Loading...
HomeMy WebLinkAboutGW1-2022-05632_Well Construction - GW1_20220610 WELL CONSTRUCTION RECORD (GW-1) For Internal Use Only: 1.Well Contractor Information: t Robin Webb 14.WATER ZONES FROM TO DESCRIPTION Well Contractor Name 0 ft- 405 ft. +sm 2418 405 ft• 465 ft' Iavm NC Well Contractor Certification Number 15.OUTER CASING for multi-cased wells OR LINER if a licable Greene Brothers Well & Pump, WT Inc. FROM TO DIAMETER THICKNESS MATERIAL p ft. 43 ft. 1 61/4 1 in. SDR21 Company Name 356896 16.INNER CASING OR TUBING(geothermal closed-loop) 2.Well Construction Permit#: FROM TO DIAMETER THICKNESS MATERIAL List all applicable well construction permits(i.e.UIC,County.State,Variance,etc.) in. 3.Well Use(check well use): ft. ft. in. 17.SCREEN Water Supply Well: FROM TO DIAMETER SLOT SIZE THICKNESS MATERIAL Agricultural [3Municipal/Public tt. ft. in. Geothermal(Heating/Cooling Supply) OResidential Water Supply(single) ft. tt. in. Industrial/Commercial Residential Water Supply(shared) 18.GROUT Irrigation FROM TO MATERIAL EMPLACEMENT METHOD&A 1tOUNT Non-Water Supply Well: 0 tt. 20 ft. Bentonite Monitoring Recovery Injection Well: Aquifer Recharge ®Groundwater Remediation 19.SAND/GRAVEL PACK if applicable) Aquifer Storage and Recovery Salinity Barrier FROM TO MATERIAL EMPLACEMENT METHOD Aquifer Test [3Stormwater Drainage Experimental Technology 13Subsidence Control Geothermal(Closed Loop) Tracer 20.DRILLING LOG attach additional sheets if necessary) FROM TO DESCRIPTION color,hardness soil/rock e, rain size,etc. Geothermal Heating/Cooling Return) Other(explain under#21 Remarks) p ft, 43 it• Clay 4.Date Well(s)Completed: 05/10/22 Well ID# 43 505 Granite R E C gl-_ f 5a.Well Location: Stu & Midge Bridge ft. ft. Facility/Owner Name Facility 1D#(ifapplicable) ft. ft. inform"on Pmc5evin3 Unit, 3372 Grapevine Rd. Marshall 28753 Physical Address,City,and Zip Madison 9729-80-0582 21.REMARKS County Parcel Identification No.(PIN) 5b.Latitude and longitude in degrees/minutes/seconds or decimal degrees: (if well field,one latllong is sufficient) .Certi t ation: 35.867 N -82.619 w 05/10/22 6.Is(are)the well(s)OPermanent or Temporary Signature of Certified Well Contractor Date By signing this form,I hereby certify that the well(s)was(were)constructed in accordance 7.Is this a repair to an existing well: ®Yes or ®No with 15A NCAC 02C.0100 or 15A NCAC 02C.0200 Well Construction Standards and that a Ifthis is a repair,fill out known well construction information and explain the nature of the copy of this record has been provided to the well owner. repair under#21 remarks section or on the back of this form. 23.Site diagram or additional well details: 8.For Geoprobe/DPT or Closed-Loop Geothermal Wells having the same You may use the back of this page to provide additional well site details or well construction,only 1 GW-1 is needed. Indicate TOTAL NUMBER of wells construction details. You may also attach additional pages if necessary. drilled:-' SUBMITTAL INSTRUCTIONS 9.Total well depth below land surface: 505 (ft•) 24a. For All Wells: Submit this form within 30 days of completion of well For multiple wells list all depths ifdierent(example-3@200'and 2@100') construction to the following: 10.Static water level below top of casing: 120 (ft.) Division of Water Resources,Information Processing Unit, Ifwater level is above casing,use"+" 1617 Mail ServiceCenter,Raleigh,NC 27699-1617 11.Borehole diameter: 6 1/4 (in.) 24b.For Iniection Wells: In addition to sending the form to the address in 24a Rotary above, also submit one copy of this form within 30 days of completion of well 12.Well construction method: construction to the following: (i.e.auger,rotary,cable,direct push,etc.) Division of Water Resources,Underground Injection Control Program, FOR WATER SUPPLY WELLS ONLY: 1636 Mail Service!Center,Raleigh,NC 27699-1636 13a.Yield(gpm) 2 Method of test: 2 Hours 24c.For Water Supply&Infection Wells: In addition to sending the form to the address(es) above, also subinit one copy of this form within 30 days of 13b.Disinfection type: HTH Amount: 92 tabs completion of well construction Ito the county health department of the county where constructed. Form GW-1 North Carolina Department of Environmental Quality-Division of Water Resources Revised 2-22-2016 P