HomeMy WebLinkAbout 20220722_Decision Letter for %US Hwy 401 bulb out Carpenter,Kristi From:Conchilla, Ryan Sent:Wednesday, June 29, 2022 3:36 PM To:King, Art C Subject: 20220722_Decision Letter for %US Hwy 401 bulb out Thanks Art. The description below provides a better understanding for the temporary impacts proposed. With a copy of the NWP, the WQC can be finalized. Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8) Division of Water Resources, NC Department of Environmental Quality Ryan.Conchilla@ncdenr.gov From: King, Art C <acking@ncdot.gov> Sent: Monday, June 27, 2022 12:33 PM To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Cc: Davis, Gregory S <gsdavis@ncdot.gov> Subject: RE: 20220722_Decision Letter for %US Hwy 401 bulb out Ryan, The way I read the plan, it showed the area of hand clearing and dewatering basically overlapping in the same place. The hand clearing is to cut back the vegetation to allow room to install the dewatering devices if needed or, the erosion controls. The water level may be below the level indicated if the work is done during a dry period. If it is, dewatering would not be necessary but, the space would be used to install silt fencing or waddles instead. I didn’t think that the 0.02 ac of temporary impacts should have been listed twice if it’s in the same spot. I chose to list dewatering as the temporary impact instead of the hand clearing because dewatering is typically more disruptive than cutting vegetation. I can change that to show both or, whichever way you wanted it listed. Thanks, Art C. King Division Environmental Supervisor NCDOT Highway Division 8 910 773 8015 office acking@ncdot.gov 121 Dot Drive Carthage, NC 28327 1 From: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Sent: Monday, June 27, 2022 11:49 AM To: King, Art C <acking@ncdot.gov> Cc: Davis, Gregory S <gsdavis@ncdot.gov> Subject: FW: 20220722_Decision Letter for %US Hwy 401 bulb out Art, Thanks for the additional info. Attached on the W-5708G Drawing, hand clearing is depicted in the project area but is not listed in the Wetland impact table. If this is correct, please include the approx. area of temporary impact. If you can forward a copy of the NWP 14 issued for this proejct, I’d appreciate it. Let me know what questions you have. Ryan Conchilla, PWS Environmental Specialist II 401 and Buffer Transportation Permitting Branch (DOT Divisions 7+8) Division of Water Resources, NC Department of Environmental Quality Ryan.Conchilla@ncdenr.gov From: King, Art C <acking@ncdot.gov> Sent: Thursday, June 23, 2022 2:37 PM To: Conchilla, Ryan <ryan.conchilla@ncdenr.gov> Cc: Davis, Gregory S <gsdavis@ncdot.gov> Subject: 20220722_Decision Letter for %US Hwy 401 bulb out Ryan, Please review the attached documents. Let us know if we are missing anything. I don’t know if your office was copied but, James Lastinger issued the NWP #14 permit for this project this morning. Thanks, Art C. King Division Environmental Supervisor NCDOT Highway Division 8 910 773 8015 office acking@ncdot.gov 121 Dot Drive Carthage, NC 28327 2 Email correspondence to and from this sender is subject to the N.C. Public Records Law and may be disclosed to third parties. 3