Loading...
HomeMy WebLinkAbout20061617 Ver 6_Modifications_201405192p0 6 1 6 1 7 ✓•(0 WN1 'ALL Wetland and Natural Resource Consultants, Inc. Ms. Jean Gibby US Army Corps of Engineers Raleigh Regulatory Field Office 3331 Heritage Trade Drive, Suite 105 Wake Forest, NC 27587 RE: Wendell Falls Permit Modification USACE AID SAW 2005 -20100 NC DWQ 2oo6 -1617 o CGC��dC� 4 D MAY 1 9 2014 D tit - m7FR A April 22, 2014 The purpose of this letter is to request an impact neutral permit modification for the Wendell Falls development located in Wake County, North Carolina. As detailed below, the applicant proposes to eliminate two road crossings in order to re- habilitate a failing dam and expand an irrigation source. The dam embankment and riser structure on a pond located within the development needs to be brought up to current safe standards. The existing conditions include a six inch PVC outlet (which is undersized) and sheet flow across the top of the dam (which results from the undersized outlet). Additionally, the dam is steeper than current safety standards and there are stumps within the embankment. The structure needs to be rehabilitated. The applicant has identified that 15 acres within the development will need to be irrigated. Their preference is to expand the existing pond for the irrigation water instead of using potable water from a municipal system. The thinking is that a pond will maintain recharge. The applicant has projected a 1.o to 1.5 acre inch application per week in drought conditions. The applicant has calculated that 3 acre feet of water will be necessary for 3 weeks of irrigation. In gallons, 15 acres will require approximately 407,000 gallons of irrigation water. Each acre foot of pond totals approximately 326,000 gallons. The irrigation demand is projected to drop the water surface elevation by 4 or more feet during periods of high demand. Using potable water for irrigation water is irresponsible and expensive. Therefore it was considered to be a non - viable alternative. Similarly, using multiple wells to generate irrigation waters was determined to be non - viable. The following narrative presumes that the submitted design is approved under the Dam Safety Program. Their review is independent and it is possible that the actual impacts will be slightly more or less than what is presented here. The applicant proposes to finalize the actual impact amounts and mitigation based on the approved drawings. Be aware that the proposed drawings were generated using a "worst- case" set of scenarios and that it is most likely that the actual impacts will be less than requested. Under this rationale, we propose that we submit the final approved drawings within 14 days of their receipt. And, at that time, we will finalize the mitigation requirements. Sparta Office 170Dew Drop Rd, Sparta, NC 28675 Stream Impacts The modifications to the dam and pond will result in permanent impacts to 135 linear feet of moderate quality stream downstream of the embankment. This length will be impacted by temporary construction areas, embankment fill and the proposed plunge pool. It is very possible that a small channel can be re- established after construction has been completed. Additional minor flooding will occur - upstream of the pond. The end of jurisdiction of this intermittent stream was established approximately 125 feet upstream of the normal pool of the pond. Approximately 