 0.75 and area of 116.98, the Q(peak) = 26.4 cfs See calculations for Velocity calculations 2. Please explain in detail how you derived the values for time of concentration used in the swale calculations. Please document any assumptions regarding the height of the most remote point in the watershed, the length of the flow path and how much of that flow path will be piped or channelized. These assumptions should necessarily be based on the "worst -case" built -out scenario. In order to give the "worst -case" built -out scenario would assume that the entire system is built via pipe networks. Therefore it is required for the Designer to estimate length of the storm drain network and the velocity within the pipes in order to arrive at a time to arrive downstream from the most remote location. Please see the calculation below which was performed in -line to the hydraulic analysis performed by Talbert & Bright while designing the downstream Detention Basin. The Tc used by Talbert & Bright for the built -out basin was 180 minutes, which is greater than either scenarios employed by Paramounte; therefore our calculation will give NCDENR a higher velocity due to a shorter Tc. Tc. Swale 1 (Pipe Flow) Hydraulic Length= 4800 if Pipe Slope= 0.002 ft/ft n = 0.013 (rcp) Diameter-- 4 ft (avg. size Win basin) Velocity-- 0.97 fps T= 82 min. Tc. Swale 2 (Pipe Flow) Hydraulic Length= 7300 If Pipe Slope= 0.002 ft/ft n = 0.013 (rcp) Diameter-- 5 ft (avg. size Win basin) Velocity= 1.13 fps T= 108 min. 2 2012 Nov o 13Y: The velocity in the pipe is achieved using the empirical Manning's Equation which employs the pipe diameter, pipe slope, and Manning's "n". Note that we 5 9 1 1 ❑ L E A N D E R D R! V E, 5 T E. 2 ❑ 1. W 1 L M I N G T❑ N. N C 2 2 4 ❑ 3 P H: ( 9 1 0) 7 9 1 - 6 7❑ 7 F A X: ( 9 1 0) 7 9 1 - G 7 G❑ could add overland -flow to the pipe system to the Tc but if the velocity works for the lesser Tc then it will work as more Time is added on. 3. Please provide documentation of the 0.042 Mannings "n" value used in the swale calculations. A value of 0.042 seems high when compared to the tables published in V.T. Chow's Open Channel Hydraulics, 1959, McGraw-Hill, and to the procedures for determining channel roughness coefficients described in the Erosion and Sediment Control Planning and Design Manual (ESCPDM). The V.T Chow tables provide Manning's n-values for a wide range of channel types. The n-value for an excavated, straight, uniform, earthen channel with short grass and a few weeds has a range of 0.022 — 0.033. The Division uses a "normal" value of .027 which is supported by the procedures described in the ESCPDM. Based on the Division's value, the resulting velocity in both swales is >1 fps, but is less than the maximum permissible velocity of 5 fps for a grass -lined swale. However, this velocity calculation is not based on the 10 year 24 hour storm, which will have a smaller intensity which will in all likelihood, reduce the velocity below 1 fps. In effort to satisfy NCDENR requirements and also New Hanover County Stormwater Requirements to be submitted and approved in the future, we used chart (Figure 60-4) within Section 60 — Open Channel Design Procedures with -in the New Hanover County Storm Water Design Manual (See attached). As you can see, we used "Curve D" to be in line with the O&M agreement. With a product of Velocity and Hydraulic Radius, we arrived at a Manning's n factor of 0.042 for vegetative retardance. 4. Bermuda is specified as the permanent grass type on the grassed swale supplement forms submitted with the application, however, centipede is specified on the plans. Centipede takes several years to establish. What sort of temporary liner will be used in the meantime to prevent erosion? If the swales will be seeded and not sodded, please provide additional swale calculations using the peak flow from a 10 year storm and a Mannings "n" value for an excavated, straight, uniform, earthen channel, recently completed (0.016 — 0.02) to determine if a temporary liner is needed to prevent erosion. • The grass on the supplement has been updated to centipede type grass, since not a choice, it is marked out on the supplement form. In addition, calculations have been provided that velocity for the earthen channel are below the threshold for lining being required 5. The application erroneously indicates that the last permit issued for this project is dated October 28, 2009. The current in -effect permit was issued on October 26, 2011. If the information you have provided in the most recent modified application is based on making changes to the information in the 2009 permit, please adjust accordingly in light of the 2011 permit. The areas in the permit application were based on the October 2Q10h ► nELUI and are correct S 9 1 1 ❑ L E A N D E R D R 1 V E, T E. 2 ❑ 1, W 1 L M 1 N G T ❑ N, N C 2 8 4 ❑ 3 P H : f 9 1 0 1 7 9 1 - 6 7 n 7 F A X: [9 1 171 1 79 1 - 6 7 6 ❑ 6. Due to the design storm differences, and to be consistent with how the 2011 permit application was completed, and to cut down on the confusion, please list the proposed drainage areas and built -upon areas for Phases 1, 11 