Loading...
HomeMy WebLinkAbout20070228 Ver 9_Stormwater Site Plans_20220513DesCgwCws the Future, Toolau. Monday, May 9, 2022 Chonticha McDaniel NCDEQ-401 Stormwater Permitting 512 N. Salisbury St. Archdale Building - 9th Floor Raleigh, NC 27604 RE: Middlesex Shell #1 (DWR # 07-0228 v7, Nash County) Dear Chonticha: The owners of the Middlesex Shell building have decided to change the Bioretention Design to a Wet Pond Design. The overall drainage concept of the proposed building and the future buildings has not changed. Changes to the site plan and the associated calculations have been included in this package. The overall site plan can be found on sheet CE-01 while the more specific details and the changes in the stormwater facility can be found on sheets CE-03 and CE-04. The proposed BUA has not changed and is 255,137 SF while the total drainage area remains at 430,808 SF. Included in this package is the Stormwater Management Plan for Middlesex Shell #1. I have included two (2) plans sets for Middlesex Shell #1 with two (2) sets of calculations. Included in those calculations is the signed Operation and Maintenance Agreement for the Wet Pond that will provide directions to assist with maintenance as well as guidelines to remediate issues that may arise around the perimeter of the BMP, the inlet device, the pretreatment area, the vegetation, and the drop inlet. Sincerely, Stocks Engineering, P.A. J. Kevin Varnell J. Michael Stocks, PE 1100 Eastern Avenue PO Box 1108 Nashville, NC 27856 252.459.8196 (voice) 252.459.8197 (fax) 252.903.6891 (mobile) mstocks(a�stocksengineering.com Middlesex Shell Wet Pond Revision Owner/Developer: Nash County 120 West Washington St. Nashville, NC 27856 Phone: (252) 459-9800 STOCKS ; r : Fss,o•• . y s. ENGINEERING AL, _ • - SEA! �• = _ 801 EAST WASHINGTON STREET P.O. BOX 1108 M • 19843 , 5 ZZ NASHVILLE, N.C. 27856 PHONE: (252) 459-8196 v :• Q•�y WWW.STOCKSENGINEERING.COM •.N GAG +' �� , r o Project: Location: Date: Basin ID: Drainage Area (A) Impervious Area % Impervious (I) Wet Pond Design Middlesex Shell #1 Middlesex , NC 14-Oct-21 1 Water Quality Volume Calculate Rv: WQV = Surface Area Orifice Sizing Rv = 9.89 5.86 59.25% Rv = 0.05+.9 X I r 0.58 3630XRDXRvXA RD = WQV = Average Depth = SA/DA Ratio = Surface Area = 1.00 20,940 3.00 2.09 Inch CF Acres Acres (Choose SA/DA Ration from the NC BMP Maunual Table 1 or 2) (SA/DA Ratio / 100) X Area (Ac.) / 43,560 (SF/Ac.) 9,004 Design Orifice Q= CoAo V2gHo CD = g= Ho = H/3= H= Ao = Design Pipe = 0.6 32.2 0.33 1 0.04 2.75 SF FT/S2 FT FT FEET INCH Design Orifice Q = 0.11 CFS Days to Drain = Wetland Plants - Vegetative Shelf Vegetative Shelf SurfaceArea = # of Wetland Plants = 2.1 1998 500 SF Table 1: Peidmont and Mountain SA/DA Table (Adapted from Driscoll, 1986) Percent Impervious Cover Permanent Pool Average Depth (ft) 3.0 4.0 5.0 6.0 7.0 >=8.0 10% 0.51 0.43 0.37 0.3 0.27 0.25 20% 0.84 0.69 0.61 0.51 0.44 0.4 30% 1.17 0.94 0.84 0.72 0.61 0.56 40% 1.51 1.24 1.09 0.91 0.78 0.71 50% 1.79 1.51 1.31 1.13 0.95 0.87 60% 2.09 1.77 1.49 1.31 1.12 1.03 70% 2.51 2.09 1.8 1.56 1.34 1.17 80% 2.92 2.41 2.07 1.82 1.62 1.4 90% 3.25 2.64 2.31 2.04 1.84 1.59 100% 3.55 2.79 2.52 2.34 2.04 1.75 Table 2: Coastal SA/DA Table (Adapted from Driscoll, 1986) Percent Impervious Cover Permanent Pool Average Depth (ft) 3.0 4.0 5.0 6.0 7.0 >=8.0 10% 0.78 0.61 0.44 0 0 0 20% 1.48 1.04 0.87 0.7 0.52 0.35 30% 2.18 1.65 1.39 1.13 0.87 0.7 40% 2.96 2.26 1.83 1.39 0.96 0.78 50% 3.65 2.87 2.35 1.83 1.31 0.96 60% 4.35 3.31 2.78 2.26 1.74 1.13 70% 5.22 3.92 3.22 2.52 1.83 1.31 80% 5.92 4.52 3.65 2.78 1.91 1.57 90% 6.53 5.05 4.18 2.96 2.44 1.74 100% 7.13 5.92 4.87 3.83 2.78 1.83 WET DETENTION FOREBAY VOLUME COMPARISON FOREBAY VOLUME ELEVATI ON SURFAC E AREA INCREM ENTAL VOLUME 201.0 516.0 678.5 202.0 841.0 1,040.5 203.0 1,240.0 1,472.5 204.0 1,705.0 1,967.0 205.0 2,229.0 1,259.3 206.0 2,808.0 1,690.8 207 3955 SUM = 8,108.5 Forebay i4 19.9% I of Pond. Pond Average Depth: 3.8 Feet POND VOLUME ELEVATI ON SURFAC E AREA INCREM ENTAL VOLUME 203.0 8,352.0 8,752.0 204.0 9,152.0 9,565.0 205.0 9,978.0 10,406.5 206.0 10,835.0 12,074.0 207 13313 SUM = 40,797.5 Buoyancy Resistance Calculations for Outlet Assumptions: Unit Weight of Saturated Soil [gsat] = Unit Weight of Concrete [gconc] = Unit Weight of Water [gw] = Base Length [L] = Base Width [W] = Known: 120 147 62.4 5 5 Inside Diameter of Structure (ft) = Outside Diameter of Structure (ft) = Depth of Structure (ft) = Minimum Base Slab Thickness (in) = Minimum Top Slab Thickness (in) = Average Invert Thickness (in) = Base Slab Area (ft2) = Displacement Volume, Wetwell (ft2) = Displacement Volume, Base Slab (ft2) = Buoyant Force = Effective Weight of Soil Over Slab Extension = Structure Weight, Walls = Structure Weight, Invert = Structure Weight, Top Slab = Structure Weight, Base Slab = Structure Weight, Total = Table of Calculations: pcf pcf pcf feet feet ID OD D T Tts Ti A Vw Vbs B S Ww Wi Wts Wbs W Same if Extended Moorbase Same if Extended Moorbase 2.78 3.44 4.5 6 0 6 A Ww Wi Wts Wbs W (ft2) (Ibs) (Ibs) (Ibs) (Ibs) (Ibs) 19.63 2131.74 445.9094 0.00 1442.438 4020.085 Vw Vbs B S (ft3) (ft) (Ibs) (Ibs) 41.80 9.81 3220.76 2678.99 Conclusion: 2'X3' Box 2'X3' Box (L x W) or pi(L/2)2 pi(OD/2)2D A(T/12) (Vw +Wbs) xgw (gsat - gw) x (A-pi(OD/2)2)D (pi(OD/2)2 - pi(ID/2)2)Dgconc pi(I D/2)2Tigconc pi(OD/2)2(Tts/12)gconc A(T/12)goono Ww+WI+Wts +Wbs W + S = 6699.08 B= 3220.76 FOS IsW+S>B? YES 2.08 Since the weight of the structure and the base slab is greater than the buoyancy for of the structure, the resistance to buoyant force is provided. Project: Location: Date: STOCKS ENGINEERING Curve Numbers Middlesex Shell #1 Middlesex, NC 14-Oct-21 Pre Development Pre Dev. 1 Curve Number 58.08 Post Development Post Dev. 1 Curve Number 82.92 Project: Location: Date: Basin ID: Drainage Area (A) Curve Numbers Middlesex Shell #1 ENGINEERING Middlesex, NC 14-Oct-21 Pre Dev. Area 1 9.89 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition I A Area (ac)I B Area (ac)I C Area (ac)I D Area (ac) Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 6.05 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 j 61 3.64 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 98 98 0.2 98 98 Soil Area per Hydrologic Group 0 9.89 ' 0 0 Drainage Area = Area Total Weighted Curve Number CN = [(CNi*Ai)+ (CNn*An)]/Atot Pre Development Area 1 Curve Number TRUE 9.89 = 9.89 58.08 Project: Location: Date: Basin ID: Drainage Area (A) Curve Numbers Middlesex Shell #1 ENGINEERING Middlesex, NC 14-Oct-21 Post Dev. Area 1 9.89 Acres Runoff Curve Numbers Cover Description Cover Type and Hydrologic Condition I A Area (ac)I B Area (ac)I C Area (ac)I D Area (ac) Cultivated Land Without Conservation Treatment 72 81 88 91 With Conservation Treatment 62 71 78 81 Wood of Forest Land Poor Cover (Thin) 45 66 77 83 Good Cover 25 55 70 77 Open Spance (lawns, parks, cemeteries, etc) Poor Condition (grass cover <50%) 68 79 86 89 Fair Condition (grass cover 50%-75%) 49 69 79 84 Good Condition (grass cover >75%) 39 j 61 4.03 74 80 Impervious Area Parking Lots, Roofs, Drives, etc. 98 98 5.86 98 98 Soil Area per Hydrologic Group 0 9.89 ' 0 0 Drainage Area = Area Total Weighted Curve Number CN = [(CNi*Ai)+ (CNn*An)]/Atot TRUE 9.89 = 9.89 Post Development Area 1 Curve Number 82.92 Watershed Model Schematic 1 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Fip eD WI Project: Pre vs Post.gpw Monday, 05 / 9 / 2022 Hydrograph Return Period Rec 2 all?Iraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Inflow hyd(s) Peak Outflow (cfs) Hydrograph Description 1-yr 2-yr 3-yr 5-yr 10-yr 25-yr 50-yr 100-yr 1 2 3 SCS Runoff SCS Runoff Reservoir 2 19.47 55.01 13.98 Pre Development Post Development Post Out of Pond Pro . file: Pre vs Post.gpw Monday, 05 / 9 / 2022 Hydrograph Summary Report 3 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 2 3 SCS Runoff SCS Runoff Reservoir 19.47 55.01 13.98 1 1 1 718 717 725 41,485 113,819 87,196 2 209.86 57,294 Pre Development Post Development Post Out of Pond Pre vs Post.gpw Return Period: 1 Year Monday, 05 / 9 / 2022 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 1 Pre Development Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 9.890 ac = 5.0 % = KIRPICH = 4.90 in = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Monday, 05 / 9 / 2022 = 19.47 cfs = 11.97 hrs = 41,485 tuft = 58.1 = 1100 ft = 5.43 min = Type II = 484 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 Pre Development Hyd. No. 1 -- 1 Year i IN 0 2 4 6 8 10 12 14 16 18 20 22 Hyd No. 1 s 24 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 26 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Hyd. No. 2 Post Development Hydrograph type Storm frequency Time interval Drainage area Basin Slope Tc method Total precip. Storm duration = SCS Runoff = 1 yrs = 1 min = 9.890 ac = 5.0 % = KIRPICH = 4.90 in = 24 hrs Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Monday, 05 / 9 / 2022 = 55.01 cfs = 11.95 hrs = 113,819 cuft = 82.9 = 1100 ft = 5.43 min = Type II = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 Post Development Hyd. No. 2 -- 1 Year 1 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 Hyd No. 2 20.0 Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 22.0 Time (hrs) 6 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Monday, 05 / 9 / 2022 Hyd. No. 3 Post Out of Pond Hydrograph type Storm frequency Time interval Inflow hyd. No. Reservoir name = Reservoir = 1 yrs = 1 min = 2 - Post Development = Wet Pond Peak discharge Time to peak Hyd. volume Max. Elevation Max. Storage = 13.98 cfs = 12.08 hrs = 87,196 cuft = 209.86 ft = 57,294 cuft Storage Indication method used. Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 Post Out of Pond Hyd. No. 3 -- 1 Year 0 5 10 15 20 25 30 35 40 45 Hyd No. 3 Hyd No. 2 IIIIII1II Total storage used = 57,294 cuft Q (cfs) 60.00 50.00 40.00 30.00 20.00 10.00 0.00 50 Time (hrs) Pond Report 7 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® by Autodesk, Inc. v2021 Pond No. 1 - Wet Pond Pond Data Contours -User-defined contour areas. Average end area method used for volume calculation. Begining Elevation = 207.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 207.00 17,268 0 0 1.00 208.00 19,152 18,210 18,210 2.00 209.00 21,104 20,128 38,338 3.00 210.00 23,113 22,109 60,447 Monday, 05 / 9 / 2022 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 24.00 2.75 0.00 0.00 Crest Len (ft) = 10.00 30.00 0.00 0.00 Span (in) = 24.00 2.75 0.00 0.00 Crest El. (ft) = 209.50 209.70 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 205.50 207.00 0.00 0.00 Weir Type = 1 Rect --- --- Length (ft) = 60.00 0.10 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 0.50 0.10 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage (ft) Stage / Discharge 3.00 2.00 1.00 0.00 0.00 3.00 Total Q 6.00 9.00 12 00 1500 1800 21 00 24 00 27 00 Elev (ft) 210.00 209.00 208.00 207.00 30 00 Discharge (cfs) U.S. 264 A LOCATION SKETCH NOT TO SCALE General Notes: 1. Topographical data performed by Civiltek Associates East, PA, Spring Hope, North Carolina. 2. The contractor shall notify and cooperate with all utility companies or firms having facilities on or adjacent to the site before disturbing, altering, removing, relocating, adjusting or connecting to said facilities. 3. All excavation is unclassified and shall include all materials encountered. 4. All structural fill material shall be free of all sticks, rocks, and clumps of mud. 5. Unusable excavated materials and all waste resulting from clearing and grubbing shall be disposed of off -site by the contractor in an approved solid waste landfill. 6. Location of underground utilities are approximate and must be field verified. Contact the NC One Call Center at least 48 hours prior to digging © 1.800.632.4949. True Line Surveying has only located the utilities that are above ground at the time of field survey. Underground lines shown hereon are approximate or as reported by various responsible parties. The surveyor does not guarantee that any underground structures such as utilities, tanks and pipes are located hereon. 7. All pipe lengths are horizontal distances and are approximate. 8. All work shall comply with all applicable codes, regulations, and/or local standards imposed by the Town of Nashville, and NCDOT. 9. All construction and materials shall meet NCDOT standards, latest edition. All work within within NCDOT right-of-way shall meet the specifications and standards of NCDOT. 10. All concrete pipe is to be ASTM C-76, Class III with ram-nek. 11. This property is not located in a Flood Hazard Zone per FEMA Map. Ref. No. (3720274400K), dated July 7, 2014. 12. All lot dimensions shown are approximate. Consult the boundary survey of actual site boundary information. 13. The contractor shall be responsible for all work zone traffic control in or adjacent to NCDOT right-of-way. All signs, pavement markings and other traffic control devices shall conform to the Manual on Uniform Traffic Control Devices (MUTCD), 2003 edition as amended. 14. Prior to placing CABC stone base, the contractor should notify the Geotechnical Engineer to inspect and proof roll the subgrade. Any stone place without prior approval will be the sole responsibility of the contractor. 15. DESIGN/FIELD CONDITIONS quite easily may vary from that represented in the initial soils report and/or topographical report. Isolated areas may show up weak and adverse soils or groundwater conditions may be discovered that were not revealed during the initial soils investigation. Therefore, the Contractor is to be aware that Stocks Engineering, P.A. will not and cannot be held responsible for any failures to either a street or parking lot pavement design as a result of soil conditions. 16. All utility services, (power, telephone, cable, etc.) are proposed to be underground. Do not seed or mulch disturbed areas until all underground utilities have been installed. 17. Regulatory signs, stops signs and street name signs shall be manufactured from high intensity reflective materials. 18. All excess topsoil and unclassified excavation is to be hauled off -site, unless otherwise directed by the owner. 19. All site construction must be inspected by The Project Engineer or Architect, as applicable, at the following stages: A. Completion of grading subgrade prior to placing Stone Base. B. Completion of Stone placement prior to paving. C. Final inspection when all work is complete. 20. The surveyor did not visibly see any cemeteries in any open areas unless otherwise noted. 21. This property does not depict encumbrances that are found during a thorough title search. 22. Concrete Sub shall be responsible for all score joints and expansion joints. 23. All on -site curb and gutter to be as shown on plans. Curb and gutter within NCDOT right-of-way to be 30" standard. 24. All curb and gutter and sidewalk concrete is to be minimum 3,000 psi at 28 days, air entrained. 25. Contractor to furnish all paint striping and thermoplastic (as required by NCDOT) as shown. 26. All dimensions are to edge of pavement (EOP) unless indicated otherwise. 27. Contractor SHALL NOT POUR any concrete before forms are inspected by the Civil engineer and/or owner. Any concrete that has not been approved by the engineer and/or owner will be the responsibility of the contractor. 28. Contractor shall saw -cut to provide smooth transitions where existing asphalt and/or curb and gutter is to be removed. 29. The contractor shall provide all the material and appurtenances necessary for the complete installation of the utilities. All pipe and fittings shall be inspected prior to being covered. A minimum of 24 hours notice shall be given to the inspector prior to covering pipe or blockings. 30. Information concerning underground utilities was obtained from available records and field conditions when possible, but the contractor must determine the exact location and elevation of all existing utilities by digging test pits by hand at all utility crossings well in advance of trenching. If the clearances are less than specified on the plans or 12 inches, which ever is less, contact the project engineer and the Owner prior to proceeding with construction. 31. The contractor is responsible for the design and implementation of all required/necessary sheeting, shoring, and special excavation measures required on the project to meet OSHA, Federal, State and Local regulations pursuant to the installation of the work indicated on the drawings. The Owner and Stocks Engineering, P.A. accept no responsibility for the design to install said items. 32. The contractor shall include in the contract price daily record keeping of the as -built condition of all of the underground utilities, construction stakeout associated with the project. Preparation of the necessary/required as -built plans to be submitted to the Town of Nashville and all other information required in connection with release of bonds. 33. The Land Disturbance Permit must be kept on the work site and shown upon request. 34. The contractor shall include in the contract price any de -watering necessary to construct the project as shown on the plans. 35. The contractor shall include in the price, any and all costs associated with providing a professional engineer on site if required, during the construction of the storm water management facilities, underground utilities, etc. as required for as -built certification. 36. All grass, topsoil and 'building debris material' dumped onsite shall be removed in the base bid prior to placement of structural fill material. 37. All generated waste shall be disposed of off -site in an approved landfill location. MI WIESEK E-I'aL # 1 INDEX COVER CE-01 CE-02 CE-03 CE-04 CE-05a CE-05 CE-06 CE-07 CE-08 CE-09 CE-1O COVER SHEET OVERALL MASTER PLAN LOT 1 DEMOLITION PLAN LOT 1 SITE and UTILITY PLAN LOT 1 GRADING and DRAINAGE PLAN LOT 1 INITIAL EROSION CONTROL PLAN LOT 1 FINAL EROSION CONTROL PLAN LOT 1 EROSION CONTROL NOTES/DETAILS LOT 1 SITE DETAILS LOT 1 SITE NOTES WET POND DETAILS PHASE 1 - CONSTRUCTION PLAN Owner/Developer Nash County 120 W. Washington St. Suite 2004 Nashville, NC 27856 Phone: 252.462.2613 Contact: Derek Hawkes, PE derek.hawkesmnashcountync.gov Civil Engineering: Stocks Engineering, P.A. 801 East Washington Street Nashville, NC 27856 Phone: 252.459.8196 Fax: 252.459.8197 Contact: J. Michael Stocks mstocksistocksengineering.com NORTH CAROLINA @NE CALL CENTER www.ncocc.org GENERAL NOTES: (LOCAL JURISDICTION) 1. Any discrepancies in layout should be brought to the Engineer's attention prior to construction. 2. Written dimensions supercede scaled dimension. All dimensions are edge of pavement, unless noted otherwise. If dimensions not shown, contractor shall submit RFI and not attempt to scale dimensions from drawings. 3. All streets noted as "PUBLIC" shall meet NCDOT minimum standards. 4. A 10' utility, drainage and road maintenance easement is reserved along and adjacent to all street right of ways. 5. Flared end sections are to be used on both inlet and/or outlet ends of storm sewer unless otherwise noted. 