HomeMy WebLinkAbout20140579 Ver 1_More Info Received_20140616p�oF w a rFgpG
PAID
20140578
Office Use Only:
Corps action ID no.
DWQ project no.
Form Version 1.4 January 2009
___J :J N - y7, TFF a'vAt iTY'
nch
Page 1 of 10
PCN Form — Version 1.4 January 2009
Pre - Construction Notification (PCN) Form
A.
Applicant Information
1.
Processing
1 a.
Type(s) of approval sought from the Corps:
❑ Section 404 Permit ❑ Section 10 Permit
1b. Specify Nationwide Permit (NWP) number: 13 or General Permit (GP) number:
1c.
Has the NWP or GP number been verified by the Corps?
❑ Yes X❑ No
1d.
Type(s) of approval sought from the DWQ (check all that apply):
X❑ 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit
❑ 401 Water Quality Certification — Express ❑X Riparian Buffer Authorization
1e.
Is this notification solely for the record
because written approval is not required?
For the record only for DWQ
401 Certification:
❑ Yes ❑X No
For the record only for Corps Permit:
❑X Yes ❑ No
1f.
Is payment into a mitigation bank or in -lieu fee program proposed for
mitigation of impacts? If so, attach the acceptance letter from mitigation bank
or in -lieu fee program.
❑ Yes X❑ No
1g.
Is the project located in any of NC's twenty coastal counties. If yes, answer 1h
below.
❑ Yes ❑X No
1h.
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
❑ Yes ❑X No
2.
Project Information
2a.
Name of project:
Prestwick Streambank Stabilization
2b.
County:
Wilson
2c.
Nearest municipality / town:
Wilson
2d.
Subdivision name:
Wilson Country Club
2e.
NCDOT only, T.I.P. or state project no:
3.
Owner Information
3a.
Name(s) on Recorded Deed:
Timothy and Jennifer Sharpe
3b.
Deed Book and Page No.
2482, 5
3c.
Responsible Party (for LLC if
applicable):
3d.
Street address:
4515 Chippenham Ct
3e.
City, state, zip:
Wilson, NC 27896
3f.
Telephone no.:
3g.
Fax no.:
3h.
Email address:
-u `
I
___J :J N - y7, TFF a'vAt iTY'
nch
Page 1 of 10
PCN Form — Version 1.4 January 2009
4.
Applicant Information (if,different from owner)
4a
Applicant is
❑ Agent ❑X Other„ specify Local Municipality
4b
'Name
City of Wilson
4c
Business name
(if applicable)
City of Wilson
4d
Street address
1800, Herring Avenue
4e
City, state, zip
Wilson, NG 27894
4f
Telephone no
252 - 296 -3305
4g
Fax no
252 - 399 -2453
4h
Email address
dnorris @wilsonnc org
,5.
Agent/Consultant Information (if applicable)
5a
Name
Daryl Norris, Stormwater Specialist
5b
Business name
(if applicable)
City of Wilson
5c
Street address
1800 Herring Avenue
5d
City, state, zip
Wilson, NC 27894
5e
Telephone no
252 - 296 -3305
5f
Fax no-
252- 399 -2453
5g�
Email address=-
dnorris @wilsonnc org
Page,2 of 10
B.
Project Information and Prior Project History
1.
Property Identification
1a
Property identification no (tax PIN or parcel ID)
3714 -82 -2982
1 b
Site coordinates (in decimal degrees)
Latitude 35 787 Longitude -77 927
1c
Property size
077 acres
,2.
Surface Waters '
2a
Name of nearest body of water to proposed project
UT to Toisnot Swamp
2b
Water Quality Classification of nearest receiving water
C, NSW, WS3 -P
2c
River basin
Neuse
3.
Project Description
3a Describe the existing conditions on the site and'the general land use in the vicinity of the project at the time ofthis
application
Streambank erosion causing heavy sediment deposition in the stream resulting in a loss of habitat and flow The land use is low density residential
and the drainage area,is,100% built out
3b
List the total estimated acreage of all existing wetlands on the property 0
3c
List the total estimated linear feet of all existing streams (intermittent and perennial) on the property 141
3d Explain the purpose of the proposed project
Stabilize the stream banks to prevent further erosion and remove deposded'sediment
3e Describe the overall project in detail, including the type of equipment to be used
,Following the natural,flow line of the,stream channel, the'banks will be sloped back, matted,, and_ heavily vegetated to prevent further erosion, Deposite
4.
Jurisdictional Determinations
4a
Have jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property /
project (including all prior phases) in the past?
❑X 'Yes ❑ No ❑ Unknown
Comments
4b
If the Corps made the jurisdictional determination, what'type
of determination was made?
Preliminary ❑ Final
4c
If yes, who delineated -the jurisdictional areas?
