Loading...
HomeMy WebLinkAbout20140521 Ver 1_More Info Received_20140603Sullivan, Shelton From: Harry Cotton <Harry @AquaDocks.com> Sent: Tuesday, June 03, 2014 5:33 PM To: Sullivan, Shelton Subject: RE: 182 Huntington project Shelton, Hopefully this is the info you are wanting. Let me know if you need anything else. Length - 120 lineal feet Class B rip rap By land with equipment Thanks Harry From: Sullivan, Shelton [ mai Ito: shelton.suIlivan(a)ncdenr.Qov] Sent: Thursday, May 29, 2014 2:28 PM To: harry a aquadocks.com Cc: tarheelburain amail.com Subject: 182 Huntington project Importance: High Harry, Regarding my voicemail and the additional information needed. Need length of shoreline to be stabilized so we can figure the square footage and what material will be used for stabilization? And how will the material be placed or constructed? Please send me an email with this information. Thank you, Shelton Su]li�Tan 401 & Buffer Permitting Unit NCDENR I DMsion of grater Resources I grater Quality Permitting Section 1650 Mail Sei0ce Center, Raleigh, NC 27699 -1650 Phone: (919)807 -6361 Fax: (919)807 -6494 Email: shelton.sullivan @ncdenr.gov �/Vebsite: http://portal.ncdenr.org/web/wq/sLAT/ws/webscape E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties AJ Please Consider the enkironnaent hef"ore printing this enlia 11,