HomeMy WebLinkAboutNCC222377_FRO Submitted_20220630CONSTRUCTION PLAN SUBMITTALS: Construction Plan Application, plans, calculations, and other supporting
documentation are due by12:UUp.m.onthe first business day of each month. Late submittals will beaccepted
until 430p.m.that day. ALate Fee of$3OUshall apply. Resubmh1abwill follow the Construction Plan Submittal
Schedule and are due by12:OOpmaswell asany applicable re -review fees.
Date of Submittal: NoVeDlber01 2021
Type oYSubmittal: 19Subdkddon 0 Site, Utility Extension, Greenxvay,etc.
Project Name Retreat GtFriendship Phase 1
W 9MI W. Owl —IV
K8/| HO[��8�JRaleigh, LL(�
��neror��vdoper
Patrick Adams
Contact Name
Street Address, City, State, Zip 1511Sunday Drive, SUite110Raleigh NC 27807
Phone Number 919-233-5725
E-Mail Address rDihorDeS
Prepared by
Patrick Kiernan
Engineering Firm Jones &CDnS3eDEngineering, PLLC
Patrick Kiernan 049838
EnQineer(Rot,LamLName PE
221 N. Salem St., Suite 001 Apex N[|27502
��etAdde�,�K5�t��
Phone Number 919-387 -1174
E-Mail Address DcoOl
Engineer's Certification Statement:
X | certify that all information requested on the construction plan application checklist has been included as
part of this construction drawing submittal and to the best of my knowledge the information provided is
complete and accurate.
Engineer's Signature:
SEAL
Please Note: Construction Plans will not be approved until the environmental permitting state
3 is received by Development Services and all required permits have been issued (including all DOT, Stat
Local, and other permits required for ).
Page
24"x36"sbewith ascale not less than 1"=5O horizontal, 1.=5'vertical (for Qreenwaysnot less than 1"=
40horizontal, 1"=5'vertica/). Each sheet shall be saved as an individual pdf file, titled with the plan sheet
number and name, and uploaded inlandscape orientation.
FSL Electronic Upload on IDT Plans of Construction Plan Application, Stormwater Impact Statement [as required
inUDOSection 6.1.7(A)(2)&6.1.7(8)(2)],Calculations, downstream sewer capacity study, Soil Erosion and
Sedimentation Control Plan Request for Plan Approval, Financial Responsibility Form, and all other
supporting documentation.
Subdivision Plan Review:
W $6OU.0OBase Fee +$10/Lot 3zNo. ofLots
(Re*ubm/tta/Fee: 112origina/feeafter 2m4thand 6tt'TRCsubmittal)
ms
Site, Utility Extension, QreenwayEtc. Review:
[] $6UO.OUBase Fee +$15/5heet No. ofSheets
(Re -submittal Fee: 112 original fee after 2 nd , 4th, and 6th TRC submittal)
Soil Erosion and Sedimentation ContrmlPlan Fee:
R $GO8per disturbed acre, numaximum (rounded tothe nearest dollar) 16.3
(Pmposed'round tonearest 1/0) $ 8,150.00 Fee Amount
Fee Amount
Fee Amount
Acres Disturbed
El + $50 per disturbed acre for future development, no maximum (rounded to the nearest dollar)
Acres Disturbed (Futune,round tonearest 1/10) Fee Amount
GtomoxxaterReview Fee:
iQ $S00base review fee for projects disturbing uptuSacres. Add $50per additional disturbed acre beyond 5
acres. Development projects that disturb less than 1acre ofland are not subject tuthe stonmwaterplan
review fees since they are exempt from stormwater controls. The stormwater plan review fee will be
limited toamaximum of5Oacres.
aLoiect Size (disturbed acresl
Stormwater Plan Review Fee
5 to 50 (max.)
$500 + $50 per additional disturbed acre
Stormwoter plan review fee should besubmitted to Development Services with construction plan
application. Allfees are per disturbed acre or portion of acre.
16.3 Amount of Disturbed Area
TOTAL FEE SUBMITTED (May be one check):
Mail check to: OR
Town ofApex, Development Services
PO Box 250
$1,065.00
$10,145.00
Deliver check to:
Town ofApex, Development Services
1O5-BUpchurch Street
Apex,NC 27502
Fee Amount
[]Yes 9No Does the proposed construction project have environmental impacts that will require a40I
permit fromNCDVVR?
[]Yes XNo Does the proposed construction project have environmental impacts that will require a 404
permit from USA[E?
El Yes XNn Does the proposed project have environmental impacts that will require a Neuse Buffer
Authorization from N[DVVR?
[]Yes OK No Does the proposed project have impacts that encroach into Special Flood Hazard Areas? If so,
aTown ofApex F|oodp|ainDevelopment Permit will berequired.
[]Yes CKNo Does the proposed project have impacts that encroach into FEIVIA floodway or non -
encroachment area? |fso, aCondition Letter ofMap Revision ([LOW1R)will berequired.
[]Yes ;KNn Does the proposed project require other environmental permits?
if yes, please specify:
If you answered yes to any of the questions above, then complete the Certification of Environmental
Compliance below and deliver toDevelopment Services. Construction Plans will not haapproved until the
following certification |sreceived byDevelopment Services and all required permits have been issued
(including all DOT, State, Local, and other permits required for approxa|).