6. Each prime contractor performing excavations or underground work shall be responsible for the location of any existing utilities in the area of their work. Notify the utility locator service (1-800-632-4949) at least 48 hours prior to commencing construction in order that existing utilities in the area may be flagged and staked. Contractor shall use all care necessary when working in areas known or suspected to contain underground utilities, including hand digging. 7. The contractor is responsible for relocating any existing utilities that conflict with the proposed construction. In addition, the contractor is responsible for repair and replacement of any utilities, curb and gutter, pavement, etc. that may be damaged during construction. Damaged items shall be repaired to at least the quality of the original workmanship. The contractor shall field verify depth of existing utilities and relocate if proposed grading causes utility cover to be less than minimum required. 8. All temporary erosion control measures shall be inspected after each rain event and necessary repairs shall be done as required. 9. Contractor to install Knox Box. Surveying: Civiltek Associates East, PA 602 E. Nash Street Spring Hope, North Carolina 27882 Phone: 252.478.5005 Contact: Ted Hopkins, PLS civiltekeastftembargmail.com SITE INFORMATION LOCATION:. .MIDDLESEX CORPORATE PARKWAY MIDDLESEX, N.C. COUNTY: NASH COUNTY TOTAL SITE ACREAGE:. ZONING. MINIMUM BUILDING SETBACKS: FRONT:. LOT 1 7.83 Ac. LOT 2 6.98 Ac. LOT 3 5.37 Ac. L -1 100' SIDE° 0' REAR:. . 0' SIDE STREET:. .50' EXISTING USEz .VACANT PROPOSED USE° JNDUSTRIAL TOTAL BUILDING SIZE:. .60,000 S.F. REQUIRED PARKING:. .TO BE DETERMINED PARKING PROPOSED: REGULAR 9x19'. .95 H.C. (REGULAR). .2 H.C. (VAN ACCESSIBLE). .2 TRUCKS. .4 TOTAL: 103 PIN: EX. IMPERVIOUS AREA: 2744 0014 2175 2744 0014 6133 2744 0013 6745 2744 0013 9706 0 Ac. PRO. IMPERVIOUS AREA: LOT 1 2.91 Ac. (37.16%) LOT 2 FUTURE LOT 3 FUTURE LANDSCAPE AREA:. . LOT 1 4.92 Ac. (62.84%) LOT 2 FUTURE LOT 3 FUTURE RIVER BASIN. NEUSE DISTURBED AREA: 6.38 Ac. N u 0 v) z 2 w Z 2 W 000 0rn ‘_cO xl 0°' CO "' o^ (.,--,1a_ u7 N W z 0 a_ 1- w w 1- cn z0 0'0 1- z_ (`I • < z I- W (/) J w= _cn o 000 z WWW.STOCKSENGINEERING.COM r % BLN=C-1874 IN; o § PI g If �Q� o •.ss. i ,, o . • F o,1;9.• �L1' Q� l SEAL . 19843 COVER ) I' REVISIONS 5/9/22 WET POND FILE NO. 2016-084 HORZ. SCALE: NONE The Lord is a refuge for the oppressed, a stronghold in times of trouble. Psalm 9:9 VERT. SCALE: NONE ( COVER ) I I N00°50'58E 25.34 ►I t ► I I H DSPITALS, INC 21192 PG. 776 L 274400041901 N \lY EDWARDS ?74400031721 \\ ADDIE WHITAKER D.B. 1724 PG. 57 U-I 0 01 00 N LI G P OLIE LOT 1 7.f33 AC LIGHT POLE ELLA SILVER D.B. 2431 PG. 838 LOT, OTAL AREA' OF PARC 289, 83,5. sq.ft. 6.655' acres NASH COUNTY PIN 2744001461 D.B,' 2480 PG. 537.88 LOT 2 6.98 AC (FUTURE)1-8 TOTAL AREA OF PARCEL: -2-99��cres NASH COU N-Th`--\ PIN 274400136745 D.B. 2480 PG. 456 TOTAL AREAATOF PARCEL: 96,417. sq.ft. \\ 2.21 acres \ASH COUNTY PIN 27- 400139706U D.3. 24k PG. 459 N82°2 '01"W — --'P PASEQ S�E_P11CAFFEA T1 JAVES E SILVER D. 3. 2431 PG. 838 IRON RE3AR FOUND \ 3,0 02' /' , , i 60' WIDE ACCESS EASEV EN T P 3. 23 PG. 76 =9� 779.06 WOOD LAND THEREFORE, EVERYONE WHO HEARS THESE WORDS OF MINE AND PUTS THEM INTO PRACTICE IS LIKE A WISE MAN WHO BUILT HIS HOUSE ON THE ROCK. MATTHEW 7:24 MIAOW. N80°1446' IKE EXUM BOBBY D.B. 2502 PG. 158 SCALE: 1" = 60' 0 60 120 150 180 BEFORE YOU DIG, CALL NORTH CAROLINA ONE CALL CENTER www.ncocc.org NASH COUNTY D.B. 2236 PG. 219 BLN=C-1874 6 OVERALL MASTER PLAN 1' REVISIONS FILE NO. 2016-084 HORZ. SCALE: 1 "=60' VERT. SCALE: NONE CJ1 NASH HOSPITALS, INC D.B. 2392 PG. 776 TAX PARCEL 274400041901 \ \\\ \ \\,ASS 2\� \ /' ' -�/ / / / /� /� / / / / / // f / / / / / /' / / / / / /' / / / / / / // /�— / / / // / / /' /' /' // / / / / / /// / / // / // /' /' /' ,/ / / / �// // / / // ,� / // / ,/ /' / / ,/ ,� /' // // /' f / / d / / / / / /' -(-� , / / / / /' AD / / // // / / • Q l /// /�/ ''' '/' / '/ �/ / /, GRUB THIS' /�v' '/ / ' ,�'/' , / /\ AREA ////LOT3 / I _. 19,5 . sc ft. - / / //4.4 acres ,/ / /' NA,SSH C0'UNTY,/' /'/ PI 274,4/0014,2175 D. 2,t80 Ft. 274 / / DANNY EDWARDS PIN: 274400031721 ADDIE WHITAKER D.B. 1724 PG. 57 0 I U1 J / / / • REMOVE CONCRETE AREA • 1' ,/' REMOVE POLE bit II IkEMO1VE wi LI(T y ai POLE • I i I 1I \ of \ \o zi of Wi w • (1)!• • ,! \ o cr W! \\ I \ i \ I / / I LEAVE THIS POLE FOR i TEMPORAR\ i POWER, • i • /"'N PROPOSED SEPTIC AREA (DO NOT DISTURB) S80°4a,13„E REMOVE LIGHT `\\ POLE \ cd • • ELLA SILVER D.B. 2431 PG. 838 / / \ \ 1 s;; • • / LIMIT OF ` DISTURBANCE 1 \- • / \\ • • • • \ \\WOOD\-L'AN D \ / / \\` // / / / \ ____/ I IP IP ENIFI ELD IP IP / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / / LOT, TOTAL AREA/ OF PARCEL: 289, 83,5. sq.ft. 6.6,5' acres NASH COUNTY PIN 274400146133 D.B,' 2480 PG. 268 537888,, / J LOT 1—B TOTAL AREA OF PARCEL: 130,626. sq.ft. -2-99��cres NASH COU N—Y---, PIN 274400136745'--, D.B. 2480 PG. 456 \N81 °18 59 LOT2\` 54 TOTAL AREA OF PA EL: 96,417. sq.ft. \\\ 2.21 acres \ASH COUNTY PIN 27- 400139706U D 3. 24k PG. 459 668.57 / / N82°2 '01 "w / \ WOOD LA\D / / / / / / / / / / / / / / / / JAMES E SILVER D.B. 2431 PG. 838 / / / / / / 1 / / / / / \\ a /\ \\/ \ / N81 1 g 59 W 29.92' B A R FOUND / / / / / / / / FOUND 0-1 IRON /Yi /(bicb, / 0 FOUND CONTROL CORNER / OPEN FID-3' TOTA-L'AIEA OF PARCEL: ,--\CASH COUNTY PIN 27440024,3-2-09 ..... ... ... ...... .... A/ 1 / i N/80.0,3'1/4: w VBAR 60' WIDE ACCESS EASEVENT CURVE TA LE DIRECT. CHORD LENGTH RADIUS 779.06 WOOD LAND IKE EXUM BOBBY D.B. 2502 PG. 158 602 EAST NASH STREET SPRING HOPE, N.C. 27882 NORTH CAROLINA &NE CALL CENTER LEGEND IRS • IRON REBAR SET EIR 0 EXISTING IRON REBAR EPK A EXISTING PK NAIL R/W RIGHT OF WAY RRS • RAILROAD SPIKE SET ERR • EX.RAILROAD SPIKE NLS ANAL SET OHE OVERHEAD ELECTRIC CP 0 COMPUTED POINT MON. GRID MONUMENT CMP CORRUGATED METAL PIPE 0 EXISTING WELL SITE DATA: PIN # 274400142175 REFERENCES: D.B. 2480 PG. 274 OWNER: NASH COUNTY OWNER MAILING ADDRESS: PARCEL ADDRESS: MIDDLESEX CORPORATE PARKWAY MIDDLESEX, NC 27557 AREA COMPUTED BY COORDINATE METHOD ALL DISTANCES SHOWN ARE HORIZONTAL • • • TOPOGRAPHIC SURVEY FOR NASH COUINTY Drywells Township Nash County North Carolina Scale: 1"= 60' Drawn By TSH 12-19-16 k E Surveying Planning Subdivision Design (252) 478-5005 141066(2)(3)(4).DWG • NASH COUNTY D.B. 2236 PG. 219 00 o 0 WWW.STOCKSENGINEERING.COM o oN cn BLN=C-1874 ;'t c•3 c•341 *1 01 kctiL4 ... ............ SEAL 19843 DEMOLMON PLAN REVISIONS FILE NO. 2016-084 HORZ. SCALE: VERT. SCALE: NONE The Lord is a refuge for the oppressed, a stronghold in times of trouble. Psalm 9.9 0 8X8 T,S, AND V -204- MIDDLESEX CORPORATE PARKWAY 80' RICH 1 OF WAY N NN I \\ \ sik IN N c \ / , /7/r/7/ 1/4//, \\\ \\\ //•/ ////, 4 / ip/// /////// 7 //////i///d \\\\A i/ 1) )111i Ill 7' III 2 ) / NEW ASPHALT 6" CABC, zz 70.0 /1 ,z / , 6" c\,,)E3c (/ DRII AY Li /7 17 7 Ci 3ft GRAVEL STRIP 8" WATER LINE ER WATER M EN_ICI SURE 3ft GRAVEL STRIP fa 0 0 Ct CO CO 0 I ICJ EE cn ABOVE gROUND ENCLOSURE FDC TO UTILITY PAD MOUNTED TRANSFORMER 1,000 GAL. OIL/WATER SEP. MANHOLE TOP 233.62 NOTE: TIE ALL ROOF DRAINS TO STORM DRAIN) SCALE: 1" = 30' NORTH CAROLINA ONE CALL CENTER (.7 CO CO co co LLI 0 z co o cn Lu cn co z WWW.STOCKSENGINEERING.COM BLN=C-1874 IN; SEAL ( SITE PLAN ) REVISIONS 10/10/10 OFFICE ADDED 5/9/22 WET POND FILE NO. 2016-084 HORZ. SCALE: 1" = 30' VERT. SCALE: NONE • The Lord is a refuge for the oppressed, a stronghold in times of trouble. Psalm 9.9 0 30 60 75 90 8X8 T,S, AND V -204- INV FES 1� G,e\ Q G HOC r)::)7 44 LF 24" HDPE ® 0.5% W/6' FES D.I.#2 -�-6P-20930 INV IN (2.75") 207.00 INV UU I 205.E EX 96 LF 30" RCP © 2.38% W/6' FES•N 273 ?�sr. \ MIDDLESEX CORPORATE PARKWAY / / \ 80' RICH I OF WAY EX FH D.I.#4 (EX) \\ TOP ±217.00 c - - \,se, �N / INV. IN 211.63 \ \ \ INV. OUT 211.43 / 1EX 184 LF 0" RCP ®3.5% \ ■ ■ ■ \ M ■ G ■ ffli G ■ ■ .2\ 125 / / I #12 (E 'il / TOP 2rg 5• t. / t/ INV. IN" 225.32 `, / I IN)✓OUT 225�/ _ I // / \/�� / /\ q4 W 6" IBC / / / 1 DRIVEWAY ( / II 1 1__ L---- 92'�, I / / J r 7 1 // / / AV' ( ^D.I.#13 (Ex) / / / I TOP 229.50 / INV. IN 226.01 INV. OUT 225.81 O \ '\' .N �\ GOO'\ L / D.I.#14 (EX) TOP 229.50 INV. OUT 226.50 IsE to 0 a 0 0) w J 0, LZZ� 228.8 PAVE NEW ASPHALT 6" CABC, -2"-ASPF1L -239.58 D.I.#5 (EX) TOP 223.50 \ INV. IN 218.27 \NV. OUT 218.07 8" WATER LINE 2 c'S\_ 80 LF 30" RC 3.5% / WATER M ER- %/ / AB�VE GROUNa RPZ / WITH ENC SURE -227 i II 8" FIRE ITIAIN 3" DOFNESTIC WATER, / r- 229.4 PAVE -231=2- S7LW - 230.7 PAVE 3ft GRAVEL STRIP w Z 00 W J W - D.I. EX� TOP/ 226.50 -. V/ IN 221.27 OUT 221.07 229.4 PAVE / 3 231.2 S/W 230.7 PAVE 3ft GRAVEL STRIP N M) N / / / / I ABOVE ROUND 8" BAC FLOW w/ ENCLOSURE FDC I. 6A (EX) TOP 229.50 INV. IN 224.34 INV. OUT 224.14 I. 7 (EX) TOP 229.50 INV. IN 224.83 INV. OUT 224.63 1 TO UTILITY PAD MOUNTED TRANSFORMER .I.#8 (EX) TOP 229.50 INV. IN 225.32 INV. OUT 225.12 1,000 GAL. OIL/WATER SEP. 1 / / / / 6" CPVC ® 1.0% CLEANOUTS ® 75' CTRS. D.I. 9 (EX) TOP 229.50 INV. IN 226.01 INV. OUT 225.81 MANHOLE TOP 233.62 OIE 222.12 -GO. �36 55J D.I. 10 (EX) TOP 229.50 INV. OUT 226.50 -230 \ \ \ \ \ \ \ \ \ NOTE: TIE ALL ROOF DRAINS TO STORM DRAIN. SCALE: 1" = 30' NORTH CAROLINA ONE CALL CENTER www.ncocc.org N U 0 Coo 0rn xl 02 co O • Lo w z 0 0 1- W w c cn z0 0 LC) 1-co o Z• cn _ = U < z 1-w (/) _1 <o cn coz WWW.STOCKSENGINEERING.COM BLN=C-1874 IN; ♦ DRAINAGE and GRADING PLAN i REVISIONS 10/10/10 OFFICE ADDED 5/9/22 WET POND FILE NO. 2016-084 HORZ. SCALE: 1"=30' VERT. SCALE: NONE • The Lord is a refuge for the oppressed, a stronghold in times of trouble. Psalm 9:9 0 30 60 75 90 CE-04 CL 204- \ 8'x10' OUTLET PROTECTION SILT FENCE \ OUTLET ` woo 44 LF 24" HDPE © 0.5% W/6' FES 210.80 210.40- D.I.