45 linear feet of this reach will be flooded. A stream assessment found the channel to be of low to moderate quality; score 32. Stream Mitigation The applicant proposes to abandon crossing Ri and re- distribute the mitigation to off set impacts for the dam embankment. The approved road crossing impacted 133 linear feet of stream. The crossing can be abandoned because the lot yield is not sufficient for the small area of high ground that would be accessed. Wetland Impacts The, majority of the wetland impacts are temporary in nature and result from the need to have safe working areas; temporary impacts total 0.o6 acres. The embankment will impact 0.03 acres and the plunge pool will impact 0.03 acres. It is important to note that the plunge pool will have standing water within it after construction. All temporary impact areas will be seeded with a wetland seed mix and will be staked with willow. Wetland Mitigation The,applicant proposes to abandon crossing R7 and re- distribute the mitigation to off set impacts for the dam embankment. The approved road crossing impacted o.11 acres of wetlands. The crossing can be abandoned because the lot yield is not sufficient for the small area of high ground that would be accessed. Thank you for your time and consideration. We look forward to working with your office on this project and please contact me at 336.4o6.0906 with any questions that you might have. Best regards, 0,,*WA Chris Huysman cc: Ms. Jennifer Burdette NC DWR 401 Permitting 1650 Mail Service Center Raleigh, NC 27699 rn W i � � � I j W w a NV'Id RIIS 'IIVHRAO ry � � el 'T.� ��p oN 'TI3QNSM Q� d A f) A[dQ 5"mA naama& Z ~ < a b C a °Lm- ter° c �� nco o ; 3WQ O, % a• u L N Y w- ±' d j Y 3 00 tD • fno� x 0003�3° — 3 E� E m LL \\ Z o_ o� c 3,,' a v° o c y o c c o °ate 2—° f9 �� v o E u o v 1 Up _ ru N ++ O v CL v Ul �I �W Jz aw g v V °n m 8 % a° c 0 � Yw Y $ a_miv" N p0 �O 1 mo RM 0. N Cl W L tn :n N N Q ` — Lfl V Cli � o C L) 3 a m K � ZN W w ry f) Z ~ < a b v o ; 3WQ O, % • fno� x < < LL \\ o� L- 1 Up z z Z / �I �W Jz aw g 8 % 3 F mo RM 0. Cli a 3 n ZN aw N •� O H x W m bD m .o w 7:5 T� v; = �' � m p N �-0 o Y ko v o o y � 3 m a, v Z L h ra a-+ N �° N C of Y nCi o E � m C .- y ;° 3 C �' 'n � ro V/ o E ! vCC v � a v > v m `�° ;° V; vi ro Vic_ N Qml N ° '-° a> u (V x V m m 'N N to 3 m ~ m C ° H � �^ oC fe 250 255 C) z � "p \ 15 F- LLJ C14 CDga, x 0 z LLJ V) 0 x Ljj x x x x LLJ —z F- z oil Lr- < LLJ C)f z a >0 : z F- z NV'-ICI SNOIIvoidi(low wva V) 5� LL) < x (DUO - Z LLJ > -j m L 01 3 o L U) o V X —h Co 12 ON 'TIaGNaA ZQf =)Lj -iz a a s LLI ➢(Va STrVA TISaMaA ryx LLJ < j)f F- 0 D x LL 0 C) 0 x 0 -XII o o 0 N or m LL. < Ln CL 4) Z) z c LLI 0 Of F- LLJ F 0 LLI < 3: LU (a fe 250 255 C) z � "p \ 15 F- LLJ C14 CDga, x 0 z LLJ V) 0 x Ljj x x x x LLJ —z F- Lr- < LLJ C)f z a >0 : z F- z 0 U) Of V) 5� LL) < x (DUO - Z LLJ > -j m L o L U) o V X —h Co LLJ Z % ZQf =)Lj -iz LLI Z 0 F- ryx LLJ < j)f F- 0 D LL 0 C) 0 fe 250 255 C) z � "p \ 15 F- LLJ C14 CDga, x 0 z LLJ V) 0 x Ljj x x x x \ % s@UD2 (Ip mEAanv §| §( § §| o ! pn grm;egcm | ■| \ �+ ! | u \ � \ /( � am & z J \ G? Lu 7 Cj � ® ■« oS } � 2k � fk � CL \ � | ■| \ �+ § ■ ■ � § § ! | u � ƒ � z & z J \ G? - � ® } N ! ` ■� j _ E| CL _ u j \ | ze ■ - k/ I7, / �a 0 u ■ \§ ` 0 E U) / \/ a LLI - & /}[7 | \ a � ± 2 = \ LU ƒ2 ®k 2 ?(V %0 o_ a � 0 ■ ! ■ m 2 ® l 2 ) 2 § ■ ■ � § § ! | � ƒ � & z - � ® �n w ■ - I7, / \\ 0 u \ \ : �` ° | \? G / \/ a )° /}[7 | \ ± 2 = \ LU ƒ2 ®k ?