and III in separate columns on the application. • The SWU-101 attachment has been updated to reflect such 7. Runways, taxiways, and any other areas that provide for overland stormwater flow, promote infiltration and treatment of stormwater into grassed buffers, shoulders, and grass swales are deemed permitted pursuant to the State's post -construction stormwater requirements. Please request DWQ concurrence that those areas of the airport that are to be "deemed permitted" meet the Session Law requirements. Although the law did not mandate that an airport submit anything or document compliance with the Session Law, it is my understanding that not doing so could subject the Airport to civil penalties (NOV) and/or leave them open to third party The burden of proof is on the airport, so having a concurrence letter from the state would go a long way to making a case that the airport is indeed in compliance with the Session Law. In order to provide this concurrence, please delineate and identify the areas which are to be "deemed permitted" under the Airport Session Law and demonstrate the required overland sheet flow by providing a grading plan. Otherwise, an inspection of that area will be conducted to determine compliance with the Session Law requirements prior to approving the requested permit modification. While SB 229 was passed in August 2012, the actual guidance for storm water on airports and Best Management Practices (Chapter 13) is out for public comment until December 2, 2012. Overland flow (Section 13.7) is a component of the manual, and we believe it is too early to be requesting concurrence for airport areas to be "deemed permitted" under the new law. Since this permit modification is for a landside project, and we are using existing NCDENR BMPs, we defer the "deemed permitted" issue until the Airport BMP manual has completed the review period and any subsequent revisions. (comment from Airport Authority). Feel free to contact me directly by phone if you have any further questions or concerns. Sincerely, Tim Clinkscales, PE, PLS Paramounte Engineering, Inc. NOV 0 2 2012 5 9 1 1 ❑ L E A ,J D E R D R I V E T E, 2 ❑ 1, W I L M I N G T ❑ N N C 2 H 4 ❑ 3 P H: ! 9 1 ❑) 7 9 1 - 6 ❑ 7 F A X: (9 1 U) 7 9 1 - 6 7 6❑ PRE-TREATMENT SWALE DESIGN/MODIFICATION PER SL 2012-200 NEW HANOVER COUNTY, NORTH CAROLINA STORMWATER NARRATIVE Prepared for: Wilmington International Airport 1740 Airport Blvd. Wilmington, NC 28405 Prepared by: -- - -- - - _ Pao 's 4 PARAMOUNTE rNOV EC0 2 2012EI VED E N C I N E E R I N G. 1 N C 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 BY: Project #12212.PE s i October 2012 S r ; LU �jy �NG I N��•'•5G4 OCT 0 9 2012 PRE-TREATMENT SWALE DESIGN NEW HANOVER COUNTY, NORTH CAROLINA Project #12212.PE Table of Contents Design Narrative Soils Map USGS Map Stormwater Calculations Dry Basin Calculations OCT 0 9 2012 PRE-TREATMENT SWALE DESIGN NEW HANOVER COUNTY, NORTH CAROLINA Project #12212.PE DESIGN NARRATIVE The Wilmington International Airport proposes to permit a Pre -Treatment device to serve a portion of the existing Dry Basin drainage area (SW8 050547). It is proposed to utilize two grassed swales per DWQ Pre -Treatment requirements (requirements per DWQ Ch. 14 — Grassed Swale downloaded 08/17/12) for a Pollutant Removal credit of 35% TSS. The proposed Pre -Treatment Swales will drain to a currently permitted Dry Basin (SW8 050547) which in turn drains to an unnamed tributary of Smith Creek (C; Sw) [18-74-631 within the Cape Fear River Basin. According to the NRCS Soil Survey of New Hanover County the majority of the soil across the drainage area consists of Leon sand (Le) and Seagate fine sand (Se). The drainage area currently consists of a majority of grassed area and a small amount of existing impervious. In addition to the permitting of pre-treatment swales, the existing permit is being modified based on SL 2012-200 that was signed in August for airport facilities. The modification will remove areas that are considered airside activities to the Wilmington International Airport and do not naturally drain to the constructed basin. a permit modification depicts the area the currently constructed dry basin can handle before the Phase III expansion is required. The area was determined as shown on the design sheets and calculations that follow. The limiting factor in determining the area the basin can hold before the Phase III construction is required is the volume of storage required. PEI has determined the amount of drainage area with corresponding impervious area that equals the previously permitted volume of storage for the combination of the Phase I and II permit modifications. For this volume, areas that were permitted in the Phase III expansion can be developed before the threshold of storage volume is reached. Because of this, the design storm of 1.5" was used for the Phase III areas. For this case, the 11.4 acres of wetlands in the Phase II section were calculated to 0% impervious unlike the 85% in the past permits. Also the area of the pretreatment swales were calculated as 0% impervious unlike the 65% in the past permits PEI also checked the total