#2 ------------------- TOP 210.00---------- INV OUT 205.50 • 3:1 SLOPE CONSTRUCT A +/- 20,593 SF SKIMMER SEDIMENT BASIN W/ A 20'W x 0.5' HIGH RIP RAP WEIR, 1.5" SKIMMER, 1.5" ORIFICE & 5 BAFFLES PER DETAIL TOTAL VOLUME = 59,584 LENGTH = 220' WIDTH = 95' TRIANGULAR SEDIMENT BASIN • SILT FENCE OUTLET Notification of Land Resources Sediment and Erosion Control Self Inspection Program: The Sedimentation Pollution Control Act was amended in 2006 to require persons responsible for land disturbing activities inspect a project after each phase of the project to make sure that the approved erosion and sedimentation control plan is being followed. Rules detailing the documentation of these inspections took effect October 1, 2010. To simplify documentation of Self -Inspection Reports and NPDES Self -Monitoring Reports, a combination form is now availible. The new form was developed to satisfy the requirements of the Sedimentation Pollution Control Act and the NPDES Stormwater Permit for Construction Activities, NCG 010000. Beginning August 1, 2013, the Division of Energy, Mineral, and Land Resources is responsible for administering both the SPCA and the NPDES Stormwater Permit for Construction Activities, NCG 010000. The combined form should make it easier to comply with self -inspection requirements. The Combined Self -Monitoring form is availible as a PDF and Word document from the Land Quality web site, http: //deg.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sedimentation-control/forms If you have questions, please contact the Land Quality Section at a DENR Regional Office. FLOW - SEDIMENT STORAGE AREA (SEE PLANS FOR DIMENSIONS) BERM MAY BE EITHER HORSESHOE OR RECTANGULAR. FOR RECTANGLE BERM SPILLWAY MAY BE BUILT BETWEEN THE TWO SIDE BERMS. �i. [_SPILLWAY _I WIDTH 1 SIDE BERMS 1' 2' MIN SPILLWAY WIDTH PER SCHEDULE OR AS NOTED ON PLANS. R = 0.75 WIDTH OF SPILLWAY EXISTING EMBANKMENT MIN. CARRY RIP -RAP UP SIDES OF SPILLWAY r )' ti NCSA #5 STONE FLOW- (IF RECTANGLE THEN 0.5 SPILLWAY WIDTH) PER SCHEDULE OR AS NOTED ON - PLANS, BUT NOT LESS THAN 1.5 1 (MAX) 1 n� CLASS I RIP RAP III �111_11111111111 1111111111111� III 11=1 1' 11=11 - - I-111111- -II, 11I III 111 1I1_1111111111IIIIIIIIIIIII- MIN. 8' MIN NATURAL GRADE SECTION THRU SPILLWAY ARC FILTER INLET PROTECT/ON NOT TO SCALE MAINTENANCE.: Inspect arc filter inlet protection at least weekly and after each significant (2 inch or greater) rainfall event and repair immediately. Remove sediment and restore the sediment storage area to its original dimensions when the sediment has accumulated to one-half the design depth of the trap. Place the sediment that is removed in the designated disposal area and replace the contaminated part of the grave facing. Check the structure for damage. Any riprap displaced from the stone horseshoe must be replaced immediately. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and provide permanent ground cover (Surface Stabilization). • - PIPE - • • • • 3. CLASS B RIP RAP OREBAY • 3:1 SLOPE • ASP ±215.00 96 LF 30" RCP ®"38% W/6' FES \_ A 220.00 �tS 215. st 3:1 SLOPE DDL-Sh X COR-)ORATh PAR 80' RIGHT OF WAY ASP ±217.90 D.I.#4 TOP ±217.00 INV. IN 211.63 INV. OUT 211.43 \iuIJ 'ice i 224.22 ASP 23.59 PARKS A 9' P 224.39 220.57 I ONC. >k 221.40 1, / I I ASP / 221.4y1 GH SCRES'�" ,W.70 MATCH ASP BUILDINQQ. • - TE PAD 220.6221.0q TO BE 8" 4,000 PSI CONCRETE ®289A ' 21 � 1 FXCELSIOB MATTI#O \\Q Y / ` 41 NOT TO SCALE nom FLOW TURNDOWN NETTING MINIMUM BURY 6" AND STAPLE EVERY 1 FT, JUST \ BELOW ANCHOR SLOT. FLOW �I 18" OVERLAP NETTING MINIMUM OVERLAP 18" AND STAPLING EVERY 1 FT THROUGH BOTH LAYERS. © TYPICAL STAPLE USE #6 GAUGE WIRE GENERAL NOTES: 1. Apply seed, and tack with rs or crs liquid emulsified asphalt at a rate equal to 10 gal. per 1000 s. f. Cover w/excelsior matting. 2. Staple every 24" along perimeter edges and overlaps. Staple every 36" to 48" randomly to secure netting. 3. Roll out netting in the direction of water flow. Do not stretch. MAINTENANCE:: 1. Inspect Rolled Erosion Control Product at least weekly and after each significant (/2 inch or greater) rainfall event and repair immediately. . 2. Good contact with the ground must be maintained, and erosion must not occur beneath the RECP. 3. Any areas of the RECP that are damaged or not in close contact with the ground shall be repaired and stapled. 4. If erosion occurs due to poorly controlled drainage, the problem shall be fixed and the eroded area protected. 5. Monitor and repair the RECP as necessary until ground cover is established. 222.60 / Lcao i ASF 224.04 / A5.9 224 15 • ASP V 224185 184 LF 30" RCP CAD 3.5%\ Sp �. 225.'3 0_ a' 8.WIDE TURN DOWN SIDEWALK SILT FENCE OUTLET D.I.#14 TOP 229 INV. 01 6.50 ONC. 227.3 D 12 0 •.50 INV. 22. 2 IN . OUT 25.1 .141 TOP 29.5• IN IN 2 . 01 I OU ' 225. 230.55 MEM. MIEN ASP ±221.60 ASP 225.64 ASP 227.24 ASP 228.84 A P 2 '9.92 GS 230.55 D.I. 5 TOP 223.50 INV. IN 218.27 INV. OUT 218.07 /<WA' 3:1 SLOPE ASP ±224.51 PRO. ' 'GE OF PAVEM T (BY OTHERS) 8-1.#6 TOP 226.50 N 22t27- T 221,I.( • • r AP 226.94 I NASP 226.63 0.44% 227 p-ASP 227.C8 /© N AS 1227.39� CONSTRUCTION ENTRANCE ASP ASP 227.87 227.87 ASP ASP 228.22 228.22 S W 230.82 SP 5:R SP 32 Se.32 ��i N S (VA ACC GS 230.55 ASP 227.62 / / _MP RR F19' ASP 229.00 230.32 AP ' 3u.39 0% :1.10 8' WIDE TURN DOWN SIDEWALI$/W 231.26/ 2SI . B/(W 2i32.193 (VAN ACCES.) - - - - 1 230.55 SILT FENCE OUTLET GS 230.55. 11=\38 1 WWI MIMI NMI J co rn a 0 J ASP /227.62 I \ A5P 230.32 / D.I.#6A TOP 229.50 INV. OUT 224.14/ TOP 229.5 INV. IN 22/.3 HP SWALE 230.50 ti TOP 229.5 INV. IN 225.32 INV. OUT 2r.12 230.50 D.I.#10 TOP 2 INV. 0 NlpflyRARI 'DIVERSION COMPACTED SOIL - 6' TYP. NOTES: BEFORE YOU DIG, CALL NORTH CAROLINA ONE CALL CENTER rNOTE: TIE ALL DRAINS TO THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION - CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RES-MAIN EROSION. PERMANENT GROUND COVER WILL BE PROVIDED FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR NO MORE THAN 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION. CONTACT DEMLR RALEIGH REGIONAL OFFICE AT LEAST 48 HOURS PRIOR TO COMMENCING THE LAND -DISTURBING ACTIVITY. THE CONTACT NUMBER IS (919) 791-4200. STORM DRAINJ NceP EROSION LEGEND EXCELSIOR MATTING IN BOTTOM TD SILT FENCE SILT FENCE OUTLET CONSTRUCTION ENTRANCE PER4rANENT SEEDING CENTIPEDE SOD HARDWARE CLOTH INLET PROTECTION CONCRETE TRUCK WASH -OUT CLASS B OUTLET PROTECTION OVER MIRAFI 140N EXCELSIOR MATTING SKIMMER SEDIMENT BASIN ARC FILTER INLET PROTECTION -rD TEMPORARY DIVERSION W/EXCELSIOR MATTING SCALE: 1" = 30' co CIO ci 0 WWW.STOCKSENGINEERING.COM cn o cn cn cn o BLN=C-1874 egc leall c.) 141 kl 141 FINAL ( EROSION CONTROL PLAN REVISIONS 10/10/10 OFFICE ADDED FILE NO. 2016-084 HORZ. SCALE: 1" = 30' VERT. SCALE: NONE The Lord is a refuge for the oppressed, a stronghold in times of trouble. Psalm 9.9 CE-05 EROSION AND SEDIMENTATION CONTROL NARRATIVE PROJECT DESCRIPTION The purpose of this project is for construction of a 60,000 S.F. Shell Building. The property is owned by Nash County. The site is currently undeveloped. Approximately 6.38 acres will be disturbed during construction. The maximum fill will be 5-7 feet. The project is scheduled to begin construction in June 2017 with project completion and final stabilization by April 2018. The erosion and sediment control program for this project will include the installation of a suitable construction entrance, silt fence, outlet protection, inlet protection, and skimmer basin with temporary seeding of the site. ADJACENT PROPERTY The adjacent property is mostly zoned Industrial. SOILS The soil at this site is a sandy clay. EROSION AND SEDIMENT CONTROL MEASURES All vegetative and structural erosion and sediment control practices shall be constructed and maintained by the contractor according to these plans and specifications and the minimum standards of the Dept. of Environmental Management, Land Quality Section and Johnston County. The contractor shall also follow any additional requirements as outlined by the Project Engineer. Structural Practices 1. Vehicle wheels shall be clean when leaving the site to prevent the tracking of mud on paved roads. 2. Construction Road Stabilization: Construction traffic shall be limited to stabilized areas. At a minimum, a temporary gravel construction entrance shall be provided as shown on this drawing. 3. Silt Fence: Silt fences shall be provided where shown and as needed on the site plan. These barriers shall be used to contain sediment. 4. Rip Rap/Gravel Filter Sediment Basins: Construct basin to the shape and dimensions shown in the details. The basin is to be placed below the existing ditch flow line by 2' with the berm built above as dimensioned. Management Strategies 1. Perimeter measures are to be installed prior to grubbing or grading. 2. Tail Ditches shall be stabilized immediately 9 followin their construction. As an alternate, rock check dams may be provided at their outlets and/or the terminal downstream end of disturbance until ground cover is implemented. 3. Stockpile and/or waste areas must be maintained within the limits of the areas _protected bythe proposed measures and otherwise temporarily seeded if to be left stockpiled over 15 calender ays. 4. Construction shall be planned so that grading operations can begin and end as quickly as possible. 5. Silt Fences shall also be installed prior to or as a first step in construction. 