Name (if known) Cherry Smith
Agency /Consultant Company, ;NCDENR
Other
4d If yes, list the dates of'the Corps jurisdictional determinations or State determinations and attach documentation
3/26/2014
5.
Project History
5a,
Have permits or certifications been requested or obtained for
this project (including all prior phases) in the past?
❑ Yes ❑X No ❑ Unknown
5b
If yes, explain in detail according to "help file" instructions
6.
Future Project Plans
6a
Is this a phased project?
❑ Yes ❑X No
6b
If yes, explain
Page 3 of 10
PCN Form — Version 14 January 2009
C. Proposed Impacts Inventory
1. Impacts Summary
1a Which sections were completed below for your project (check all that apply)
❑ Wetlands ❑X 'Streams— tributaries ❑X Buffers ❑ Open Waters ❑ Pond'Construction
2. Wetland Impacts
If there are =wetland impacts proposed on the site, then complete this question for each wetland area impacted
2a
Wetland impact
number
Permanent (P) or
Temporary
2b
Type of impact
2c
Type of,wetland
2d
Forested
2e
Type of jurisdiction
Corps (404,10) or
DWQ (401, other)
2f
Area of
impact
(acres)
W1 -
Choose one
Choose one
Yes /No
-
W2 -
Choose one
Choose one
Yes /No
W3 -
Choose one
Choose one
Yes /No
W4 -
Choose one
'Choose one
Yes /No
W5 -
Choose one
Choose,one
Yes /No
W6 -
Choose one
Choose,one
Yes /No
2g Total Wetland Impacts:
2h Comments -
3. Stream Impacts
If there are perennial or'intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted
3a
Stream impact
number
Permanent (P) or
Temporary (T)
3b
Typ&6f impact
3c
Stream name
3d
Perennial (PER) or
intermittent (INT)?
3e
Type of
jurisdiction
3f
Average
stream
width
(feet)
3g
Impact
length
(linear
feet)
S1 T
Stabilization
UT to Toisnot Swamp
PER
Corps
2
14,1
S2
Choose one
-
-
S3
Choose one
-
S4
Choose one
S5
Choose one
S6
Choose one
i
3h Total stream and tributary impacts
31 Comments-
Page 4 of 10
PCN Form — Version 14 January'2009
4. Open Water Impacts
If there are proposed Impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of
the U S then indiv ually list all open water Impacts below
4a
Open water
Impact number
Permanent (P) or
Temporary
4b
Name of waterbody
(If applicable)
4c
Type of Impact
4d
Waterbody
type
4e
Area of Impact (acres)
01
Choose one
Choose
O2
Choose one
Choose
03
Choose one
Choose
04
Choose one
Choose
4f Total open water impacts
4g Comments
5. Pond or Lake Construction
If pond or lake construction proposed, the complete the chart below
5a
Pond ID number
5b
Proposed use or
purpose of pond
5c
Wetland Impacts (acres)
5d
Stream Impacts (feet)
5e
Upland
(acres)
Flooded
Filled
Excavated
Flooded
I Filled
Excavated
P1
Choose one
P2
Choose one
5f Total:
5g Comments
5h Is a dam high hazard permit required?
❑ Yes ❑ No If yes, permit ID no
51 Expected pond surface area (acres)
5j Size,of pond watershed (acres)
5k Method of construction
6. Buffer Impacts (for DWQ)
If project will impact a protected riparian buffer, then complete the chart below If yes, then Individually list all buffer Impacts
below If any impacts require mitigation, then you MUST fill out Section D of this form
6a. Project is, In which protected basin?
❑X Neuse ❑ Tar - Pamlico ❑ Catawba ❑ Randleman ❑ Other
6b
Buffer Impact
number —
Permanent (P) or
Temporary
6c
Reason for Impact
6d
Stream name
6e
Buffer
mitigation
required ?'
6f
Zone 1
Impact
(squat a
feet )
6g
Zone 2
impact
(square
feet
B1 T
Bank Stabilization
UT to Toisnot Swamp
No
2,820
0
B2
Yes /No
B3
Yes /No
B4
Yes /No
B5
Yes /No
B6
Yes /No
6h Total ,Buffer Impacts:
2,820
0
61 Comments Impacts will be limited to only'those areas required for sloping back,and stabilizing the stream banks -
Page 5of10
D. Impact Justification and Mitigation
1. Avoidance and Minimization
1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project
Impacts will be,limited to,only those areas required for sloping back and stabilizing the stream banks
lb Specifically, describe measures taken to avoid or minimize the proposed impacts through construction techniques
A pump,around bypass system Will be used during construction to minimize any additional impacts from the construction process The banks well be
matted to provide additional stabilization until vegetation establishes
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a Does the project require Compensatory Mitigation for
impacts to Waters of'the U S or Waters of the State?
