HomeMy WebLinkAboutNCC221966_Site Plan or Location Map_2022052511 100 1 200 411 :11
PL ® PL PL
TW - A '
TSA
TOFA ,�TOFA
TOFA
PL --- � PL
PL � PL
PL PL
C:-) c�)
PL PL PL PL P
V7
C]
ra_
t�j
Im
�o
o
=L PL • PL PLAIRPORT ROAD PL PL >00
PL \ `
Cc
pt m
T \ P
a a a o c� ptz
a — o
\\\\\\\\\\\\\\\\\\\\\\\\\\\\\ T T T T T T ■ N\\ \\\\\\\ I — `
` � � � � � � I I Q CONSTRUCTION
m
• • REHAB HAUL TRAILER
ROUTE T
I•I� I I - I• I� � I I
�T_T �_T\ 0 I I B M 3 ,
CONSTRUCTION I r — — — — — — — — — — — — - 000
■
STAGING AREA
T�T�T�T� �TLTLT�T -I REHAB SOUTH
i GA APRON
T T T
T F 7T�
• ••
•• •••
r
7v •
BM4 BM5
s •
BM6
• •
O
O
•
°pnoa°
•��
L.L.a
Laid
o
O O
p o
°°mop°°
��•
a s
a
Ln
L~
a
Ln
~
a a.
V,
�. •
• a O . „b..
FA
TOFA
TOFA
TOFA
TOFA •
•m TOFA o
n-TO FI'�
•TSA TOFA � TO
s
®N_
TO
..
e
e
•
•
• • •
s • s
TW - A
•
•
A
TGfj
TS
TSA
TSA
Q
FA TO
`�S
TOFA
TOFA
TOFA TOFA
TOFA
TOFA TOFA TOFA
TOFA
I•SC
SC SC
4SC
°
+
I•SC
SURVEYOR
NAME
VAUGHN & MELTON
ADDRESS
1318 PATTON AVE #F
ASHEVILLE, NC 28806
PHONE
828.253.2796
HORIZONTAL DATUM
NAD83
VERTICAL DATUM
NAVD88
GRID ZONE
NORTH CAROLINA
BENCH MARK SCHEDULE
ID
NORTHING
EASTING
ELEVATION
BM1
633176.78
946002.16
2162.60
BM2
632964.07
946011.77
2160.87
BM3
632804.68
946113.21
2160.19
BM4
633083.29
945721.14
2156.82
BM5
632890.44
945787.64
2157.83
BM6
632583.01
945864.93
2154.05
HAUL ROAD NOTES
1. THE CONTRACTOR SHALL RESTORE ALL TURFED AND PAVED AREAS USED FOR HAUL
ROADS TO THEIR ORIGINAL CONDITION, INCLUDING THE ESTABLISHMENT OF TURF. ALL
COST FOR CONSTRUCTING, REMOVING, AND RESTORING OF HAUL ROADS REQUIRED
FOR THE COMPLETION OF THE WORK SHALL BE BORNE BY THE CONTRACTOR AT NO
COST TO THE OWNER.
2. NO CONTRACTOR VEHICLES ARE TO CROSS ACTIVE RUNWAYS, NAVAID CRITICAL AREAS,
OR TAXIWAYS. ALL CONTRACTOR VEHICLES NOT WITHIN DESIGNATED WORK AREAS
SHALL BE CONTROLLED BY PERSONNEL IN DIRECT COMMUNICATION WITH
ATCT/GROUND COMMUNICATION AND MONITORING AIRPORT TRAFFIC FREQUENCIES
ON TWO-WAY RAD10 AT ALL TIMES.
TOFA �— TOFA
TSA •
F-
i
T TSA
TOFA• TOFA TOFA
i
e.eme.e_e.e ,�.
TOFA TOFA
�wr /o
x� J— TOFA
TOFA TOFA TO
TSA TSA
3
P
FA -
PHASING GENERAL NOTES
1. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER TWO (2) WEEKS IN ADVANCE OF ANY APRON OPENING/CLOSURES TO ALLOW
SUFFICIENT TIME FOR COORDINATION.
2. THE PHASES SHOWN ON THE FOLLOWING SHEETS SHALL BE COMPLETED CONSECUTIVELY AND EACH SUBSEQUENT PHASE SHALL BEGIN
IMMEDIATELY UPON COMPLETION OF THE PREVIOUS PHASE.
3. LIQUIDATED DAMAGES WILL BE ASSESSED AGAINST THE CONTRACTOR FOR EACH CALENDAR DAY OR PORTION THEREOF THAT THE CONTRACT
TIME OR SPECIFIC MILESTONES ARE EXCEEDED.
4. THE CONTRACTOR SHALL SUBMIT A DETAILED CONSTRUCTION SCHEDULE TO THE ENGINEER PRIOR TO THE PRECONSTRUCTION MEETING. THE
SCHEDULE SHALL CLEARLY DELINEATE THE PROPOSED WORK AREAS AND THE NUMBER OF DAYS ANTICIPATED FOR THE COMPLETION OF EACH
AREA INCLUDING MILESTONES AND SUB PHASES OF WORK TO BE ACCOMPLISHED. SPECIFIC WORK TASK ARE NOT TO BE INCLUDED.
5. PRIOR TO REMOVING ANY CLOSED BARRICADES, THE CONTRACTOR SHALL CLEAN ALL FOREIGN OBJECT DEBRIS (FOD) FROM THE PAVEMENT
SURFACES AND ESTABLISH THE SAFETY AREAS IN ACCORDANCE WITH THE SPECIFICATIONS.
6. THE CONTRACTOR SHALL HAVE A MOTORIZED VACUUM SWEEPER AND OPERATOR ON SITE AT ALL TIMES WORK IS BEING CONDUCTED.
7. REFERENCE IS DIRECTED TO THE CONSTRUCTION SAFETY AND PHASING PLAN (CSPP) AND PROJECT SPECIFICATIONS FOR ADDITIONAL
RESPONSIBILITIES OF THE CONTRACTOR THROUGHOUT THE PROJECT DURATION.
� -
Asheville
REGIONAL AIRPO R T
ASHEVILLE REGIONAL AIRPORT
61 TERMINAL DRIVE, SUITE 1
FLETCHER, NC 28732
PARRISH&PARTN RE S
PARRISH AND PARTNERS OF NORTH CAROLINA, PLLC
C1
C1
a
z
0
_L
>
LU
z
O
a
U
Ln
Lu
0
Lu
a
0
0
z
DESIGNER
TECHNICIAN
QC REVIEWER
HTB
CSM
JMM
LEGEND
AIRFIELD PAVEMENT
(EXISTING)
BUILDING (EXISTING)
CONTRACTOR STAGING AREA
TAXIWAY SAFETY AREA
TAXIWAY OBJECT FREE AREA
RUNWAY SAFETY AREA
— ROFA - ROFA -
RUNWAY OBJECT FREE AREA
PL PL
PROPERTY LINE
TREE/SHRUB LINE
HAUL ROUTE
AIRPORT PROPERTY
PUBLIC PROPERTY
PROJECT NAME
REHABILITATE
SOUTH GA APRON
FAA AIPNO. N/A
STATE GRANT NO. N/A
SHEET NAME
GENERAL
LAYOUT
ENGINEER'S SEAL
AS -BID REVIEW
NOT FOR
CONSTRUCTION
DATE PREPARED JAN UARY 2022
P&P PROJECT NO. 1334
DRAWING NO.
G-103
CLICCT C (lC 7G