6. The Contractor shall be responsible for the installation and maintenance of all erosion and sediment control practices. PVC END CAP PVC END CAP PVC TEE Vegetative Ground Cover Immediately following grading, all areas shall receive either permanent or temporary seeding, as applicable, as follows: INFLOW STRUCTU Site Area Description: Stabilization Time Frame: Stabilization Time Frame Exceptions: Perimeter dikes, swales, ditches de slopes. 7 Days None High Quality Water (HQW) Zones. 7 Days None Slope steeper than 3:1 7 Days If slopes are 10' or Tess in length de are not steeper than 2:1, 14 days are allowed. Slopes 3:1 or flatter. 14 Days 7 Days for slopes greater than 50 feet in length. All other areas with slopes flatter than 4:1 14 Days None (Except for perimeters and HQW Zones) TEMPORARY SEEDING SPECIFICATIONS SEEDING MIXTURE SPECIES WINTER/EARLY SPRING - RYE (GRAIN) KOBE LESPEDEZA SUMMER - GERMAN MILLET PERMANENT SEEDING SPECIFICATIONS SEEDING MIXTURE FEB-MAY KY 31 TALL FESCUE O 1,000 LBS/ACRE PLUS CENTIPEDE GRASS O 50 LBS/ACRE JUNE-OCT KY 31 TALL FESCUE O 1,000 LBS/ACRE PLUS CENTIPEDE GRASS © 5 LBS/ACRE NOV-JAN KY 31 TALL FESCUE 0 1,000 LBS/ACRE PLUS RYE GRAIN 40 LBS/ACRE RATE (LB/ACRE) 120 50 40 NURSE PLANT$ BETWEEN APR. 15 AND AUG. 15, ADD 10 LB/ACRE GERMAN MILLET OR 15 LB/ACRE SUDANGRASS. PRIOR TO MAY 1 OR AFTER AUG. 15 ADD 25 LB/ACRE RYE (GRAIN). SKIMMWR SENNENTBAS/N NOT TO SCALE ARM ASSEMBLY A PERSPECTIVE VIEW NOT TO SCALE PVC ELBOW PVC PIPE 1/2" HOLES IN UNDERSIDE "C" ENCLOSURE WATER ENTRY UNIT WATER SURFACE SCHEDULE 40 PVC PIPE FLEXIBLE HOSE PVC VE PIPE SCHEDULE 40 PVC PIPE ORIFICE PLATE PVC TEE BOTTOM SURFACE DEWATERI ZONE / FILTER FABR4 END VIEW NOT TO SCALE FRONT VIEW NOT TO SCALE :411 0 4.! A PLAN VIEW BAFFLES ))) ))))) 1 NOT TO SCALE INFLOW `STRUCTURE SOIL AMENDMENTS APPLY LIME AND FERTILZER ACCORDING TO SOIL TEST. IF SOIL TEST IS NOT AVAILABLE APPLY 2 TONS/ACRE AGRICULTURAL GRADE UMESTONE AND 1,000 LBS/ACRE OF 10-10-10 FERTILIZER OR APPLY 3 000-5 000 LSEDANGRASS. PRIOR TO MAY 1 OR AFTER AUG 15, ADD 25 LB/ACRE RYE (GRAIN). LB/ACRE MULCH APPLY 4,000 LB/ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. MAINTENANCE IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTIUZE THE SECOND YEAR. ACCORDING TO SOIL TESTS OR TOPDRESS WITH 500 LB/ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. Maintenance 1. Reseed and mulch bare spots larger than 9 square feet (limited to 5% maximum of site area.) 2. Maintain all seeded areas until uniform stand is acceptable. 3. If growth is not established by final project inspection, continue specified attention until the stand is acceptable. 4. Correct and repair all undue settling and erosion within 1 year after final inspection. 5. Remove from the site, all erosion control structures after complete stabilization at end of construction period. 6. Remove silt from sediment pits and from behind check dams when silt is within half depth of the pit or spillway. Dispose of in an area where silt cannot re-enter pit / trap. Calculations The practice utilized for the proposed site did require formal calculations. Calculations have been provided. OWNER NASH COUNTY 120 WEST WASHINGTON STREET SUITE 2004 NASHVILLE, N.C. 27856 PHONE: 252.462.2613 CONSTRUCTION SEQUENCE: 1. Obtain erosion control plan approval prior to beginning land disturbance. Retain a copy of the approved erosion control plan and permit on site. Call NCDEMLR to notify the Inspector of a start date prior to land disturbance 0 919-791-4200. 2. Clear the area needed to construct the perimeter erosion control measures only. 3. Construct silt fence & silt fence outlets where shown to contain sediment onsite. 4. Install drainage pipe at drivewayand install arc filter inlet per detail. 9 PP 5. Construct the construction entrance as shown on the plans. Maintain the construction entrance daily to ensure that mud and silt will not be tracked onto the paved surface. If mud is tracked onto the road surface, it is to be removed immediately. 6. Construction entrance location may not vary without prior approval from Engineer and NCDEQ. 7. Begin clearing & grubbing. 8. Begin demolition of concrete area, light poles, etc. 9. Construct sediment basins. Stabilize immediately. 10. Install Temporary Diversions including excelsior matting according to plans. 11. Begin topsoil stripping. 12. Rough grade all parking and site. 13. Construct the storm sewer system throughout project. Install inlet protection devices immediately. 15. Construct CABC on parking lot. 16. Seed, straw and tack areas that are graded to their final disposition. 17. See sheet CE-09 for conversion of sediment basin to bio-retention. 18. Upon completion of the project, contact NCDEQ to inspect prior to removing EC measures. 19. Seed, straw and tack any remaining exposed areas. SEDIMENT STO ZONE SKIMMER DEWATERING DEVICE BAFFLES / l CROSS-SECTION VIEW NOT TO SCALE 1' FREEBOARD EMERGENCY SPILLWAY EMBANKMENT 6" MIN. INVERT ELEVATION OF EMERGENCY SPILLWAY STAKE (TYP) 10 MIL PLASTIC LINING STRAW BALES 14' STAPLE (2 PER BALE) 10 MIL PLASTIC DNING 14' SILT FENCE STRAW BALE METAL STAKE (2 PER BALE) PLYWOOD PAINTED WHITE BLACK LETTERS 6" TALL fW00D POST GROUND LEVEL CONSTRUCTION SPECIFICATIONS.: 1. CONCRETE WASHOUT SIGN SHALL BE INSTALLED NO FURTHER THAN 25' FROM THE FACILITY AND SHALL BE VISIBLE TO ALL CONSTRUCTION TRAFFIC. 2. POLYETHYLENE SHEETING SHALL BE 10 MILS FREE OF HOLES, TEARS, OR LEAKS. MAINTENANCE.: FACILITY SHALL NOT BE FILLED MORE THAN 12" FROM THE TOP BEFORE DISPOSING OF CONCRETE. CONCRETE SHALL BE DISPOSED OF IN THE SAME MANNER AS OTHER NON-HAZORDOUS MATERIALS FROM 7HE SITE OR MAY BE BROKEN UP AND USED AS FILL IN NON-STRUCTURAL AREAS. CONCRETE Welt 1#YASHOUT NOT TO SCALE EMERGENCY SPILLWAY CONSTRUCTION SPECIFICATIONS: 1. Clear, grub, and strip the area under the embankment of all vegetation and root mat. Remove all surface soil containing high amounts of organic matter and stockpile or dispose of it properly. Haul all objectionable material to the designated disposal area. Place temporary sediment control measures below basin as needed. 2. Ensure that fill material for the embankment is free of roots, woody vegetation, organic matter, and other objectionable material. Place the fill in lifts not to exceed 9 inches, and machine compact it. Over fill the embankment 6 inches to allow for settlement. 3. Shape the basin to the specified dimensions. Prevent the skimming device from settling into the mud by excavating a shallow pit under the skimmer or providing a low support under the skimmer of stone or timber. 4. Place the barrel (typically 4-inch Schedule 40 PVC pipe) on a firm, smooth foundation of impervious soil. Do not use pervious material such as sand, grave/, or crushed stone as backfill around the pipe. Place the fill material around the pipe spillway in 4-inch layers and compact it under and around the pipe to at least the same density as the adjacent embankment. Care must be taken not to raise the pipe from the firm contact with its foundation when compacting under the pipe haunches. Place a minimum depth of 2 feet of compacted backfill over the pipe spillway before crossing it with construction equipment. In no case should the pipe conduit be installed by cutting a trench through the dam after the embankment is complete. 5. Assemble the skimmer following the manufacturers instructions, or as designed. 6. Lay the assembled skimmer on the bottom of the basin with the flexible joint at the inlet of the barrel pipe. Attach the flexible joint to the barrel pipe and position the skimmer over the excavated pit or support. Be sure to attach a rope to the skimmer and anchor it to the side of the basin. This will be used to pull the skimmer to the side for maintenance. 7. Earthen spillways - Install the spillway in undisturbed soil to the greatest extent possible. The achievement of planned elevations, grade, design width, and entrance and exit channel slopes are critical to the successful operation of the spillway. The spillway should be lined with laminated plastic or impermeable geotextile fabric. The fabric must be wide and long enough to cover the bottom and sides and extend onto the top of the dam for anchoring in a trench. The edges may be secured with 8-inch staples or pins. The fabric must be long enough to extend down the slope and exit onto stable ground. The width of the fabric must be one piece, not joined or spliced; otherwise water can get under the fabric. if the length of the fabric is insufficient for the entire length of the spillway, multiple sections, spanning the complete width, may be used. The upper section(s) should overlap the lower section(s) so the water cannot flow under the fabric. Secure the upper edge and sides of the fabric in a trench with staples or pins. 8. Inlets - Discharge water into the basin in a manner to prevent erosion. Use temporary slope drains or diversions with outlet protection to divert sediment -laden water to the upper end of the pool area to improve basin trap efficiency. 9. Erosion control - Construct the structure so that the disturbed area is minimized. Divert surface water away from bare areas. Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway immediately after construction. 10. Install porous baffles as specified. 11. After all the sediment -producing areas have been permanently stabilized, remove the structure and all the unstable sediment. Smooth the area to blend with the adjoining areas and stabilize properly. MAINTENANCE.: Inspect skimmer sediment basins at least weekly and after each significant (one-half inch or greater) rainfall event and repair immediately. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-half the height of the first baffle. Pull the skimmer to one side so that the sediment underneath it can be excavated. Excavate the sediment from the entire basin, not just around the skimmer or the first cell. Make sure vegetation growing in the bottom of the basin does not hold down the skimmer. Repair the baffles if they are damaged. Re -anchor the baffles if water is flowing underneath or around them. If the skimmer is clogged with trash and there is water in the basin, usually jerking on the rope will make the skimmer bob up and down and dislodge the debris and restore flow. if this does not work, pull the skimmer over to the side of the basin and remove the debris. Also check the orifice inside the skimmer to see if it is clogged; if so, remove the debris. If the skimmer arm or barrel pipe is clogged, the orifice can be removed and the obstruction cleared with a plumber's snake or by flushing with water. Be sure and replace the orifice before repositioning the skimmer. Check the fabric lined spillway for damage and make any required repairs with fabric that spans the full width of the spillway. Check the embankment, spillways, and outlet for erosion damage, and inspect the embankment for piping and settlement. Make all necessary repairs immediately. Remove all trash and other debris from the skimmer and pool areas. Freezing weather can result in ice forming in the basin. Some special precautions should be taken in the winter to prevent the skimmer from plugging with ice. Maintenance Notes: 1. Do not let any area remained exposed for more than 7 or 14 calendar days according to chart without applying temporary seeding. 2. Maintain all erosion control measures daily and reseed disturbed areas as needed. 3. Inspect all erosion control measures weekly and after each rainfall event. Repair as needed. 4. At the end of each day's storm drainage operation, construct a temporary pipe inlet protection device until the next day's operation continues. SUPPORT ROPE TO ,-WIRE TO PREVENT SAGGING SUPPORT POST, 24" INTO BOTTOM OR SIDE COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE SED BASIN BAFFLES SCALE: N.T.S. SILT FENCE NOT TO SCALE BACKFILL MIN. 8" THICK LAYER OFF GRAVEL. V-TRENCHJ MIRAFI 100X OR TREVIRA S1115 FILTER CLOTH. SECURE TO POST. 8 'b4X. COMPACTED FILL FILTER FABRIC -- EXTENSION OF FABRIC AND WIRE INTO TRENCH SILT FENCE OUTLET NOT TO SCALE 12" OF #57 WASHED STONE GROUND LINE 2' MIN. CROSS SECTION SILT FENCE /SILT FENCE 1'-8" MIN. r_ CLASS B EROSION CONTROL STONE 2: 1 FILTER FABRIC SEE PLAN STAKE TO SUPPORT WIRE 1'-8" MIN. SEE PLAN TOP VIEW SILT FENCE CIJYSTRUCTIO#FNTBAiYCE 2" - 3" COARSE AGGREGATE CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON THE PLANS, AND SMOOTH IT. 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER SUITABLE OUTLET. 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE.: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. CONSTRUCTION SPECIFICATIONS: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE GROUND SURFACE. (HIGHER FENCES MAY IMPOUND VOLUMES OF WATER SUFFICIENT TO CAUSE FAILURE OF THE STRUCTURE). 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOUS ROLL CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD FILTER FABRIC BY IMRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. IMRE OR PLASTIC ZIP 77ES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP 77ES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE: INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. CONSTRUCTION SPECS: 1. CLEAR & GRUB THE AREA AROUND THE SILT FENCE OUTLET AND PROPERLY DISPOSE OF DEBRIS. 2. PLACE GRAVEL TO THE SPECIFIC GRADE AS SHOWN PER THE DETAIL. 3. PROPERLY OVERLAP STONE BEYOND EDGES OF SILT FENCE OPENING. MAINTENANCE: INSPECT OUTLETS WEEKLY AND AFTER EACH RAIN EVENT. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR AS NEEDED. CAREFULLY CHECK OUTLETS FOR EROSION AND REPAIR IMMEDIA TEL Y. ENSURE THERE IS NO SCOURING APPARENT DOWNSTREAM OF OUTLET. IMMEDIA TEL Y STABILIZE ANY AREAS THAT NEED REPAIR. PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL FILTER BLANKET OR (MIRAFI 140N) La l�l�ll1�1 SECTION A -A PIPE OUTLET TO FLAT AREA NO WELL-DEFINED CHANNEL La FILTER BLANKET OR (MIRAFI 140N) SECTION A -A PIPE OUTLET TO WELL-DEFINED CHANNEL t=*- GENERAL NOTES: 1. La = THE LENGTH OF THE RIP RAP APRON. 2. d = 1.5 TIMES THE MAXIMUM STONE DIAMETER BUT NOT LESS THAN 6". 3. IN A WELL-DEFINED CHANNEL EXTEND THE APRON UP THE CHANNEL BANKS TO AN ELEVATION OF 6" ABOVE THE MAXIMUM TAILWATER DEPTH OR TO THE TOP OF THE BANK, WHICHEVER IS LESS. 4. A FILTER BLANKET OR FILTER FABRIC SHOULD BE INSTALLED BETWEEN THE RIP RAP AND SOIL FOUNDATION. 5. FLARED END SECTION IS OPTIONAL. SEE PLANS FOR REQUIREMENT. 6. SEE PLAN AND PROFILES FOR ACTUAL DIMENSIONS. PIPE OUTLET PROTECTION SCALE: N.T.S. hARDWARECLOTH & GRAVEL INLETPROTECT/ON NOT TO SCALE STANDARD METAL POSTS 2'-0" IN GROUND owl0 ITA egQa,: Vie`-1„ie7 t��r r; •o ��ocA WA• • let. QX1©.o000 0 OD0•.00oaKDOEOCADCa0 # 57 WASHED STONE PLACED TO A HEIGHT OF 12"-18" MINIMUM ABOVE TOP OF BOX GALVANIZED HARDWARE WIRE EXTENDS TO TOP OF BOX 0 A 0 MAINTENANCE: INSPECT THE BARRIER AFTER EACH RAIN AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT AS NECESSRY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. U 0 co O X O I- w w 1- H cn z� O I00 - z_ E • in z 1-w (n _1 <cn w= o c00 WWW.STOCKSENGINEERING.COM BLN=C-1874 EROSION NOTES/DETAILS REVISIONS FILE NO. 2016-084 HORZ. SCALE: NONE 14, VERT. SCALE: NONE ♦ CE-06 The Lord is a refuge for the oppressed, a stronghold in times of trouble. Psalm 9:9 • co rn CO 12" //- RESERVED PARKING 11 MAXIMUM PENALTY $250 11 VAN ACCESSIBLE JJ R7-8 or R7-8a GREEN GREEN BLUE WHITE SYMBOL WHITE BACKGROUND R7-8D VAN —ACCESSIBLE SIGN AT VAN SPACE ONLY NOTE: HC SIGNS TO BE POLE MOUNTED OR MOUNTED ON BUILDING AS SHOWN. R7-8 HANDICAP SIGN SCALE: N.T.S. 6'-0' MINIMUM (UNLESS OTHERWISE SPECIFIED) 12,1 MAXIMUM SLOPE SIDEWALK ACCESS RAM 1/2' EXPANSION JOIN SECTION A -A DEPRESSED CURB STANDARD 2'-0' CURB & GUTTER SLIP RESISTANT WARNING SURFACE MAT RESET CONCRETE TO ENSURE MAT /S 'FLUSH' AT EDGES MAXIMUM SLOPE = 12 ' 1 TYPICAL SCORED ✓T. LOCA770N VAR/ES UP OF CURB— . DIAGONAL STRIPES AT3=0'O.C. 5' S7D. 8' VAN ACCESSIBLE SPACE 11' 2.5R (4'R VAN ACCESSIBLE) 4' MIN. 30" R1-1 NOTE: SEE SIGN POST PER DETAIL 11, THIS SHEET STOP SIGN SCALE: N.T.S. NOTE: INSTALL 'MAT' TRUNCATED DOMES UNLESS CONTRACTOR PROVIDES LETTER FROM MUNICIPALITY THAT THEY ARE NOT ALLOWED. CONTRACTOR TO DISCUSS WITH OWNER PRIOR TO INSTALLATION!!! A OBS7RUC770N LEVEL & CLEAR AREA . 04. NOT TO EXCEED 2X /N ANY D/REC770N WHEN X' /S LESS 7HAN 48', FLARED SIDE SLOPE CANNOT EXCEED 1 : 12 TRUNCATED DOMES ON RAMP SURFACE (MAT ONLY) RESET CONCRE7E 70 ENSURE MAT /S 'FLUSH' AT EDGES TRUNCATED DOMES O1 0 2.35" PLAN VIEW NOTES: 1. DETECTABLE WARNINGS SHALL CONTRAST VISUALLY WITH ADJOINING SURFACES, EITHER LIGHT ON DARK OR DARK ON UGHT 2. THE MATERIAL USED TO PROVIDE CONTRAST SHALL BE AN INTEGRAL PART OF THE WALKING SURFACE. 3. DOMES SHALL BE MAT. BLOCKS AND STAMPED CONCRETE WILL NOT BE ALLOWED. I 0.9" I SECTION A -A HANDICAP RAMP IN WALK (TYP) 0.2" GENERIC DETAIL — SEE GRADING PLAN FOR ACTUAL DIMENSIONS AND GRADES SCALE: N.T.S. HEAVY DUTY FLEXIBLE PAVEMENT NOT TO SCALE 2" SF9.5B 2.0" B-25.0B ASPHALT 8" CABC COMPACTED SUBGRADE DUMPSTER PAD -I- LOADING AREA HEAVY DUTY RIGID PAVEMENT NOT TO SCALE 4,000 PSI CONC. © 28 DAYS 6" THICK 4" CABC COMPACTED SUBGRADE LIGHT DUTY FLEXIBLE PAVEMENT NOT TO SCALE 2" SF9.5B ASPHALT 6" CABC COMPACTED SUBGRADE '—'I_III� SIDEWALKS + H.C. RAMPS LIGHT DUTY RIGID PAVEMENT NOT TO SCALE 4,000 PSI CONC. © 28 DAYS 4" THICK COMPACTED SUBGRADE —7=711 PAVEMENT SECTIONS SCALE: N.T.S. 3.0" HD 2.5" LD 8" HD 6" LD SEAL HOLES W ASPHALT CEMENT BASE COURSE 2'-0" MIN. BITUMINOUS SURFACE ft • 12" * RARKING AREA ROOF DRAIN (DOWN SPOUT) FABRICATE TRANSITION 6" 90' ELBOW 6"x12' NIPPLE 6" 45' ELBOW 6" NIPPLE IN —LINE WYE SEE ROOF DRAINAGE PLAN FOR PIPE SIZE AND GRADE ROOF DRAIN TIE—IN SCALE: N.T.S. 1 1/2" CHAMFER #3 BARS BITUMINOUS SURFACE 1/2" DIA. RODS 2'-0" LONG SECTION A —A A 7'-0" 1'—O' 2'-6" 2'-6" 1'-0" 1/2" DIA. RODS 2'-0" LONG ASPHALT PAVEMENT ELEVATION 1 1/2" CHAMFER _ BASE COURSE A NOTE: ANCHOR RODS TO BE SLEEVED OR GREASED THRU CONC. CURBS TO PERMIT RELOCATION OF CURBS. WHEEL STOP DETAIL SCALE: N.T.S. v0 \\\\\% 0 % % o °°0 ° ` 0So 0 ` oS 0 00° 0 00%3 o Ooo� 0 0 p 0 a a o % a ° .o e� o ' a °° o. 0 0 °o °0 0 0 °0 0 0 o COMPACTED SUBGRADE I>• CONCRETE SLAB /! 0 0 0 0 00 I- p0 ° a 0 poo o 0 e ! 0 0 � = % ° g m O% m' o e o ° e 'v o, o ° o �o °0 °o� ° I 1- 12" T I I—_I/1 I �, „ 11 1 4" 12" COMPACTED—/ SUBGRADE 4" CRUSHED AGGREGATE BASE COURSE 7" CONCRETE/BITUMINOUS PAVEMENT INTERFACE SCALE: N.T.S. NOTE: PAINT/SEAL ALL EXPOSED MASONRY BLOCK TO MATCH EXTERIOR OF MAIN BUILDING WALL CAP SCALE: N.T.S. SLOPE /a 7'-7 1 /2" SPRING LOCK PRE —FINISHED ALUMINUM Z— COPING WITH CONCEALED FASTENERS TO MATCH MAIN BUILDING \_ CONTINUOUS METAL CLEAT SEALANT BOTH SIDES PRESSURE TREATED 2X WOOD BLOCKING 1/2" 0 ANCHOR BOLT © 48" 0.C. COUNTERSINK #5 CONTINUOUS MASONRY HORIZONTAL JOINT REINFORCEMENT j PROPOSED SIGN 2 LB/FT. GALVANIZED—N U—CHANNEL POST USE 6" PIPE BOLLARD FILLED W/CONCRETE AND PAINTED TRAFFIC YELLOW SLOPE TOP 3 OF CONCRETE • /PAVING •� 4 GROUND SURFACE 3500 P.S.I. P.C. CONCRETE 4 a• d • L1 ill 4 id 1'-6" Z N NOTE: THE MIN. HEIGHT OF THE BOTTOM OF THE LOWEST SIGN SHALL BE 7'-0". SIGN BASE DETAIL (ALL SIGNS) SCALE: N.T.S. CONCRETE CORNER DETAIL SCALE: N.T.S. NOTE: SEE ARCH PLANS FOR HEIGHT AND DETAIL OF SIMILAR GENERATOR/TRANSFORMER ENCLOSURE. 