Loading...
HomeMy WebLinkAbout20150955 Ver 1_Meeting Minutes_20121129ORIGINAL AUGUST 16, 2012 CONCURRENCE POINT 2A BRIDGING DECISIONS AND ALIGNMENT REVIEW Section 404 /NEPA Merger Team Meeting Agreement Concurrence Point 2A: Bridging Decisions and Alignment Review Project Name /Description: Topsail Island Bridge Replacement, Pender County, NC TIP Project No.: B -4929 Federal Aid Project No.: BRSTP -50 (10) WBS No.: 40233.1.1 Bridging Decisions and Alignment Review The Project Team has reviewed the bridging and alignments of the seven Detailed Study Alternatives (DSA) and agreed to carry five of the seven DSAs forward into the Concurrence Point 3. Alternatives 6 and 7 have been eliminated due to their adverse impacts to Soundside Park, a Section 4(f) resource, as well as their limited off -site detour options, constructability concerns and higher overall costs compared with other five DSAs. Alternatives 4, 5, 5R, 11, and 17 will be carried forward to Concurrence Point 3. Table below shows the begin and end stations and associated minimum roadway /hydraulic bridge lengths for each DSA. Detailed Study Alternative No. Begin Station End Station Minimum Roadway /Hydraulic Control Bridge Length (feet) Alt 4 516 +40 553 +90 3,750 Alt 5 615 +40 652 +16 3,676 Alt 5R 615 +40 651 +94 3,654 A#-6 1 1321+70 rv� 1' 70 520 Alt n Beteuf 21+13 36 +00 4-,437 Ait7 1511+5 1 5 21.i79 4,02-0 A-ra 7 De +te 3 36$90 44&7 Alt 11 919 +00 959 +40 4,040 Alt 17 406 +75 444 +00 3,725 The Project Team met and concurred on this date of August 16, 20A2: USACE ( EQV NCDOT USEPA USFWS NCDCR NCDWQ FHWA NCWRC USCG NCDCM NCDMF NMFS --• NORTH CAROLINA TOPSAIL ISLAND BRIDGE REPLACEMENT DEPARTMENT OF TRANSPORTATION T.I.P. No. B -4929 AUGUST 2012 ORIGINAL CONCURRENCE POINT 2A AUGUST 16, 2012 BRIDGING DECISIONS AND ALIGNMENT REVIEW Section 404 /NEPA Merger Team Meeting Aareement Concurrence Point 2A: Bridging Decisions and Alignment Review Project Name /Description: Topsail Island Bridge Replacement, Pender County, NC TIP Project No.: B-4929 Federal Aid Rro ;--,t No.: BRSTP -50 (10) WBS No.: 40233.1.1 Bridging Decisions and Alignment Review The Project Team has reviewed the bridging and alignments of the seven Detailed Study Alternatives (DSA) and agreed to carry five of the seven DSAs forward into the Concurrence Point 3. Alternatives 6 and 7 have been eliminated due to their adverse impacts to Soundside Park, a Section 4(f) resource, as well as their limited off -site detour options, constructability concerns and higher overall costs compared with other five DSAs. Alternatives 4, 5, 5R, 11, and 17 will be carried forward to Concurrence Point 3. Table below shows the begin and end stations and associated minimum roadway /hydraulic bridge lengths for each DSA. Detailed Study Alternathe Ntr. BeginSta ©it_.1 _ Sttint> Minimum Rtidway lHyt(r2tulia,octtrot,__ Brid e.Len th feet Alt 4 516 +40 553 +90 3,750 Alt 5 615 +40 652 +16 3,676 Alt 5R 615 +40 651+94 3,654 Att 6 1316 +58 1321+7 629 Alt 6 Bette 21+13 36+89 44P Alt-7 1611+6 4524 - +78 4;= Alt 7 - Det 21+13 36+00 4 ;4 7 Alt 11 919 +00 959 +40 4,040 Alt 17 406 +75 444 +00 3,725 The Project Team met and concurred on this date of August 16, 20 2: USACE / g ,t�, 2vi z - NCDOT USE P �� /'t ' _ 2i -- 12- USFWS NCDCR NCDWQ — FHWA NCWRC USCG z NCDCM���,i/� -��,. NCDMF NMFS --• NORTH CAROLINA TOPSAIL ISLAND BRIDGE REPLACEMENT DEPARTMENT OF TRANSPORTATION T.I.P. No. B-4929 AUGUST 2012 ORIGINAL CONCURRENCE POINT 2A AUGUST 16, 2012 BRIDGING DECISIONS AND ALIGNMENT REVIEW Section 4041NEPA Mercer Team Meeting Aureement Concurrence Point 2A: Bridging Decisions and Alignment Review Project Name /Description: Topsail Island Bridge Replacement, Pender County, NC TIP Project No.: B4929 Federal- Aid- Pro,-°ct -No.: BRSTP -50 (10) WBS No.: 40233.1.1 Bridging Decisions and Alignment Review The Project Team has reviewed the bridging and alignments of the seven Detailed Study Alternatives (DSA) and agreed to carry five of the seven DSAs forward into the Concurrence Point 3. Alternatives 6 and 7 have been eliminated due to their adverse impacts to Soundside Park, a Section 4(0 resource, as well as their limited off -site detour options, constructability concerns and higher overall costs compared with other five DSAs. Alternatives 4, 5, 5R, 11, and 17 will be carried forward to Concurrence Point 3. Table below shows the begin and end stations and associated minimum roadway /hydraulic bridge lengths for each DSA. Detained Study Alternative No Beg inStatiori . End Statiotl- Minimum Roadway /Hydraulic Gontrai,:. B -rid e;t.en th, feet . Alt 4 516 +40 553 +90 3,750 Alt 5 615 +40 652 +16 3,676 Alt 5R 615 +40 651 +94 3,654 A" 1316+59 4324 +70 520 Alt 6 - Deteu 21*13 36+09 487 41487 Alt- -7 46- 114.60 4-524*70 4;029 Alt -7 - Beteu 21+43 36+08 4�7 Alt 11 919 +00 959 +40 4,040 Alf 17 406 +75 444 +00 3,725 The Project Team met and concurred on this date of August 16, 20 2: USACE� NCDOT ° USEP ,� -24 r I z USFWS i NCDCR g NCDWQ i — FHWA _ NCWRC USCG NCDCM���,�/� NCDMF NMFS '- RPO NORTH CAROLINA TOPSAIL ISLAND BRIDGE REPLACEMENT DEPARTMENT OF TRANSPORTATION T.I.P. No. 8-4929 AUGUST 2012 ORIGINAL AUGUST 16, 2012 CONCURRENCE POINT 2A BRIDGING DECISIONS AND ALIGNMENT REVIEW Section 404/NEPA Merger Team Meeting Agreement Concurrence Point 2A: Bridging Decisions and Alignment Review Project Name /Description: Topsail island Bridge Replacement, Pender County, NC TIP Project No.: 8-4929 Federal Aid-Project No,: BRSTP - 50_001 WBS No.: 40233.1.1 Bridging Decisions and Alignment Review The Project Team has reviewed the bridging and alignments of the seven Detailed Study Alternatives (DSA) and agreed to carry five of the seven DSAs forward into the Concurrence Point 3. Alternatives 6 and 7 have been eliminated due to their adverse impacts to Soundside Paris, a Section 4(0 resource, as well as their limited off -site detour options, constructability concerns and higher overall costs compared with other five DSA9. Alternatives 4, 5, 5R, 11, and 17 will be carried forward to Concurrence Point 3. Table below shows the begin and end stations and associated minimum roadway /hydraulic bridge lengths for each DSA. Detailed Study Detailed No, g gilt 3tatlont. tend 5tltii t Minimum Roadway /Hydraulic Control Brill e.Len th feat All 4 516 +40 553 +90 3,750 Alt 5 616 +40 652 +16 3,676 Alt 5R 615 +40 1 651 +94 3,654 Alt 8 4318+-iA 1324*70 620 A44-9etaw 21413 26+00 4 A1-7 16-14 +60 1424*N 1,020 Alt 2+13 26+OA 1 Alt 11 919 +00 959 +40 4,040 Alt 17 406 +75 44400 3,725 The Project Team met and concurred on this date of August 16, 20 2: USACE g I6.2a 1 Z- NCDOT USEP X-.1 g_ �1 12- USFWS NCDCR 4,iz�. ;.' % -c� �% ,,y,.�71 NCDWQ I'M FHWA� NCWRC USCG NCDCM ��� —� -.� NCDMF �� NMFS RPO NORTH CAROLINA TOPSAIL ISLAND BRIDGE REPLACEMENT DEPARTMENT oKTRANSPORTATION T.I.P. No. 8 -4929 AUGUST 2012