HomeMy WebLinkAbout20190495 Ver 1_CowfordAsBuiltReview_20220628From: Davis. Erin B
To: Baker, Caroline D
Subject: Fw: [External] Notice of As -Built Review/ NCDMS Cowford Mitigation Site/ SAW-201900487/ Onslow County
Date: Tuesday, June 28, 2022 8:26:18 AM
Laserfiche Upload: Email
DWR#: 20190495 v.1
Doc Type: Mitigation Information
From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil>
Sent: Monday, June 27, 2022 5:12 PM
To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <IMCEAEX-
_o=ExchangeLabs_ou=Exchange+20Ad m in istrative+20Group+20+28 FYD I BOH F23SP DLT+29_cn=Recipients_cn=225d 3fe2693d4f009c3cd baa99de8fef-
Haywood+2C+20Ca@NAMP111.PROD.OUTLOOK.COM>; Davis, Erin B<erin.davis@ncdenr.gov>; Wilson, Travis W.<travis.wilson@ncwildlife.org>;
Dunn, Maria T. <maria.dunn@ncwildlife.org>; Brittingham, Cathy <cathy.brittingham@ncdenr.gov>; kathryn_matthews@fws.gov
<kathryn_matthews@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Merritt, Katie <katie.merritt@ncdenr.gov>
Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Matt Butler <m butler@ res.us>; Bradley Breslow <bbreslow@res.us>; Crumbley, Tyler A CIV
USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy. E. Fennel@ usace.a rmy.m il>
Subject: [External] Notice of As -Built Review/ NCDMS Cowford Mitigation Site/ SAW-201900487/ Onslow County
CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam.
Good evening IRT,
The below referenced FINAL As -Built Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review
follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any
comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough
that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be
considered.
At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to
approve or disapprove this Final Record Drawing and initial credit release.
15-Day Comment Start Date: June 29, 2022
15-Day Comment Deadline: July 13, 2022
45-Day Credit Release Approval Deadline: August 12, 2022
The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT review:
Project Information —
Name: Cowford
USACE ID: SAW-2019-00487
DWR ID: 2019049S
DMS Project #: 10009S
RFP: 16-007S77-Issued S/17/2018
Institution: 2/4/2019—Full Delivery
River Basin: White Oak 03030001 (1988 NHD)/03020302 (200S NHD)
County: Onslow
Mitigation Plan Assets: 3,S38.670 SMUs (Warm) / 2.991 WMUs
Provider: RES/EBX, Matt Butler 919.770.SS73
DMS PM: Lindsay Crocker
Please note:
Stream construction was completed July 2021 and planting was completed March 2022; 2022 will be Monitoring Year 1 for this project. Deviations from the
construction plan are on the As -Built drawing, The as -built stream length is 24 linear feet more than the centerline design length. No change in project stream
credits is requested.
IRT-DMS SharePoint Page (Updated):
httos://nccon nect.shareooi nt.com/sites/IRT-DMS/SitePa2es/Home.aSDX
RIBITS:
httos:Hribits.00s.usace.army.mil/ords/f?o=107:10:30161231625817::::P10 BANK ID:5330
Please send any comments back to me and reach out with any questions.
Thanks,
Kim
Kim (Browning) Isenhour
Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107