8" BOND BEAM WITH (1) #5 CONTINUOUS TOP OF MASONRY = 6'-4" ABOVE TRASH FINISH GRADE 1// // ENCLOSURE SLAB 8" SPLIT —FACED CMU WALL REINFORCED WITH #5 VERTICAL AT 24" 0.C. FULL HEIGHT (CENTERED IN WALL). GROUT ENTIRE WALL SOLID 8" SMOOTH —FACED CMU BAND CENTERED ON WALL HEIGHT. COLOR TO MATCH BLDG. 1/2" PREFORMED JOINT FILLER AND SEALANT HORIZONTAL JOINT REINFORCING AT 16" O.C. (TYPICAL) 4. 4 a 12" a •Q ' 4 a a . G • ° • Li a • a . a• A 24" CONCRETE SLAB 8" SMOOTH FACE CMU TO 4" ABOVE T.O. SLAB #5 DOWELS WITH STANDARD HOOK AT 24" 0.C. — CENTER IN WALL — LAP WITH VERTICAL WALL REINFORCING (TYPICAL) CONTINUOUS WALL FOOTING W/ (2) #5 CONTINUOUS WALL SECTION FOR DUMPSTER PAD SCALE: N.T.S. /CONCRETE SIDEWALI NOTE: WHEELCHAIR RAMPS TO BE INSTALLED AT ALL PAINTED H/C ACCESS STALLS ON THIS PROJECT. WHEELCHAIR RAMPS TO BE INSTALLED AT ALL CONC. SIDEWALK INTERSECTIONS. r HITE- (TYP.) o o, 12" WHITE STRIPE 4" WI - STRIPE _p„ MIN. MIN. MIN. 9'_O" 8' -0” 8'-O" 8'-O„ 0.1 VAN VAN PAINTED H/C ACCESS STALLS/ 4" WHITE STRIPE 90° HANDICAP STALLS — TYPICAL SCALE: N.T.S. 6" CURB OR AS NOTED SEALANT 6"x6" - W1.4xW1.4 W.W.M. 4" CONCRETE SIDEWALK " STONE BASE 4 STEEL REINFORCEMENT CONTINUOUS) 6" SIDEWALK TURN —DOWN SCALE: N.T.S. NOTES, SAW JOINT SHALL BE MADE AS SOON AS CONCRETE HAS GAINED SUFFICIENT STRENGTH TO RETAIN AGGREGATE AGAINST THE SAWING ACTION 6x6-W1,4xW1,4 WWF AT MIDDEPTH OF 4' SLAB 6x6-W2,9xW2,9 WWF AT MIDDEPTH OF 6' SL SAW JOINT FILLED W/ COAL T 1-3/16" SAW CUT CRUSHED STONE -1' @ 4' SLAB -1 1/2' @ 6' SLAB TYPICAL SLAB CRACK CONTROL JOINT DETAIL "SJ" SCALE: N.T.S. U 0 CO 00 xl 0 m`n o^ 0 1.0 z 0 0 UJ LIJ cn z'0 o10 Z_cn • z UJ in a5 w = (n o< 0O Z WWW.STOCKSENGINEERING.COM BLN=C-1874 egc rt4 1E4 col) ct W Z W " y v • SITE DETAILS REVISIONS FILE NO. 2016-084 HORZ. SCALE: NONE VERT. SCALE: NONE ♦ CE-07 The Lord is a refuge for the oppressed, a stronghold in times of trouble. Psalm 9:9 I 3 11 FOREBAY 2.36 FT. FREEBOARD y 1-YR STORM 209.86 WQV TEMP. POOL 208.14 y PERMANENT POOL 207.00 2 -I 1 11- FOREBAY� EXIT 206.00 ENTRANCE 199.00 18" MCP I\V. OREBAY SEDIMENT STORAGE ELEVATION 201.00 2 11- MAIN POND SEDIMENT STORAGE ELEVATION 203.00 BOTTOM POND 202.00 WET DETENTION POND PROFILE NOT TO SCALE OUT 205.50 STANDPIPE SHALL - BE CONNECTED TO THE BOX 5 2'x3' D0P I\LET WITH TRASH AC'< TOP 209.50 4" PVC ORIFICE INV I\. 207.00 (SEE DETAIL) 3OTTOV OF 30X 205.50 4" PVC CAP WITH SCREW TYPE PLUG TOP ELEV. 208.00 NORMAL POOL = INV. ELEV. 207.00 BOTTOM ELEV. 206.50 PVC CAP W/2.75" HOLE DRILLED IN CAP. Conversion Procedure Sediment Basin to Wet Detention Pond TOP OF DAM 210.50 INV FES 1 205.25 6:1 VEGETATED SHELF TOP 207.00 BOTTOM 206.00 1. After the site is completely stabilized, contact Stocks Engineering @ 252-459-8196 for verification of completion and stabilization. 2. Contact DEQ for approval to remove all temporary erosion control measures. 3. Upon approval from NC DEQ, begin the conversion of the wet pond from a temporary sediment trap to a permanent BMP as follows. 4. If standing water is in the basin, contractor shall pump the water out discharging through a silt bag. 5. Remove the skimmer which is connected to the riser and convert to the permenent orifice as shown below in detail. 6. Bring the side slopes surrounding the pond and vegetated shelf to the proposed grade. 7. Contractor shall verify pond depth and muck out sediment to the design depth of the pond. 8. Excavated material must be disposed of in an approved off -site location 9. Care must be taken to prevent any sedimentation/re-sedimentation during this process, as sediment deposits in the bottom of the pond may affect the depth. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering @ 252-459-8196 to inspect excavated pond before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing pond per details. Establish appropriate permanent vegetation around pond as soon as possible. 12. Upon completion of pond construction, remove sediment from silt fence and dispose of at an approved off -site location. Plant vegetated shelf and seed and mulch side slopes. 13. Contact Stocks Engineering @ 252-459-8196 to inspect completed pond before placing pond in service. 0 NOTE: VEGETATED SHELF MUST HAVE 6 IN OF TOPSOIL SAS THE TOP LAYER OF MATERIAL VEGETATED SHELF LANDSCAPE PLAN VEGETATED SHELF = 1,998 S.F. ALL PLANTS SHALL BE 3" CONTAINER PLANTS, THERE SHALL BE A MINIMUM OF 3 PLANT SPECIES, AND A MINIMUM OF 50 PLANTS PER 200 SF OF VEGETATED SHELF. BELOW PERMANENT POOL Botanical Name Iris virginica Helianthus augustifolius Peltandra virginica Common Name Blue flag iris Swamp Sunflower Arrow arum POND SIDE SLOPES Vegetate w/Centipede Seed CD a rate of 60 lbs./Ac. QTY• 166 167 167 1 44 LF 24" HDPE © 0.5% W/6' FES D.I.#2 TOP 209.50 INV IN (2.75") 207.00 - -INV OUT 205.50 SCALE: 1" = 20' 20 40 50 60 70 80 STAGE/STORAGE TABLE r STAGE ELEVATION CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0 207.00 17,268 0 0 1.00 208.00 19,152 18,210 18,210 1.12 208.12 19,229 2,309 20,519 2.00 209.00 21,104 17,819 38,338 3.00 210.00 23,113 22,109 60,447 J Sg EX 96 LF 30" RCP Q 2.38% W/6' FES 14/ (NOTE: CONTRACTOR TO COMPACT BOTTOM OF POND TO ENSURE INFILTRATION IS LESS THAN 0.01 IN./HR. (NOTE: A PORTABLE PUMP SHALL BE USED FOR PUMP DOWN AND MAINTENANCE. U 0 Z F wz 0 0 WWW.STOCKSENGINEERING.COM BLN=C-1874 \` C A 07/ SEAL 19843 •NeINEE'�,0c:) �cHAEL I it 10/14/2021 STORMWATER WET POND DETAIL REVISIONS 5/9/22 WET POND FILE NO. 2021-000 HORZ. SCALE: NONE VERT. SCALE: NONE LET ME GET YOU SOMETHING TO EAT, SO YOU CAN BE REFRESHED AND THEN GO ON YOUR WAY GENESIS 18:5 CE-04 I 3 11 FOREBAY 2.36 FT. FREEBOARD y 1-YR STORM 209.86 WQV TEMP. POOL 208.14 y PERMANENT POOL 207.00 2 -I 1 11- FOREBAY� EXIT 206.00 ENTRANCE 199.00 18" MCP I\V. OREBAY SEDIMENT STORAGE ELEVATION 201.00 2 11- MAIN POND SEDIMENT STORAGE ELEVATION 203.00 BOTTOM POND 202.00 WET DETENTION POND PROFILE NOT TO SCALE OUT 205.50 STANDPIPE SHALL - BE CONNECTED TO THE BOX 5 2'x3' D0P I\LET WITH TRASH AC'< TOP 209.50 4" PVC ORIFICE INV I\. 207.00 (SEE DETAIL) 3OTTOV OF 30X 205.50 4" PVC CAP WITH SCREW TYPE PLUG TOP ELEV. 208.00 NORMAL POOL = INV. ELEV. 207.00 BOTTOM ELEV. 206.50 PVC CAP W/2.75" HOLE DRILLED IN CAP. Conversion Procedure Sediment Basin to Wet Detention Pond TOP OF DAM 210.50 INV FES 1 205.25 6:1 VEGETATED SHELF TOP 207.00 BOTTOM 206.00 1. After the site is completely stabilized, contact Stocks Engineering @ 252-459-8196 for verification of completion and stabilization. 2. Contact DEQ for approval to remove all temporary erosion control measures. 3. Upon approval from NC DEQ, begin the conversion of the wet pond from a temporary sediment trap to a permanent BMP as follows. 4. If standing water is in the basin, contractor shall pump the water out discharging through a silt bag. 5. Remove the skimmer which is connected to the riser and convert to the permenent orifice as shown below in detail. 6. Bring the side slopes surrounding the pond and vegetated shelf to the proposed grade. 7. Contractor shall verify pond depth and muck out sediment to the design depth of the pond. 8. Excavated material must be disposed of in an approved off -site location 9. Care must be taken to prevent any sedimentation/re-sedimentation during this process, as sediment deposits in the bottom of the pond may affect the depth. If any sedimentation occurs during this process, Contractor shall remove sediment immediately. 10. Contact Stocks Engineering @ 252-459-8196 to inspect excavated pond before continuing construction. 11. Upon approval of Stocks Engineering, continue constructing pond per details. Establish appropriate permanent vegetation around pond as soon as possible. 12. Upon completion of pond construction, remove sediment from silt fence and dispose of at an approved off -site location. Plant vegetated shelf and seed and mulch side slopes. 13. Contact Stocks Engineering @ 252-459-8196 to inspect completed pond before placing pond in service. 0 NOTE: VEGETATED SHELF MUST HAVE 6 IN OF TOPSOIL SAS THE TOP LAYER OF MATERIAL VEGETATED SHELF LANDSCAPE PLAN VEGETATED SHELF = 1,998 S.F. ALL PLANTS SHALL BE 3" CONTAINER PLANTS, THERE SHALL BE A MINIMUM OF 3 PLANT SPECIES, AND A MINIMUM OF 50 PLANTS PER 200 SF OF VEGETATED SHELF. BELOW PERMANENT POOL Botanical Name Iris virginica Helianthus augustifolius Peltandra virginica Common Name Blue flag iris Swamp Sunflower Arrow arum POND SIDE SLOPES Vegetate w/Centipede Seed CD a rate of 60 lbs./Ac. QTY• 166 167 167 1 44 LF 24" HDPE © 0.5% W/6' FES D.I.#2 TOP 209.50 INV IN (2.75") 207.00 - -INV OUT 205.50 SCALE: 1" = 20' 20 40 50 60 70 80 STAGE/STORAGE TABLE r STAGE ELEVATION CONTOUR AREA (SF) INCREMENTAL STORAGE (CF) TOTAL STORAGE (CF) 0 207.00 17,268 0 0 1.00 208.00 19,152 18,210 18,210 1.12 208.12 19,229 2,309 20,519 2.00 209.00 21,104 17,819 38,338 3.00 210.00 23,113 22,109 60,447 J Sg EX 96 LF 30" RCP Q 2.38% W/6' FES 14/ (NOTE: CONTRACTOR TO COMPACT BOTTOM OF POND TO ENSURE INFILTRATION IS LESS THAN 0.01 IN./HR. (NOTE: A PORTABLE PUMP SHALL BE USED FOR PUMP DOWN AND MAINTENANCE. U 0 Z F wz 0 0 WWW.STOCKSENGINEERING.COM BLN=C-1874 \` C A 07/ SEAL 19843 •NeINEE'�,0c:) �cHAEL I it 10/14/2021 STORMWATER WET POND DETAIL REVISIONS 5/9/22 WET POND FILE NO. 2021-000 HORZ. SCALE: NONE VERT. SCALE: NONE LET ME GET YOU SOMETHING TO EAT, SO YOU CAN BE REFRESHED AND THEN GO ON YOUR WAY GENESIS 18:5 CE-09 Operation & Maintenance Agreement Project Name: Middlesex Shell #1 Project Location: Middlesex, Nash County, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply& corresponding O&M sheets will be added automatically): Infiltration Basin Quantity: Location(s): Infiltration Trench Quantity: Location(s): Bioretention Cell Quantity: Location(s): Wet Pond Quantity: 1 Location(s): Northeast Corner of Site Stormwater Wetland Quantity: Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity: Location(s): Rainwater Harvesting Quantity: Location(s): Green Roof Quantity: Location(s): Level Spreader- Filter Strip Quantity: Location(s): Proprietary System Quantity: Location(s): Treatment Swale Quantity: Location(s): Dry Pond Quantity: Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Firstwave Innovations, Inc. Title & Organization: Michael Druga, President Street address: 2609 Discovery Drive, Suite 115 City, state, zip: Raleigh, NC 27616 Phone number(s): 678.373.6751 Email: mdruga@sinnovatek.com n n Sign ture: :r , / VAA _ Date: 5--- 13 I, ? -(,Lt j�y�� .