Certification of Environmental Compliance
as a duly registered
in the State of North
Carolina, do hereby certify that all environmental permits/approvals applicable to the construction of (project
have been granted bythe appropriate regulatory agency(s).
Signature:
Registration Number:
**THIS CHECKLIST SERVES AS A MINIMUM GUIDE ONLY AND IS NOT TOTALLY INCLUSIVE OF ALL FEDERAL,
STATE, OR LOCAL REQUIREMENTS. IT IS THE DUTY OF THE DESIGN ENGINEER TO ENSURE ALL
REQUIREMENTS ARE MET**
GENERAL
I� All required plan notes from the Site/Subdivision Plan shall be carried over to the Construction Plan and be
consistent with Town approved Site/Subdivision Plan — see Checklist at the end of the applicable
Site/Subdivision Plan Application. All plan sheets from the Site/Subdivision Plan shall be carried over to
the Construction Plan (including architectural elevations).
�I Include Site Data Table from the Site/Subdivision Plan
1 All conditions set forth by the Town Council and TRC have been met
All plan sheets must be signed and sealed by a design professional. This includes details. Plans not signed
and sealed will not be accepted for review. Preliminary statements may be affixed to the documents to
allow design professionals to seal preliminary plans. A Professional Engineer licensed in the State of North
Carolina must sign and seal all sheets proposing utility improvements and public roadway
improvements. All sheets proposing SCMs and any alterations thereof shall be signed and sealed by a
North Carolina registered professional (professional engineer, landscape architect, or land
surveyor). Please see LIDO Section 6.1.12 for further information on professionals qualified to design
SCMs
Include Easement Exhibit Page(s) in each set. See example of an acceptable Easement Exhibit on our
website.
C? Include Signage/Striping Page(s) in each set. See example of an acceptable Street Signage/Striping
Exhibit on our website.
® Add the signature block below to the lower right hand corner of every construction plan sheet (including
details, landscape, and architectural sheets). Do not add to the Cover Sheet.
The signatures affixed below certify that this sheet has been reviewed and approved solely per
the certifications signed on the cover sheet of these construction plans.
Public Works —Transportation
Building Inspections
Water Resources — Utility Engineering
Electric
Water Resources — Stormwater
Planning
Planning — Transportation
Fire
Water Resources — Soil & Erosion Control Parks, Recreation & Cultural Resources
Page 4
COVERSHEET
X Add the following certification statements to the cover sheet of the Construction Plan
BUILDING INSPECTIONS & PERMITS TOWN OF APEX CERTIFICATION
This drawing has been reviewed by the Town of Apex Building Inspections & Permits
Department, and to the best of my knowledge and belief, conforms to the
requirements established within the Town's Code of Ordinances and the North
Carolina State Building Codes. However, this signature does not constitute a variance
from any requirements contained in any federal, state, or local code, law,
specification, rule or ordinance. It is the sole responsibility of the owner/developer,
or any of his agents or contract professionals to ensure that this construction plan
meets all the aforementioned requirements.
By:
ELECTRIC TOWN OF APEX CERTIFICATION
This drawing has been reviewed by the Town of Apex Electric Department, and to the
best of my knowledge and belief, conforms to the requirements established in the
Standard Specifications and Construction Details and the Unified Development
Ordinance of the Town of Apex. However, this signature does not constitute a
variance from any requirements contained in any federal, state, or local code, law,
specification, rule or ordinance. It is the sole responsibility of the owner/developer,
or any of his agents or contract professionals to ensure that this construction plan
meets all the aforementioned requirements.
By:
FIRE DEPARTMENT TOWN OF APEX CERTIFICATION
This drawing has been reviewed by the Town of Apex Fire Department, and to the
best of my knowledge and belief, conforms to the requirements established within
the Town's Standard Specifications, Fire Protection Ordinances, and the North
Carolina International Fire Code. However, this signature does not constitute a
variance from any requirements contained in any federal, state, or local code, law,
specification, rule or ordinance. It is the sole responsibility of the owner/developer,
or any of his agents or contract professionals to ensure that this construction plan
meets all the aforementioned requirements.
By:
PARKS, RECREATION, AND CULTURAL RESOURCES
117 TOWN OF APEX CERTIFICATION
These plans have been reviewed by the Town of Apex, and to the best of my
knowledge and belief, conform to representations made by the developer to myself
and the Parks, Recreation, and Cultural Resource Advisory Commission consistent
with the projects requirements for public Parks and Recreation, either in total or in
part, as outlined in the Town of Apex Unified Development Ordinance and Town of
Apex Code of Ordinances. However, this signature does not constitute a variance
from any requirements contained in any federal, state, or local code, law,
specification, rule or ordinance. It is the sole responsibility of the owner/developer,
or any of his agents or contract professionals to ensure that this construction plan
meets all the aforementioned requirements.