(V %0 \ l 2 ) \ 2 _£±\ k�2/ § | ■ ■ « ° ƒ ° \ § a # \_k z uL lw \uxol ul�lwv r «i.a !•1�41s1)vNw� Iwm.�.gs.e.q- YW-1 4. t— - —M vLR16UN PRELIMINARY Y UT FOR ILLUSTRAtfIVE PURPOSES 0141LY L;�-J If I MUL I -FAMIL SITE Rom f lip _ 1 April 11, 2014 Permit Modification Impacts to be Re- distributed Wendell Falls, Wake County, NC USACE: 2005-20100 NC DWQ: 20o6 -1617 Sheet 1 of 1 Approved Impact R -7 o.11 acres N ROAD TO BE POOLE ROAD 2&G2 LAKE MYRA Approved Impact R -1 r 133 linear feet DADWAY CROSSING GRAPHIC SCALE _EWER CROSSING 2000 0 1000 2000 4(W = GREENWAY GROSSING M - FORCE MAIN CROSSING LW WATER LINE CROSSING 1 inch = 2000 ft. WENDELL FALLS OVERALL WITHERS {- RAVENEL STREAM IMPACT MAP ENGINEERS 1 PLANNERS 1 SURVEYORS MWIAI WAKFCUUNN NURMI, Ak1A1N\ ,�,.,�..,.,,,.... �.. .4..<.0... »�� �. .�.,.>,�« �.�..,... .......m,,. i I ♦� � q(� 1 April 11, 2014 Permit Modification Impacts to be Re- distributed Wendell Falls, Wake County, NC USACE: 2005-20100 NC DWQ: 20o6 -1617 Sheet 1 of 1 Approved Impact R -7 o.11 acres N ROAD TO BE POOLE ROAD 2&G2 LAKE MYRA Approved Impact R -1 r 133 linear feet DADWAY CROSSING GRAPHIC SCALE _EWER CROSSING 2000 0 1000 2000 4(W = GREENWAY GROSSING M - FORCE MAIN CROSSING LW WATER LINE CROSSING 1 inch = 2000 ft. WENDELL FALLS OVERALL WITHERS {- RAVENEL STREAM IMPACT MAP ENGINEERS 1 PLANNERS 1 SURVEYORS MWIAI WAKFCUUNN NURMI, Ak1A1N\ ,�,.,�..,.,,,.... �.. .4..<.0... »�� �. .�.,.>,�« �.�..,... .......m,,. 1 U AS CE AID# _'ZCX'YV ' 20 \ 00 " 2..y r Z' DWQ,# �,��1— Site # (indicate on attached map) STREAM QUALITY ASSESSMENT 'WORKSHEET Provide the following information for the - stream reach under assessment: 1.,Apphcant's,name r�l \a `Qkki 2. Evaluator',s name V � 3. Date of evaluation L 'Z Q\4- 4. Time�of evaluation-. 5. Name of stream- tAM12- �` s - - 6. River basin is , —XS5' 7.,A0proximate,drainage area: i t5- 8. Stream order. 9. L' ength' of reach evaluated aT, 'Ur 10. County l� 11. Site,coordinates (if known) —T ^p-�refer /in decimal,degrees 12.- Subdivision name (if any) �a Latitude (ex 34,872312)* �, l 1 ZV Longitude (ex -7755566_1 1). � 7 s � 6 'k Metliod location detemimed•(circle) GP Topo Sheet Ortho (Aerial) Photo /GiS Other GIS Other 13. Location of reach undei ,evaluation;(note nearby roads and IandmaFks and attach map identifying stream (s)•location) 14. Proposed channel work (if any) 15. Recent weather conditions \A oo v,K) 16. Site conditions,at time of visit* n�' Tr 17. Identify any special waterway classifications known _Section 10 _Tidal Waters _Essential Fisheries. Habitat _Trout Waters _Outstanding Resource Waters _ Nutrient Sensitive Waters _Water Supply Watershed (i -1V) 18. Is there a pond or lake located upstream of the,evaluation point? YES 0 If,yes, estimate the water surface -area: 19. Does-channel, appear on USGS quad map? YES NO 20. Does channel appear on USDA Soil Survey? YES NO 21. Estimated watershed land use % Residential % Commercial _% Industrial _% Agricultural ('-7 % Forested IN Cleared / Logged, _% Other 22. Bankfull width �t 23 Bank height,(from bed to top of bank) -' `, - 24. Channel slope down center of stream. _Flat (0 to-2 %) Gentle (2 to 4 %) _Moderate (4 to 10 %) _Steep ( >I0 %) 25. Channel sinuosity Straight !