Loading...
HomeMy WebLinkAboutWQ0014391_Monitoring - 04-2022_20220519 n .. ti DWR - NonDischarge Monitoring Report Submittal ' •4 .. NORTH CAROLINA Erwlr...1M Qua(ily Monitoring Report Submittal .............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Permit Number#* WQ0014391 Name of Facility:* Builders First Source Month:* April Year:* 2022 Report Information Type* Upload Document* NDMR, NDAR-1, NDAR-2, NDMLR BFS NDMR 4-22.pdf 5.6MB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2,NDMLR,GW-59). Confirmation Email Address:* Biowater@aol.com Name of Submitter:* Randall Jarrell Signature: Date of submittal: 5/19/2022 This will be filled in automatically Initial Review ............................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................................. Reviewer: Gerald,Wanda Is the project number correct?* WQ0014391 Is the monitoring report accepted?* Yes No Regional Office* Raleigh Accepted Date: 6/7/2022 FORM: NDMR 05-16 NON-DISCHARGE MONITORING REPORT(NDMR) Page 1 of s Permit No.: WQ0014391 Facility Name: Builders FirstSource-Apex Yard WWTF County: Chatham Month: April Year: 2022 l PPI: 002 Flow Measuring Point: E Influent ❑Effluent ❑No flow generated Parameter Monitoring Point: ❑Influent 0 Effluent ❑Groundwater Lowering ❑Surface Water Parameter Code —* 50050 00310 31616 00610 00625 00620 00600 00400 00665 00530 c t co f. 1° v c c 2 m m U) c m „ a� 0 v CO N E w o o o o N CO R w o 2 w t « c o Q . H LL O LL — E Y r F º F Ñ oº ó r U m U .�. Z Z Z o 7 CO O Q a- co 24-hr hrs GPD mg/L #/100 mL mg/L mg/L mg/L mg/L su mg/L mg/L 1 800 2 800 3 16:50 0.42 800 _ 6.79 4 800 5 800 6 800 7 800 8 800 _ 9 800 10 800 11 13:15 0.25 800 6.22 _ 12 848 _ 13 848 14 848 15 848 16 848 17 848 18 848 _ 19 11:55 0.42 848 6.49 20 848 21 848 22 848 23 848 24 848 25 09:45 0.5 848 6.39 _ 26 848 _ 27 848 28 848 29 848 30 848 31 Average: 830 _ Daily Maximum: 848 6.79 Daily Minimum: 800 6.22 Sampling Type: Estimate Grab Grab Grab Grab Grab Grab Grab Grab Grab Monthly Limit: 3,750 30 200 15 30 Daily Limit: _ Sample Frequency: Monthly 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year 3 X Year Weekly 3 X Year 3 X Year FORM: NDMR 05-16 NON-DISCHARGE MONITORING REPORT(NDMR) Page 2 of t Sampling Person(s) Certified Laboratories Name: Randall Jarrell Name: ENCO Name: Name: Wastewater Management, L.L.C. Does all monitoring data and sampling frequencies meet the requirements in Attachment A of your permit? E Compliant ❑Non-Compliant If the facility is non-compliant, please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective action(s)taken.Attach additional sheets if necessary. Operator in Responsible Charge(ORC)Certification Permittee Certification ORC: Randall Jarrell Permittee: Goldston-Apex Properties, L.L.C. Certification No.: 23925 Signing Official: Randall Jarrell Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC Has the ORC changed since the previous NDMR? ❑Yes 2 No Phone Number: Permit Expiration: T64)-1 rl�(u Signatl re Date Signature Date By this signature,I certify that this report is accurrate and complete to the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page of `ó Permit No.: WQ0014391 J Facility Name: Builders FirstSource-Apex Yard WWTF J County: Chatham Month: April Year: 2022 Field Name: 01-1A Field Name: 01-1B Field Name: 01-2A Field Name: 01-2B Did irrigation occur Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19 at this facility? Cover Crop: Cover Crop: Cover Crop: Cover Crop: ❑YES 0 NOHourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 5.68 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Weather Freeboard Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES Rl NO Field Irrigated? ❑YES El NO Field Irrigated? ❑YES 2 NO m c ID 0 º a> m º' e y a en E ca m L -a CD E en e y -a ca E 01 a> -0 -0 rn E rn T o 0 Y co Nº E a) a> 2 >. c 7 c E °7 ai a> >, c c T c E m a •: > c ? C E d a ;; > c 3 T c as V IE c- � _ as E _ R • v E m • v E 3 v E R E .3 '5 0 º •Q o º E rn Ñ K o m c Q E m 2 X o 6º E . R 2 % o º E `° N X o 2 m 3 aº oº f- c o o as x o oº o o = o óº i= c D o m x o óº o o m x o w E y co 16 º i Q i J J > a J J > a J J i Q J g J as a> a O R e °F in ft ftgal min in ingal min in ingal min in in gal min in in ,1 2 3 C 72 0.89 3.4 - 5 — — - 6 7 8 _ 9 10 _ 11 C 78 0.73 3.3 _ 12 13 14 _ _ 15 16 17 _ 18 19 C 53 1.34 3.1 20 21 22 23 _ _ 24 25 C 71 0 3 26 27 _ 28 29 _ 30 31_ Monthly Loading: 0 › 0.00 % 0 //'' 0.00 r 0 r 0.00 % %,0 0.00 r/ 12 Month Floating Total(in): % �i, 5.96 %/'�������/ 5.96 /�����4//r.: AZ 5.821��������/ % 5.74 �i% A. FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page ci of Permit No.: WQ0014391 I Facility Name: Builders FirstSource-Apex Yard WWTF I County: Chatham _ Month: April Year: 2022 Field Name: 01-3A Field Name: 01-3B Field Name: 01-4A Field Name: 01-4B Did irrigation occur Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19 Area(acres): 0.19 at this facility? Cover Crop: Cover Crop: Cover Crop: Cover Crop:P� p: p: ❑YES ❑NO Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Hourly Rate(in): 0.4 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Annual Rate(in): 22.48 Weather Freeboard Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES 0 NO m E 0 y º a, d º my a a) E Trn m ° v rn Trn my ° a� E Trn m � -a al E Trn 0 cc :4 co m E °� a> .' >, c ° _ c E m m :: ' E ° — c E a> a> °: >, c 3 L c E m d m > c ° _ `1) •- 2 ñ E rn •� E ° 3 ñ E rn •� 5 E E v ° º E ° E ° 3 ñ E •1 E_ á º ó X o _ o as rn R as rn cc r •„ >,º ° º f- c o 0 óº •c o ca o óº i= o o K ° o º o o x ° o E al co Q > Q J 2 = J > < _ -J 5 = J > < _ -J 5 = J iQ -J 2 = J a, as F d u) - °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 2 3 C 72 0.89 3.4 4 5 6 7 8 9 10 11 C 78 0.73 3.3 _ 12 13 14 15 16 17 18 19 C 53 1.34 3.1 20 21 22 23 24 25 C 71 0 3 26 27 28 29 30 31 Monthly Loading: 0 0.00 � 0 �!yi% 0.00 / 0 r 0.00 �%% 0 0.00 12 Month Floating Total(in):�������/ i% 5.68 j�//í/Jí� /%•�������� 5.68 63j�/ A3��� 5.80 / i% �/%�/��/% / 5.707% � FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT (NDAR-1) Page 5 of Permit No.: WQ0014391 I Facility Name: Builders FirstSource-Apex Yard WWTF I County: Chatham Month: April Year: 2022 Field Name: 02-1A Field Name: 02-1B Field Name: 02-2A Field Name: 02-2B Did irrigation occur Area(acres): 0.18 Area(acres): 0.22 Area(acres): 0.28 Area(acres): 0.23 at this facility? Cover Crop: Cover Crop: Cover Crop:' ro Cover Crop: p� ❑YES NO Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Weather Freeboard Field Irrigated? ❑YES ❑NO Field Irrigated? ❑YES ❑NO Field Irrigated? ❑YES ❑NO Field Irrigated? ❑YES ❑NO 2 c =_ 1 _0 •º e ) a' o -O en E rn a) -p 13 E _ >, o m y rn ºR E m e .1 >, c ` c E .2 m a; >, c ac E m a> 2 >. c E 2 c E = E m v .E '5 _= - E • E > c E t E 'S ° > a oº R R . o o m x O oº R• •C o o m 2 O oº I 2 o o 11 x O o 0- ~ o ó •m = ó °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 _ _ 2 3 C 72 0.89 3.4 4 5 6 7 9 10 11 C 78 0.73 3.3 12 - . 13 14 15 16 17 18 19 C 53 1.34 3.1 20 21 22 23 24 25 C 71 0 3 26 27 28 29 30 31 Monthly Loading:// 0 0.00 % o / 0.00 %� o 0.00 / o % 0.00 l 12 Month Floating Total(in):✓//���0��� 7.40 /�00� ������/ 6.05 /��/� ��/. 4.76 ����/„������'� , 5.72 /// FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page es:, of Permit No.: W00014391 I Facility Name: Builders FirstSource-Apex Yard WWTF I County: Chatham Month: April Year: 2022 Field Name: 02-3A Field Name: 02-3B Field Name: 02-4A Field Name: 02-4B Did irrigation occur Area(acres): 0.32 Area(acres): 0.25 Area(acres): 0.28 Area(acres): 0.32 at this facility? Cover Crop: Cover Crop: Cover Crop: Cover Crop: _ ❑YES E NO Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Hourly Rate(in): 0.2 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Annual Rate(in): 18.11 Weather Freeboard Field Irrigated? ❑YES 0 NO Field Irrigated? ❑YES (]NO Field Irrigated? ❑YES J NO Field Irrigated? ❑YES 0 NO !,- 0 _ .0 º y m º' y -a •a O) E 07 a> v -a o) E o m -o •a o E 0) a� v v rn E a> > Ú R Via, ú E m m „ �, c 3 ? c E a m á > c S a c E m d >, c ?` c E m m ;; > c T c m º E I> á E s- á 3 E I á E E á 3 E c • á E '5 v _2 E R : v E 's á p a� 0- •º y Cº F- rn D o x O 2 oº i- á� ca m X O 2 O a. H O O iC 0 2 O O. F a p to K O �a ,•_, E y V) íTc Q > Q = J = J Q _ J 0 = J > a _ J = J Q _ J 5 = J a) Ñ a L as °F in ft ft gal min in in gal min in in gal min in in gal min in in 1 2 _ 3 C 72 0.89 3.4 _ 4 5 6 7 _ 8 _ 9 _ 10 11 C 78 0.73 3.3 12 _ 13 14 15 16 17 18 _ _ 19 C 53 1.34 3.1 20 21 T - ._ . 22 T 23 24 25 C 71 0 3 26 27 28 29 _ 30 31 Monthly Loading: 0 / 0.00 r 0 % 0.00 %7j/ 0 /%///%%///// 0.00 r ,/ ///0//// r 0.00 r 12 Month Floating Total(in):r�����1 6.58 8.42 ��������i/�����/. 7.46 ������J. ////O/��i.A/ 6.41!i FORM: NDAR-1 05-16 NON-DISCHARGE APPLICATION REPORT(NDAR-1) Page Z of Did the application rates exceed the limits in Attachment B of your permit? E Compliant ❑Non-Compliant Were adequate measures taken to prevent effluent ponding in or runoff from the sites? 0 Compliant ❑Non-Compliant Was a suitable vegetative cover maintained on all sites as specified in your permit? E Compliant ❑Non-Compliant Were all setbacks listed in your permit maintained for every application to each permitted site? I Compliant ❑Non-Compliant Were all freeboards maintained in accordance with the specified freeboard heights in your permit? ❑Compliant ❑Non-Compliant If the facility is non-compliant, please explain in the space below the reason(s)the facility was not in compliance. Provide in your explanation the date(s)of the non-compliance and describe the corrective action(s)taken.Attach additional sheets if necessary. Operator in Responsible Charge(ORC)Certification Permittee Certification ORC: Randall Jarrell Permittee: Goldston-Apex Properties, L.L.C. Certification No.: 23925 Signing Official: Randall Jarrell Grade: Phone Number: 919-210-2500 Signing Official's Title: ORC Has the ORC changed since the previous NDAR-1? ❑Yes 0 No Phone Number: 919-201-0347 Permit Exp.: 4.4)VI S 142-y Si 1512L Signature Date Signature Date By this signature,I certify that this report is accurrate and complete to the best of my knowledge. I certify,under penalty of law,that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that all qualified personnel properly gathered and evaluated the information submitted.Based on my inquiry of the person or persons who manage the system,or those persons directly responsible for gathering the information,the information submitted is,to the best of my knowledge and belief,true,accurate,and complete.I am aware that there are significant penalties for submitting false information,including the possibility of fines and imprisonment for knowing violations. Mail Original and Two Copies to: Division of Water Resources Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 Builders First Source 12 Month Rolling Total Application In Inches 2022 2022 2022 2022 2021 2021 2021 2021 2021 2021 2021 2021 2022 Field Jan Feb March April May June July August Sept Oct Nov Dec Total 1 5.96 0 0 0 0 0 0 0 0 0 0 0 5.96 2 5.96 0 0 0 0 0 0 0 0 0 0 0 5.96 3 5.82 0 0 0 0 0 0 0 0 0 0 0 5.82 4 5.74 0 0 0 0 0 0 0 0 0 0 0 5.74 5 5.68 0 0 0 0 0 0 0 0 0 0 0 5.68 6 5.68 0 0 0 0 0 0 0 0 0 0 0 5.68 7 5.8 0 0 0 0 0 0 0 0 0 0 0 5.8 8 5.7 0 0 0 0 0 0 0 0 0 0 0 5.7 9 0 0 0 0 0 5.46 0 0 1.94 0 0 0 7.4 10 0 0 0 0 0 4.46 0 0 1.59 0 0 0 6.05 11 0 0 0 0 0 3.48 0 0 1.28 0 0 0 4.76 12 0 0 0 0 0 4.2 0 0 1.52 0 0 0 5.72 13 0 0 0 0 0 3.07 0 0 3.51 0 0 0 6.58 14 0 0 0 0 0 3.93 0 0 4.49 0 0 0 8.42 15 0 0 0 0 0 3.45 0 0 4.01 0 0 0 7.46 16 0 0 0 0 0 2.96 0 0 3.45 0 0 0 6.41