Loading...
HomeMy WebLinkAboutGW1-2022-05971_Well Construction - GW1_20220617 ••��L o v�. a iev ,a a�1�1 JtEUU10((iwq) For Internal Use Only: 1.Well Contractor Information: ` ,�� I 14.WATER ZONES ! , Well Contractor Name FROM TO DESCRIPTION - A i /I 2O it. /F r ft. NC Well Contractor Certification Number T" 15.OUTER CASING for multi-cased wells OR LINER(if a ]icable Barnette Well Drilling, Inc. FROM TO DIAMETER THICKNESS MAT RIAL A' rt 2 9 rL n �( ? Company Name , lJ FJ✓ K ,(] 16.INNER CASING OR TUBING(geothermal closed-loon) 2.Well Construction Permit#: �( FROM TO DIAMETER I Tnrck'vESS I MATERIAL List all applicable well construction permits rl.e.UIC,Cotmv.State,Ybriance,etc.) ft fL in. 3.Well Use(check well use): ft ft in. i Water Supply Well: 17.SCREEN FROM TO DIAMETER SLOT SIZE I THICKNESS I MATERIAL ❑Agricultural ❑Municipal/Public fL ft in. ❑Geothermal(Heating/Cooling Supply) nResidential Water Supply(single) ft ft in. ❑Industrial/Commercial ❑Residential Water Supply(shared) 18.GROUT ❑hri ation ❑Wells>100,000 GPD FROM I TO MATERIAL EMPLACEMENT METHOD&AMOUNT Non-Water Supply Well: ft ft Cement/Sand Poured ❑Monitoring ❑Recovery I ft ft. Injection Well: ft. ft ❑Aquifer Recharge ❑Groundwater Remediation 39.SAND/GRAVEL PACK tf a licable) ❑Aquifer Storage and Recovery ❑Salinity Barrier; FROM TO MATERIAL I EMPLACEMENT METHOD ❑Aquifer Test ❑Stormwater Drainage ft. fL ❑Experimental Technology ❑Subsidence Control ft ft. ❑Geothermal(Closed Loop) ❑Tracer i 20.DRILLING-LOG attach additional sheets if necessary) []Geothermal(Heating/Cooling Return) ❑Other(explain under#21 Remarks) FROM TO DESCRIPTION(color,hardness,s illrock e,grain size etc.) 4.Date Well(i)Completed: 6 _ Jc�"z Z.Well ID# I � �� ft. ft. 5a.Well Location: ft. $^if. X/A-K lj2e-�rt 2,1 C" 2 Lrc�rt• 3`1t�5 rt. C Facility/Owner Name Facility ID#(ifapplicable) it. rt Physical Address,City,and Zip It. ft J PY � A 1 P 1-1-1a l 21 REMARKS t Y 1 J County Parcel Identification No.(PIN) 'v v:V'i P.rs7 Sb.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (ifwell field,one lat/IDng is sufficient) 22.Certification: ?� 6.Is(are)the weU(s):4!11 a manent or ❑Temporary Signatute of Certified Well Contractor Date By signing this form,l hereby certiti,that the well(s)was(were)constructed in accordance with 7.1s this a repair to an existing well: ❑Yes or �U 15A NCAC 02C.0100 or 154 NCAC 02C.0200 Well Construction Standards and that a copy If this is a repair,fill out lotown well construction in formation and exp/din the nature of the of this record has been provided to the well owner. repair under#21 remarks section or on die back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal,Wells having the same You may use the back of this page to provide additional well construction info construction,only t GW-.I is needed. Indicate TOTAL NUMBER of wells (add'See Over'in Remarks Box).You may also attach additional pages if necessary. drilled: i 24.SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: —7 ' (ft.) For multiple,vells list all depths rfelifferent(example-3Q200'and 2Q100� Submit this GW-1 within 30 days of well completion per the following: 10.Static water level below top of casing: ; ( ) 24a. For All Wells: Original form to Division of Water Resources (DWR), 1f water level is above casing,use"+" Information Processing Unit,1617 MSC,Raleigh,NC 27699-1617 I 11.Borehole diameter: (in,) 24b.For Injection Wells: Copy to DWR,Underground Injection Control(IUC) Program,1636 MSC,Raleigh,NC 27699-1636 12.Well construction method:Air Rota 24c.For Water Supply and Open-Loop Geothermal Return Wells:Copy to the (i.e.auger,rotary,cable,direct push,etc.) county environmental health department of the county where installed L13a. ATER SUPPLY WELLS ONLY: i 24d.For Water Wells producjn2 over 100.000 GP D:Copy to DWR.CCPCUA `` ! Permit Program,1611 MSC,Raleigh,NC 27699-1611 eld(gpm) L71T'1� Methodoftest: 1,9,1�(.00A sinfection type: H ` R Amount: 't� Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 6-6 2018