volume of storage required for the entire basin including the Phase III expansion and these calculations are shown as well. To match the storage volumes including the Phase III expansion, a storage volume was calculated using an arbitrary drainage area and impervious area, this is depicted in the stormwater table as "future impervious to meet original design". This was calculated to match as close as possible to approved permit on October 26, 2011. OCT u.:9 2012 SOILS MAP OCT 0.9 ZOIZ 1O 77' 55' 29' �W �z I ' g :n. g 5T a 0 91 x g` 77' 54' 4V' _ . A". y � OCT 0.9 Z01Z I 77' 55' 29' 77' 54' 49" USGS MAP OCT u 9 2012 STORMWATER CALCULATIONS OUT 0,9 2012 Project Name: Bus. Park PH. 3 Stormwater ` AR1"'3 MO V 1 �I T Client: ILM E Project Number: 12212.PE a, N E Prepared By: TGC Date: 10/5/12 Pre -Treatment Area #1 - Swale Calculations Drainage Area = 115.52 Ac. Impervious Area = 75.08 Ac. % Impervious = 65.0% CGRASS = 0.15 CIMPERV. = 0.95 CWEIGHTED = 0.67 Tc = 82 min. I10YR. = 2.38 in/hr Q10VR. = 184 cfs Swale Parameters B (Base Width) = 22 ft m (Side Slope) = 5 m:1 S (Long. Slope) = 0.02 % D (Total Depth) = 13 ft d (Depth @ Peak) = 4.26 ft VAcruAL = 1.00 fps Swale Requirements Non -erosive Vel. @ 10 yr. = Less than 1 fps Free Board (6" req.) = Approx. 6' (72") provided Swale Length = 150' Side Slopes = 5:1 OCT 0 .9 2012 Channel Report Hydraflow Express Extension forAutoCAD® Civil 3D®2009 byAutodesk, Inc. PRE-TREATMENT SWALE-1 Trapezoidal Bottom Width (ft) = 22.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 13.00 Invert Elev (ft) = 11.50 Slope (%) = 0.02 N-Value = 0.042 Calculations Compute by: Known Q Known Q (cfs) = 184.00 Elev (ft) 25.00 23.00 21.00 19.00 17.00 15.00 13.00 11.00 9.00 0 20 40 60 80 Section Friday, Oct 5 2012 Highlighted Depth (ft) = 4.26 Q (cfs) = 184.00 Area (sqft) = 184.46 Velocity (ft/s) = 1.00 Wetted Perim (ft) = 65.44 Crit Depth, Yc (ft) = 1.18 Top Width (ft) = 64.60 EGL (ft) = 4.28 Depth (f 13.50 11.50 4 e 7.50 5.50 3.50 1.50 -0.50 -2.50 100 120 140 160 180 200 UUT 0 9 2012 RPar:h (ft) Project Name: Bus. Park PH. I Stormwater Client: ILM pARAo►uNTE Project Number: 12212.PE Prepared By: TGC Date: 10/5/12 Pre -Treatment Area #2 - Swale Calculations Drainage Area = 116.98 Ac. Impervious Area = 88.00 Ac. % Impervious = 75.2% CGRAss = 0.15 CIMPERV. = 0.95 CWEIGHTED = 0.75 Tc = 108 min. I10YR. = 1.96 in/hr Q10YR. = 172 cfs Swale Parameters B (Base Width) = 22 ft m (Side Slope) = 5 m:1 S (Long. Slope) = 0.02 % D (Total Depth) = 13 ft d (Depth @ Peak) = 4.12 ft VAcruAL = 0.98 fps Swale Requirements Non -erosive Vel. @ 10 yr. = Less than 1 fps Free Board (6" req.) = Approx. 6' (72") provided Swale Length = 150' Side Slopes = 5:1 OCT 0 9 2012 Channel Report Hydraflow Express Extension forAutoCAD® Civil 3D® 2009 byAutodesk, Inc. PRE-TREATMENT SWALE-2 Trapezoidal Bottom Width (ft) = 22.00 Side Slopes (z:1) = 5.00, 5.00 Total Depth (ft) = 13.00 Invert Elev (ft) = 11.50 Slope (%) = 0.02 N-Value = 0.042 Calculations Compute by: Known Q Known Q (cfs) = 172.00 Elev (ft) 25.00 23.00 21.00 19.00 17.00 15.00 13.00 11.00 9.00 0 20 40 60 80 Section Friday, Oct 5 2012 Highlighted Depth (ft) = 4.12 Q (cfs) = 172.00 Area (sqft) = 175.51 Velocity (ft/s) = 0.98 Wetted Perim (ft) = 64.02 Crit Depth, Yc (ft) = 1.14 Top Width (ft) = 63.20 EGL (ft) = 4.13 Depth (f 13.50 11.50 9.50 7.50 5.50 3.50 1.50 -0.50 -2.50 100 120 140 160 180 200 OCT U 9 2012 RPac:h (ft) 1PV Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. Thursday, Nov 1 2012 PRE-TREATMENT SWALE-1 DURING CONSTRUCTION Trapezeldal Highlighted Bottom Width (ft) = 22.00 Depth (ft) = 2.62 Side Slopes (z:1) = 5.00, 5.00 Q (cfs) = 184.00 Total Depth (ft) = 13.00 Area (sqft) = 91.96 Invert Elev (ft) = 11.50 Velocity (ft/s) = 2.00 Slope (%) = 0.02 Wetted Perim (ft) = 48.72 N-Value = 0.016 Crit Depth, Yc (ft) = 1.18 Top Width (ft) = 48.20 Calculations EGL (ft) = 2.68 Compute by: Known Q Known Q (cfs) = 184.00 Elev (ft) 25.00 23.00 21.00 19.00 17.00 15.00 13.00 11.00 9.00 0 j1EC,F-1Vrt NOV 02292 Section Depth (ft) 13.50 11.50 9.50 7.50 5.50 3.50 1.50 -0.50 -2.50 20 40 60 80 100 120 140 160 180 200 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3138 2009 by Autodesk, Inc. Thursday, Nov 12012 PRE-TREATMENT SWALE-2 - DURING CONSTRUCTION Trapezoidal Highlighted Bottom Width (ft) = 22.00 Depth (ft) = 2.53 Side Slopes (z:1) = 5.00, 5.00 Q (cfs) = 172.00 Total Depth (ft) = 13.00 Area (sqft) = 87.66 Invert Elev (ft) = 11.50 Velocity (ft/s) = 1.96 Slope (%) = 0.02 Wetted Perim (ft) = 47.80 N-Value = 0.016 Crit Depth, Yc (ft) = 1.14 Top Width (ft) = 47.30 Calculations EGL (ft) = 2.59 Compute by: Known Q Known Q (cfs) = 172.00 RECENED NOV 0 2 2012 BY: Elev (ft) Section Depth (ft) 25.00 13.50 23.00 11.50 21.00 9.50 19.00 7.50 17.00 5.50 15.00 ri 3.50 I 13.00 1.50 11.00 -0.50 9.00 -2.50 0 20 40 60 80 100 120 140 160 180 200 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD® Civil 3D® 2009 by Autodesk, Inc. Thursday, Nov 1 2012 PRE-TREATMENT SWALE-1 - RATIONAL METHOD PEAK FLOW Trapezoidal Highlighted Bottom Width (ft) = 22.00 Depth (ft) = 1.45 Side Slopes (z:1) = 5.00, 5.00 Q (cfs) = 23.30 Total Depth (ft) = 13.00 Area (sqft) = 42.41 