Loading...
HomeMy WebLinkAbout20072227 Ver 2_Notice of Violation_20140512A � WDENR �:. -North Carolina - Department, of Environment - and - Natural Resources ..w -.._ _:..__.. . Pat McCrory John E. Skvarla, III Governor Secretary May 12, 2014 CERTIFIED MAIL 70121010 0002 1967 8449 RETURN RECEIPT REQUESTED Rutherford County Attn: Carl Classen 289 North Main Street Rutherfordton, NC 28139 Clary Hood Inc. Attn: Tom Addley 150 Conway Black Road Spartanburg, SC 29307 SUBJECT: NOTICE OF VIOLATION and RECOMMENDATION FOR ENFORCEMENT Queens Gap Phase 1 Project # (2007- 2227 -V2) 401 Water Quality Certification (WQC) Conditions Stream Standard Rutherford County Response deadline: ,May 26, 2014 Dear Messrs. Classen and Addley: On May 2, 2014, Tim Fox from the Asheville Regional Office of the Division of Water Resources (DWR) conducted a site inspection for Queens Gap Phase 1 in Rutherford County. Darlene Kucken with DEMLR and Kenny Terry with Clary Hood were present during the inspection. 401 WQC and stream standard violations were noted during the inspection. Turbidity standards were exceeded in Chalk Creek (Class C;Trout waters). As a result of the site inspection and file review, the following violations were identified: VIOLATIONS I. 401 WQC Condition Violations - The WQC issued for the project impacts specifies that the activities must follow all conditions listed therein. The following condition violations were noted: 1. No Impacts Beyond those Authorized in the Written Approval or Beyond the Threshold of Use of this Certification = Turbidity standards were exceeded in Chalk Creek (Class C;Trout waters). 2. Standard Erosion and Sediment Control Practices — Failure to install and maintain proper erosion and sediment control measures Water Quality Regional Operations— Asheville Regional Office 2090 US Hwy 70, Swannanoa, NC 28778 Phone: 828 - 296115001 FAX: 828 - 299 -7043 Internet hftp : / /podal.nedenr.org/web/wq/ws An Equal Opportunity 1 Affirmative Action Employer Rutherford County / Clary Hood May 12, 2014 Page 2 of 2 Wor -k-in- the -Dry— cul -vert- installation occurred - without working�in the dry II. Stream Standard — (Turbidity) - Upon arrival for the inspection, turbid water was observed below the project site. During the inspection the contract crew was observed hammering rock and excavating stream material within the stream channel. Extremely turbid water was being caused by this activity. When asked why the pump around method was not being utilized, the project manager stated that, upper management had instructed the crew to not use the pump around. REQUIRED RESPONSE The DWR requests that you respond by May 26, 2014. Your response should be sent to the attention of Tim Fox, Division of Water Resources, 2090 US HWY 70, Swannanoa, NC 28778 and should address the following items: I. 401 Water Quality Certification Condition Violations Please explain why work was not being done in the dry. Address what steps will be taken to ensure WQC conditions will be followed in the future, including protecting water quality standards and proper installation, operation and maintenance of Erosion and Sediment Control practices. In addition, clear and accurate communications between Rutherford County, Clary Hood and DENR are critical to avoiding water quality standard and 401 WQC condition violations, as well as possible additional enforcement actions. Thank you for your attention to this matter. This Office is considering sending a recommendation for enforcement to the Director of the Division of Water Resources regarding these issues and any future /continued violations that may be encountered. Your above - mentioned response to this correspondence will be considered in this process. This office requires that the violations, as detailed above, be abated immediately. These violations and any future violations are subject to a civil penalty assessment of up to $25,000.00 per day for each violation. Should you have any questions regarding these matters, please contact Tim Fox at (828) 296 -4500 or tim.fox @ncdenr.gov. Sincerely, G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Asheville Regional Office cc: Karen Higgins - 401 & Buffer Permtting Unit ARO File Copy Laura Herbert - Division of Energy, Mineral, and Land Resources (e -copy) William Elliot — The US Army Corp of Engineers (e -copy) G: \WR \WQ \Rutherford \401s\Non- DOnQueens Gap 2007 - 2227- V2\NOV- 2014- PC- 0104.QueensGap.05- 09- 14.doc