Loading...
HomeMy WebLinkAbout20190495 Ver 1_CowfordAsBuiltReview_20220628From: Davis. Erin B To: Baker, Caroline D Subject: Fw: [External] Notice of As -Built Review/ NCDMS Cowford Mitigation Site/ SAW-201900487/ Onslow County Date: Tuesday, June 28, 2022 8:26:18 AM Laserfiche Upload: Email DWR#: 20190495 v.1 Doc Type: Mitigation Information From: Browning, Kimberly D CIV USARMY CESAW (USA) <Kimberly.D.Browning@usace.army.mil> Sent: Monday, June 27, 2022 5:12 PM To: Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Haywood, Casey M CIV (USA) <IMCEAEX- _o=ExchangeLabs_ou=Exchange+20Ad m in istrative+20Group+20+28 FYD I BOH F23SP DLT+29_cn=Recipients_cn=225d 3fe2693d4f009c3cd baa99de8fef- Haywood+2C+20Ca@NAMP111.PROD.OUTLOOK.COM>; Davis, Erin B<erin.davis@ncdenr.gov>; Wilson, Travis W.<travis.wilson@ncwildlife.org>; Dunn, Maria T. <maria.dunn@ncwildlife.org>; Brittingham, Cathy <cathy.brittingham@ncdenr.gov>; kathryn_matthews@fws.gov <kathryn_matthews@fws.gov>; Bowers, Todd <bowers.todd@epa.gov>; Merritt, Katie <katie.merritt@ncdenr.gov> Cc: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>; Matt Butler <m butler@ res.us>; Bradley Breslow <bbreslow@res.us>; Crumbley, Tyler A CIV USARMY CESAW (USA) <Tyler.A.Crumbley2@usace.army.mil>; Fennel, Tommy E CIV USARMY CESAW (USA) <Tommy. E. Fennel@ usace.a rmy.m il> Subject: [External] Notice of As -Built Review/ NCDMS Cowford Mitigation Site/ SAW-201900487/ Onslow County CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Good evening IRT, The below referenced FINAL As -Built Report review has been requested by NCDMS. Per Section 332.8(o)(9) of the 2008 Mitigation Rule, this review follows the streamlined review process, which requires an IRT review period of 15 calendar days from this email notification. Please provide any comments by 5 PM on the 15-day comment deadline shown below. When providing comments please indicate if your concerns are great enough that you recommend not issuing the credit release. Comments provided after the 15-day comment deadline (shown below) may not be considered. At the conclusion of this comment period, a copy of all comments will be provided to NCDMS and the NCIRT along with District Engineer's intent to approve or disapprove this Final Record Drawing and initial credit release. 15-Day Comment Start Date: June 29, 2022 15-Day Comment Deadline: July 13, 2022 45-Day Credit Release Approval Deadline: August 12, 2022 The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT review: Project Information — Name: Cowford USACE ID: SAW-2019-00487 DWR ID: 2019049S DMS Project #: 10009S RFP: 16-007S77-Issued S/17/2018 Institution: 2/4/2019—Full Delivery River Basin: White Oak 03030001 (1988 NHD)/03020302 (200S NHD) County: Onslow Mitigation Plan Assets: 3,S38.670 SMUs (Warm) / 2.991 WMUs Provider: RES/EBX, Matt Butler 919.770.SS73 DMS PM: Lindsay Crocker Please note: Stream construction was completed July 2021 and planting was completed March 2022; 2022 will be Monitoring Year 1 for this project. Deviations from the construction plan are on the As -Built drawing, The as -built stream length is 24 linear feet more than the centerline design length. No change in project stream credits is requested. IRT-DMS SharePoint Page (Updated): httos://nccon nect.shareooi nt.com/sites/IRT-DMS/SitePa2es/Home.aSDX RIBITS: httos:Hribits.00s.usace.army.mil/ords/f?o=107:10:30161231625817::::P10 BANK ID:5330 Please send any comments back to me and reach out with any questions. Thanks, Kim Kim (Browning) Isenhour Mitigation Project Manager, Regulatory Division I U.S. Army Corps of Engineers 1 919.946.5107