HomeMy WebLinkAbout20220442 Ver 1_Design/Maps/Site Plans Revised_202206152 06 PM Mon M42
Z
9 ? 47% ■0-
nm
G�
Replanting
All trees replanted will be 2.5" in
W
diameter or greater. All trees will be
o
from NCDWQ recommended tree list.
= o
o o
All trees will be spaced adequately.
C _
Trees will be planted in the dormant
rn
rn
season to ensure minor damage.
agr.
(Zone 2) (Zone 1)
Construction Construction
Corridor 160 sgft Corridor 2,592sgft
No trees removed 19 trees removed. /
D
v
Z
O
O
Place riprap/ class B stone along the
entire shoreline. The riprap will be 4'x216'.
Below NWL= (432 sqft)
Above NWL= (432 sgft)
The construction corridor 12'x216' will be
left with the pre -construction topography.
Silt fence and chips will be lining all of
Zone 1 and disturbed access in Zone 2 will
be laid with seed and straw to prevent erosion.