Invert Elev (ft) = 11.50 Velocity (ft/s) = 0.55 Slope (%) = 0.02 Wetted Perim (ft) = 36.79 N-Value = 0.042 Crit Depth, Yc (ft) = 0.32 Top Width (ft) = 36.50 Calculations EGL (ft) = 1.45 Compute by: Known Q Known Q (cfs) = 23.30 Elev (ft) 25.00 23.00 21.00 19.00 17.00 15.00 13.00 11.00 9.00 0 20 40 60 RECEIVED NOV 0 2 2D12 BY: Section Depth (ft) 13.50 11.50 9.50 FAM11 1=11 3.50 1.50 -0.50 -2.50 80 100 120 140 160 180 200 Reach (ft) Channel Report Hydraflow Express Extension for AutoCAD@ Civil 3D@ 2009 by Autodesk, Inc. Thursday, Nov 12012 PRE-TREATMENT SWALE-2 - RATIONAL METHOD Trapezoidal Highlighted Bottom Width (ft) = 22.00 Depth (ft) = 1.56 Side Slopes (z:1) = 5.00,5.00 Q (cfs) = 26.40 Total Depth (ft) = 13.00 Area (sqft) = 46.49 Invert Elev (ft) = 11.50 Velocity (ft1s) = 0.57 Slope (%) = 0.02 Wetted Perim (ft) = 37.91 N-Value = 0.042 Crit Depth, Yc (ft) = 0.35 Top Width (ft) = 37.60 Calculations EGL (ft) = 1.57 Compute by: Known Q Known Q (cfs) = 26.40 NOV 0 2 2012 Elev (ft) Section Depth (ft) 25.00 - 13.50 23.00 11.50 21.00 - 9.50 19.00 - 7.50 17.00 - 5.50 15.00 - 3.50 13.00 - T- 1.50 11.00 - -0.50 9.00 - -250 0 20 40 60 80 100 120 140 160 180 200 Reach (ft) NEwffim R CoUNTPSTORM WATER DESIGN MANUAL SECU02V 60 - OPEN CHANNEL DESIGNPROCEDURES Steps for determining channel design for using a vegetative lining proceeds as follows: 60.2.1 60.2.2 60.2.3 60.2.4 60.2.5 With the known flow rate, Q, and channel slope, s, select channel geometry type and lining type. Determine permissible velocity from Table 60-1. Estimate channel size by dividing Q by the permissible velocity. Then estimate channel width, depth and side slope to fit site conditions. Compute the hydraulic radius of the trial channel configuration. Determine Manning's n using vegetative retardance class from Figure 60-4 and the graph below using the permissible velocity and hydraulic radius. It is recommended to use at least one retardance class higher than the one determined from the graph. Y=_ =a- P F6 V = 1,00 Nov 0�2 2012 60.2.6 Calculate velocity and flow using Manning's equation. Compare results with Permissible velocity and required capacity. 60.2.7 Repeat the above. steps as necessary adjusting channel geometry to obtain required capacity within velocity limitations. 60.2.7.1 The nomograph on Figure 60-2 provides for the solution of equation for a trapezoidal channel with side slopes from 1 to 6 horizontal to vertical. An example is shown in the lower right comer of the nomograph. 60.2.7.2 If the channel velocity exceeds 2 fps, a temporary lining may be required to stabilize the channel prior to the vegetation establishing. The procedure for designing temporary linings is the same as shown for riprap lined channels. ADOPTED SEPTEMBER S, 2000 PAGE 60-5 NEWHANOYER COUN7YSTORM WATER DESIGNMANUAL SEC77ON 60 - OPEN CHANNEL DESIGNPROCEDURES Steps for determining channel design for using a vegetative lining proceeds as follows: 60.2.1 With the known flow rate, Q, and channel slope, s, select channel geometry type and lining type. 60.2.2 Determine permissible velocity from Table 60-1. 60.2.3 Estimate channel size by dividing Q by the permissible velocity. Then estimate channel width, depth and side slope to fit site conditions. 60.2.4 Compute the hydraulic radius of the trial channel configuration. 60.2.5 Determine Manning's n using vegetative retardance class from Figure 60-4 and the graph below using the permissible velocity and hydraulic radius. It is recommended to use at least one retardance class higher than the one determined from the graph. a..,, = 2:-74 V=0.9S PPs v�--977 RECEIVED NOV 0 � 2012 BY:�_ 60.2.6 Calculate velocity and flow. using Manning's equation. Compare results with Permissible velocity and required capacity, 60.2.7 Repeat the above -steps as necessary adjusting channel geometry to obtain required capacitywithm velocity limitations. 60.2.7.1 The nomograph on Figure 60-2 provides for the solution of Manning's equation for a trapezoidal channel with side slopes from 1 to 6 horizontal to 1 vertical. An example is shown in the lower right corner of the nomograph, 60.2.7.2 If the channel velocity exceeds 2 fps, a temporary lining may be required to stabilize the channel prior to the vegetation establishing. The procedure for designing temporary linings is the same as shown for riprap lined channels. ADOPTED SEPTEMBER 5, 2000 - PAGE 60-5 DRY BASIN CALCULATIONS OCT 0 9 2012 Project Name: PH.III Detention Expansion Client: ILM Project Number: 11181.PE Prepared By: TGC Date: October 2011 approval State Stormwater Information (Mod. SW8050547) Phase I (Per SWSOS0547 Mod.) Drainage Area = 6,534,000 sf Impervious = 4,247,100 sf % Impervious = 65.00 % Design Rainfall Depth = 1.00 in Volume Req. = 345,758 cf Min. Req. Sed. Storage = 20 % Req. Sed. Storage Volume = 69,152 cf Min. Req. Volume w/ Sed. Storage = 414,910 cf Phase II (Per SW8050547 Mod.) Drainage Area = 4,965,840 sf Impervious = 4,220,964 sf % Impervious = 85.00 % Design Rainfall Depth = 1.50 in Volume Req. = 505,895 cf Min. Req. Sed. Storage = 25 % Req. Sed. Storage Volume 126,474 cf Min. Req. Volume w/ Sed. Storage 632,369 cf Phase III (Proposed