By:
PLANNING/ZONING TOWN OF APEX CERTIFICATION
This construction drawing has been reviewed by the Town of Apex Planning
Department, and to the best of my knowledge and belief, conforms to the
Subdivision or Site Plan that was approved by the Town of Apex Town Council or
Technical Review Committee, as appropriate, and meets the standards of the Town
of Apex Unified Development Ordinance. This signature does not constitute a
variance from any requirements of the originally approved Subdivision or Site Plan
cited above, or any federal, state, or local code, law, specification, rule, guideline, or
ordinance. It is the sole responsibility of the owner/developer, or any of his agents or
contract professionals to ensure that this construction plan meets all the
aforementioned requirements.
By:
PUBLIC WORKS & TRANSPORTATION
I = TOWN OF APEX CERTIFICATION
This drawing has been reviewed by the Town of Apex Public Works &
Transportation Department, and to the best of my knowledge and belief, provides
an acceptable transportation system with consideration for the elements contained
within the Transportation Plan conforming to the requirements established in the
Standard Specifications & Standard Details and the Unified Development Ordinance
of the Town of Apex. However, this signature does not constitute a variance from
any requirements contained in any federal, state, or local code, law, specification,
rule or ordinance. It is the sole responsibility of the owner/developer, or any of his
agents or contract professionals to ensure that this construction plan meets all the
aforementioned requirements.
By:
WATER RESOURCES SOIL EROSION & SEDIMENTATION CONTROL
TOWN OF APEX CERTIFICATION
This drawing has been reviewed by the Town of Apex, and to the best of my
knowledge and belief, conforms to the requirements established in the Soil Erosion
and Sedimentation Control Ordinance of the Town of Apex. However, this signature
does not constitute a variance from any requirements contained in any federal, state,
or local code, law, specification, rule or ordinance. It is the sole responsibility of the
owner/developer, or any of his agents or contract professionals to ensure that this
construction plan meets all the aforementioned requirements.
This signature does not constitute plan approval, only plan requirements. A
separate letter of plan approval will be mailed to the financially responsible person
at a later date according to the construction sequence.
By:
WATER RESOURCES STORMWATER ENGINEERING
TOWN OF APEX CERTIFICATION
This drawing has been reviewed by the Town of Apex Water Resources Stormwater
&Utility Engineering Division and to the best of my knowledge and belief, conforms
to the requirements established in the Standard Specifications and Standard Details
and the Unified Development Ordinance of the Town of Apex. However, this
signature does not constitute a variance from any requirements contained in any
federal, state, or local code, law, specification, rule or ordinance. It is the sole
responsibility of the owner/developer, or any of his agents or contract professionals
to ensure that this construction plan meets all the aforementioned requirements.
This signature serves as the stormwater permit for this project.
By:
WATER RESOURCES UTILITY ENGINEERING
TOWN OF APEX CERTIFICATION
This drawing has been reviewed by the Town of Apex Water Resources Department,
and to the best of my knowledge and belief, conforms to the requirements
established in the Standard Specifications and Standard Details of the Town of Apex.
However, this signature does not constitute a variance from any requirements
contained in any federal, state, or local code, law, specification, rule or ordinance. It
is the sole responsibility of the owner/developer, or any of his agents or contract
professionals to ensure that this construction plan meets all the aforementioned
requirements.
By:
CO\NERSH0ET-continued
K All site and/or subdivision plan conditions and all rezoning conditions shall be listed on the cover sheet of
the Construction Plan
�~ Include Site Data Table from the Site/Subdivision Plan
Add the Site / Subdivision Plan Expiration Date tothe cover sheet
X Add Public Infrastructure Table to the cover sheet listing all new public infrastructure added as follows:
VVaterUnes- LF Storm Drain (pubUc)-LF
Sewer Lines -LF Sidewa|k/Greenways-LF
pCurb& Gutter-LF "New Streets (public) - LF-Lane
*Curb & Gutter (public) — All newlreplaced public curb & gutter on both sides of street
"New Streets /pub0d—LFper lone
The Public Infrastructure Table will be used toassess construction inspection fees. An invoice for
construction inspection fees will be prepared upon receipt of the signature set. Half ofthe invoice will be
payable upon release of the approved construction plans and the remainder will be due prior to first plat
for subdivisions o/first certificate ofoccupancy for site plans.
�M Allowed & proposed built -upon area clearly indicated insite data table
56 Provide latitude and longitude (decimal degrees) on the centroid of the project in site data table
CK Primary or secondary watershed protection overlay district indicated in site data table
9 Type nfgrading indicated (mass vsstaged) insite data table
indicate amount nfnatural drainage patterns preserved in site data table
Add a text box indicating which Town Standard Specifications and Standard Details version the plans are
subject to. The Standard Specifications and Standard Details in effect at the time of first Construction Plan
submittal shall apply,
X Add the following Table to the Coversheet for Approved Exceptions
APPROVED EXCEPTIONS
The following items have been approved as exceptions for this drawing
by the Town of Apex Department Director(s), and to the best of my
knowledge and belief, this drawing conforms to the requirements
established by the Director(s) allowing deviation from the Standard
Specifications and Standard Details of the Town of Apex. The signature
below represents that the requesting Engineer has been granted a
variance ONLY for the items listed. The developer/engineer/contractor is
solely responsible for meeting all applicable requirements.
(List items below add number as needed)
APPROVED EXCEPTION
DIRECTOR GRANTING
EXCEPTION
1.
