HomeMy WebLinkAbout20140521 Ver 1_More Info Received_20140603Sullivan, Shelton
From: Harry Cotton <Harry @AquaDocks.com>
Sent: Tuesday, June 03, 2014 5:33 PM
To: Sullivan, Shelton
Subject: RE: 182 Huntington project
Shelton,
Hopefully this is the info you are wanting. Let me know if you need anything else.
Length - 120 lineal feet
Class B rip rap
By land with equipment
Thanks
Harry
From: Sullivan, Shelton [ mai Ito: shelton.suIlivan(a)ncdenr.Qov]
Sent: Thursday, May 29, 2014 2:28 PM
To: harry a aquadocks.com
Cc: tarheelburain amail.com
Subject: 182 Huntington project
Importance: High
Harry,
Regarding my voicemail and the additional information needed.
Need length of shoreline to be stabilized so we can figure the square footage and what material will be used for
stabilization? And how will the material be placed or constructed?
Please send me an email with this information.
Thank you,
Shelton Su]li�Tan
401 & Buffer Permitting Unit
NCDENR I DMsion of grater Resources I grater Quality Permitting Section
1650 Mail Sei0ce Center, Raleigh, NC 27699 -1650
Phone: (919)807 -6361 Fax: (919)807 -6494
Email: shelton.sullivan @ncdenr.gov
�/Vebsite: http://portal.ncdenr.org/web/wq/sLAT/ws/webscape
E -mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to
third parties
AJ Please Consider the enkironnaent hef"ore printing this enlia 11,