Loading...
HomeMy WebLinkAbout20220191 Ver 2_Certification of Completion_20220613Strickland, Bev From: John Jakubowski <john@alevelbuilder.com> Sent: Monday, June 13, 2022 3:22 PM To: Perez, Douglas J Subject: [External] Certificate of completion #2022-0191V2 Attachments: Certificate of Completion Walkway to Dock.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Doug, Please find the attached Certificate of Completion for my walkway project located at 356 Yacht Rd, Mooresville 28117 Please let me know if there is anything else I need to do. Thank you for walking me through the process. Best Regards, John Jakubowski (704) 620-3311 1 CERTIFICATE OF COMPLETION NCDWR Project No.: (l County: �t fZCOEM Applicant: Project Name: Y({-r +o cic�G�t Date of Issuance of 401 Water Quality Certification: u • �y I c 0-1-G3a Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Wetland & Buffer Permitting Unit, North Carolina Division of Water Resources, 1617 Mail Service Center, Raleigh, NC, 27699-1617. This form may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification lV hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approxed plans and specifications, and other supporting materials. Signature: T6J"' "" T%x�--�- - Date: J U ^J Agent's Certification 1, hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Engineer's Certification Partial Final Date: 1, . as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature Registration No. Date