Loading...
HomeMy WebLinkAboutNCC222377_FRO Submitted_20220630CONSTRUCTION PLAN SUBMITTALS: Construction Plan Application, plans, calculations, and other supporting documentation are due by12:UUp.m.onthe first business day of each month. Late submittals will beaccepted until 430p.m.that day. ALate Fee of$3OUshall apply. Resubmh1abwill follow the Construction Plan Submittal Schedule and are due by12:OOpmaswell asany applicable re -review fees. Date of Submittal: NoVeDlber01 2021 Type oYSubmittal: 19Subdkddon 0 Site, Utility Extension, Greenxvay,etc. Project Name Retreat GtFriendship Phase 1 W 9MI W. Owl —IV K8/| HO[��8�JRaleigh, LL(� ��neror��vdoper Patrick Adams Contact Name Street Address, City, State, Zip 1511Sunday Drive, SUite110Raleigh NC 27807 Phone Number 919-233-5725 E-Mail Address rDihorDeS Prepared by Patrick Kiernan Engineering Firm Jones &CDnS3eDEngineering, PLLC Patrick Kiernan 049838 EnQineer(Rot,LamLName PE 221 N. Salem St., Suite 001 Apex N[|27502 ��etAdde�,�K5�t�� Phone Number 919-387 -1174 E-Mail Address DcoOl Engineer's Certification Statement: X | certify that all information requested on the construction plan application checklist has been included as part of this construction drawing submittal and to the best of my knowledge the information provided is complete and accurate. Engineer's Signature: SEAL Please Note: Construction Plans will not be approved until the environmental permitting state 3 is received by Development Services and all required permits have been issued (including all DOT, Stat Local, and other permits required for ). Page 24"x36"sbewith ascale not less than 1"=5O horizontal, 1.=5'vertical (for Qreenwaysnot less than 1"= 40horizontal, 1"=5'vertica/). Each sheet shall be saved as an individual pdf file, titled with the plan sheet number and name, and uploaded inlandscape orientation. FSL Electronic Upload on IDT Plans of Construction Plan Application, Stormwater Impact Statement [as required inUDOSection 6.1.7(A)(2)&6.1.7(8)(2)],Calculations, downstream sewer capacity study, Soil Erosion and Sedimentation Control Plan Request for Plan Approval, Financial Responsibility Form, and all other supporting documentation. Subdivision Plan Review: W $6OU.0OBase Fee +$10/Lot 3zNo. ofLots (Re*ubm/tta/Fee: 112origina/feeafter 2m4thand 6tt'TRCsubmittal) ms Site, Utility Extension, QreenwayEtc. Review: [] $6UO.OUBase Fee +$15/5heet No. ofSheets (Re -submittal Fee: 112 original fee after 2 nd , 4th, and 6th TRC submittal) Soil Erosion and Sedimentation ContrmlPlan Fee: R $GO8per disturbed acre, numaximum (rounded tothe nearest dollar) 16.3 (Pmposed'round tonearest 1/0) $ 8,150.00 Fee Amount Fee Amount Fee Amount Acres Disturbed El + $50 per disturbed acre for future development, no maximum (rounded to the nearest dollar) Acres Disturbed (Futune,round tonearest 1/10) Fee Amount GtomoxxaterReview Fee: iQ $S00base review fee for projects disturbing uptuSacres. Add $50per additional disturbed acre beyond 5 acres. Development projects that disturb less than 1acre ofland are not subject tuthe stonmwaterplan review fees since they are exempt from stormwater controls. The stormwater plan review fee will be limited toamaximum of5Oacres. aLoiect Size (disturbed acresl Stormwater Plan Review Fee 5 to 50 (max.) $500 + $50 per additional disturbed acre Stormwoter plan review fee should besubmitted to Development Services with construction plan application. Allfees are per disturbed acre or portion of acre. 16.3 Amount of Disturbed Area TOTAL FEE SUBMITTED (May be one check): Mail check to: OR Town ofApex, Development Services PO Box 250 $1,065.00 $10,145.00 Deliver check to: Town ofApex, Development Services 1O5-BUpchurch Street Apex,NC 27502 Fee Amount []Yes 9No Does the proposed construction project have environmental impacts that will require a40I permit fromNCDVVR? []Yes XNo Does the proposed construction project have environmental impacts that will require a 404 permit from USA[E? El Yes XNn Does the proposed project have environmental impacts that will require a Neuse Buffer Authorization from N[DVVR? []Yes OK No Does the proposed project have impacts that encroach into Special Flood Hazard Areas? If so, aTown ofApex F|oodp|ainDevelopment Permit will berequired. []Yes CKNo Does the proposed project have impacts that encroach into FEIVIA floodway or non - encroachment area? |fso, aCondition Letter ofMap Revision ([LOW1R)will berequired. []Yes ;KNn Does the proposed project require other environmental permits? if yes, please specify: If you answered yes to any of the questions above, then complete the Certification of Environmental Compliance below and deliver toDevelopment Services. Construction Plans will not haapproved until the following certification |sreceived byDevelopment Services and all required permits have been issued (including all DOT, State, Local, and other permits required for approxa|). Certification of Environmental Compliance as a duly registered in the State of North Carolina, do hereby certify that all environmental permits/approvals applicable to the construction of (project have been granted bythe appropriate