Phase for Permit Mod.) Drainage Area = 2,498,325 sf Impervious = 1,479,341 sf % Impervious = 59.21 % Design Rainfall Depth = 1.50 in Runoff Coefficient, Rv = 0.583 Volume Req. = 182,040 cf Min. Req. Sed. Storage = 25 % Req. Sed. Storage Volume = 45,510 cf Min. Req. Volume w/ Sed. Storage = 227,550 cf Total Basin Information Drainage Area = Impervious = % Impervious = Volume Req. = Req. Sed. Storage Volume = El. @ Sed. Storage Volume = Min. Req. Volume w/ Sed. Storage = Design Rainfall Depth (Weighted) _ Req. Forebay Volume = Provided Forebay Volume = Temporary Storage Elevation = Provided Storage Elevation = Provided Storage Volume = Drawdown Time = 'PARAMOUNTE 13,998,165 sf 9,947,405 sf 71.06 % 1,033,693 cf 241,135 cf 10.96 el. 1,274,829 cf 1.27 in 254,966 cf 20.67 % 13.30 el. 13.50 el. �� No 1,397,405 cf 2.65 days nW- ccerge-t- OCT 0,911 201Z 1P'Y: _ Project Name: PH.III Detention Expansion -Airport Exemption SL 2012-200 Client: ILM Project Number: 11181.PE Prepared By: TGC- ............... ... Date: 1019/12 D � RA MOO N T E E N G N IN IN State Stormwater Information (Mod. SW8050547) Phase I (Per SW8050547 Mod.) Drainage Area = 8,292,894 sf Impervious = 5,342,129 sf % Impervious = 64.42 % Design Rainfall Depth = Volume Req. = I cf Min. Req. Sed. Storage = 1 Req. Sed. Storage Volume = 93, Min. Req. Volume w/ Sed. Storage I cf Phase II (Per SW8050547 Mod.) Drainage Area = 4,236,212 sf Impervious = 3,178,705 sf % Impervious = 75 % Design Rainfall Depth = 1.50 in Volume Req. = 384,081 cf Min. Req. Sed. Storage = 25 % Req. Sed. Storage Volume = 96,020 cf Min. Req. Volume w/ Sed. Storage = 480,101 cf Phase III (Proposed Phase for Permit Mod.) Drainage Area = 1,511,968 sf Impervious = 1,230,350 sf % Impervious = 81.37 % Design Rainfall Depth = 1.50 in Runoff Coefficient, Rv 0.782 Volume Req. = 151,432 cf Min. Req. Sed. Storage = 25 % Req. Sed. Storage Volume = 37,858 cf Min. Req. Volume w/ Sed. Storage = 189,290 cf Total Basin Information Drainage Area = 14,041,074 sf Impervious = 9,751,184 sf Impervious = 69.45 % Volume Req. = 1,003,039 cf Req. Sed. Storage Volume = 227,383 cf El. @ Sed. Storage Volume = 10.88 el. Min. Req. Volume w/ Sed. Storage = 1,230,423 cf Design Rainfall Depth (Weighted) = 1.30 in Req. Forebay Volume = 254,966 cf Provided Forebay Volume = 20.67 % Temporary Storage Elevation = 13.30 el. Provided Storage Elevation = 13.50 el. Provided Storage Volume = 1,397,405 cf Drawdown 'rime = 2.65 days S(of vas, kl ggo t a l 4>>.33 10 1 401 OCT 0 1 2012 - -.. _....--- ............... .......................... ................. ..... PARAMOUNTE Phase I (Per SWS050547 Mod.) Oct 2012 Update Addition from Phase III Pre -Treatment Swale Area Drainage Area = 7,003,210 sf 1,215,450 74,234 Impervious = 4,552,087 sf 790,043 0 % Impervious = 65.00 % 65.00 0.00 Design Rainfall Depth = 1.00 in 1.50 1.50 Runoff Coefficient, Rv = 0.635 0.63 0.050 Volume Req. _ 7 cf 96,476 464 Phase II (Per SW8050547 Mod.) Drainage Area = 4,236,212 sf Impervious = 3,178,705 sf % Impervious = 75.04 Design Rainfall Depth = 1.50 in Runoff Coefficient, Rv 0.725 Volume Req. = 384,081 cf Phase III (Proposed Phase for Permit Mod.) Future to meet original design Drainage Area = 1,511,968 sf 570820 sf Equivalent Area Impervious = 899,275 sf 331075 sf % Impervious = 59.48 % 58.00 % Design Rainfall Depth = 1.50 in 1.50 in Runoff Coefficient, Rv = 0.585 0.572 Volume Req. = 110,618 cf 40,814 cf OCT 0 9 2012 State Stormwater Information (Mod. SW8050547 October 2011) Phase 1 and II (Per SW8050547 Mod.) Drainage Area = 11499840 sf Impervious = 8468064 sf % Impervious = 73.64 Volume Req. = 851653 cf Req. Sed. Storage Volume 195626 cf Min. Req. Volume w/ Sed. St( 1047279 of Phase III (Proposed Phase for Permit Mod.) Drainage Area = 2498325 sf impervious = 1479341 sf % Impervious = 59.21 % Volume Req. = 182040 cf Min. Req. Volume w/ Sed. 227550 cf State Stormwater Information (Mod. SW80SO547 November 2012 Update) Total Phase I and II as in Supplement Drainage Area = 12,529,106 Impervious = 8,520,834 % Impervious = 68.01 Volume Req. = 851,601 ✓ey,��C Req. Sed. Storage Volume 194373 Min. Req. Volume w/ Sed. Storage = 1,045,98 Phase III as in Supplement Drainage Area = 1,511,051 Impervious _ 1,230,350 % Impervious = 81.42 Volume Req. = 147,858 Min. Req. Volume w/ Sed. Storage 184,823 Total Basin Information Total Basin Information Drainage Area = 13998165 of Drainage Area = Impervious = % Impervious = 9947405 sf Impervious = Volume Req. = 71.06 % 1033693 of % Impervious = Volume Req.. = Req. Sed, Storage Volume = El. (81 Sed. Storage Volume = 241135 cf Req. Sed. Storage Volume = Min. Req. Volume w/ Sed. St( 10.96 el. 1274820 of El. @ Sed. Storage Volume = Min. Req. Volume w/ Sed. Storage Design Rainfall Depth (Weigh Req. Forebay Volume - 1.27 in Design Rainfall Depth (Weighted) Provided Forebay Volume = 254966 cf 20.67 % Req Forebay Volume = Temporary Storage Elevation 13.3 el. Provided Forebay Volume = Temporary Storage Elevation = Provided Storage Elevation = 13.5 el. Provided Storage Elevation = Provided Storage Volume = 1397405 cf Provided Storage Volume = Drawdown Time = 2.65 days Drawdown Time = 14,040,157 9,751,184 