HomeMy WebLinkAboutSW3220301_Plansheet 7 - Misc. Detail_20220519SEEDING MIXTURE RATE (lb/acre) Tall Fescue 80 Sericea Lespedeza 20 Kobe Lespedeza 10 SEEDING NOTES After Aug. 15 use unscarified sericea seed. Where periodic mowing is planned or a neat appearance is desired, omit sericea and increase Kobe lespedezo to 40 Iblacre. To extend spring seeding dates into June, add 15 Iblacre hulled Bermudagrass. However, after mid —Apr. it is preferable to seed temporary cover. NURSE PLANTS Between May 1 and Aug. 15, add 10 lb/acre German millet or 15 Iblacre Sudongross. Prior to May I or after Aug. 15 add 40 Iblocre rye (grain). SEEDING DATES Best Possible Falk Aug. 25 Sept. 15 Aug. 20 — Oct. 25 Late Win ter. Feb. 15 Mar. 21 Feb. 1 — Apr. 15 Fall is best for tall fescue and late winter for lespedezos. Overseeding of Kobe lespedeza over fall —seeded tall fescue is very effective. SOIL AMENDMENTS Apply lime and fertilizer according to soil tests, or apply 4,000 Iblocre around agricultural limestone and 1,000 Iblacre 10-10-10 fert&lzer. MULCH Apply 4,000 Iblocre grain straw or equivalent cover of another suitable mulch. Anchor straw by tacking with asphalt, netting, or roving or by crimping with a mulch anchoring tool. A disc with blades set nearly straight con by used as a mulch anchoring tool. MAINTENANCE Refertilize in the second year unless growth is fully adequate. May be mowed once or twice a year, but mowing is not necessary. Reseed, fertilize, and mulch damaged areas immediately. Reference: Table 6.11 / from NC Erosion and Sediment Control Planning and Design Manual, 1988. SEEDING MIXTURE RATE (I/acre} Species 200 (4_511, 000ft 2) Tall Fescue NURSE PLANTS Between May 1 and Aug. 15, add 10 Iblacre Sudangrass or 10 Iblacre German millet. Prior to May 1 or after Aug. 15 add 40 lblGcre rye (grain). SEEDING DATES Best: August 25 — October Possible: February — April 15 Avoid seeding from Nov. to Jan. If seeding must be done at this time, add 401blacre rye grain and use a channel lining that offers maximum protection. SOIL AMENDMENTS Apply lime and fertilizer according to soil tests, or apply 4,000 Iblacre ground agricultural limestone and 1,000 lb/acre 10-10-10 fertilizer. Operate tillage equipment across the waterway, MULCH Use jute, excelsior matting, or other effective channel lining material to cover the bottom of channels and ditches, and staple securely. The lining should extend above the highest calculated depth of flow. On channel side slopes above this height, and in drainages not requiring temporary linings, apply 4,000 lb/'acre grain straw and anchor straw by stapling netting over the top. Mulch and anchoring materials must not be allowed to wash down slopes where they con clog drainage devices. MAINTENANCE Inspect and repair mulch frequently. Refertilize in late winter of the following year, use soil tests or apply 150 Iblocre 10-10-10. Mow reqularly to a height of 2-4 inches. Refer to Appendix 8.02 for botanical names. Natural ground M Wire fence Cross-section View Filter Steel fabric Backfill trench Natural post and compact ground horoughly 0 t 4" #a min o upslope 24" 87 min Maintenance Inspect sediment fences at least once a week and after each rainfall. Make any required repair-, immediately. Should the fabric of ®a sediment fence collapse, tear, decompose or become ineffective, replace it promptly. Remove sediment deposits as necessary to provide adequate storage volume for the next in and to reduce pressure on the fence. Take care to avoid underminin" the ienec durino clearrout, 0 0 Remove all fencing materials and unstable sediment deposits and brin- the area to grade and stabilize it after the contributing drainage area has been properly stabilized. MA I ram & q 19ff= M. N, I "M MIAMI Z aENERAL__N=: 1 . SEDIMENT FILTER OUTLET HARDWARE CLOTH SHALL BE 24" HIGH AND STONE SHALL BE A MINIMUM OF 12" HIGH, 2. HARDWARE CLOTH SHALL BE ANCHORED TO THE STEEL POSTS SECURELY USING APPROPRIATE ANCHORS. HARDWARE CLOTH SHALL BE KEYED IN A MINIMUM OF 12 INCHES IN LENGTH AND BACKIFILLED PROPERLY AS SHOWN IN ABOVE DETAIL, HARDWARE CLOTH TO BE SAME AS STD, #3009 (19 GAUGE, 1/4- SPACING). 