regulatory agency(s). Signature: Registration Number: **THIS CHECKLIST SERVES AS A MINIMUM GUIDE ONLY AND IS NOT TOTALLY INCLUSIVE OF ALL FEDERAL, STATE, OR LOCAL REQUIREMENTS. IT IS THE DUTY OF THE DESIGN ENGINEER TO ENSURE ALL REQUIREMENTS ARE MET** GENERAL I� All required plan notes from the Site/Subdivision Plan shall be carried over to the Construction Plan and be consistent with Town approved Site/Subdivision Plan — see Checklist at the end of the applicable Site/Subdivision Plan Application. All plan sheets from the Site/Subdivision Plan shall be carried over to the Construction Plan (including architectural elevations). �I Include Site Data Table from the Site/Subdivision Plan 1 All conditions set forth by the Town Council and TRC have been met All plan sheets must be signed and sealed by a design professional. This includes details. Plans not signed and sealed will not be accepted for review. Preliminary statements may be affixed to the documents to allow design professionals to seal preliminary plans. A Professional Engineer licensed in the State of North Carolina must sign and seal all sheets proposing utility improvements and public roadway improvements. All sheets proposing SCMs and any alterations thereof shall be signed and sealed by a North Carolina registered professional (professional engineer, landscape architect, or land surveyor). Please see LIDO Section 6.1.12 for further information on professionals qualified to design SCMs Include Easement Exhibit Page(s) in each set. See example of an acceptable Easement Exhibit on our website. C? Include Signage/Striping Page(s) in each set. See example of an acceptable Street Signage/Striping Exhibit on our website. ® Add the signature block below to the lower right hand corner of every construction plan sheet (including details, landscape, and architectural sheets). Do not add to the Cover Sheet. The signatures affixed below certify that this sheet has been reviewed and approved solely per the certifications signed on the cover sheet of these construction plans. Public Works —Transportation Building Inspections Water Resources — Utility Engineering Electric Water Resources — Stormwater Planning Planning — Transportation Fire Water Resources — Soil & Erosion Control Parks, Recreation & Cultural Resources Page 4 COVERSHEET X Add the following certification statements to the cover sheet of the Construction Plan BUILDING INSPECTIONS & PERMITS TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Building Inspections & Permits Department, and to the best of my knowledge and belief, conforms to the requirements established within the Town's Code of Ordinances and the North Carolina State Building Codes. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: ELECTRIC TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Electric Department, and to the best of my knowledge and belief, conforms to the requirements established in the Standard Specifications and Construction Details and the Unified Development Ordinance of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: FIRE DEPARTMENT TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Fire Department, and to the best of my knowledge and belief, conforms to the requirements established within the Town's Standard Specifications, Fire Protection Ordinances, and the North Carolina International Fire Code. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: PARKS, RECREATION, AND CULTURAL RESOURCES 117 TOWN OF APEX CERTIFICATION These plans have been reviewed by the Town of Apex, and to the best of my knowledge and belief, conform to representations made by the developer to myself and the Parks, Recreation, and Cultural Resource Advisory Commission consistent with the projects requirements for public Parks and Recreation, either in total or in part, as outlined in the Town of Apex Unified Development Ordinance and Town of Apex Code of Ordinances. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: PLANNING/ZONING TOWN OF APEX CERTIFICATION This construction drawing has been reviewed by the Town of Apex Planning Department, and to the best of my knowledge and belief, conforms to the Subdivision or Site Plan that was approved by the Town of Apex Town Council or Technical Review Committee, as appropriate, and meets the standards of the Town of Apex Unified Development Ordinance. This signature does not constitute a variance from any requirements of the originally approved Subdivision or Site Plan cited above, or any federal, state, or local code, law, specification, rule, guideline, or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: PUBLIC WORKS & TRANSPORTATION I = TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Public Works & Transportation Department, and to the best of my knowledge and belief, provides an acceptable transportation system with consideration for the elements contained within the Transportation Plan conforming to the requirements established in the Standard Specifications & Standard Details and the Unified Development Ordinance of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: WATER RESOURCES SOIL