69.45 999465.92 231337.153 10.91 1230803 1.J_5 246,161 283,473 13.23 13.5 1,397,405 2.65 P owl I0'q-I Z -f If�gsZ2 /04 Lewis,Linda From: Tim Clinkscales [tclinkscales@paramounte-eng.com] Sent: Thursday, October 18, 2012 2:54 PM To: Lewis,Linda; Julie Wilsey Cc: Russell, Janet Subject: RE: Additional Information / SW8 050547 Attachments: MANNINGS CALC-ILM.pdf Linda, For the comments you have provided for items 1-3, we would like to work through these issues before any formal resubmittals because these are items that need to clarified in such a manner. The other reason for this is to avoid resubmittal fees that may be required as we discuss these calculations. I know this may not be common practice in the express program but we believe this may be the best way to communicate for these items for both parties on this project. We would appreciate such on this project We are enclosing our response to these three comments and related information Thanks for your time and have a good day 1. The "for credit" grassed swales must meet two separate velocity criteria: 1) provide a non -erosive velocity for the peak flow of the 10 year storm; and, 2) provide a maximum velocity of 1 fps for the 10 year 24 hour storm. The calculations appear to provide only the 10 year peak flow instead of the 10 year 24 hour storm to demonstrate compliance with the 1 fps velocity limit. Essentially, you need to provide two velocity calculations, one based on the 10 year peak flow (to demonstrate nonerosive flow for the chosen swale lining and slope) and one based on the less intense 10 year 24 hour storm (to demonstrate that the velocity is no more than 1 fps.) We have performed the velocity calculation within the swales by first calculating the flow rate (Q) at different storm events. Flow rate (Q) was achieved by using the Rational Method to determine storm water runoff (Q=CIA). This method is able to give the designer flow rates at different design storms (1 yr., 10 yr., 25 yr., and so on). The flow rates per design storm are achieved through the corresponding intensity rainfall rate ("I"). "I" is achieved through IDF curves (Intensity Duration Factor) where the intensity varies as the time of concentration ("Tc") varies. Therefore, the Rational Method gives a Peak Flow Rate for the Storm Intensity implemented. Now the language "10 year 24 hour storm" reflects a different method than the Rational to estimate Stormwater Runoff called the SCS Method (NRCS Method). The SCS Method uses Rainfall Depth (P) instead of Rainfall Intensity (1) in the input to achieve volume and peak flow rate. The SCS Method calculates a peak flow rate along a bell shaped curve (curves differ by Types and Shape Factors); this method is not a simple calculation. We did not use the SCS Method to calculate Flow rate (Q) but rather the Rational Method. In short, there is only one velocity to be calculated (peak velocity), the storm duration ("10 yr. 24 hour") is rhetoric differentiating between different methods. Please find the Peak Velocity calculation submitted as meeting the requirement to provide peak velocity calculations for the 10 year storm event (10 year 24 hour storm event language would be applicable if we used the SCS Method). 2. Please explain in detail how you derived the values for time of concentration used in the swale calculations. Please document any assumptions regarding the height of the most remote point in the watershed, the length of the flow path and how much of that flow path will be piped or channelized. These assumptions should necessarily be based on the "worst -case" built -out scenario. In order to give the "worst -case" built -out scenario would assume that the entire system is built via pipe networks. Therefore it is required for the Designer to estimate length of the storm drain network and the velocity within the pipes in order to arrive at a time to arrive downstream from the most remote location. Please see the calculation below which was performed in -line to the hydraulic analysis performed by Talbert & Bright while designing the downstream Detention Basin. The Tc used by Talbert & Bright for the built -out basin was 180 minutes, which is greater than either scenarios employed by Paramounte; therefore our calculation will give NCDENR a higher velocity due to a shorter Tc. Tc. Swale 1(Pipe Flow) Hydraulic Length= Pipe Slope= n= Diameter= Velocity= T= Tc. Swale 2 (Pipe Flow) Hydraulic Length= Pipe Slope= n= Diameter= Velocity= T= 4800 If 0.002 ft/ft 0.013 (rcp) 4 ft (avg. size w/in basin) 0.97 fps 82 min. 7300 If 0.002 ft/ft 0.013 (rcp) 5 ft (avg. size w/in basin) 1.13 fps 108 min. The velocity in the pipe is achieved using the empirical Manning's Equation which employs the pipe diameter, pipe slope, and Manning's "n". Note that we could add overland -flow to the pipe system to the Tc but if the velocity works for the lesser Tc then it will work as more Time is added on. 3. Please provide documentation of the 0.042 Mannings "n" value used in the swale calculations. A value of 0.042 seems high when compared to the tables published in V.T. Chow's Open Channel Hydraulics, 1959, McGraw- Hill, and to the