HomeMy WebLinkAboutNCC222292_ESC Approval Submitted_20220701G&mrnw 'LJZ4$ETH 5, RISER .Yl�orr DhT11 sr Pine Gate Renewables ATTN: Ben Catt 130 Roberts Street Asheville, NC 28801 NORTH CAROLW,% EA7Yeftm tW47"A7y June 3, 2022 LETTER OF APPROVAL RE: Project Name: East Nash Solar Array Acres Approved: 200.4 Acres Project ID: NASH-2022-016 County: Nash City: Spring Hope Address: US 64A River Basin: Tar -Pamlico Stream Classification: Other Submitted By: Gregory R. Hoffman, Civil Design Concept, PA Date Received by LQS: May 20, 2022 Plan Type: Revised Dear Mr. Catt, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please direct questions about the eNOI form to the - m [amim DeWh," d tmWunmentAojafty I Nshi o d LrwTW. 6rk" wA land Rrsnvrm WKWhUrl &"Strad I IWKAStrW*CMrr I 4hcff1tic4rrA�na2 •Lti? 25 910M 9 Letter of Approval Pine Gate Renewables June 3, 2022 Page 2 of 3 Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGO1 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. I I3A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Letter of Approval Pine Gate Renewables June 3, 2022 Page 3 of 3 Your cooperation is appreciated. Sincerely, Ivana Barham, PE Assistant Regional Engineer Land Quality Section Enclosures: Certificate of Approval NPDES NCGO1 Fact Sheet cc: Gregory R. Hoffman, Civil Design Concept, PA [Electronic] Regional Office file