EROSION & SEDIMENTATION CONTROL TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex, and to the best of my knowledge and belief, conforms to the requirements established in the Soil Erosion and Sedimentation Control Ordinance of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. This signature does not constitute plan approval, only plan requirements. A separate letter of plan approval will be mailed to the financially responsible person at a later date according to the construction sequence. By: WATER RESOURCES STORMWATER ENGINEERING TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Water Resources Stormwater &Utility Engineering Division and to the best of my knowledge and belief, conforms to the requirements established in the Standard Specifications and Standard Details and the Unified Development Ordinance of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. This signature serves as the stormwater permit for this project. By: WATER RESOURCES UTILITY ENGINEERING TOWN OF APEX CERTIFICATION This drawing has been reviewed by the Town of Apex Water Resources Department, and to the best of my knowledge and belief, conforms to the requirements established in the Standard Specifications and Standard Details of the Town of Apex. However, this signature does not constitute a variance from any requirements contained in any federal, state, or local code, law, specification, rule or ordinance. It is the sole responsibility of the owner/developer, or any of his agents or contract professionals to ensure that this construction plan meets all the aforementioned requirements. By: CO\NERSH0ET-continued K All site and/or subdivision plan conditions and all rezoning conditions shall be listed on the cover sheet of the Construction Plan �~ Include Site Data Table from the Site/Subdivision Plan Add the Site / Subdivision Plan Expiration Date tothe cover sheet X Add Public Infrastructure Table to the cover sheet listing all new public infrastructure added as follows: VVaterUnes- LF Storm Drain (pubUc)-LF Sewer Lines -LF Sidewa|k/Greenways-LF pCurb& Gutter-LF "New Streets (public) - LF-Lane *Curb & Gutter (public) — All newlreplaced public curb & gutter on both sides of street "New Streets /pub0d—LFper lone The Public Infrastructure Table will be used toassess construction inspection fees. An invoice for construction inspection fees will be prepared upon receipt of the signature set. Half ofthe invoice will be payable upon release of the approved construction plans and the remainder will be due prior to first plat for subdivisions o/first certificate ofoccupancy for site plans. �M Allowed & proposed built -upon area clearly indicated insite data table 56 Provide latitude and longitude (decimal degrees) on the centroid of the project in site data table CK Primary or secondary watershed protection overlay district indicated in site data table 9 Type nfgrading indicated (mass vsstaged) insite data table indicate amount nfnatural drainage patterns preserved in site data table Add a text box indicating which Town Standard Specifications and Standard Details version the plans are subject to. The Standard Specifications and Standard Details in effect at the time of first Construction Plan submittal shall apply, X Add the following Table to the Coversheet for Approved Exceptions APPROVED EXCEPTIONS The following items have been approved as exceptions for this drawing by the Town of Apex Department Director(s), and to the best of my knowledge and belief, this drawing conforms to the requirements established by the Director(s) allowing deviation from the Standard Specifications and Standard Details of the Town of Apex. The signature below represents that the requesting Engineer has been granted a variance ONLY for the items listed. The developer/engineer/contractor is solely responsible for meeting all applicable requirements. (List items below add number as needed) APPROVED EXCEPTION DIRECTOR GRANTING EXCEPTION 1. 2. 3. By: Date: Requesting Engineer EXISTING CONDITIONS SHEET o� Riparian buffers shown in accordance with Town Watershed Protection Overlay District Map oron-site field determination Reference riparian buffer call project number (if applicable) � Riparian buffers measured from top of bank with all zones properly labeled Topography: Town UDARorfield-verified survey. NoWake County G|Sallowed 100-year floodplain boundary clearly shown and labeled (if applicable) NOTES, GRADING, AND EROSION CONTROL SHEETS Z Add the following Construction Sequence to the Notes sheet as well as all Grading and Erosion Control Town of Apex Construction Sequence The following begins only after Construction Plans are approved, signed by Town staff and copies are received. 1. Through the Infrastructure Inspections Manager at (919) 249-3386, schedule a pre -construction meeting with inspectors and other Town staff. 2. Fill out Tree/Protection Fencing Installation Permit Application (obtain from Planning Department). 