HomeMy WebLinkAbout20190495 Ver 1_Mitigation Information_20220617From:
Davis, Erin B
To:
Baker, Caroline D
Subject:
FW: NCDMS As -Built Review / Cowford / SAW-2019-00487 / Onslow Co.
Date:
Friday, June 17, 2022 1:46:45 PM
Attachments:
innaae001.ona
Cowford Proiect 100095 WO 01 STIR RW Initial Release.odf
Laserfiche Upload: Email & Attachment
DWR#: 20190495 v.1
Doc Type: Mitigation Information
From: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov>
Sent: Friday, June 17, 2022 10:51 AM
To: Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV (USA) <casey.m.haywood@usace.army.mil>; Tugwell,
Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>;
Kim Browning <Kimberly.D.Browning@usace.army.miI>
Cc: Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Matt Butler <mbutler@res.us>;
Brad Breslow <bbreslow@res.us>
Subject: NCDMS As -Built Review / Cowford / SAW-2019-00487 / Onslow Co.
The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT
review:
Project Information —
Name:
USACEID:
DWR ID:
DMS Project #:
RFP:
Institution:
River Basin:
County:
Mitigation Plan Assets
Provider:
DMS PM:
Cowford
SAW-2019-00487
20190495
100095
16-007577-Issued 5/17/2018
2/4/2019—Full Delivery
White Oak 03030001 (1988 NHD)/03020302 (2005 NHD)
Onslow
3,538.670 SMUs (Warm) / 2.991 WMUs
RES/EBX, Matt Butler 919.770.5573
Lindsay Crocker
Please note:
Stream construction was completed July 2021 and planting was completed March 2022; 2022 will be Monitoring Year 1 for this
project. Deviations from the construction plan are on the As -Built drawing, The as -built stream length is 24 linear feet more than
the centerline design length. No change in project stream credits is requested.
The final baseline (as -built) report and as -built drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT
review
https://ncconnect.sharepoint.com/sites/IRT-DMS/Site Pages/Home.as xx
The credit ledger for the 30% release is attached for review and signature.
Lindsay Crocker
Eastern Regional Supervisor
NORTH CAROLINA j/ Division of Mitigation Services
Departmaut of Environmemal 4ual\ 217 West Jones St., Raleigh, NC 27603
Cell: 919/594/3910
Mitigation Project Name
Cowford Project
USACE Action ID
DMS ID
100095
DWR Permit
River Basin
White Oak
Date Project Instituted
Cataloging Unit
03030001
Date Prepared
County
Onslow
Stream/Wet. Service Area
Signature of Official Approving Credit Release
2019-00487
2019-0495
2/4/2019
6/6/2022
White Oak 03030001
1 - For NCDMS, no credits are released during the first milestone (Site Establishment).
2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and
posted to the NCDMS Portal, provided the following criteria are met:
1) Approval of Final Mitigation Plan;
2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property;
3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan;
4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required.
3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met.
Credit Release Milestone
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Warm Stream Credits
Proposed Not Approved Approved
Released # #Releases Credits
Anticipated
Release
Year
Approved
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
1,061.600
1,061.600
0.000
1,061.600
2022
6/6/2022
3 - Year 1 Monitoring
10.00%
353.867
2023
4 - Year 2 Monitoring
10.00%
353.867
2024
5 - Year 3 Monitoring
10.00%
353.867
2025
6 - Year 4 Monitoring
5.00%
176.934
2026
7 - Year 5 Monitoring
10.00%
353.867
2027
8 - Year 6 Monitoring
5.00%
176.934
2028
9 - Year 7 Monitoring
10.00%
353.867
2029
Stream Bankfull Standard
10.00%
353.867
2026
Totals
1,061.600
Total Gross Credits
3,538.670
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
1,061.600
Total Percentage Released
30.00%
Remaining Unreleased Credits
2,477.070
Credit Release Milestone
Riparian Credits
Project Credits
Scheduled
Releases %
Estimated
Scheduled
Release #
Proposed
Released #
Not Approved
#Releases
Approved
Credits
Anticipated
Release
Year
Approved
Release
Date
1 - Site Establishment
N/A
N/A
N/A
N/A
N/A
N/A
N/A
2 - Year 0 / As -Built
30.00%
0.896
0.896
0.000
0.896
2022
6/6/2022
3 - Year 1 Monitoring
10.00%
0.299
2023
4 - Year 2 Monitoring
10.00%
0.299
2024
5 - Year 3 Monitoring
15.00%
0.449
2025
6 - Year 4 Monitoring
5.00%
0.150
2026
7 - Year 5 Monitoring
15.00%
0.449
2027
8 - Year 6 Monitoring
5.00%
0.150
2028
9 - Year 7 Monitoring
10.00%
0.299
2029
Totals
0.896
Total Gross Credits
2.991
Total Unrealized Credits to Date
0.000
Total Released Credits to Date
0.896
Total Percentage Released
29.96%
Remaining Unreleased Credits
2.095
Cowford Project
Page 1 of 3 White Oak 03030001
Mitigation Project Name Cowford Project USACE Action ID 2019-00487
DMS ID 100095 DWR Permit 2019-0495
River Basin White Oak Date Project Instituted 2/4/2019
Cataloging Unit 03030001 Date Prepared 6/6/2022
County Onslow Stream/Wet. Service Area White Oak 03030001
Cowford Project
Page 2 of 3 White Oak 03030001
Mitigation Project Name
Cowford Project
USACE Action ID
DMS ID
100095
DWR Permit
River Basin
White Oak
Date Project Instituted
Cataloging Unit
03030001
Date Prepared
County
Onslow
Stream/Wet. Service Area
Notes
Contingencies (if any)
Project Quantities
Mitigation Type
Restoration Type
Physical Quantity
Warm Stream
Restoration
3,337.000
Riparian
Restoration
2.991
2019-00487
2019-0495
2/4/2019
6/6/2022
White Oak 03030001
Debits
Warm Stream
Restoration
Credits
Riparian
Restoration
Credits
Beginning Balance (mitigation credits)
3,538.670
2.991
Released Credits
1,061.600
0.896
Unrealized Credits
0.000
0.000
Converted Credits
0.000
0.000
Owning Program
Req. Id
TIP #
Project Name
USACE
Permit #
DWR Permit
#
DCM Permit
#
Remaining Balance (Released credits)
1,061.600
0.896
Remaining Balance (Unreleased credits)
2,477.070
2.095
Total Remaining Balance (Released and Unreleased credits)
3,538.670
2.991
Cowford Project
Page 3 of 3 White Oak 03030001