Loading...
HomeMy WebLinkAboutNCS000171_Inspection Report_20220603Compliance Inspection Report Permit: NCS000171 Effective: 06/01/11 Expiration: 05/31/16 Owner: Kennametal Inc SOC: Effective: Expiration: Facility: Kennametal Incorporated County: Vance 139 Warehouse Rd Region: Raleigh Henderson NC 27536 Contact Person: Joe Stephusin Title: Plant Manager Phone: 252-430-3306 Directions to Facility: System Classifications: SWNC, Primary ORC: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 06/03/2022 Primary Inspector: Lauren Garcia Secondary Inspector(s): Entry Time 10:OOAM Reason for Inspection: Routine Permit Inspection Type: Stormwater Discharge, Individual Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Certification: Phone: Exit Time: 11:15AM Phone: 919-707-3648 Inspection Type: Compliance Evaluation Page 1 of 3 Permit: NCS000171 Owner - Facility: Kennametal Inc Inspection Date: 06/03/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Inspection Summary: This particular Kenametal facility manufactures dry metal powder that is shipped to other Kenametal facilities for the production of hardened cutting tools like those used for mining or in road excavators. All manufacturing and industrial processes takes place within the facility. All products, wastes, etc. are either stored within warehouses or in secondary containment. The silos in the photos contain liquid hydrogen, argon and heptane. The heptane is contained within the silo that has the secondary containment pit. All internal drains flow to the sanitary sewer. David is not aware of why the facility was required to apply for an individual permit originally, but he provided a detailed SWPPP and we reviewed multiple years of stormwater samples during the inspection. The samples values all appeared to read well below the benchmarks on average. They have been sampling for cobalt, but there is not currently a benchmark. I do not know if the average value from the samples is of any significance or not. It does appear that there is some detection. David performs facility inspections monthly. It was visible that housekeeping regualry occurrs in the outdoor areas. No issues were observed. The facility produces about 180 thousand kilos of hardened metal powders annually. Page 2 of 3 Permit: NCS000171 Owner - Facility: Kennametal Inc Inspection Date: 06/03/2022 Inspection Type: Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ # Is the Plan reviewed and updated annually? 0 ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? 0 ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? 0 ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? 0 ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3