3. Have a surveyor flag property lines, easements, buffers, tree protection areas, and flag the protection limits, 4. Contact anApex Planning Department Zoning Compliance Officer at(919)249-3426torequest approval for tree protection fencing locations. S. Install approved tree protection fencing, signs, and/or any other protection measures that may be required. Call Planning at249-3426for afinal inspection ufprotection measures. Planning will forward approval tnWater Resources, Erosion Control field staff. 6. Submit the applicable 5&Eperformance guarantee tothe Development Services Supervisor at249-3394 inDevelopment Services. Aninvoice can berequested from Water Resources ut(919)36Z-8166. The erosion control Letter of Plan Approval will not be issued until the guarantee has been submitted. The guarantee will be returned once all Stormwater Control Measures (SCMs) have been converted and accepted bythe Town, all temporary erosion control measures have been removed and the site is 100% permanently stabilized. 7. Request a Letter of Plan Approval for sedimentation and erosion control measures from Water Resources staff at(919)362'O166. 8. Complete and submit an electronic Notice of Intent (e-NOI) form with NCDEMLR requesting a Certificate of Coverage (CUC) under the NCGOl Construction StonmwaterGenera| Permit. Visit the following website: The [O[ must be submitted to the Town prior to the commencement of any land disturbing activity. 9. Install gravel construction entrance, temporary diversions, silt fencing, sediment basins, bypass channels, and/or other measures as shown on the approved plans. Clear only as necessary to install these devices. 10. When completed, call Water Resources staff at (919) 362-8166 for an on -site inspection and to request aCertificate wfCompliance. Water Resources will also forward ucopy tothe Building Inspections & Permitting Department. 11. Complete a Grading Permit Application, if required, from the Building Inspections & Permitting Department. 12. Once Grading Permit is reviewed and issued by the Building Inspections & Permitting Department, arrange apre-construction meeting with Tim Sawyer at(919)904'8744o/Brandon Beck at(919)2OO- O362prior tnany grading activities. This meeting isseparate from any other pre -construction meetings required inthe Construction Sequence. 13. Post Grading Permit prominently onsite atall times. 14, Begin clearing, grubbing, and rough grade of the site in accordance with the approved grading plan. 15. Stockpile a sufficient amount of topsoil to cover 3 inches over landscaped areas at the end of the project. 16. Install storm sewer, if applicable, and protect inlets with inlet protection devices, sediment devices, and/or other approved measures asshown onplans. Maintain S&Emeasures asneeded. 17. After completion of any phase of grading or when land -disturbing activities have temporarily ceased, establish groundcover on swales and ditches and graded slopes steeper than 3:1 within 7 calendar days; slopes that are ]:1orflatter must establish Qroundcoverwithin 14calendar days. 18. Stabilize site as areas are brought up to finished grade with vegetation or paving. 19. Prior to plat approval, all disturbed areas both public and private, must be properly stabilized. All temporary erosion control measures must be installed, be functioning properly and be maintained for the entire area contained within the plat. JO. Flush and dean all stormwate/system pipes. Clean and remove sediment from temporary sediment holding devices. Follow the SCM Construction Sequence found on the Grading and/or SCM Detail sheet onthe Construction Plan set. 21. Remove all temporary diversions, silt fencing, sediment basins, etc. and provide adequate cover or pave any resulting bare areas. All permanent erosion control devices should be installed at this point. 22. When vegetation has been established, call Water Resources staff at (919) 362-8166 fora final site inspection and torequest aCertificate mf Completion. The S&Eperformance guarantee will bereleased with the issuance ofthe Certificate ofCompletion. Visit the State vvebabelisted above and submit an electronic Notice of Termination (e-NOT) to end coverage under the NCGO1 permit. 23. The Property Owner/Home Owners Association will be responsible for permanent erosion control maintenance ofthe site. GRADING AND DRAINAGE PLAN SHEET X All public and private storm drainage infrastructure clearly shown and labeled CK All public and private drainage easements clearly shown and labeled Q� Junction box, yard inlet, or other structure separating public / private clearly shown and labeled 0� All S[Msclearly shown and labeled X Grading plan shows all off -site contributing drainage areas entering and exiting the project boundary X All SCM maintenance & access easements tied to a public ROW clearly shown and labeled All riparian buffers clearly shown and labeled Limits of disturbance clearly shown and labeled X All outlet protection clearly shown and labeled with dimensions t4lp, 1:1 All retaining walls clearly shown and labeled I00-yearfloodpbinboundary clearly shown and labeled; if not covered by current FEMA FIRM Panel, 100- year floodplain shall be calculated All culvert crossings designed from actual field survey topo and