2.
3.
By: Date:
Requesting Engineer
EXISTING CONDITIONS SHEET
o� Riparian buffers shown in accordance with Town Watershed Protection Overlay District Map oron-site
field determination
Reference riparian buffer call project number (if applicable)
� Riparian buffers measured from top of bank with all zones properly labeled
Topography: Town UDARorfield-verified survey. NoWake County G|Sallowed
100-year floodplain boundary clearly shown and labeled (if applicable)
NOTES, GRADING, AND EROSION CONTROL SHEETS
Z Add the following Construction Sequence to the Notes sheet as well as all Grading and Erosion Control
Town of Apex Construction Sequence
The following begins only after Construction Plans are approved, signed by Town staff and copies are received.
1. Through the Infrastructure Inspections Manager at (919) 249-3386, schedule a pre -construction meeting
with inspectors and other Town staff.
2. Fill out Tree/Protection Fencing Installation Permit Application (obtain from Planning Department).
3. Have a surveyor flag property lines, easements, buffers, tree protection areas, and flag the protection
limits,
4. Contact anApex Planning Department Zoning Compliance Officer at(919)249-3426torequest approval
for tree protection fencing locations.
S. Install approved tree protection fencing, signs, and/or any other protection measures that may be
required. Call Planning at249-3426for afinal inspection ufprotection measures. Planning will forward
approval tnWater Resources, Erosion Control field staff.
6. Submit the applicable 5&Eperformance guarantee tothe Development Services Supervisor at249-3394
inDevelopment Services. Aninvoice can berequested from Water Resources ut(919)36Z-8166. The
erosion control Letter of Plan Approval will not be issued until the guarantee has been submitted. The
guarantee will be returned once all Stormwater Control Measures (SCMs) have been converted and
accepted bythe Town, all temporary erosion control measures have been removed and the site is 100%
permanently stabilized.
7. Request a Letter of Plan Approval for sedimentation and erosion control measures from Water
Resources staff at(919)362'O166.
8. Complete and submit an electronic Notice of Intent (e-NOI) form with NCDEMLR requesting a Certificate
of Coverage (CUC) under the NCGOl Construction StonmwaterGenera| Permit. Visit the following
website:
The [O[ must be submitted to the Town prior to the
commencement of any land disturbing activity.
9. Install gravel construction entrance, temporary diversions, silt fencing, sediment basins, bypass
channels, and/or other measures as shown on the approved plans. Clear only as necessary to install
these devices.
10. When completed, call Water Resources staff at (919) 362-8166 for an on -site inspection and to request
aCertificate wfCompliance. Water Resources will also forward ucopy tothe Building Inspections &
Permitting Department.
11. Complete a Grading Permit Application, if required, from the Building Inspections & Permitting
Department.
12. Once Grading Permit is reviewed and issued by the Building Inspections & Permitting Department,
arrange apre-construction meeting with Tim Sawyer at(919)904'8744o/Brandon Beck at(919)2OO-
O362prior tnany grading activities. This meeting isseparate from any other pre -construction meetings
required inthe Construction Sequence.
13. Post Grading Permit prominently onsite atall times.
14, Begin clearing, grubbing, and rough grade of the site in accordance with the approved grading plan.
15. Stockpile a sufficient amount of topsoil to cover 3 inches over landscaped areas at the end of the project.
16. Install storm sewer, if applicable, and protect inlets with inlet protection devices, sediment devices,
and/or other approved measures asshown onplans. Maintain S&Emeasures asneeded.
17. After completion of any phase of grading or when land -disturbing activities have temporarily ceased,
establish groundcover on swales and ditches and graded slopes steeper than 3:1 within 7 calendar days;
slopes that are ]:1orflatter must establish Qroundcoverwithin 14calendar days.
18. Stabilize site as areas are brought up to finished grade with vegetation or paving.
19. Prior to plat approval, all disturbed areas both public and private, must be properly stabilized. All
temporary erosion control measures must be installed, be functioning properly and be maintained for
the entire area contained within the plat.
JO. Flush and dean all stormwate/system pipes. Clean and remove sediment from temporary sediment
holding devices. Follow the SCM Construction Sequence found on the Grading and/or SCM Detail sheet
onthe Construction Plan set.
21. Remove all temporary diversions, silt fencing, sediment basins, etc. and provide adequate cover or pave
any resulting bare areas. All permanent erosion control devices should be installed at this point.
22. When vegetation has been established, call Water Resources staff at (919) 362-8166 fora final site
inspection and torequest aCertificate mf Completion. The S&Eperformance guarantee will bereleased
with the issuance ofthe Certificate ofCompletion. Visit the State vvebabelisted above and submit an
electronic Notice of Termination (e-NOT) to end coverage under the NCGO1 permit.
23. The Property Owner/Home Owners Association will be responsible for permanent erosion control
maintenance ofthe site.
