Loading...
HomeMy WebLinkAbout20220840 Ver 1_ePCN Application_20220623 DW R mrlsloa of ware.Besourcrs Pre-Construction Notification (PCN) Form For Nationwide Permits and Regional General Permits (along with corresponding Water Quality Certifications) April 13,2022 Ver 4.3 Initial Review Has this project met the requirements for acceptance in to the review process?* Yes No Is this project a public transportation project?* Yes No Change only if needed. Pre-Filing Meeting Date Request was submitted on: 4/29/2022 BIMS#Assigned" Version#* 20220840 1 Is a payment required for this project?* No payment required Fee received Reviewing Office* Fee needed-send electronic notification Central Office-(919)707-9000 Select Project Reviewer* Ryan Conchilla:eads\rjconchilla Information for Initial Review 1a.Name of project: Running Creek Road Bridge Replacement 1a.Who is the Primary Contact?* Jerry Parker 1 b.Primary Contact Email:* 1c.Primary Contact Phone:* japarker3@ncdot.gov (336)451-6629 Date Submitted 6/23/2022 Nearest Body of Water UT to Haw River Basin Cape Fear Water Classification WS-IV;NSW 16-(6.5) Site Coordinates Latitude: Longitude: 36.233449 79.561187 A. Processing Information u County(or Counties)where the project is located: Guilford Is this a NCDMS Project Yes No Is this project a public transportation project?* Yes No Is this a NCDOT Project?* Yes No (NCDOT only)T.I.P.or state project number: WBS#(1) 17BP.7.R.134 1a.Type(s)of approval sought from the Corps: Section 404 Permit(wetlands,streams and waters,Clean Water Act) Section 10 Permit(navigable waters,tidal waters,Rivers and Harbors Act) Has this PCN previously been submitted?" Yes No 1 b.What type(s)of permit(s)do you wish to seek authorization? Nationwide Permit(NWP) Regional General Permit(RGP) Standard(IP) 1c.Has the NWP or GP number been verified by the Corps? Yes No Nationwide Permit(NWP)Number: 14-Linear transportation NWP Numbers(for multiple NWPS): 1d.Type(s)of approval sought from the DWR: 401 Water Quality Certification-Regular 401 Water Quality Certification-Express Non-404 Jurisdictional General Permit Riparian Buffer Authorization Individual 401 Water Quality Certification le.Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: Yes No For the record only for Corps Permit: Yes No 1f.Is this an after-the-fact permit application?* Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1g.Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? Yes No 1 h.Is the project located in any of NC's twenty coastal counties? Yes No 1j.Is the project located in a designated trout watershed? Yes No B. Applicant Information 1d.Who is applying for the permit? Owner Applicant(other than owner) le.Is there an Agent/Consultant for this project?" Yes No 2.Owner Information 2a.Name(s)on recorded deed: NCDOT 2b.Deed book and page no.: 2c.Contact Person: 2d.Address Street Address 1584 Yanceyville Street Address Line 2 P.O.Box 14996 City State/Province/Region Greensboro NC Postal/Zip Code Country 27415-4996 USA 2e.Telephone Number: 2f.Fax Number: (336)487-0000 2g.Email Address:* warcher@ncdot.gov C. Project Information and Prior Project History " 1.Project Information 1b.Subdivision name: (if appropriate) 1c.Nearest municipality/town: Greensboro 2.Project Identification 2a.Property Identification Number: 2b.Property size: 2c.Project Address Street Address Address Line 2 City State/Province/Region Postal/Zip Code Country 3. Surface Waters 3a.Name of the nearest body of water to proposed project: UT to Haw River 3b.Water Resources Classification of nearest receiving water:* WS-IV;NSW 16-(6.5) 3c. What river basin(s)is your project located in?* Cape Fear 3d.Please provide the 12-digit HUC in which the project is located. 030300020207 4. Project Description and History 4a.Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Project site is a rural forested area interspersed with single family residences and farmland. 4b.Have Corps permits or DWR certifications been obtained for this project(including all prior phases)in the past? Yes No Unknown 4f.List the total estimated acreage of all existing wetlands on the property: 0 4g.List the total estimated linear feet of all existing streams on the property: 4h.Explain the purpose of the proposed project:* The purpose of the project is to replace a structurally deficient bridge with a box culvert. 