centered in flow line of channel at correct elevation with correctly sized headwalls, end walls and wing walls UTILITY PLAN SHEET 9 Water and Sewer systems designed inaccordance with 15A02T, andN6AC 18C Rules EX Water and Sewer systems designed in accordance with current Town of Apex Standard Specifications and Standard Details IN Water and Sewer systems designed in accordance with the Town of Apex Master Facilities Plans 9 A downstream sewer capacity study, including pump stations, has been performed and provided 04 All water and sewer mains and points ufconnection clearly shown and labeled 4 Pool discharge rates do not exceed 50 GPM, downstream sewer capacity or pump station capacity INT All appurtenances clearly shown and labeled EK All cross connection devices clearly shown and labeled with appropriate model based on degree of hazard 0K All manholes clearly shown and labeled IR All water and sewer services clearly shown outside of driveways / paved surfaces M All required public utility easements clearly,shown and labeled with proper width per Town of Apex Standard Specifications and Standard Details QR All required public utility easements are free and clear of impoundments, structures, retaining walls, concrete or paved surfaces (unless approved by Director of Water Resources), private utilities, plantings, |undscupe/hurdscape, ER All sewer extensions upeach natural draw clearly shown Q� All sewer lines in or within 50 feet of a wetland have been designed to water line pressure standards All water and sewer extensions are designed to reach entire frontage of development Riparian buffers measured from top of bank with all zones properly labeled. NtA [] All retaining walls clearly shown and labeled ER All 6CMsclearly shown and labeled including exterior slopes Q? All footprints ofstock piles nrborrow pits clearly shown and labeled E9 All required notes are clearly shown UTILITY PROFILE SHEET QR Sheets are tobeplan view ontop portion ofsheet and matching profile below 5( Utility Profiles (Water/Sewer/Storm Drain) and other known conflicting utilities clearly shown and labeled UL 10}Year Flood Plain Elevation clearly shown and labeled (if applicable) [] Aerial Crossings with structural design clearly shown and labeled (if applicable) O� Stream Crossings to be field surveyed and accurately shown on profile with structural design (if applicable) QD Clearly label all manholes with proper diameter, invert information, rim elevation, cone or flattop, any special wraps urcoatings, drop inlets QQ Clearly label all sewer mains with proper size, slope, and material information 0K Clearly label sewer material as: SDR35,C9O0/C905-DR18,DIP, FUD|P @Q Clearly label any special bedding ifapplicable IK Any sewer line less than 3feet deep isDIP C� Clearly label all water lines with proper size and material Clearly identify bore casings (if applicable) SEWER PUMP STATIONS AND FORCE MAINS 141k [] Has been previously approved bythe Director ofWater Resources O All shop drawings, design calculations, and site layout have been submitted for review [] Meets Master Facilities plan and /or is designed to meet basin requirements for 2030 land use plan L] Meets all Federal, State, and Local requirements [] Has dedicated parcel ofland for site including buffer requirements [] Has dedicated driveway from public ROW with appropriate sized access road or easement to station [] Identify all new or existing manholes within 1,200 feet of a force main discharge to be coated per Town of Apex Standard Specifications and Standard Details [] Identify any required ARV(s) and identify ARV manhole to be coated per Town of Apex Standard Specifications and Standard Details BUILDING INSPECTIONS ITEMS F­1 Schematic Floor Plans (for Site Plans only) FLOODPLAIN ITEMS [] For proposed developments that encroach Special Flood Hazard Areas, a Floodplain Development Permit must beissued bythe Town ofApex prior UoConstruction Plan Approval. Please contact Adam Stephenson, P.E. at ur(919) 249-3417 for more information. TRANSPORTATION ITEMS RoadPbn/Pmfibs 0� Roadway Typical Sections including pavement design LJ include roadway stationing and cross sections at 50-foot intervals along existing and proposed thoroughfares and collector streets O Transportation Facility (R)Permit approved byN0BNRDivision of Air Quality for large parking lots (1500+surface parking spaces,750+ structured parking spaces, or1000+combination surface/ structured parking spaces). Construction plans will not be approved without this permit being approved 6Vthe Division of Air Quality. STORMWATER CONTROL MEASURE (SCM) ITEMS 9. include the following note as shown below on all Stormwater Control Measure (SCM) Plans: ALL SCIVIS MUST BE CONSTRUCTED PER THE APPROVED PLAN INA TIMELY MANNER. NO EXCEPTIONS! include the following notes on all StonnwaterControl Measure (SJCM) Plans: The following must occur prior to Final Plat and/or Certificate of Occupancy (CO): 1 All Stonnwater Control Measures (SCMs) must be installed in accordance with the approved construction drawings. l Town Soil Erosion & Sedimentation Control staff shall be notified at least 10 days priorto the clewatering ofasediment basin asrequired bythe N[GO1permit. 