� Occasional bends _Frequent meander =Very sinuous _Braided channel Instructions for completion of worksheet (located ompage 2): Begin by determining'the most iappropriate ecoregion based on. location,, terrain, vegetation, stream classification, etc Every characteristic must be scored using the.same ;ecoregion Assign points to each characteristic within the range shown for the ecoregion. Page 3 provides a brief description of how to review the characteristics identified in the worksheet Scores should reflect an overall assessment of the stream reach under evaluation If a characteristic cannot be evaluated due to site or weather conditions, enter'0 in the scoring box and provide,an explanation in the comment section Where there are obvious changes in the character of a stream under review (e g , the stream flows from a pasture into a forest), the stream may be divided into - smaller reaches that display more continuity, -and a separate form used to'evaluate each reach The total score assigned to a stream reach must range between 0 and 100, with a- score -of 100,representing a stream of the highesi,quality. Total Score (from reverse):` Comments: Evaluator's Signature M "i v" 4 >< 'adz ' L1 NN V ro 43'i" — Date This channel evaluation rm is intended to be used only -as,a guide to assist - landowners and environmental professionals in gathering the data required by the -United' States Army Corps of Engineers to make a preliminary assessment of stteam quality. The total score resulting from the coipletion of this form is subject to ,USACE approval and does not imply a particular mitigation`ratio or requirement. Form'sbbject to change - version 06%03 To Comment;, please�call,919- 876 -8441 x'26- STREAM QUALITY ASSESSMENT WORK-SHEET These clfaract&hsttcs are not assessed in coastal streams fttl� i7i ANKNOXG -8T, 5- NiR URUJI'Aml xt6fisiv r WN I-A a mp,9,4 tz� p g.� gq lit N- xdntig&6rK-fNVide1b-u .rTsn I-M ig -N-Y, Ro 3 ,;M�we rpf,"!� VVE 'F�VVQ10 -M 0 �0 W i s c Wa F "o60 �-;N",E qum rge�� R A, 09hiffiMfg7e sprnigs�eseej)§;,�. ifi6d§.00��-'m 1pplin RN RIM-- § NO -1 T , Z N E US 'I 'r 444�-" 1" ""0,- p6intO DPW- -0 I-P"KQ115 -M rela 03 0M. ffl7,?ep1y;enrmncp:ed Fft 0;4ff,�quenf, z.9 ng:= mmkpoints):4-2 OUR— P, lldfldfiQ �-tnt;- Mkr n6tt ma-s%,Tza n ffi4 " 07; &C, F! r:,% o poin WIN m-a6x,' N Ir(v iWs 6 M=M' 9g t! t I &-t-- � 10, ef 71-TAYINK-l", ,q_ PA ,7 ME c W—Up"I A�% Ml"k'�Zl- �A t fiosi c RON fel rgii A WR i rts �Nl 'r fj 9, Pl- 1VyeKS-1t Y5 fl, rnt oit lei �hc 151 fine, }iom enousr „` =0 tar -A !jig= F F =ti Q- -r g 711!4Vfd� fjdfajn'Uh i%o-U&N 4. %OTJ� n c i F1, n Mi 4��'Poffits);XVMZ 0 ZJ A V 10 — g �W-. ;g - h 5rvr 'rub] i i Fo �Go -nt iggg- -q Ak V -6nse,Wetff6tiiti6dizi 'no utsible roofs t- maxi po� 6tI R F cuQ a0z OT5�7_- -31 0=96"Ifio ev g�' A �g mcangf-gim&V l/a 0-11'-fimesirippip 1 ue An ic r-po e Md oped. - - ppe r p pp q f, libitiqrcomplexi'g, N 8 NINE in ka I% !'1-7-ss i!§ (H4 o - �v'Mets%WQ ITe g covert V "a g�_ CF- -5 T,;W 0 no-Q Q R mgvegetavon,.,jQYbn Mdo s,� Yi�a4hiW b n M Tsf;m fibstr Wibid�jeii m -(06eplyiem eglecl,�E05400sest IN-M 44) ' — - 11 1 1 , -AMIS 0-15NVINITIN idence,�� o i i t AR ;fA rnon;inurnerou ” -, R p - I- HE I 211, eiieP6 fi j S RP R"'I'MRS, - -4 Fp 1--�p VOR 17� R-1 - evidence on,�Tnu e , =W 'R�- - - pr...- IZARNTM fil� iekg Wcfe 6ffi s 'PIr wl- 4Z 14, 4_'!: WNW:- esigm- bb(s6bifi P Au All mum4,�q &ZC N 0 5ft RAI no evidence idenc� 40 A omts 5 teL v igg�, 5"MU'l N iff NRI IFE 10 NO Na, jcq N 0 a -1,00"NET qi"PIR111 0 Ali K .1%, r VT� 10� These clfaract&hsttcs are not assessed in coastal streams