Project Num: 20201723 Version: 1 Status: Issued
Project Name: NCDOT - Replace Bridge 8 on NC 704 Project Type: Replace bridge with bridge
County: Stokes Region: Winston-Salem
Location: NCDOT - Replace Bride 8 on NC 704
Latitude: +360 30' 52" Longitude: -80' 18' 11"
SW Plan Location:
Site Owner Name: NC DOT Division 9
Inspection Date: 6/14/2022
Reason for Inspection: Routine
Inspection Type: Site Inspection (DOT)
Inspection Contact Person: Title: Phone:
On -Site Representative(s):
Primary Inspector: Dave Wanucha Phone: 336-776-9703
Secondary Inspector(s):
Facility Compliance Status: 0 Compliant ❑ Not Compliant
Program Areas: 401 (includes isolated/non-404)
Question Areas:
Permit (401 WQC)
Inspection Summary:
page 1
Site Number: 20201723 Owner: Tippett, Lyndo
Inspection Date: 6/14/2022 Inspection Type: Site Inspection (DOT) Reason for Visit: Routine
Permit (401 WOO Yes No NA NE
Does the impact(s) match what was approved in the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Are the culverts and/or filled areas installed properly? ❑ ❑ 0 ❑
Is the site compliant with additional conditions of the 401 WQC or non 404 permit? 0 ❑ ❑ ❑
Comment: I met with DOT staff and contractors to review progress on bridge construction. Delays have occured
due to supply issues. northside bents were installed along with causeway. Staff were instream
attempting to make repairs to turbidity curtain that came loose during a storm event and subsequent high
flows. No turbidity issues were evident.