Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutC204535_Suspension_of_Work_Letter_06132022.doc
STATE OF NORTH CAROLINA
DEPARTMENT OF TRANSPORTATION
ROY COOPER J. ERIC BOYETTE
GOVERNOR SECRETARY
Mailing Address:
NC DEPARTMENT OF TRANSPORTATION
DISTRICT ENGINEER’S OFFICE
220 NORTH BOULEVARD
CLINTON, NC 28328
Telephone: 910-682-5100
Fax: 910-592-8209
Customer Service: 1-877-368-4968
Website: ncdot.gov
Location:
220 NORTH BOULEVARD
CLINTON, NC 28328
CL
June 13, 2022
WBS No. 45594.3.1
Contract No. C204535
TIP No. B-5639
County Duplin
Description Bridge #36 Over Maxwell Creek on NC-11
(Clodfelter Rd)
Subject: Suspension of Work due to Erosion Compliance
Concerns
David Knoll
ST Wooten Corporation
P.O. Box 2408
Wilson, NC 278942408
Mr. Knoll:
In accordance with Article 108-7 (A), in the 2018 NCDOT Standard Specifications for
Roads and Structures, all work on the construction of the project, except for erosion
control, is being suspended immediately (June 13, 2022). Work is being suspended due
to Erosion Compliance Concerns on the project.
All erosion concerns on the project including but not limited to those issues related to the
last rainfall event which occurred on June 8, 2022 must be satisfactorily completed and
verified by the Engineer prior to resuming any work on the project. As of today, June 13,
2022, no effort has been made to remove lost material from behind the silt fence or
material that has been displaced up against the silt fence in multiple areas.
Work will resume upon notification from the Department.
If you have any questions, please advise.
Sincerely,
Dan Cumbo, PE
Resident Engineer
CC: Anthony Law, Division Construction Engineer
Trevor Carroll, PE, Assistant Division Construction Engineer
Sean Farrell, Environmental Program Supervisor