GRADING AND DRAINAGE PLAN SHEET
X All public and private storm drainage infrastructure clearly shown and labeled
CK All public and private drainage easements clearly shown and labeled
Q� Junction box, yard inlet, or other structure separating public / private clearly shown and labeled
0� All S[Msclearly shown and labeled
X Grading plan shows all off -site contributing drainage areas entering and exiting the project boundary
X All SCM maintenance & access easements tied to a public ROW clearly shown and labeled
All riparian buffers clearly shown and labeled
Limits of disturbance clearly shown and labeled
X All outlet protection clearly shown and labeled with dimensions
t4lp, 1:1 All retaining walls clearly shown and labeled
I00-yearfloodpbinboundary clearly shown and labeled; if not covered by current FEMA FIRM Panel, 100-
year floodplain shall be calculated
All culvert crossings designed from actual field survey topo and centered in flow line of channel at correct
elevation with correctly sized headwalls, end walls and wing walls
UTILITY PLAN SHEET
9 Water and Sewer systems designed inaccordance with 15A02T, andN6AC 18C Rules
EX Water and Sewer systems designed in accordance with current Town of Apex Standard Specifications and
Standard Details
IN Water and Sewer systems designed in accordance with the Town of Apex Master Facilities Plans
9 A downstream sewer capacity study, including pump stations, has been performed and provided
04 All water and sewer mains and points ufconnection clearly shown and labeled
4 Pool discharge rates do not exceed 50 GPM, downstream sewer capacity or pump station capacity
INT All appurtenances clearly shown and labeled
EK All cross connection devices clearly shown and labeled with appropriate model based on degree of hazard
0K All manholes clearly shown and labeled
IR All water and sewer services clearly shown outside of driveways / paved surfaces
M All required public utility easements clearly,shown and labeled with proper width per Town of Apex
Standard Specifications and Standard Details
QR All required public utility easements are free and clear of impoundments, structures, retaining walls,
concrete or paved surfaces (unless approved by Director of Water Resources), private utilities, plantings,
|undscupe/hurdscape,
ER All sewer extensions upeach natural draw clearly shown
Q� All sewer lines in or within 50 feet of a wetland have been designed to water line pressure standards
All water and sewer extensions are designed to reach entire frontage of development
Riparian buffers measured from top of bank with all zones properly labeled.
NtA [] All retaining walls clearly shown and labeled
ER All 6CMsclearly shown and labeled including exterior slopes
Q? All footprints ofstock piles nrborrow pits clearly shown and labeled
E9 All required notes are clearly shown
UTILITY PROFILE SHEET
QR Sheets are tobeplan view ontop portion ofsheet and matching profile below
5( Utility Profiles (Water/Sewer/Storm Drain) and other known conflicting utilities clearly shown and labeled
UL 10}Year Flood Plain Elevation clearly shown and labeled (if applicable)
[] Aerial Crossings with structural design clearly shown and labeled (if applicable)
O� Stream Crossings to be field surveyed and accurately shown on profile with structural design (if applicable)
QD Clearly label all manholes with proper diameter, invert information, rim elevation, cone or flattop, any
special wraps urcoatings, drop inlets
QQ Clearly label all sewer mains with proper size, slope, and material information
0K Clearly label sewer material as: SDR35,C9O0/C905-DR18,DIP, FUD|P
@Q Clearly label any special bedding ifapplicable
IK Any sewer line less than 3feet deep isDIP
C� Clearly label all water lines with proper size and material
Clearly identify bore casings (if applicable)
SEWER PUMP STATIONS AND FORCE MAINS 141k
[] Has been previously approved bythe Director ofWater Resources
O All shop drawings, design calculations, and site layout have been submitted for review
[] Meets Master Facilities plan and /or is designed to meet basin requirements for 2030 land use plan
L] Meets all Federal, State, and Local requirements
[] Has dedicated parcel ofland for site including buffer requirements
[] Has dedicated driveway from public ROW with appropriate sized access road or easement to station
[] Identify all new or existing manholes within 1,200 feet of a force main discharge to be coated per Town of
Apex Standard Specifications and Standard Details
[] Identify any required ARV(s) and identify ARV manhole to be coated per Town of Apex Standard
Specifications and Standard Details
BUILDING INSPECTIONS ITEMS
F1 Schematic Floor Plans (for Site Plans only)
FLOODPLAIN ITEMS
[] For proposed developments that encroach Special Flood Hazard Areas, a Floodplain Development Permit
must beissued bythe Town ofApex prior UoConstruction Plan Approval. Please contact Adam
Stephenson, P.E. at ur(919) 249-3417 for more information.
TRANSPORTATION ITEMS
RoadPbn/Pmfibs
0� Roadway Typical Sections including pavement design
LJ include roadway stationing and cross sections at 50-foot intervals along existing and proposed
thoroughfares and collector streets
O Transportation Facility (R)Permit approved byN0BNRDivision of Air Quality for large parking lots
(1500+surface parking spaces,750+ structured parking spaces, or1000+combination surface/ structured
parking spaces). Construction plans will not be approved without this permit being approved 6Vthe
Division of Air Quality.
STORMWATER CONTROL MEASURE (SCM) ITEMS
9. include the following note as shown below on all Stormwater Control Measure (SCM) Plans:
ALL SCIVIS MUST BE CONSTRUCTED PER THE APPROVED
PLAN INA TIMELY MANNER. NO EXCEPTIONS!
include the following notes on all StonnwaterControl Measure (SJCM) Plans:
The following must occur prior to Final Plat and/or Certificate of Occupancy (CO):
1 All Stonnwater Control Measures (SCMs) must be installed in accordance with the approved
construction drawings.
l Town Soil Erosion & Sedimentation Control staff shall be notified at least 10 days priorto the clewatering
ofasediment basin asrequired bythe N[GO1permit.