4i.Describe the overall project in detail,including indirect impacts and the type of equipment to be used: The project proposes to replace Bridge#183 over an UT to Haw River on Running Creek Rd.The existing structure is a one span bridge which will be replaced by 2@12'X10'RCBC.The structure has been designed to have minimum impact on surface waters.The proposed culvert will function similarly to the existing bridge.It will provide a better alignment with the stream and provide bank stabilization in the vicinity of the crossing.A justification for a bridge to culvert has been attached to this application. 5. Jurisdictional Determinations 5a.Have the wetlands or streams been delineated on the property or proposed impact areas?* Yes No Unknown Comments: 5b.If the Corps made a jurisdictional determination,what type of determination was made?* Preliminary Approved Not Verified Unknown N/A Corps AID Number: 5c.If Sa is yes,who delineated the jurisdictional areas? Name(if known): Sandy Smith Agency/Consultant Company: Axiom Other: 6.Future Project Plans 6a.Is this a phased project?* Yes No Are any other NWP(s),regional general permit(s),or individual permits(s)used,or intended to be used,to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory u 1. Impacts Summary 1a.Where are the impacts associated with your project?(check all that apply): Wetlands Streams-tributaries Buffers Open Waters Pond Construction 3. Stream Impacts 0 3a.Reason for impact(?) 3b.lmpact type* 3c.Type of impact* 3d.S.name* 3e.Stream Type" 3f.Type of 3g.S.width 3h.Impact (?) Jurisdiction" length" S1 Culvert Permanent Culvert UT to Haw River Perennial Both 71 Average(feet) (linear feet) S2 Culvert Temporary Culvert UT to Haw River Perennial Both 8 31 � Average(feet) (linear feet) S3 Bank Stabilization Permanent Bank Stabilization UT to Haw River Perennial Both 8 71 Average(feet) (linear feet) 31.Total jurisdictional ditch impact in square feet: 0 31.Total permanent stream impacts: 3i.Total temporary stream impacts: 142 31 31.Total stream and ditch impacts: 173 3j.Comments: 6. Buffer Impacts (for DWR) 6a.Project is in which protect basin(s)? Check all that apply. Neuse Tar-Pamlico Catawba Randleman Goose Creek Jordan Lake Other 6b.Impact Type 6c.Per or Temp 6d.Stream name 6e.Buffer mitigation required? 6f.Zone 1 impact 6g.Zone 2 impact Road Crossing P UT to Haw River No 7,221 3,379 Utilities Easement P UT to Haw River No 1,070 2,378 6h. Total buffer impacts: Zone 1 Zone 2 Total Temporary impacts: 0.00 0.00 ..._.......... Zone 1 Zone 2 Total Permanent impacts: 8,291.00 5,757.00 Zone 1 Zone 2 Total combined buffer impacts: 8,291.00 5,757.00 6i.Comments: E. Impact Justification and Mitigation U 1.Avoidance and Minimization la.Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: Roadway approach work was minimized as much as possible to reduce the overall footprint of the project.An offsite detour will be utilized during construction in order to avoid the need for a temporary crossing.Future stream impacts will be reduced by protecting the inlet and outlet ends of the culvert with riprap bank stabilization. 1 b.Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: NCDOT Best Management Practices for Construction and Maintenance Activities and Best Management Practices for Protection of Surface Waters will be utilized.Erosion and sedimentation devices will be installed prior to commencing construction.Dewatering of the site will occur to prevent impacts to the stream and downstream aquatic resources.A pre-construction meeting with the Division Environmental Supervisor or his assignee will occur prior to beginning work. 2.Compensatory Mitigation for Impacts to Waters of the U.S.or Waters of the State 2a.Does the project require Compensatory Mitigation for impacts to Waters of the U.S.or Waters of the State? Yes No 2b.If this project DOES NOT require Compensatory Mitigation,explain why: Neither the stream impacts nor the buffer impacts meet the thresholds for requiring mitigation. F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan la.Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? Yes No What type of SCM are you providing? Level Spreader Vegetated Conveyance(lower SHWT) Wetland Swale(higher SHWT) Other SCM that removes minimum 30%nitrogen Proposed project will not create concentrated stormwater flow through the buffer 2. Stormwater Management Plan 2a.Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250? Yes No Comments: G. Supplementary Information U 1. Environmental Documentation la.Does the project involve an expenditure of public(federallstatellocal)funds or the use of public(federal/state)land? Yes No 1 b.If you answered"yes"to the above,does the project require preparation of an environmental document pursuant to the requirements of the National or State(North Carolina) Environmental Policy Act(NEPAISEPA)?* Yes No Comments:* Project does not meet nor exceed the thresholds for requiring preparation of a NEPA/SEPA document. 2.Violations (DWR Requirement) 2a.Is the site in violation of DWR Water Quality Certification Rules(15A NCAC 2H.0500),Isolated Wetland Rules(15A NCAC 2H.1300),or DWR Surface Water or Wetland Standards or Riparian Buffer Rules(15A NCAC 2B.0200)?* Yes No 3. Cumulative Impacts (DWR Requirement) 3a.Will this project result in additional development,which could impact nearby downstream water quality? Yes No 3b.If you answered"no,"provide a short narrative description. Due to the minimal transportation impact resulting from the proposed project,stimulated growth and influence in nearby land use is not anticipated. 4. Sewage Disposal (DWR Requirement) 4a.Is sewage disposal required by DWR for this project?* Yes No N/A 5. Endangered Species and Designated Critical Habitat(Corps Requirement) 5a.Will this project occur in or near an area with federally protected species or habitat? Yes No 5b.Have you checked with the LISFWS concerning Endangered Species Act impacts?* Yes No 5c.If yes,indicate the USFWS Field Office you have contacted. Raleigh 5d.Is another Federal agency involved?* Yes No Unknown 5e.Is this a DOT project located within Division's 1-8? Yes No 5j.What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS IPaC website and environmental consultants 6. Essential Fish Habitat(Corps Requirement) 6a.Will this project occur in or near an area designated as an Essential Fish Habitat? Yes No 6b.What data sources did you use to determine whether your site would impact an Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a.Will this project occur in or near an area that the state,federal or tribal governments have designated as having historic or cultural preservation status?* Yes No 7b.What data sources did you use to determine whether your site would impact historic or archeological resources?* NCDOT Cultural Resource personnel 8. Flood Zone Designation (Corps Requirement) 8a.Will this project occur in a FEMA-designated 100-year floodplain?* Yes No 8b.If yes,explain how project meets FEMA requirements: NCDOT Hydraulics Unit coordination with FEMA Sc.What source(s)did you use to make the floodplain determination?* FEMA Flood Maps Miscellaneous U Please use the space below to attach all required documentation or any additional information you feel is helpful for application review.Documents should be combined into one file when possible,with a Cover Letter,Table of Contents,and a Cover Sheet for each Section preferred. Click the upload button or drag and drop files here to attach document Running Creek Rd Permit Drawings.pdf 3.64MB Running Creek Rd SW Plans.pdf 103.2KB Running Creek Rd Topo Map.pdf 573.62KB Running Creek No Archaeological.pdf 2.56MB Running Creek No Architecture.pdf 1.62MB Running Creek Rd Bridge to Culvert Justification.pdf 51.55KB Running Creek Rd Plant Survey.pdf 42.42KB File must be PDF or KMZ Comments Signature By checking the box and signing below,I certify that: • The project proponent hereby certifies that all information contained herein is true,accurate,and complete to the best of my knowledge and belief';and • The project proponent hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. • I have given true,accurate,and complete information on this form; • I agree that submission of this PCN form is a"transaction"subject to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66,Article 40 of the NC General Statutes(the"Uniform Electronic Transactions Act"); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature;AND • I intend to electronically sign and submit the PCN form. Full Name: W.R.Archer III,PE Signature W--IF 63{o6m r --38/,4- Date 6/23/2022