From: Steenhuis, Joanne
Sent: Tuesday, June 17, 2014 8:24 AM
To: Dana A. Lutheran; Tammy Spivey; Crumbley, Tyler SAW; gallantmc @yahoo.com
Cc: Burdette, Jennifer a; Howell, Jonathan
Subject: corrected page 2
Attachments: corrected pluris total.pdf
Sorry, I transposed the total
> « «> Joanne Steenhuis > « « <>
Senior Environmental Specialist
Wilmington Regional Office
127 Cardinal Drive Ext.
Wilmington, NC 28405
Direct phone 910.796.7306
T�arre `'teerh��s < %r«ler,.���
Pluris Hampstead, LLC
Attn: Maurice Gallarda
June 16, 2014
DWR Project # 2014 0432
Page 2 of 6
Type of Impact
Amount Approved
Amount Approved
Plan Location or
(units)
(units)
Reference
Permanent
Temporary
Stream
Site 1
N/A
N/A
404/401 Wetlands
Site 1
N/A
N/A
Isolated Wetlands
W1
0.72acres
N/A
Isolated Wetland
Impact Site Plan
(attached)
TOTAL IMPACTS
0.72 acres
2. This approval is for the purpose and design described in your application. The plans and
specifications for this project are incorporated by reference as part of the Certification. If
you change your project, you must notify the Division and you may be required to submit a
new application package with the appropriate fee. If the property is sold, the new owner
must be given a copy of this approval letter and General Certification and is responsible for
complying with all conditions.
No waste, spoil, solids, or fill of any Kind shall occur in wetlands, waters, or riparian areas
beyond the footprint of the impacts depicted in the Pre - Construction Notification for this
project. All construction activities, including the design, installation, operation, and
maintenance of sediment and erosion control Best Management Practices shall be
performed so that no violations of state water quality standards, statutes, or rules occur.
Approved plans and specifications for this project are incorporated by reference and are
enforceable parts of this permit.
4. Sediment and Erosion Control
Erosion and sediment control practices must be in full compliance with all specifications
governing the proper design, installation and operation and maintenance of such Best
Management Practices and if applicable, comply with the specific conditions and
requirements of the NPDES Construction Stormwater Permit issued to the site:
a. Design, installation, operation, and maintenance of the sediment and erosion control
measures must be such that they equal or exceed the requirements specified in the
most recent version of the North Carolina Sediment and Erosion Control Manual. The
devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil)
projects, including contractor -owned or leased borrow pits associated with the project.