3. During the SCM conversion process, all efforts shall be made to protect downstream waters. The drain '
valve shall not be left open at any time during 3CK8 conversion. Askimmer dravvdown system shall be
installed and utilized until the S[K8isfully converted.
4. The design engineer must submit an as -built package which meets all requirements presented in the
Town Spec Book including asigned and sealed certification statement.
5. For subdivisions only, a 25% maintenance guarantee is required to be submitted to Jean Weatherman
inDevelopment Services at(919)249-3394.
6. The appropriate executed SCM O&M Agreement must be eRecorded with Development Services.
7. A0na| inspection bythe 6tormwater& Utility Engineering staff shall be conducted once the as -built
submittal has been received. Once approved, staff will send an official SCM approval letter to the owner.
D. In lieu ofSCK8 completion and final approval by staff, the Town may accept a 12596 performance
guarantee in accordance with UDO Section 6112(G). This guarantee will be collected by Jean
Weatherman inDevelopment Services et(919)249-3394.
9. All SCMs are required to be completed final CO (for a site plan) or by final plat (for a subdivision).
10. If an SCM counts towards RCA, the required landscaping shall be installed during the appropriate
growing season and coordinated with the Town Zoning Compliance Officer at (919) 249-3426.
All SCIVIs have been designed in accordance with the Town's LIDO storm water control requirements, Town
Standard Specifications and Standard Details Manual, NC Stormwater Design Manual
All SCK1water quality/quantity calculations have been submitted
SCK8contributing drainage area maps have been submitted
NCDE[\SCMsupplements have been submitted
[] SHWT evaluation has been conducted with summary report included in calculations
54 SCK4 details provided (including plan view, croso-aection, riser/burre|,dam embankment, high -flow bypass,
1K SCM landscaping plan is included
PARKS AND RECREATION CHECKLIST & FEES
Construction Plans will not be accepted at first submittal without required plan and profile sheet(s) for all
public greenways, to be consistent with the Town of Apex Standard Specifications and Construction Details for
paved and non -paved 0neenways.
GreenwayConstruction Cost Estimate must bereviewed and approved byTown Staff prior tosubmittal ofthe
Final Signature Set of the Construction Drawings.
PARKS AND RECREATION CHECKLIST & FEES -contnued
*� Include the following information onthe Site Data Table onthe Cover Sheet. Please fill inknown
information below atthe time of1stSubmittal for Construction Drawings
Fee -in -lieu of dedication
#ufsingle-family detached units
#ofsingle-family attached units
# of multi -family units
x$�
x$
*/ unit =
*/ unit =
x unit=
Total Fee-n-l|euofdedication
________
*Use current fee schedule
And/or
Acres of Land Dedication
#ofsingle-family detached units x1/3U (.O3329)acre / unit
=
#ofsingle-family attached units _x1/45(IO223)acre / unit =
# of multi -family units
Total Land Dedication
QreenwaVComatruction El Yes 9No
6neenwayConstruction Cost Estimate x125%ofestimate =Greenvvay
Performance Guarantee (payable bycash, certified check, surety bond, or
letter ufcnedit). Please contact Jean Weatherman, Development Services Supervisor at (919) 249-
3394priortusubmittinQthePerfonnanceGuarantee.
Application for approval of Erosion Control Plan:
$500 per disturbed acre, no maximum (rounded to the nearest dollar)
16.3 Acres Disturbed (Proposed, round to nearest 1/10) $ 8,150.00 Fee Amount
+ $50 per disturbed acre for future development, no maximum (rounded to the nearest dollar)
Acres Disturbed (Future, round to nearest 1/10) $ Fee Amount
$ 1 0 . 60 Total Fee
Performance Guarantee: $2,500 per disturbed acre in the form of a certified check, cash, or irrevocable letter of
credit. The Performance Guarantee is due prior to the Town issuing a letter of soil erosion and sedimentation
control plan approval. Please contact Jean Weatherman at (919) 249-3394 prior to submitting the Performance
Guarantee.
1. Familiarize yourself with the Town of Apex Soil Erosion and Sedimentation Control Checklist.
• Develop your Soil Erosion and Sedimentation Plans accordingly.
• Complete and sign one the Request far Plan Approval form.
• Complete and sign a Town of Apex Sail Erosion and Sedimentation Control Checklist.
• Complete a Financial Responsibility/Ownership form.
• Prepare your construction plans. If your supporting calculations are on separate sheets, upload a separate
file of your calculations.
• Submit the Soil and Erosion Control Fee to Development Services.
2. Submit the Request for Plan Approval, construction plans, supporting calculations, and the Financial
ResponsibilityjOwnership form to the Town of Apex Development Services through IDT Plans. Submit yourfees
via check to Development Services.
Page 1
The enclosed Soil Erosion and Sedimentation Control (S&E) Plan is respectfully submitted for your review and
approval.
