Loading...
HomeMy WebLinkAbout660030_Compliance Evaluation Inspection_20220615ivision of Water Resources Facility Number f - © 0 Division of Soil and Water Conservation C 0 Other Agency Type of Visit: Compliance Inspection 0 Operation Review 0 Structure Evaluation 0 Technical Assistance Reason for Visit: Olioutine0 Complaint 0 Follow-up 0 Referral 0 Emergency 0 Other 0 Denied Access Zii Date of Visit: < < Arrl Time: Departure Time: County: R on:� Farm Name:6n!!�Vvl 5 Owner Email: Owner Name: Phone: Mailing Address: Physical Address: Facility Contact: Onsite Representative: Certified Operator: Title: ✓ -» Phone: Z S�Z � � � q s Integrator: d Certification Number: Back-up Operator: Certification Number: II-- q / p Location of Farm: Latitude��t r 4$5� Longitude Swine Wean to Finish Wean to Feeder Feeder to Finish Farrow to Wean Farrow to Feeder Farrow to Finish Gilts Boars Other Design Current Design Current Capacity Pop. Wet Poultry Capacity Pop. Layer Non -Layer Design Current Dry Poultry ranacity Pon. Layers Non -Layers Pullets Turkeys Turkey Pouets Other Discharges and Stream Impacts I. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Design Current Cattle Capacity Pop. Dairy Cow Dairy Calf Dairy Heifer Dry Cow Non -Dairy Beef Stocker Beef Feeder Beef Brood Cow ❑ Yes )ZNo ❑ NA ❑ NE ❑ Yes ) ' o ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes 6No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE ❑ Yes.1 _ o ❑ NA ❑ NE Page I of 3 511212020 Continued •' Facilit Number: - Date of Inspection: k ' Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? ❑ Yes No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? ❑ Yes �No ❑ NA ❑ NE Structure I Structure 2 Structure 3 �7Structure 4 Structure 5 Structure 6 Identifier:'21, Z�"-Z �$—, L$" Z ltr' Spillway?: 6 Designed Freeboard (in): + flS kOt �o} let. Observed Freeboard (in): jq'c? �o 3�----- 5. Are there any immediate threats to the integrity of any of the structures observed? (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a waste management or closure plan? Z-� i Ok, 3 3 -3 ❑ YesrC�`No ❑ NA ❑ NE ❑ Yes No ❑ NA ❑ NE If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes eE7No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes ,ENo ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes ,E!fNo ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes.Z�No ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ET -No ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure?Sludge into Bare Soil ❑ Outside of Acceptable Crop Window [] Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes/f7`No ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ,❑"No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Flo ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes �No ❑ NA [] NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes ;a"&o ❑ NA ❑ NE Renuired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes PTNo ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes 2TNo ❑ NA ❑ NE the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes k No ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Rainfall [:]Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and V Rainfall Inspections 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ;No23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ NA ❑ NE ❑ Weather Code ❑ Sludge Survey ❑NA ❑NE ❑NA ❑NE Page 2 of 3 511212020 Continued Z Facility Number: IDate of Inspection; tV5r4AJ 'I 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes et!J'No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check [] Yes )2j"No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey [:]Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes EjNo ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes ONo ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes KNo ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concem? ❑ Yes KNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes 1jj111``"`"�No ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes �No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes eNo ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes o ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes No ❑ NA ❑ NE Comments (refer to question #): Explain any YES answers and/or any additional recommendations or any other comments. Use drawings of facility to better explain situations (use additional pages as necessary). ,jo►I 1-,o �.02�-'1 La�ao►�, 30-1 �flrZ uinL 8i 11, 2O2.� C,,,,��l�k P� CCC L► c5��^ 1 `i .'Z Iq .Z -P 0 6 -z0Z3 �,2, zozi �Uc Z9Z2. Zj P 6'�3 2�5 o,s$ 305 a MG Reviewer:'Inspector Name: Reviewer;'Inspector Signature: Page 3 of 3 b0 ��Z3 Ps>h a,-C 3 zc., _V77- o ,33 t4 , V+ 1X+ y .zv Phone: Date: �� 1 1 5- r ZO ��- 5112/2020