Loading...
HomeMy WebLinkAboutSWA000105_Stormwater Narrative_20220525LaBeLLa Powered by partnership Stormwater Narrative -modified This project is low density with ribbon pavement without curb & gutter. Minimal piping has been placed. Grassed swales with bottom widths of 2 feet and 3H:1V or flatter side slopes have been placed to treat the stormwater in channels at the rear of the lots as shown on the stormwater record drawing sheet C1.0. The Professional Land Surveyor went to the field and obtained as -built invert elevations on the storm drainage pipes and also on the swales as shown on the plan. The Developer, Justin Nifong, decided to increase the per lot (proposed houses & driveways) allocation to 4,000 square feet per lot to allow more flexibility in the proposed house construction. This increase has been accounted for in the project density calculation. -HE2E i1.2E No �uiiui2E Respectfully submitted, LABELLA Paul A. Stimpson, PE Regional Civil Leader/Office Manager 939 Burke Street, Suite H Winston-Salem, NC 27101 p (704) 560-8514 wwW.labeLLapc.corn