07tO-4a -715W, D7Z-O-V'T-277'4
Tax Map No. Parcel No.(s) 0710 - 041, o%e,,*
zoning PUD-CZ
Subdivision: Retreat at Friendship - f94A-,f_ �
Recorded:
Registry Book No.
Land Use:
Present:
. Vacant
Size of Tract:
Page No.
Total Acres: 0.
r
Z�.
Future: Residential
Number of Acres to be Disturbed 1 6.3
Total Number of Family Units: 1325 Percent Impervious Surface:
- 7 '3'- 1.,
Location of Tract: of: 40,A,V6�11-14V_ 1, V
Project Name: Retreat at Friendship - a,14,;f t
t
Owner(s) Name- M/1 Homes
Address: 115 )l 1 Sunday Dr, Ste 110
City State, zip a
Raleiah, NC 27607
Phone: 919-205-9980 E-mail: eleatham@MIHOMES.com
Person Financially Responsible: Erica Leatham
A ress: 11511 Sunday Dr, Ste 110
City State, zip Raleigh, NC 27607
Phone: E-mail:
919-205-9980 eleathamrd)MIHOMES.com
Page 1
PART A (check all items included)
@iiiiName ofProject: Retreat at Friendship Phase 1
9Soil Erosion and Sedimentation Control Checklist completed and signed
XRequest for Plan Approval: One (1)copy completed and signed
gR Preliminary Zoning and Subdivision Approval: One (1) copy of approved notification
0KApex Financial Responsibility/Ownership Form: Completed, signed, and notarized
iiPermit Application Fees: $5OOper disturbed acre, nomaximum (rounded tothe nearest dollar)
1&3 Acres Disturbed (Pooposed,round tonearest 1/10) $ 8,150M Fee Amount
+ $50 per disturbed acre for future development, no maximum (rounded to the nearest dollar)
Acmes Disturbed (Futune, round to nearest 1/10) Fee Amount
Total Fee Amount
M�One (1)Set ofSedimentation and Erosion Control Plans Including Details
AOne (1)Full Set ofthe Construction Drawings
K One (1) Set of Calculations
PART B (check all items included)
Ome(1) Copy nfSoil Erosion Control Plan, Including:
Q� Location Map (showing project in relation toState road system)
O� Existing and Proposed Contours (plans and profiles for roadways)
M Boundaries ofTotal Tract (including project limits)
XOff-Site Conditions (ownership, zoning, drainage areas, and adjacent topography)
X Easements, Lot Lines/Numbers, Road Names, Buffers, Wetlands Limits, Streams, Ponds, and Lakes
2Flood Zones (community panel number, basin and stream number, flood fringe with elevations, flood way, RFPEs,etc.)
X Utilities (community water and sewer, plan/profiles, easements, and sediment controls)
XBmrrovvand Spoil Areas (located and specified onplan)
E& Concrete Washout Area(s) (located and specified on plan)
X Proposed Improvements (roads, buildings, parking areas, grassed, landscaped, and natural areas)
��
�_Stu,mnvvaterNetvvurk(in|eto.cu|verts'swo|es,ditches,channds,anddrainuQeeaxemento)
N Disturbed Area (clearly delineated with acreage specified onplan)
XTemporary Sediment Controls (locations and dimensions of gravel entrances, diversion ditches, silt fences, sediment
basins, etc.)
XPernmanent Erosion Controls (locations and dimensions ofdissipaters, ditch linings, armoring, retaining walls, etc.)
X Detail Drawings (sections, elevations, and perspectives of measures sufficient for construction as designed)
L4 Construction Sequence (use Town Construction Sequence and modify asnecessary)
X SCM Construction Sequence (to befollowed once contributing drainage area isfully stabilized)
C9 Scale, Legend, Orientation, and Signature Seal
^�,.
��
mteu(asnecessorytodescribeprocedures tubefollowed)
Page
Plans Prepared By: Jones & Cnossen Engineering, PLLC
Address: 221 N. Salem St., Suite 001
City State, Zip Apex, NC 27502
Documents, Maps and Computations Submitted with this Request:
The 5&EPlan, supporting documents, maps, and computations submitted for the above tract are all inaccordance
/ignature
-tinted Name I I
II/I / /; z' I
Date
X Specifications (seedbed preparation, soil amendments, construction and seeding schedules, etc)
&Indicate Watershed Protection Overlay District [Primary or Secondary] (describe water quality protection methods)
One Set ufCalculations, Including:
Peak Discharge of Runoff (pre -construction, construction, and final phase discharges for the site up to and.at the
property line)
X-TenopmraryDevices (sediment storage and Q25capacity and dimensions)
K Ditches, Swales, and Channels (Q25, V10, tractive force/shear stress, capacity, and geometry)
kDissipaters({l1Ovelocities, stone size, and dimensions)
X.Storm Culverts and Inlets (inverts, length, slope, Q100 and HW100 in natural drainage ways; Q10 and HW10 for all
others)
Other Requirements
El R40W-80W Zoning (locations, dimension, details, calculations, and specifications for watershed protection measures)
El Narrative Describing the Nature and Purpose of Construction Activity (phasing, clearing and grubbing, special
sequencing, experimental devices, etc.)