3. POSTS SHALL BE NO MORE THAN 4 FEET APART. 4SITE OUTLETS AT LOW AREAS IN CONJUNCTION WITH AND ALONG LONG RUNS OF SILT FENCE AT INTERVALS NO CLOSER THAN 100 FEET, DRAINAGE AREA TO OUTLETS SHALL NOT EXCEED 1/4 ACRE. 5, EQUIVALENT ALTERNATIVES MAY BE USED WITH PRIOR CITY APPROVAL. REF. NCDOT STD. 1607.01 STEEL POST HARDWARE CLOTH WASHED STONE (NCDOT #5 OR #57) � SLOW 1VAjNjENAqQf__N0ES: 1. FILTER OUTLETS SHALL BE INSPECTED BY THE FINANCIALLY RESPONSIBLE PARTY OR HIS AGENT IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY DURING PROLONGED RAINFALL. ANY REPAIRS NEEDED SHALL BE MADE IMMEDIATELY. 2. THE STONE SHALL BE REPLACED PROMPTLY AFTER ANY EVENT THAT HAS CLOGGED OR REMOVED IT, 3. SEDIMENT DEPOSITS SHOULD BE REMOVED WHEN DEPOSITS REACH HALF THE HEIGHT OF THE BARRIER, ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE OUTLET IS REMOVED SHALL BE DRESSED TO CONFORM TO THE EXISTING GRADE, PREPARED AND SEEDED, AM.5- I 1. PROVIDE TURNING RADIUS SUFFICIENT TO ACCOMMODATE LARGE TRUCKS. 2. LOCATE ENTRANCES TO PROVIDE FOR UTILIZATION BY ALL CONSTRUCTION VEHICLES. 3. MUST BE MAINTAINED! IN A CONOITION �'IIIHICH WILL PREVENT TRACKTNG OR DIRECT FLOI MUD ONTO STREETS. PERIODIC TOPDRESSING WITH STONEWILL BE NECESSARY. 4, ANY MATERIAL TRACKED ONTO THE ROADWAY MUST BE CLEANED UP IMMEDIATELY. 5. LOCATE GRAVEL CONSTRUCTION ENTRANCE AT ALL POINTS OF ,.,yy UNTIL SITE IS STABILIZED. PROVIDE FREOUENT CHECKS OF THE DEVICE ANDTIMELYMAINTENANCE. 6. NUMBER ANDLOCATION OF CONSTRUCTION ENTRANCES TO BE DETERMINED BY THE ENGINEER. 71, USE CLASSW STONEOR OTHER COARSE AGGREGA'TEAPPROVED BY THE ENGINEER. 8. INSTALLCONSTRUCTION ENTRANCES IN ANI TO PREVENT VEHICLES FROI.tBYPASSINGCONSTRUCTIONENTRANCE LEAVINOPROJECT SITE. V MIN. k-w.—.1 4'#SWASHED STONE LAYER OF FILTER FABRIC SECTION B-13 ISOMETRIC VIEVI 2` (MAX 2' DOPE STAKEPSNATURAL GROUND MATTING 2' DOWNSLOPE CROSS SECTION STAKE VEE DITCH 2 IN. 2' UPSLOPE STAKE NATURAL GROUND X, MATTING 2' DO SLOPE CROSS SECTION STAKE TRAPEZOIDAL DITCH, NOTES: 1, CLASS OR MEDIAN SIZE OF RIPRAP AND LENGTH, WIDTH AND DEPTH OF APRON PER R IPRAP APRON DATA BLOCK SHOWN BELOW. 2. REFER TO THE N.C. EROSION CONTROL MANUAL FOR RIP RAP APRON DESIGN STANDARDS. 3. RIPRAP SHOULD EXTEND UP BOTH SIDES OF THE APRON AND AROUND THE END OF THE PIPE OR CULVERT AT THE DISCHARGE OUTLET AT A MAXIMUM SLOPE OF 2:1 AND A HEIGHT NOT LESS THAN TWO THIRDS THE PIPE DIAMETER OR CULVERT HEIGHT. 4. THERE SHALL BE NO OVERFLOW FROM THE END OF THE APRON TOTHE SURFACE OF THE RECEIVING CHANNEL, THE AREA TO BE PAVED OR RIPRAPPED SHALL BE UNDERCUT SO THAT THE INVERT OF THE APRON SHALL BE AT THE SAME GRADE (FLUSH) WITH THE SURFACE OF THE RECEIVING CHANNEL. THE APRON SHALL HAVE A CUTOFF OR TOE WALL AT THE DOWNSTREAM END. 5. THE WIDTH OF THE END OF THE APRON SHALL BE EQUAL TO THE BOTTOM WIDTH OF THE RECEIVING CHANNEL. MAXIMUM TAPER TO RECEIVING CHANNEL 5:1 6. ALL SUBGRADE FOR STRUCTURE TO BE COMPACTED TO 950/6 OR GREATER, 7. THE PLACING OF FILL, EITHER LOOSE OR COMPACTED IN THE RECEIVING CHANNEL SHALL NOT BE ALLOWED, 8. NO BENDS OR CURVES IN THE HORIZONTAL ALIGNMENT OF THE APRON WILL BE PERMITTED, 11 *�Wxuw= 1 I I 1111110 ms I I MENImm rMmnmm COIR FIBER WATTLE DETAILNTS JI�IM NOTES: USE MINIUUM12 IN. DIAMETER BOIS FIBER (COCONUT FIBER) WATTLE. USE 2 FT. WOODEN STAKES WITH A 2 IN. BY 2 IN. NOMINAL CROSS SECTION. ONLY INSTALL WATTLE(S) TO A HEIGHT IN DITCH 80 FLOW WILL NOT WASH AROUND WATTLE AND SCOUR DITCH SLOPES AND AS DIRECTED. INSTALL A MINIMUM OF 2 UPSLOPE STAKES AND 4 DOWNSLOPE STAKES AT AN ANGLE TO WEDGE WATTLE TO BOTTOM OF DITCH. PROVIDE STAPLES MADE OF 0.125 IN. DIAMETER STEEL WIRE FORMED INTO A U SHAPE NOT LESS THAN 112" IN LENGTH. INSTALL STAPLES APPROXIMATELY EVERY I LINEAR FOOT ON BOTH SIDES OF WATTLE AND AT EACH END TO SECURE IT TO THE SOIL. INSTALL MATTING IN ACCORDANCE WITH SECTION 1631 OF THE STANDARD SPECIFICATIONS, STAPLES STAKES # INSET A INSET B