Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20220442 Ver 1_Design/Maps/Site Plans Revised_20220523
2:06 PM Mon Ma%2 Z 9 ^ 47% ■ 74.0 0 Go Ole nm _. O m C t7 d;O AZ rr1 Z A �m O� 3529 03 N (n = C Cn yT O O 70 A (� O )> � = T md;O �O rn �10o m 3543 (Zone 2) construction corridor 160 sgft Remove 2 dead trees OON Place riprap/ class B stone along the entire shoreline. The riprap will be 4'x216% Below NWL= (432 sgft) Above NWL= (432 sqft) (Zone 1) The construction corridor 81x216' Construction corridor 1,726 sgft will be left with pre -construction Remove 3 dead trees topography. Silt fence will be lining the shoreline and entire work area will be seeded/strawed upon completion to prevent erosion. ©2022 Google