HomeMy WebLinkAboutW-5701G Impact Table (4) WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
ac (ac) (ac) (ac ac ac ac (ft) (ft) (ft
-LT-188 62.02 to 189+50.26 D13LT Road fill 0.030
dewatering 0.020
TOTALS*: 0.03 0.02 0.00 0.00 0.00 0.00 0.00 0 0 0
*Rounded totals are sum of actual impacts
NOTES:
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
6/22/2022
Hoke County
W-5708G
Reised 2018 Feb SHEET 1 OF 1
WETLAND AND SURACE WATER IMPACTS SUMMARY
WETLAND IMPACTS SURFACE WATER IMPACTS
Hand Existing Existing
Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural
Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream
No. (From/To) Size/Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design
(ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft)
188 62.02 to 189+50.26 DI Road fill 0.03
dewatering 0.02
TOTALS: 0.03 1 0.02 1 0 1 0 1 0
*Rounded totals are sum of actual impacts
NOTES:
NC DEPARTMENT OF TRANSPORTATION
DIVISION OF HIGHWAYS
6/22/2022
Hoke County
W-5708G
Revised 2018 Feb I SHEET 1 OF 1