❑ Yes ❑X No
2b If yes, mitigation is required by (check all that apply)
❑ DWQ ❑ Corps
2c If yes, which mitigation option1will be used for this
project?
❑ Mitigation bank
E] Payment to in -lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if'Using a Mitigation Bank
3a Name of °Mitigation Bank
3b Credits Purchased (attach receipt and letter)
Type Choose one
Type Choose one
Type Choose one
Quantity-,
Quantity,
Quantity
3c Comments
4. Complete if Making a Payment to In -lieu Fee Program
4a Approval letter from in -lieu fee program is attached
❑ Yes
4b Stream mitigation requested
linear feet
4c If using stream, mitigation, stream temperature
Choose one'
4d Buffer mitigation requested (DWQ only)
square'feet
4e Riparian wetland mitigation requested-
acres
4f Non- ripanan,wetland mitigation requested
acres,
4g- Coastal (tidal) Wetland mitigation requested
acres
4h Comments
5,. Complete if'Using,a Permittee Responsible Mitigation Plan
5a. If using 'afpermittee,responsible mitigation plan, provideia description of the proposed mitigation plan
Page 6 of 10
PCN Form —Version 1 4 January 2009
6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ
6a Will the project result in an impact withmaaprotected riparian buffer that,requires
❑ Yes ❑ No
buffer mitigation ?'
6b If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the
amount of mitigation required
6c
6d
6e
Zone
Reason for impact
Total impact
Multiplier
Required mitigation
(square feet)
(square,feet)
`Zone 1
3 (2 for,Catawba)
Zone 2
1 5
6f Total buffer mitigation required:
6g If'buffer mitigation is required, discuss what type of mitigation is proposed (e g , payment to private mitigation bank,
permittee responsible npanambuffer restoration, payment into an approved'in -lieu fee fund)
6h Comments
Page 7 of 10
E.
Stormwatee Management and Diffuse Flow Plan (required by DWQ)
1.
Diffuse Flow Plan
la
Does the protect Include or is it adjacent tohprotected riparian buffers identified
Yes ❑ No
within one,of the,NC Riparian Buffer Protection Rules?
lb
If yes, then is a diffuse flow plan included? If no, explain why
No The flow of the stream will be pumped,a round during construction No,otherdischarges are included
this
❑ Yes ❑X No
in
project
2.
Stormwater Management Plan
2a
What is the overall percent imperviousness of this project?
0
2b
Does this project require a Stormwater Management Plan?
❑ Yes ❑X No
2c
If this protect DOES NOT require a Stormwater Management Plan, explain why
It`is only a bank sta ilzation protect under Nationwide 13
2d
If this protect DOES require a Stormwater Management Plan,`then provide a brief, narrative description of the plan
2e_
Who will be responsible for the review of the Stormwater Management Plan!
3.
Certified Local Government Stormwater Review
3a In which local governmentis jurisdiction is this project?
City,of Wilson
❑ Phase 11
❑X NSW
3b
Which of the following locally - implemented stormwater management programs
❑ USMP
apply (check all that apply)
0 Water Supply Watershed
❑ Other
3c
Has the approved Stormwater Management Plan with proof of approval been
❑Yes ❑ No
attached?
4.
DWQ Stormwater Program Review
❑Coastal counties
❑HQW,
4a
Which of'the following state - implemented stormwater management programsaapply
❑ORW
(check all that apply)
❑Session Law 2006 -246
❑ Other
4b
Has the approved Stormwater Management Plan with proof of approval been
❑ Yes ❑ No
attached?
5.
DWQ 401 Unit Stormwater Review
5a
Does the Stormwater Management Plan meet the appropriate requirements?
❑ Yes' ❑ No
5b
Have all of the 401 Unit submittal requirements been met?
❑ Yes ❑ No
Page.8 of 10
PCN Form — Version 1 4 January 2009
F. Supplementary Information
1.
Environmental Documentation (DWQ Requirement)
1a
Does the project involve an expenditure,of public (federal /state /local) funds or the
❑x Yes ❑ No
use of public (federal /state) land?
lb
If you answered "yes -to the above, does the project require preparation of an
environmental document pursuant to the requirements of the National or State
❑ Yes ❑X No
(North Carolina) Environmental Policy Act (NEPA/SEPA)?
1c
If you answered "yes" to the above, has the,document review been finalized by the
State Cleanng ,House? (If so, attach a copy of the NEPA or SEPA final approval
❑ Yes ❑ No
letter)
Comments
2.
Violations (DWQ Requirement)
2a
Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500), Isolated
Wetland Rules (15A NCAC 2H 1300), DWQ Surface Water or Wetland "Standards,
❑ Yes ❑X No
or Riparian Buffer Rules (15A NCAC 213 0200)?