[] Na Tf Receiving Water (only here stormwater system discharges are to occur)
PART C (Other Related Regulatory Requirements)
NPDE5
The Federal Clean Water Act requires that National Pollutant Discharge Elimination System (NPDES) permits be
obtained for discharges of stormwater runoff from construction activities disturbing one or more acres. In North
Carolina, the NPDES stormwater discharge permit for construction activities is considered automatically effective
once the N[ Division of Land Resources or the delegated local program approves the Soil Erosion and
Sedimentation Control Plan. Applicants will receive a copy of the permit once the Soil Erosion and Sedimentation
Control Plan has been reviewed and o Letter of Plan Approval is issued. Should you have questions regarding
NPDES permit, please contact Sara Knies, (DENR-Surface Water Protection) at (919) 791-4258.
Wetlands
Any project having the possibility of wetlands (indicators being flood hazard solid or alluvial soils, wetland
vegetation, b|ue|ine streams, etc.) within its boundaries should be invesLigated by the U.S. Army Corps of
Engineers prior to any disturbance todetermine the existence ofwetlands and any requirements thereof. For
information contact James Lastinger, Raleigh Field Office, U.S. Army Corps of Engineers, (919) 554-4884 ext. 32.
No person may initiate any land -disturbing activity on twenty (20) thousand square feet or more before this form has been
completed and filed with the Town of Apex Water Resources Department.
PART A
Name of Project: Retreat at Friendship Phase 1
Location of Land -Disturbing Activity: 0 Humie Olive Road, 8824 New Hope Farm Road and 8829 New Hope Farm Road
Approximate Date Land -Disturbing Activity will Commence: Winter 2021
Acreage of Land to be Disturbed: 16-3 ac-
Latitude: Longitude:
Land Owner(s) of Record (use blank page to list additional owners):
Name• Jeff & Lisa Cicin
Current Mailing Address:
104 Corsica Lane
City, State, Zip: Cary, NC 27511-6476
PART B
Name• Edward & Deborah Peart
Current Mailing Address
8829 New Hope Farm Road
City, State, Zip New Hill, NC 27562-9179
Person or firm financially responsible (developer) for this land disturbing activity. Financial responsibility includes, but
may not be limited to: payment of civil fines and criminal penalties and any other costs associated with bringing the
project into compliance with the Town of Apex Soil Erosion and Sedimentation Control Ordinance.
Name of Person or Firm: M/I Homes of Raleigh, LLC
Telephone: 919-233-5725
Current Mailing Address:
1511 Sunday Drive, Suite 100
City, State, Zip: Raleigh, NC 27607
EM."
Street Address (if different from mailing address)
City, State, Zip
Revised 312712020 Page 1
Land Owner(s) of Record
Henry Kastelberg
8824 New Hope Farm Rd
New Hill, NC 27562-9178
If the financially responsible party is not a resident of Wake County, complete the following for an appointed agent, in
Wake County, to receive any notice, process, pleading in any action or legal proceeding arising from a violation of the
Town of Apex Soil Erosion and Sedimentation Control Ordinance. By signing below, it is agreed that any notice, process,
or pleading against the person or firm who is financially responsible for this land -disturbing activity may be served on
the undersigned and shall be of the same force and effect as if served on the financially responsible person or firm. The
intent of this provision is to establish the presumption that the constructive notice from the Town of Apex will be
addressed through the undersigned agent.
Name: N/A
Telephone:
Current Mailing Address:
City, State, Zip:
Signature:
Street Address (if different from mailing address)
City, State, Zip
If the financially responsible party is a partnership or other person engaging in business under an assumed name, complete
Page 4 of this form, or attach a copy of the Certificate of Assumed Name or Partnership as recorded in the Register of
Deeds. If the financially responsible party is a corporation, complete the information on Page 5 of this form and submit a
current copy of the Annual Report as filed with the Secretary of State.
The information contained in this form is true and correct to the best of my knowledge and belief and was provided by
me while under oath. (This form must be signed by the financially responsible person if an individual or by an officer,
director, partner, or registered agent with authority to execute instruments for a corporation or partnership if it is the
financially responsible party). I agree to provide corrected information should there be any change in the information
provided herein.
Name: Erica Leatham
Date: /0 - 9 &.,'2- �
Title or Authority: M/I Homes of Raleigh, LLC, Vice President of Land
Signature:
1, a Notary Public of the County of Wee State
of North Carolina hereby certify that � k i't (Z- personally appeared before me this
day and under oath acknowledged that the above form was executed by him/her. Witness my hand and smj,this
J, day of C4)0
Notary
r{rNrAN,4
"S
0 -rA
6/4'
My Commission Expires
Financial responsibility encompasses personal liability by the person signing this disclosure form,*-,4,,TJeHA' iin a ,,, 'tie
111141
partnership or if an officer or director of a corporation which is either: (a) dissolved lawfully under North Carolina statutes:
(b) suspended from transacting business in North Carolina by the North Carolina Secretary of State; (c) insolvent; (d) in
bankruptcy; (e) undercapitalized to the extent it is unable to comply with the Soil Erosion and Sedimentation Control
Ordinance; or (f) a "she[[" corporation.
Revised 312712020 Page 2