No preview available
HomeMy WebLinkAbout20181259 Ver 3_2022_05_18 Rivercross SMP Report_20220519STORMWATER MANAGEMENT PLAN REPORT FOR RIvE RCROSS Catawba Springs, Lincoln County, NC AMH Rivercross Development TRS, LLC 16905 Northcross Drive, Suite 200 Huntersville, NC 28078 Date: 12.20.18 Revised: 05.18.22 URBAN DESIGN PARTNERS UDP Project No: 18-001 Calculations By: udp .,,-�H CARO',f L �O¢QF S51p ` 9 ., q D. t S°!0', 05.18.2022 SolL MAP 3 Hydrologic Soil Group—Lincoln County, North Carolina 3 (SCM Drainage Boundary Soil Map) 4 0 81 W 493e00 4691C 53olI0m 91:01LD 50B200 5003C0 35" 34'N I- .. _ w1r+. aais-C-.:. 3�28'4'N { 1 • / )4/ — LdB2 �' ti. r _ _...-. PeC2 , A LdB2 - PeC2 ; ' PeC2 . ..- ) PeC2 tit. :r • • _ Jesse pa,;---- r x 1� �` pi ":Clll. lH4lc-A...':'iI i?WC*ik:6 M,EBOA Mil fabP w.0 c111C3„ ._. ... r w 35.2734'N I Y 35.2734'N 493110 49-4300 MOM 50010E 50020E 3 3 0 hip Sale:1:4,460 t prim cn A pertrad(&5"x 11")dieet M N Metersf° Q 30 1C0 20D MO $ Few Q 2'b 4� 8a3 72rX1 I�P Prr:Web hl�ramr Gorr�er ooadra[es vYC84 tics:UM Zane 17N vYC84 tisrm Natural Resources Web Soil Survey r Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Lincoln County, North Carolina (SCM Drainage Boundary Soil Map) MAP LEGEND MAP INFORMATION Area of Interest (AOl) Area of Interest (AOl) Soils Soil Rating Polygons 0 A 0 ND 0 0 BID 0 C CID 0 D 0 Not rated or not available Soil Rating Lines • A r • ND ,.y B/D 0 C ▪ CID • D O Not rated or not available Water Features Streams and Canals Transportation }-1-4- Rails ans. Interstate Highways US Routes Major Roads Local Roads Background I. Aerial Photography The soil surveys that comprise your A01 were mapped at 1:24,000. Waming: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. B This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. . r C . • CID . ,. D . w Not rated or not available Soil Rating Points A The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background G A/D imagery displayed on these maps. As a result, some minor • B shifting of map unit boundaries may be evident. • BID Soil Survey Area: Lincoln County, North Carolina Survey Area Data: Version 22, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 8, 2015 Nov 28, 2017 USDA Natural Resources Conservation Service Web Soil Survey National Cooperative Soil Survey Hydrologic Soil Group —Lincoln County, North Carolina SCM Drainage Boundary Soil Map Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOl CeB2 Cecil sandy clay loam, 2 to 8 percent slopes, moderately eroded B 32.2 61.8% LdB2 Lloyd sandy clay loam, 2 to 8 percent slopes, moderately eroded B 5.2 10_0% PeC2 Pacolet sandy clay loam, 8 to 15 percent slopes, moderately eroded B 14.7 28.3% Totals for Area of Interest 521 100.0% (JSi)A Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey Hydrologic Soil Group —Lincoln County, North Carolina SCM Drainage Boundary Soil Map Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (ND, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, BID, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff. None