procedures for determining channel roughness coefficients described in the Erosion and Sediment Control Planning and Design Manual (ESCPDM). The V.T Chow tables provide Manning's n-values for a wide range of channel types. The n-value for an excavated, straight, uniform, earthen channel with short grass and a few weeds has a range of 0.022 — 0.033. The Division uses a "normal" value of .027 which is supported by the procedures described in the ESCPDM. Based on the Division's value, the resulting velocity in both swales is > 1 fps, but is less than the maximum permissible velocity of 5 fps for a grass -lined swale. However, this velocity calculation is not based on the 10 year 24 hour storm, which will have a smaller intensity which will in all likelihood, reduce the velocity below 1 fps. • In effort to satisfy NCDENR requirements and also New Hanover County Stormwater Requirements to be submitted and approved in the future, we used chart (Figure 60-4) within Section 60 — Open Channel Design Procedures with -in the New Hanover County Storm Water Design Manual (See attached). As you can see, we used "Curve D" to be in line with the 0&M agreement. With a product of Velocity and Hydraulic Radius, we arrived at a Manning's n factor of 0.042 for vegetative retardance. Tim Tim Clinkscales PE, PLS DARAMOUNTE 11. M PARAMOUNTE ENGINEERING, INC 5911 Oleander Drive, Suite 201 Wilmington, NC 28403 OFFICE: (910) 791-6707 CELL: (910) 520-1991 FAX: (910) 791-6760 From: Lewis,Linda [mailto:linda.lewis@ncdenr.gov] Sent: Wednesday, October 17, 2012 2:41 PM To: Julie Wilsey Cc: Tim Clinkscales; Russell, Janet Subject: Additional Information / SW8 050547 Julie: Attached please find my Express review comments for the subject project. Linda MCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Charles Wakild, P. E. Governor Director October 17, 2012 Julie Wilsey, Deputy Director New Hanover County Airport Authority 1740 Airport Boulevard Wilmington, NC 28405 Subject: Request for Additional Information — Express Review Stonmwater Project No. SW8 050547 Wilmington International Airport New Hanover County Dear Ms. Wilsey: The Wilmington Regional Office received an Express Permit Application for Wilmington International Airport preliminary review of that information has determined complete. The following information is needed to con The "for credit" grassed swales must meet two provide a non -erosive velocity for the peak flow provide a maximum velocity of 1 fps for the 10 calculations appear to provide only the 10 year 24 hour storm to demonstrate compliance with you need to provide two velocity calculations, c flow (to demonstrate nonerosive flow for the ch one based on the less intense 10 year 24 hour velocity is no more than 1 fps.) Dee Freeman Secretary State Stormwater Management on October 9, 2012. A that the application is not tinue the stormwater review: separate velocity criteria: 1) of the 10 year storm; and, 2) year 24 hour storm. The peak flow instead of the 10 year the 1 fps velocity limit. Essentially, ne based on the 10 year peak osen swale lining and slope) and storm (to demonstrate that the 2. Please explain in detail how you derived the values for time of concentration used in the swale calculations. Please document any assumptions regarding the height of the most remote point in the watershed, the length of the flow path and how much of that flow path will be piped or channelized. These assumptions should necessarily be based on the "worst -case" built -out scenario. Please provide documentation of the 0.042 Mannings "n" value used in the swale calculations. A value of 0.042 seems high when compared to the tables published in V.T. Chow's Open Channel Hydraulics, 1959, McGraw-Hill, and to the procedures for determining channel roughness coefficients described in the Erosion and Sediment Control Planning and Design Manual (ESCPDM). The V.T Chow tables provide Manning's n-values for a wide range of channel types. The n-value for an excavated, straight, uniform, earthen channel with short grass and a few weeds has a range of 0.022 — 0.033. The Division uses a "normal" value of .027 which is supported by the procedures described in the ESCPDM. Based on the Division's value, the resulting velocity in both swales is >1 fps, but is less than the maximum permissible velocity of 5 fps for a grass -lined swale. However, this velocity calculation is not based on the 10 year 24 hour storm, which will have a smaller intensity which will in all likelihood, reduce the velocity below 1 fps. Wilmington Regional Office 127 Cardinal Drive Extension, Wilmington, North Carolina 28405 ne Phone: 910-796-72151 FAX: 910-350-20041 DENR Assis+tance:1.877-623-6748 No Carolina Internet www wwaterquality.oig awngliff An Fminl Meefimily 1 ATfirmafiv &Ann Fmnln— Ms. Wilsey October 17, 2012 Stormwater Application No. SW8 050547 Mod. 4. Bermuda is specified as the permanent grass type on the grassed swale supplement forms submitted with the application, however, centipede is specified on the plans. Centipede takes several years to establish. What sort of temporary liner will be used in the meantime to prevent erosion? If the swales will be seeded and not sodded, please provide additional swale calculations using the peak flow from a 10 year storm and a Mannings "n" value for an excavated, straight, uniform, earthen channel, recently completed (0.016 — 0.02) to determine if a temporary liner is needed to prevent erosion. 