3. During the SCM conversion process, all efforts shall be made to protect downstream waters. The drain ' valve shall not be left open at any time during 3CK8 conversion. Askimmer dravvdown system shall be installed and utilized until the S[K8isfully converted. 4. The design engineer must submit an as -built package which meets all requirements presented in the Town Spec Book including asigned and sealed certification statement. 5. For subdivisions only, a 25% maintenance guarantee is required to be submitted to Jean Weatherman inDevelopment Services at(919)249-3394. 6. The appropriate executed SCM O&M Agreement must be eRecorded with Development Services. 7. A0na| inspection bythe 6tormwater& Utility Engineering staff shall be conducted once the as -built submittal has been received. Once approved, staff will send an official SCM approval letter to the owner. D. In lieu ofSCK8 completion and final approval by staff, the Town may accept a 12596 performance guarantee in accordance with UDO Section 6112(G). This guarantee will be collected by Jean Weatherman inDevelopment Services et(919)249-3394. 9. All SCMs are required to be completed final CO (for a site plan) or by final plat (for a subdivision). 10. If an SCM counts towards RCA, the required landscaping shall be installed during the appropriate growing season and coordinated with the Town Zoning Compliance Officer at (919) 249-3426. All SCIVIs have been designed in accordance with the Town's LIDO storm water control requirements, Town Standard Specifications and Standard Details Manual, NC Stormwater Design Manual All SCK1water quality/quantity calculations have been submitted SCK8contributing drainage area maps have been submitted NCDE[\SCMsupplements have been submitted [] SHWT evaluation has been conducted with summary report included in calculations 54 SCK4 details provided (including plan view, croso-aection, riser/burre|,dam embankment, high -flow bypass, 1K SCM landscaping plan is included PARKS AND RECREATION CHECKLIST & FEES Construction Plans will not be accepted at first submittal without required plan and profile sheet(s) for all public greenways, to be consistent with the Town of Apex Standard Specifications and Construction Details for paved and non -paved 0neenways. GreenwayConstruction Cost Estimate must bereviewed and approved byTown Staff prior tosubmittal ofthe Final Signature Set of the Construction Drawings. PARKS AND RECREATION CHECKLIST & FEES -contnued *� Include the following information onthe Site Data Table onthe Cover Sheet. Please fill inknown information below atthe time of1stSubmittal for Construction Drawings Fee -in -lieu of dedication #ufsingle-family detached units #ofsingle-family attached units # of multi -family units x$� x$ */ unit = */ unit = x unit= Total Fee-n-l|euofdedication ________ *Use current fee schedule And/or Acres of Land Dedication #ofsingle-family detached units x1/3U (.O3329)acre / unit = #ofsingle-family attached units _x1/45(IO223)acre / unit = # of multi -family units Total Land Dedication QreenwaVComatruction El Yes 9No 6neenwayConstruction Cost Estimate x125%ofestimate =Greenvvay Performance Guarantee (payable bycash, certified check, surety bond, or letter ufcnedit). Please contact Jean Weatherman, Development Services Supervisor at (919) 249- 3394priortusubmittinQthePerfonnanceGuarantee. Application for approval of Erosion Control Plan: $500 per disturbed acre, no maximum (rounded to the nearest dollar) 16.3 Acres Disturbed (Proposed, round to nearest 1/10) $ 8,150.00 Fee Amount + $50 per disturbed acre for future development, no maximum (rounded to the nearest dollar) Acres Disturbed (Future, round to nearest 1/10) $ Fee Amount $ 1 0 . 60 Total Fee Performance Guarantee: $2,500 per disturbed acre in the form of a certified check, cash, or irrevocable letter of credit. The Performance Guarantee is due prior to the Town issuing a letter of soil erosion and sedimentation control plan approval. Please contact Jean Weatherman at (919) 249-3394 prior to submitting the Performance Guarantee. 1. Familiarize yourself with the Town of Apex Soil Erosion and Sedimentation Control Checklist. • Develop your Soil Erosion and Sedimentation Plans accordingly. • Complete and sign one the Request far Plan Approval form. • Complete and sign a Town of Apex Sail Erosion and Sedimentation Control Checklist. • Complete a Financial Responsibility/Ownership form. • Prepare your construction plans. If your supporting calculations are on separate sheets, upload a separate file of your calculations. • Submit the Soil and Erosion Control Fee to Development Services. 2. Submit the Request for Plan Approval, construction plans, supporting calculations, and the Financial ResponsibilityjOwnership form to the Town of Apex Development Services through IDT Plans. Submit yourfees via check to Development Services. Page 1 The enclosed Soil Erosion and Sedimentation Control (S&E) Plan is respectfully submitted for your review and approval. 07tO-4a -715W, D7Z-O-V'T-277'4 Tax Map No. Parcel No.(s) 0710 - 041, o%e,,* zoning PUD-CZ Subdivision: Retreat at Friendship - f94A-,f_ � Recorded: Registry Book No. Land Use: Present: . Vacant Size of Tract: Page No. Total Acres: 0. r Z�. Future: Residential Number of Acres to be Disturbed 1 6.3 Total Number of Family Units: 1325 Percent Impervious Surface: - 7 '3'- 1., Location of Tract: of: 40,A,V6�11-14V_ 1, V Project Name: Retreat at Friendship - a,14,;f t t Owner(s) Name- M/1 Homes Address: 115 )l 1 Sunday Dr, Ste 110 City State, zip a Raleiah, NC 27607 Phone: 919-205-9980 E-mail: eleatham@MIHOMES.com Person Financially Responsible: Erica Leatham A ress: 11511 Sunday Dr, Ste 110 City State, zip Raleigh, NC 27607 Phone: E-mail: 919-205-9980 eleathamrd)MIHOMES.com Page 1 PART A (check all items included) @iiiiName ofProject: Retreat at Friendship Phase 1 9Soil Erosion and Sedimentation Control Checklist completed and signed XRequest for Plan Approval: One (1)copy completed and signed gR Preliminary Zoning and Subdivision Approval: One (1) copy of approved notification 0KApex Financial Responsibility/Ownership Form: Completed, signed, and notarized iiPermit Application Fees: $5OOper disturbed acre, nomaximum (rounded tothe nearest dollar) 1&3 Acres Disturbed (Pooposed,round tonearest 1/10) $ 8,150M Fee Amount + $50 per disturbed acre for future development, no maximum (rounded to the nearest dollar) Acmes Disturbed (Futune, round to nearest 1/10) Fee Amount Total Fee Amount M�One (1)Set ofSedimentation and Erosion Control Plans Including Details AOne (1)Full Set ofthe Construction Drawings K One (1) Set of Calculations PART B (check all items included) Ome(1) Copy nfSoil Erosion Control Plan, Including: Q� Location Map (showing project in relation toState road system) O� Existing and Proposed Contours (plans and profiles for roadways) M Boundaries ofTotal Tract (including project limits) XOff-Site Conditions (ownership, zoning, drainage areas, and adjacent topography) X Easements, Lot Lines/Numbers, Road Names, Buffers, Wetlands Limits, Streams, Ponds, and Lakes 2Flood Zones (community panel number, basin and stream number, flood fringe with elevations, flood way, RFPEs,etc.) X Utilities (community water and sewer, plan/profiles, easements, and sediment controls) XBmrrovvand Spoil Areas (located and specified onplan) E& Concrete Washout Area(s) (located and specified on plan) X Proposed Improvements (roads, buildings, parking areas, grassed, landscaped, and natural areas) �� �_Stu,mnvvaterNetvvurk(in|eto.cu|verts'swo|es,ditches,channds,anddrainuQeeaxemento) N Disturbed Area (clearly delineated with acreage specified onplan) XTemporary Sediment Controls (locations and dimensions of gravel entrances, diversion ditches, silt fences, sediment basins, etc.) XPernmanent Erosion Controls (locations and dimensions ofdissipaters, ditch linings, armoring, retaining walls, etc.) X Detail Drawings (sections, elevations, and perspectives of measures sufficient for construction as designed) L4 Construction Sequence (use Town Construction Sequence and modify asnecessary) X SCM Construction Sequence (to befollowed once contributing drainage area isfully stabilized) C9 Scale, Legend, Orientation, and Signature Seal ^�,. �� mteu(asnecessorytodescribeprocedures tubefollowed) Page Plans Prepared By: Jones & Cnossen Engineering, PLLC Address: 221 N. Salem St., Suite 001 City State, Zip Apex, NC 27502 Documents, Maps and Computations Submitted with this Request: The 5&EPlan, supporting documents, maps, and computations submitted for the above tract are all inaccordance /ignature -tinted Name I I II/I / /; z' I Date X Specifications (seedbed preparation, soil amendments, construction and seeding schedules, etc) &Indicate Watershed Protection Overlay District [Primary or Secondary] (describe water quality protection methods) One Set ufCalculations, Including: Peak Discharge of Runoff (pre -construction, construction, and final phase discharges for the site up to and.at the property line) X-TenopmraryDevices (sediment storage and Q25capacity and dimensions) K Ditches, Swales, and Channels (Q25, V10, tractive force/shear stress, capacity, and geometry) kDissipaters({l1Ovelocities, stone size, and dimensions) X.Storm Culverts and Inlets (inverts, length, slope, Q100 and HW100 in natural drainage ways; Q10 and HW10 for all others) Other Requirements El R40W-80W Zoning (locations, dimension, details, calculations, and specifications for watershed protection measures) El Narrative Describing the Nature and Purpose of Construction Activity (phasing, clearing and grubbing, special sequencing, experimental devices, etc.) [] Na Tf Receiving Water (only here stormwater system discharges are to occur) PART C (Other Related Regulatory Requirements) NPDE5 The Federal Clean Water Act requires that National Pollutant Discharge Elimination System (NPDES) permits be obtained for discharges of stormwater runoff from construction activities disturbing one or more acres. In North Carolina, the NPDES stormwater discharge permit for construction activities is considered automatically effective once the N[ Division of Land Resources or the delegated local program approves the Soil Erosion and Sedimentation Control Plan. Applicants will receive a copy of the permit once the Soil Erosion and Sedimentation Control Plan has been reviewed and o Letter of Plan Approval is issued. Should you have questions regarding NPDES permit, please contact Sara Knies, (DENR-Surface Water Protection) at (919) 791-4258. Wetlands Any project having the possibility of wetlands (indicators being flood hazard solid or alluvial soils, wetland vegetation, b|ue|ine streams, etc.) within its boundaries should be invesLigated by the U.S. Army Corps of Engineers prior to any disturbance todetermine the existence ofwetlands and any requirements thereof. For information contact James Lastinger, Raleigh Field Office, U.S. Army Corps of Engineers, (919) 554-4884 ext. 32. No person may initiate any land -disturbing activity on twenty (20) thousand square feet or more before this form has been completed and filed with the Town of Apex Water Resources Department. PART A Name of Project: Retreat at Friendship Phase 1 Location of Land -Disturbing Activity: 0 Humie Olive Road, 8824 New Hope Farm Road and 8829 New Hope Farm Road Approximate Date Land -Disturbing Activity will Commence: Winter 2021 Acreage of Land to be Disturbed: 16-3 ac- Latitude: Longitude: Land Owner(s) of Record (use blank page to list additional owners): Name• Jeff & Lisa Cicin Current Mailing Address: 104 Corsica Lane City, State, Zip: Cary, NC 27511-6476 PART B Name• Edward & Deborah Peart Current Mailing Address 8829 New Hope Farm Road City, State, Zip New Hill, NC 27562-9179 Person or firm financially responsible (developer) for this land disturbing activity. Financial responsibility includes, but may not be limited to: payment of civil fines and criminal penalties and any other costs associated with bringing the project into compliance with the Town of Apex Soil Erosion and Sedimentation Control Ordinance. Name of Person or Firm: M/I Homes of Raleigh, LLC Telephone: 919-233-5725 Current Mailing Address: 1511 Sunday Drive, Suite 100 City, State, Zip: Raleigh, NC 27607 EM." Street Address (if different from mailing address) City, State, Zip Revised 312712020 Page 1 Land Owner(s) of Record Henry Kastelberg 8824 New Hope Farm Rd New Hill, NC 27562-9178 If the financially responsible party is not a resident of Wake County, complete the following for an appointed agent, in Wake County, to receive any notice, process, pleading in any action or legal proceeding arising from a violation of the Town of Apex Soil Erosion and Sedimentation Control Ordinance. By signing below, it is agreed that any notice, process, or pleading against the person or firm who is financially responsible for this land -disturbing activity may be served on the undersigned and shall be of the same force and effect as if served on the financially responsible person or firm. The intent of this provision is to establish the presumption that the constructive notice from the Town of Apex will be addressed through the undersigned agent. Name: N/A Telephone: Current Mailing Address: City, State, Zip: Signature: Street Address (if different from mailing address) City, State, Zip If the financially responsible party is a partnership or other person engaging in business under an assumed name, complete Page 4 of this form, or attach a copy of the Certificate of Assumed Name or Partnership as recorded in the Register of Deeds. If the financially responsible party is a corporation, complete the information on Page 5 of this form and submit a current copy of the Annual Report as filed with the Secretary of State. The information contained in this form is true and correct to the best of my knowledge and belief and was provided by me while under oath. (This form must be signed by the financially responsible person if an individual or by an officer, director, partner, or registered agent with authority to execute instruments for a corporation or partnership if it is the financially responsible party). I agree to provide corrected information should there be any change in the information provided herein. Name: Erica Leatham Date: /0 - 9 &.,'2- � Title or Authority: M/I Homes of Raleigh, LLC, Vice President of Land Signature: 1, a Notary Public of the County of Wee State of North Carolina hereby certify that � k i't (Z- personally appeared before me this day and under oath acknowledged that the above form was executed by him/her. Witness my hand and smj,this J, day of C4)0 Notary r{rNrAN,4 "S 0 -rA 6/4' My Commission Expires Financial responsibility encompasses personal liability by the person signing this disclosure form,­*-,4,,TJeHA' iin a ,,, 'tie 111141 partnership or if an officer or director of a corporation which is either: (a) dissolved lawfully under North Carolina statutes: (b) suspended from transacting business in North Carolina by the North Carolina Secretary of State; (c) insolvent; (d) in bankruptcy; (e) undercapitalized to the extent it is unable to comply with the Soil Erosion and Sedimentation Control Ordinance; or (f) a "she[[" corporation. Revised 312712020 Page 2