October 22, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Taylor Morrison of the Carolinas
Attention: Thomas Johnson, VP Land Development
11405 North Community House Road
Charlotte, North Carolina 28277
RE: Project Name: Allburn Subdivision
Acres Approved: 48.46
Project ID: CABAR-2020-079
County: Cabarrus, City: Harrisburg
Address: Lakeland Road
River Basin: Yadkin-PeeDee
Stream Classification: Other
Submitted By: Taylor Morrison of the Carolinas
Date Received by LQS: 10/15/2021
Plan Type: Revised, Ownership Transfer
Dear Mr. Johnson:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be
acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall expire three
(3) years following the date of approval, if no land -disturbing activity has been undertaken, as is required by
Title 15A NCAC 413 .0129.
Please be aware that your project will not be covered by the NPDES Construction Stormwater General
Permit NCGO10000 issued with the original Letter of Approval dated December 31, 2020. Please become
familiar with all the requirements and conditions of this permit in order to achieve compliance. As of March
1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent
(NOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction Stormwater
General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on
the above named project. The NOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions
about the NOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul Clark at Paul.clark@ncdenr.gov.
After you submit a complete and correct NOI Form, a COC will be emailed to you within three business
days. Initially, DEMLR will not charge a fee for coverage under the NCGO1 permit. However, on or after
May 1, 2019, a $100 fee will be charged annually. This fee is to be sent to the DEMLR Stormwater Central
Office in Raleigh.
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
::fu- Q Mooresville Regional Office 1610 East Center Avenue, Suite 3011 Mooresville, North Carolina 28115
704-663-1699
Letter of Approval
Taylor Morrison of the Carolinas
October 22, 2021
Page 2 of 3
Please be advised that Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control
plan be on file at the job site. Also, you should consider this letter to give the Notice required by G.S.
113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring protection of
existing natural resources and adjoining properties. If, following the commencement of this project, it is
determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this
office may require revisions to the plan and implementation of the revisions to insure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water
quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to
this land -disturbing activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility Form, which you have provided. You are requested to file an amended form if there is any
change in the information included on the form. In addition, it would be helpful if you notify this office of
the proposed starting date for this project.
Your cooperation is appreciated.
Sincerely,
Christopher Graybeal
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
c: Geoscience Group
Attention: Kevin S. Caldwell, PE
500-K Clanton Road
Charlotte, North Carolina 28217
Inspection Department
Letter of Approval
Taylor Morrison of the Carolinas
October 22, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Allburn Subdivision
Project ID: CABAR-2020-079
County: Cabarrus
Modifications pursuant to applicable North Carolina General Statutes and/or Regulations:
As was listed in the original approval letter.
Comments and Recommendations:
This ESC plan approval is only for the ownership transfer of CABAR-2020-079 to new FRO parry. All
conditions or modifications listed in the original Letter of Approval dated December 31, 2020 continue to
apply to this plan approval.
CERTIFICATE OF PLAN APPROVAL
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environment and Natural Resources
in accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and
North Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be
posted at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A, Chapter
4B.0127 (b).