5. The application erroneously indicates that the last permit issued for this project is dated October 28, 2009. The current in -effect permit was issued on October 26, 2011. If the information you have provided in the most recent modified application is based on making changes to the information in the 2009 permit, please adjust accordingly in light of the 2011 permit. 6. Due to the design storm differences, and to be consistent with how the 2011 permit application was completed, and to cut down on the confusion, please list the proposed drainage areas and built -upon areas for Phases I, II and III in separate columns on the application. 7. Runways, taxiways, and any other areas that provide for overland stormwater flow, promote infiltration and treatment of stormwater into grassed buffers, shoulders, and grass swales are deemed permitted pursuant to the State's post - construction stormwater requirements. Please request DWQ concurrence that those areas of the airport that are to be "deemed permitted" meet the Session Law requirements. Although the law did not mandate that an airport submit anything or document compliance with the Session Law, it is my understanding that not doing so could subject the Airport to civil penalties (NOV) and/or leave them open to third party lawsuits. The burden of proof is on the airport, so having a concurrence letter from the state would go a long way to making a case that the airport is indeed in compliance with the Session Law. In order to provide this concurrence, please delineate and identify the areas which are to be "deemed permitted" under the Airport Session Law and demonstrate the required overland sheet flow by providing a grading plan. Otherwise, an inspection of that area will be conducted to determine compliance with the Session Law requirements prior to approving the requested permit modification. Please note that a revision to one number may have a domino effect on other numbers, which may require revision of the applications, calculations, supplements, plans, details, and associated documentation. Please verify all numbers are correct to ensure consistency in the application documents. Please note that this request for additional information is in response to a preliminary review. The requested information should be received in this Office prior to October 25, 2012, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. If you need additional time to submit the information, please mail, email or fax your request for a time extension to the Division at the address and fax number at the bottom of this letter. The request must indicate the date by which you expect to submit the required information. In the Express program, no more than 2 time extensions may be granted, for a total of 10 days. Page 2of3 Ms. Wilsey October 17, 2012 Stormwater Application No. SW8 050547 Mod. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. The proposed modification may not be constructed until the permit modification is approved and issued. Please reference the State assigned project number on all correspondence. Any original documents that need to be revised have been sent to the engineer or agent. All original documents must be returned or new originals must be provided. Copies are not acceptable. If you have any questions concerning this matter please feel free to call me at (910) 796-7301 or email me at Iinda.lewisCaD-ncdenr.gov Sincerely, Linda Lewis Environmental Engineer III GDS/arl: S:MMStormwaterVermits & Projects120051050547 HD1201210 addinfo 050547 cc: Tim Clinkscales, P.E., Paramounte Engineering Wilmington Regional Office Stormwater File Page 3 of 3 PARAMOU-NTE E N G 1 N E E M 1 N V, 1 N C. 9 9 9 1 1 OLEANDER DRIVE, SUITE 20 1 W I L M I N G T O N, NC 2 8 4 0 3 9 1 0- 7 9 1- 6 7 0 7( O) 9 1 0- 7 9 1- 6 7 6 0 ( F) L E T T E R 0 F T R A N 9 M T T T A T To: NCDENR-Land Quality Section Date 1 10/09/2012 127 Cardinal Drive Extension Wilmington, NC 28405 Re: Wilmington International Airport Stormwater MOD & Pre -Treatment Attu: Proect No. I 12212. PE e are sencli ® Originals he following items: ❑ Correspondence ® Prints ❑ Shop Drawings ❑ Calculations ® Plans ❑ Specifications ® Other as listed below Quantity Date Dwg. No. Description 2 Plans (Final Design — Not Released For Construction) 1 Stormwater Narrative w/ Calculations 1 Check for Express Review Fee ($4000.00) 1 Stormwater Permit Application Form (Original & Copy) 1 Grassed Swale Basin Supplement (Original) 1 Grassed Swale O&M Agreement (Original) ssue Status ® For Approval ❑ As Requested ❑ Construction ❑ Bid ❑ For Your Use ❑ For Review and Comment ❑ Approved as Noted ❑ See Remarks tion Taken: ❑ No Exceptions Taken ❑ Make Corrections Noted ❑ Amend & Resubmit ❑ Rejected - See Remarks ❑ Approved as Submitted ❑ Other Im 0 0- - M ' toil W.VDmarks: 1 Chris Millis RR-4 OCT 0,,9 2012 BY: