HomeMy WebLinkAbout20220722 Ver 1_W-5708G PA 17-10-0001 Hoke (NSR)_20220525 rrojecr t ractctng tva.:
17-10-0001
oo NO ARCHAEOLOGICAL SURVEY REQUIRED FORM 1 ,
Q' a� This form only pertains to ARCHAEOLOGICAL RESOURCES for this project. It is not `
valid for Historic Architecture and Landscapes. You must consult separately with the
Historic Architecture and Landscapes Group.
PROJECT INFORMATION
Project No: W-5708G County: Hoke
WBS No: 44854.3.7 Document: Federal PCE
F.A. No: HSIP-0401(290) Funding: ❑ State ® Federal
Federal Permit Required? ❑ Yes ® No Permit Type:
Project Description:The project involves the construction of a synchronized street with bulb-outs on US
401 at the intersections of SR 1411 and SR 1413 east of Raeford in Hoke County,North Carolina. The
archaeological Area of Potential Effects(APE)encompasses all areas of potential ground disturbing
activity. According to submitted mapping,construction appears to be confined to the existing right-of-
way.
SUMMARY OF CULTURAL RESOURCES REVIEW
Brief description of review activities,results of review, and conclusions:
Permitting and funding information was reviewed for determining the level of archaeological input required by
state and federal laws. Based on the submitted"request for cultural resources review"form,the project is
federally-funded.As such,Section 106 of the National Historic Preservation Act will apply to the project and the
Federal Highway Administration(FHwA)will serve as the lead federal agency. Next,construction design and other
data was examined(when applicable)to define the character and extent of potential impacts to the ground
surfaces embracing the project locale. Because the potential impacts appear to be relatively minor,the APE
embraces the existing right-of-way at the SR 1411 and SR 1413 intersection locations.
Once an APE was outlined,a map review and site file search was conducted at the Office of State Archaeology
(OSA)on Thursday, November s, 2017. No archaeological sites are situated within or directly adjacent to the
project study area.
Examination of National Register of Historic Places(NRHP),State Study Listed(SL), Locally Designated (LD),
Determined Eligible(DE),and Surveyed Site(SS)properties employing resources available on the NCSHPO website
is important in establishing the location of noteworthy historic occupations related to a perspective construction
impact area.A cross-check of these mapped resources concluded that no historic structures with potential
archaeological deposits are situated within the currently defined APE.
In addition,historic maps of Hoke County were appraised to identify former structure locations, land use patterns,
cemeteries,or other confirmation of historic occupation in the project vicinity.Archaeological/historical reference
materials were inspected as well. In general,the cultural background review established that no previously
recorded archaeological sites, NRHP properties with potential archaeological components,or cemeteries are
located within the APE. Based on cultural-historical factors,the APE is considered to have a low potential for the
documentation of archaeological resources.
Further, topographic, geologic, flood boundary, and NRCS soil survey maps were referenced to evaluate
pedeological, geomorphological, hydrological, and other environmental determinants that may have resulted in
past occupation at this location. Aerial and on-ground photographs (NCDOT Spatial Data Viewer) and the Google
Street View map application(when amenable)were also examined/utilized for additional assessment of
"No ARCHAEOLOGY SURVEY REQUIRED"form for•the Amended Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
1 of 2
rrojeci i racKing tvo..
17-10-0001
disturbances, both natural and human induced, which compromise the integrity of archaeological sites.
Environmental/impact factors do not suggest a heightened potential for archaeological resource recovery.
Brief Explanation of why the available information provides a reliable basis for reasonably predicting
that there are no unidentified historic properties in the APE:
The entire existing right-of-way and APE has been heavily impacted by road construction/maintenance.Significant,
intact,and preserved archaeological deposits eligible for NRHP listing are unlikely to be present in the defined APE.
As currently proposed as a federally-funded project, no further consultation is advocated.A finding of"no
archaeological survey required" is considered appropriate for the APE as presently defined.
SUPPORT DOCUMENTATION
See attached: ® Map(s) ® Previous Survey Info ❑ Photos ❑Correspondence
❑ Photocopy of County Survey Notes Other:
FINDING BY NCDOT ARCHAEOLOGIST
NO ARCHAEOLOGY SURVEY REQUIRED
NCDOT
"No ARCHAEOLOGY SURVEY REQUIRED"form for the Amended Minor Transportation Projects as Qualified in the 2015 Programmatic Agreement.
2 of 2
ul w
VtLL
y L @ 7
W 00
�. Z O_
U r2
u
S�mom
r` a Sa z
c
O
c
Brock Kd` / CL co
slay` Sperry per Fzd E
GI c>v
e Gru `m E
v oO pitlm 0) o
= O F
o G jib
tV �I c o f
//a4dfe"" 4n 'ar t £IL
i
of u
�pvC,
4 s• N f
m W c
00
o i
U ^ ec G C
In _;
et Church Rd i
O e-DN gk
t = N t r
o
LL
�� sd
Ld
h
i
Fin ,
n w1mr,
Se
00
is N
0
of <o
I
tits. i9 xAp � t
�. � Y 44 • • �- N
y� r
rI ' � / • ��k� dr�/ • C
101
10
.01
itoo
00 ISO*low
x00
-•_.r
j j .�,t - �:• `�M�q!" ` � d �'"'�" `.'._l�___ It o
t
t - F
v�
A
�. .• � � '� '� .� ram: �� �we 'rt
E
z
3,t
RK
�I
F
r sFi
1
� � e
Y '
r- rf I
�� ..;
-— R4O-
-
�c J unrobin Dr"
tirl ng_Ct .� U 4Vm J y„6 p + ,�q�D r 1N_'��
f�;. era Dr
/!O Hara DrjcGr
e9o� + �n t• s '' '
Donegal r4/
m
le
Ct O Li rtY C
I depe6den Dr
' l CaffiPbeli r
1 1 k r # # SD
VL
tCO �a�/ m� k d
i Q p� p� eA
5k � � J� '
atDttyT 1 I t
P
r
I
1/
Ic Olson-�r gi, ClifdAle
3978
_ it Fay tteville Rd
a ' 1411 ar'' o
Q W 141
~ O U-
Qtom. as
j �` • `� '
Jul,/---_;: x f w g ��►� „ •_
r..
1 - 1417�
-^ • a
iffD
•4� f t �#,�, 't I ," ra/,Dept / ...-``` � .