,2b
Is this an after - the -fact permit applications
El Yes ❑X No
2c
Ifyou answered "yes"'to one or both of'the above questions, provide an explanation of the violation(s)
3.
Cumulative Impacts (DWQ Requirement)
3a
Will this project (based on past and reasonably anticipated future impacts) result in
El Yes ❑X No
additional development, which could impact nearby downstream water quality?
3b
If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the
most recent" DWQ policy If you answered "no;" provide,a short narrative description
4.
Sewage Disposal (DWQ Requirement)
4a Clearly detail the ultimate treatment methods and disposition (non - discharge or discharge) of wastewater generated' from
the'proposed project, or available capacity of the subject facility
Page 9� of 1'0
PCN Form -- Version 14 January 2009
S. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a Will this project occur in or near an area with federally protected, species or
Yes X No
❑ ❑
habitat?
5b Have you checked with the USFWS concerning Endangered Species Act
❑ Yes ❑X No
impacts?
5c if yes, indicate the USFWS Field Office you have contacted
-
5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
City of Wilson GIS layers
6. Essential Fish Habitat (Corps Requirement)
6a Will this project occur in or near an area designated as essential fish habitat?
❑, Yes ❑X No
6b What data sources did you use to determine,whether your site would impact Essential Fish Habitat?
City of Wilson GIS layers
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this project occur Wor near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation
❑ Yes ® No
status (e g , National Historic Trust designation, or properties signs icant in
North Carolina history and archaeology)?
7b What data sources did you use to determine whether your site would 'impact historic or archeological resources?
City of Wilson GIS layers
8. Flood Zone Designation (Corps Requirement)
8a Will this project occur in, a FEMA - designated 100 -year floodplain?
❑ Yes [X] No
8b If yes, explain how project'meets FEMA requirements
8c What source(s) did you use to make the floodplain determination?
City of Wilson GIS layers
Daryl Norris - City of Wilson
06 -04 -2014
Applicant/Agent's Printed Name
Date
Applicant/Agent's Signature
(Agent's signaturels valid only if•an authorization
letter frornthe applicantis provided')
Page 10 of 10
5. Endangered Species and DesignatedZritical, Habitat (Corps�Requirement)
5a: fl l project occur In or near an area'wdh federally protected species or
Yes x0 No
habitat?
5b Have you checked with the,USFWS concerning Endangered Species Act
0 Yes ® No
impacts?
5c If yes, indicate the USFWS,Field Office you have,contacted
-
5d. 'What data,sources did you use to determine whether'your site would °impact Endangered Species or Designated Critical
Habitat?
City of Wilson GIS layers
6. Essential Fish ;Habitat (Corps Requirement)
6a Wilf'this protect occur in or,near an area designated as essential fish habitat?
Yes ®,No
6b What data sources did you use to determine whether your site would impact Essential Fish Habitat?
City of Wilson GIS layers
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a Will this proiect,occur in or near an areaQhat the state, federal or,tnbal
governments have designated as having historic or cultural preservation
Yes ❑X No
status (e g , National Historic Trust, designation or properties significant in
North Carolina history-and archaeology)?
7b What,data sources,did you use to determine.whether your site would impact historic or archeological resources?
City of Wilson GIS layers
8. Flood,Zone Designation (Corps Requirement)
8a Will this project occur in a FEMA - designated 100- yearfloodplain?
❑ Yes ® No
8b. If yes, explain how probed meets FEMA requirements
8c What source(s) did you use to make the floodplain determination?
City of Wilson,GIS layers
1
Daryl Norris -City'of Wilson
06 -04 -2014
Applicant/Agents Printed Name
Date
icant/Agen a ure
(Ad&frs signature is valid only if an authorization
Aettef from the applicant is provided
Page 10,of 10
'Maher, Niki
From: Daryl Norris [dnorns @wdsonnc org]
Sent: Monday, June 16, 2014 5 16 PM
To: Maher, Niki
Subject: Prestwick Streambank Stabilization PCN Revisions
Attachments: prestwick pcn2revised6_16_14 pdf
Niki;
Attached is the revised PCN. We measured the actual length, of impacted stream to 141 linear foot.
I have submitted the request for check to our finance office for $240.00. It should be mailed to you soon.
Thanks,
Daryl Norris, P.E., CFIVI, CPSWQ, EE, LID
Stormwater Environmental Specialist
City of Wilson
Stormwater Division
252 - 296 -3305
.dnorris @wilsonnc,org
Pursuant to;North Carolina. General Statutes, Chapter 132,et.seq., this electronic mail message and any
attachment hereto, as well as any electronic mail message(s) that may be sent in response to it may be
considered public record and as such are subject to requests for review.