-_. --,1(2< , a Notary Public for the State of n/IC', (`a f'd Cu. � County of •\ ) (41 fi. ' v1A.-- , do hereby certify that C/`10_Q , irbi.7 a u personally appeared before me this /J�i" day of Lin& ;r ahld acknowledge the due execution of the O erations and Maintenance Agreem U Witness my hand and official seal, 1i1 L{.. v�,/Y 4,.. 7 USA WINSTEAD-STOKES NOTARY PUBLIC Johnston County t North tna .L. My Commission� � �I Seal My commission expires ) !'LA-4r( i'\.. LI / •42-6' a 7 STORM-EZ 5/13/2022 Version 1.5 O&M Agreement Page 1 of 5 Wet Pond Maintenance Requirements Important operation and maintenance procedures: Immediately after the wet detention basin is established, the plants on the vegetated shelf and - perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). _ No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. _ If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as possible. At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to remove the gully, plant ground pond erosive gullies have cover and water until it is established. Provide lime and a one- formed. time fertilizer application. The inlet pipe is clogged (if applicable). Unclog the pipe. Dispose of the sediment off-site. The inlet pipe is cracked The inlet device or otherwise damaged (if Repair or replace the pipe. applicable). Erosion is occurring in the Regrade the swale if necessary and provide erosion control swale (if applicable). devices such as reinforced turf matting or riprap to avoid future problems with erosion. Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design depth for sediment where it will not cause impacts to streams or the SCM. The forebay storage. Erosion has occurred, Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has accumulated to a depth Search for the source of the sediment and remedy the problem greater than the original if possible. Remove the sediment and dispose of it in a location design sediment storage where it will not cause impacts to streams or the SCM. depth. The main treatment area Algal growth covers over Consult a professional to remove and control the algal growth. 50% of the area. Cattails, phragmites or other invasive plants cover Remove the plants by wiping them with pesticide (do not spray). 50% of the basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. The vegetated shelf Determine the source of the problem: soils, hydrology, disease, Plants are dead, diseased etc. Remedy the problem and replace plants. Provide a one- or dying. time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Shrubs have started to Remove shrubs immediately. grow on the embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers and beaver activity is present. repair any holes or erosion. The embankment A tree has started to grow Consult a dam safety specialist to remove the tree. on the embankment. An annual inspection by an appropriate professional shows that Make all needed repairs immediately. the embankment needs repair. Clogging has occurred. Clean out the outlet device and dispose of any sediment in a gg g location where it will not cause impacts to streams or the SCM. The outlet device The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer trees Remove the weeds or trees. are growing on the mat. Floating wetland island (if applicable) The anchor cable is damaged, disconnected or Restore the anchor cable to its design state. missing. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs of damage have occurred at Repair the damage and improve the flow dissipation structure. the outlet. The receiving water Discharges from the wet pond are causing erosion or sedimentation in the Contact the local NCDEQ Regional Office. receiving water. Wet Detention Pond Design Summary Wet Pond Diagram WET POND ID FOREBAY MAIN POND 1 Permanent Pool El. 207 Permanent Pool El. 207 Temporary Pool El: _ 208.14 Temporary Pool El: 208.14 Pretreatment other No Clean Out Depth: 6 Clean Out Depth: 4 than forebay? Sediment Removal El 201 Sediment Removal El 203 Has Veg. Filter? No Bottom Elevation: 199 Bottom Elevation: 202 ATTACH ADDITIONAL SHEETS IF NECESSARY SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Middlesex Shell#1 2 Project Area(ac) 9.89 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 50 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond 1 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: J.Michael Stocks,PE President 28 Organization: Stocks Engineering,PA 29 Street address: 801 E.Washington Street 30 City,State,Zip: Nashville,NC 27856 31 Phone number(s): (252)459-8196 32 Email: mstocks@stocksengineering.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer 11111ttf0f,%I 2o,oFESS 4;.• 111( :11.1•00 gr)C4--S -9 ; � Sign lure of Designer ` °' SEAL i vs 19843 .. . • OlyAEL•5���•%% c r r Z L t,��ft3ljAt1111, Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 5 Is all/part of this project subject to previous rule versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM Wet Pond 5 Total drainage area (sq ft) 430808 6 Onsite drainage area (sq ft) 430808 7 Offsite drainage area (sq ft) 0 8 Total BUA in project (sq ft) 255173 sf 9 New BUA on subdivided lots (subject to permitting) (sq ft) NA 10 New BUA not on subdivided lots (subject to permitting) (sf) NA 11 Offsite BUA (sq ft) NA 12 Breakdown of new BUA not on subdivided lots: - Parking (sq ft) 132637 sf - Sidewalk (sq ft) - Roof (sq ft) 122500 sf - Roadway (sq ft) - Future (sq ft) - Other, please specify in the comment box below (sq ft) 13 New infiltrating permeable pavement on subdivided lots (sq ft) 14 New infiltrating permeable pavement not on subdivided lots (sq ft) 15 Existing BUA that will remain (not subject to permitting) (sq ft) 16 Existing BUA that is already permitted (sq ft) 17 Existing BUA that will be removed (sq ft) 18 Percent BUA 19 Design storm (inches) 1.0 in 20 Design volume of SCM (cu ft) 20940 cf 21 Calculation method for design volume Equation 2 ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND 1 Drainage area number 1 2 Minimum required treatment volume (cu ft) 20940 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM (H:V)? 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered I side slopes? No 7 Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC (8)? Yes 12 Does the drainage easement comply with General MDC (9)? N/A 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? N/A 14 Is there an O&M Agreement that complies with General MDC (11)? Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM designed by an NC licensed professional? Yes WET POND MDC FROM 02H .1053 18 Sizing method used SA/DA 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment removal) (fmsl) 202.00 21 Elevation of the main pool bottom (top of sediment removal) (fmsl) 203.00 22 Elevation of the bottom of the vegetated shelf (fmsl) 206.00 23 Elevation of the permanent pool (fmsl) 207.00 24 Elevation of the top of the vegetated shelf (fmsl) 207.00 25 Elevation of the temporary pool (fmsl) 208.14 26 Surface area of the main permanent pool (square feet) 17268 27 Volume of the main permanent pool (cubic feet) 48906 cf 28 Average depth of the main pool (feet) 3.80 ft 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) 31 If using equation 3, width of submerged veg. shelf (feet) 32 Volume of the forebay (cubic feet) 8109 cf 33 Is this 15-20% of the volume in the main pool? Yes 34 Clean -out depth for forebay (inches) 24 in 35 Design volume of SCM (cu ft) 20940 cf 36 Is the outlet an orifice or a weir? Orifice 37 If orifice, orifice diameter (inches) 3 in 38 If weir, weir height (inches) 39 If weir, weir length (inches) 40 Drawdown time for the temporary pool (days) 2.1 41 Are the inlet(s) and outlet located in a manner that avoids short- circuiting? Yes 42 Are berms or baffles provided to improve the flow path? No 43 Depth of forebay at entrance (inches) 96 in 44 Depth of forebay at exit (inches) 12 in 45 Does water flow out of the forebay in a non -erosive manner? Yes 46 Width of the vegetated shelf (feet) 6 ft 47 Slope of vegetated shelf (H:V) 6:1 48 Does the orifice drawdown from below the top surface of the permanent pool? Yes 49 Does the pond minimize impacts to the receiving channel from the 1- yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that MDC(9) is met.) No 51 Is a trash rack or other device provided to protect the outlet system? Yes 52 Are the dam and embankment planted in non -clumping turf grass? Yes 53 Species of turf that will be used on the dam and embankment Bermuda 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION r 55 Please use this space to provide any additional information about the wet pond(s): Wet Pond 3 10:01 AM 5/10/2022