Loading...
HomeMy WebLinkAbout20190495 Ver 1_Mitigation Information_20220617From: Davis, Erin B To: Baker, Caroline D Subject: FW: NCDMS As -Built Review / Cowford / SAW-2019-00487 / Onslow Co. Date: Friday, June 17, 2022 1:46:45 PM Attachments: innaae001.ona Cowford Proiect 100095 WO 01 STIR RW Initial Release.odf Laserfiche Upload: Email & Attachment DWR#: 20190495 v.1 Doc Type: Mitigation Information From: Crocker, Lindsay <Lindsay.Crocker@ncdenr.gov> Sent: Friday, June 17, 2022 10:51 AM To: Davis, Erin B <erin.davis@ncdenr.gov>; Haywood, Casey M CIV (USA) <casey.m.haywood@usace.army.mil>; Tugwell, Todd J CIV USARMY CESAW (US) <Todd.J.Tugwell@usace.army.mil>; Wilson, Travis W. <travis.wilson@ncwildlife.org>; Kim Browning <Kimberly.D.Browning@usace.army.miI> Cc: Stanfill, Jim <jim.stanfill@ncdenr.gov>; Harmon, Beth <beth.harmon@ncdenr.gov>; Matt Butler <mbutler@res.us>; Brad Breslow <bbreslow@res.us> Subject: NCDMS As -Built Review / Cowford / SAW-2019-00487 / Onslow Co. The final baseline (as -built) report and record drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT review: Project Information — Name: USACEID: DWR ID: DMS Project #: RFP: Institution: River Basin: County: Mitigation Plan Assets Provider: DMS PM: Cowford SAW-2019-00487 20190495 100095 16-007577-Issued 5/17/2018 2/4/2019—Full Delivery White Oak 03030001 (1988 NHD)/03020302 (2005 NHD) Onslow 3,538.670 SMUs (Warm) / 2.991 WMUs RES/EBX, Matt Butler 919.770.5573 Lindsay Crocker Please note: Stream construction was completed July 2021 and planting was completed March 2022; 2022 will be Monitoring Year 1 for this project. Deviations from the construction plan are on the As -Built drawing, The as -built stream length is 24 linear feet more than the centerline design length. No change in project stream credits is requested. The final baseline (as -built) report and as -built drawings were uploaded to the DMS/IRT SharePoint and DWR Laserfiche for IRT review https://ncconnect.sharepoint.com/sites/IRT-DMS/Site Pages/Home.as xx The credit ledger for the 30% release is attached for review and signature. Lindsay Crocker Eastern Regional Supervisor NORTH CAROLINA j/ Division of Mitigation Services Departmaut of Environmemal 4ual\ 217 West Jones St., Raleigh, NC 27603 Cell: 919/594/3910 Mitigation Project Name Cowford Project USACE Action ID DMS ID 100095 DWR Permit River Basin White Oak Date Project Instituted Cataloging Unit 03030001 Date Prepared County Onslow Stream/Wet. Service Area Signature of Official Approving Credit Release 2019-00487 2019-0495 2/4/2019 6/6/2022 White Oak 03030001 1 - For NCDMS, no credits are released during the first milestone (Site Establishment). 2 - For NCDMS projects, the initial credit release milestone occurs when the as -built report (baseline monitoring report) has been approved by the NCIRT and posted to the NCDMS Portal, provided the following criteria are met: 1) Approval of Final Mitigation Plan; 2) Recordation of the preservation mechanism, as well as a title opinion acceptable to the USACE covering the property; 3) Completion of all physical and biological improvements to the mitigation site pursuant to the mitigation plan; 4) Receipt of necessary DA permit authorization or written DA approval for projects where DA permit issuance is not required. 3 - A 10% reserve of credits is to be held back until the bankful event performance standard has been met. Credit Release Milestone Project Credits Scheduled Releases % Estimated Scheduled Release # Warm Stream Credits Proposed Not Approved Approved Released # #Releases Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 1,061.600 1,061.600 0.000 1,061.600 2022 6/6/2022 3 - Year 1 Monitoring 10.00% 353.867 2023 4 - Year 2 Monitoring 10.00% 353.867 2024 5 - Year 3 Monitoring 10.00% 353.867 2025 6 - Year 4 Monitoring 5.00% 176.934 2026 7 - Year 5 Monitoring 10.00% 353.867 2027 8 - Year 6 Monitoring 5.00% 176.934 2028 9 - Year 7 Monitoring 10.00% 353.867 2029 Stream Bankfull Standard 10.00% 353.867 2026 Totals 1,061.600 Total Gross Credits 3,538.670 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 1,061.600 Total Percentage Released 30.00% Remaining Unreleased Credits 2,477.070 Credit Release Milestone Riparian Credits Project Credits Scheduled Releases % Estimated Scheduled Release # Proposed Released # Not Approved #Releases Approved Credits Anticipated Release Year Approved Release Date 1 - Site Establishment N/A N/A N/A N/A N/A N/A N/A 2 - Year 0 / As -Built 30.00% 0.896 0.896 0.000 0.896 2022 6/6/2022 3 - Year 1 Monitoring 10.00% 0.299 2023 4 - Year 2 Monitoring 10.00% 0.299 2024 5 - Year 3 Monitoring 15.00% 0.449 2025 6 - Year 4 Monitoring 5.00% 0.150 2026 7 - Year 5 Monitoring 15.00% 0.449 2027 8 - Year 6 Monitoring 5.00% 0.150 2028 9 - Year 7 Monitoring 10.00% 0.299 2029 Totals 0.896 Total Gross Credits 2.991 Total Unrealized Credits to Date 0.000 Total Released Credits to Date 0.896 Total Percentage Released 29.96% Remaining Unreleased Credits 2.095 Cowford Project Page 1 of 3 White Oak 03030001 Mitigation Project Name Cowford Project USACE Action ID 2019-00487 DMS ID 100095 DWR Permit 2019-0495 River Basin White Oak Date Project Instituted 2/4/2019 Cataloging Unit 03030001 Date Prepared 6/6/2022 County Onslow Stream/Wet. Service Area White Oak 03030001 Cowford Project Page 2 of 3 White Oak 03030001 Mitigation Project Name Cowford Project USACE Action ID DMS ID 100095 DWR Permit River Basin White Oak Date Project Instituted Cataloging Unit 03030001 Date Prepared County Onslow Stream/Wet. Service Area Notes Contingencies (if any) Project Quantities Mitigation Type Restoration Type Physical Quantity Warm Stream Restoration 3,337.000 Riparian Restoration 2.991 2019-00487 2019-0495 2/4/2019 6/6/2022 White Oak 03030001 Debits Warm Stream Restoration Credits Riparian Restoration Credits Beginning Balance (mitigation credits) 3,538.670 2.991 Released Credits 1,061.600 0.896 Unrealized Credits 0.000 0.000 Converted Credits 0.000 0.000 Owning Program Req. Id TIP # Project Name USACE Permit # DWR Permit # DCM Permit # Remaining Balance (Released credits) 1,061.600 0.896 Remaining Balance (Unreleased credits) 2,477.070 2.095 Total Remaining Balance (Released and Unreleased credits) 3,538.670 2.991 Cowford Project Page 3 of 3 White Oak 03030001