Specified Tie -break Rule: Higher iisnm Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey STORM DRAINAGE PIPE CALCULATIONS Rivercross JOB NO.: 18-001 BY: udp DATE: 06.01.18 P.M.: Ibr REVISED: 08.03.20 Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 Storm Drainage Design Data STRUCTURE I❑ DRAINAGE AREA RUNOFF C i _ PIPE _ 512E (Inches) VELOCITY ACTUAL INVERT ELEV. UPSTREAM I DOWNSTREAM INV INV OUT IN COVER UPSTREAM PIPE MATERIAL UPSTREAM UPSTREAM DOWNSTREAM (acres) Qinlet (Cis) Qpipe (cfs) n SLOPE LENGTH (%) (ft) CAPACITY VEL. (fps) RIM ELEVATION COVER DEPTH (FROM) (TO) (cfsy SD200 - PIPE NETWORK CB-220 CB-201 0.17 0.80 6.29 0.9 11.1 0.013 1.15% 39 18 11.30 7.73 762.25 761.80 769.43 5.47 RCP III CB-202 CB-201 0.11 0.80 6.29 0.6 9.2 0.013 3.45% 148 15 12.04 11.18 768.50 763.40 776.10 6.17 RCP III 06-201 FES-200 0.15 0.80 629 0.7 21.0 0.013 0.96% 31 24 22.27 8.51 761.30 761.00 769.43 5.88 I RCP III OCS-2002 JB-2001 0.00 0.80 6.29 0.0 18.8 0.013 0.76% 33 24 19.83 7.58 758.00 757.75 765.00 4.75 RCP III RCP III JB-2001 FES-2000 0.00 0.80 6.29 0.0 18.8 0.013 0.97% 77 24 22.35 8.25 757.75 757.00 766.00 6.00 ISD300 - PIPE NETWORK 01-302 DI-301 0.12 0.80 6.29 0.6 34.8 0.013 0.82% 184 30 37.13 9.08 750.00 748.50 767.50 14.75 HOPE DI-301 FES-300 0.16 0.80 6.29 0.8 35.6 0.013 0.82% i 61 30 37.14 9.16 748.50 748.00 765.25 14.00 HOPE 1 0.00 0.80 6.29 27.9 0.013 30 RCP OCS-3001 . HW-3000 1 0.0 0.64% 39 32.96 7.79 745.00 744.75 752.50 4.71 5D400 - PIPE NETWORK CB-451B CB-451A 0.24 0.70 6.29 1.1 1.1 0.013 0.59% 34 15 4.97 3.08 747.40 747.20 751.00 2.16 RCPV CB-451A 'I CB-451 0.09 0.08 0.25 0.70 6.29 1 0.4 1.5 0.013 0.57% 141 15 4.89 3.38 747.20 748.40 750.85 2.21 RCP V i 0.90 2.3 0.013 0.013 RCP Ili RCP Ili RCP III RCP III RCP Ill RCP III RCP III 00-452 I 00-451 629 I 0.4 0.74% 34 18 9.03 4.14 I 750.00 749.75 755.19 3A8 06-451 HW-450 0.90 6.29 1.4 5.2 0.71 % 21 18 8.85 5.16 746.15 746.00 755.14 7.28 I OCS-4501 FES-4500 0.00 0.70 6.29 0.0 11.7 0.013 1.00% 50 24 22.72 7.23 743.00 742.50 749.10 3.85 I 08-405 08-404 0.12 0.95 6.29 0.7 10.4 0.013 1.00% 40 18 10.54 7.22 760.20 759.80 765.55 3.64 00-404 I JB-401 0.06 0.95 6.29 1 0.3 10.7 0.013 2.95% I 51 18 18.10 10.55 755.00 753.50 1 765.60 8.89 09-403 CB-402 0.15 0.80 6.29 I 0.8 0.8 1 0.013 0.79% 38 15 5.76 2.82 760.30 780.00 764.23 2.49 06-402 JB-401 0.06 0.95 6.29 0.3 8.7 0.013 8.90% 51 15 19.33 14.49 758.00 753.50 764.14 4.70 JB-401 I FES-400 0.00 0.95 629 I 0.0 19.4 0.013 1.69% I 12 24 29.51 1024 753.20 753.00 759.00 3.55 RCP III 005-4001 I FES-4000 0.00 0.95 6.29 I 0.0 5.2 0.013 1.44% I 104 18 12.62 6.57 749.50 748.00 756.50 5.29 RCP III Rivercross JOB NO.: DATE: REVISED: 18-001 06.01.18 08.03.20 BY: udp P.M.: Ibr Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 Storm Drainage Design Data STRUCTURE I❑ DRAINAGE AREA RUNOFF C 1 I PIPE VELOCITY ACTUAL INVERT UPSTREAM INV ELEV. I DOWNSTREAM INV IN COVER UPSTREAM PIPE MATERIAL UPSTREAM UPSTREAM DOWNSTREAM Q inlet Q pipe n SLOPE LENGTH (%) ((t) 512E (Inches) CAPACITY VEL. RIM ELEVATION COVER DEPTH (FROM) (TO) (acres) I (Cfs} (cfs) (c sy (Vs) OUT SO600 - PIPE NETWORK CB-653 FS-652 0.14 0.80 6.29 0.7 28.2 0.013 0.55% 36 30 30.54 7.47 734.20 734.00 744.63 7.64 RCP III FS-652 JB-651 0.00 0.70 6.29 0.0 28.2 0.013 3.22% 72 30 73.75 13.37 733.50 731.20 743.00 6.75 HDPE JB-651 HW-650 0.00 0.70 6.29 0.0 29.2 0.013 0.91% 11 30 39.28 8.96 731.20 731.10 736.50 2.55 I HDPE FS-#h9 ST-6 - 0.70 6.29 0.0 7.6 0.013 0.54% 15 18 7.73 5.25 734.00 733.92 743.00 7.33 I HDPE ST-6 BF-6 - 0.70 6.29 0.0 1.0 0.013 2.33% 5 12 5.45 4.72 I 734.25 734.13 743.00 7.65 HDPE BF-6 JB-651 - 0.70 6.29 0.0 1.0 0.013 1.0096 10 12 3.57 3.68 731.30 731.20 740.00 7.60 I HDPE JB-604 FS-603 0.00 0.70 6.29 0.0 8.1 0.013 0.76% 52 18 9.21 6.15 749.00 748.60 755.65 4.98 HDPE FS-603 JB-602 0.00 0.70 0.70 6.29 0.0 8.1 0.013 0.013 1.67% 15 18 13.60 7.93 1 748.00 747.75 754.50 4.83 HDPE I HDPE JB-602 JB-601 0.00 6.29 0.0 8.1 2.0796 68 18 15.15 8.57 747.75 746.35 754.50 5.08 JB-601 I-IW-600 0.00 0.70 6.29I 0.0 8.1 0.013 1.3196 11 18 12.06 7.44 746.15 746.00 750.50 2.68 HDPE I 00-603B T CO-603A 0.18 0.95 6.29T 1.1 1.1 0.013 2.45%T 98 8 1.90 5.60 752.50 750.10 755.10 1.69 HDPE CO-603A BF-5 0.05 0.95 6.29 0.3 1.4 0.013 1.4796 50 8 1.47 5.04 749.90 749.17 751.81 1.20 I HDPE FS-603 ST-5 - 0.70 6.29 0.0 2.1 0.013 0.73% 8 12 3.05 4.23 748.60 748.54 754.50 4.73 I RCP III ST-5 BF-5 - 0.70 6.29 0.0 1.0 0.013 1.13% 9 12 3.80 3.92 I 747.60 747.50 754.00 5.30 HDPE BF-5 JB-601 - 0 0.70 6.29 0.0 1.0 0.013 0.57% 26 8 0.91 3.14 746.50 746.35 752.00 4.79 HDPE Rivercross Urban Design Partners 1213 West Morehead St Suite 450 Charlotte, NC 28208 JOB NO.: 18-DD1 BY: udp DATE: 05.30.19 P.M.: BDS REVISED: 5/18/22 Storm Drainage Design Data STRUCTURE ID DRAINAGE RUNOFF PIPE VELOCITY INVERT ELEV. COVER AREA REO'❑ ACTUAL UPSTREAM DOWNSTREAM UPSTREAM UPSTREAM UPSTREAM DOWNSTREAM C I 0 inlet 0 pipe n SLOPE LENGTH SIZE SIZE CAPAC[IY VEL. INV INV RIM COVER PIPE (FROM) (TO) (acres) (cfs) (cfs) (%) (ft) (inches) (inches) (cfs) (fps) OUT IN ELEVATION DEPTH MATERIAL SD700 - PIPE NETWORK DCB-742 DCB-741 0.26 0.95 6.29 1.5 1.5 0.013 0.54% 28 9.8 15 4.74 3.28 753.10 752.95 756.37 1.84 RCPV DCB-741 CB-740 0.15 0.95 629 0.9 2.4 0.013 0.58% 38 11.5 15 4.91 3.84 752.95 752.73 756.37 1.99 RCPV CB-740 CB-701 0.31 0.95 6.29 1.8 4.2 0.013 0.60% 38 14.1 15 5.02 4.75 752.73 752.50 756.97 2.80 RCP V CB-703 CB-702 0.02 0.95 6.29 0.1 25.3 0.013 3.07% 65 20.3 24 39.72 13.40 755.50 753.50 763.95 6.20 RCP III CB-702 CB-701 0.04 0.95 629 0.2 25.5 0.013 2.97% 45 20.4 24 39.07 13.56 753.5D 752.15 760.00 4.25 RCP III CB-701 FS-700 0.03 0.95 6.29 0.2 29.9 0.013 1.01% 15 26.5 30 41.40 9.45 751.65 751.50 757.88 3.44 RCP III FS-700 JB-7002 0.00 0.95 6.29 0.0 29.9 0.013 4.80% 31 19.8 30 90.09 15.6D 751.DD 749.50 758.25 4.46 RCP III JB-7002 JB-7001 0.00 0.95 6.29 0.0 30.9 0.013 0.73% 68 28.6 30 35.15 8.45 749.50 749.00 759.50 7.21 RCP III JB-7001 HW-7000 0.00 0.95 6.29 0.0 30.9 0.013 0.57% 21 29.9 36 50.70 7.6D 749.DD 748.88 759.25 6.92 RCP III CB-702 BF-8 - 0.85 6.29 0.0 3.0 0.013 9.76% 23 7.3 8 3.79 12.36 753.5D 751.27 760.00 5.79 HDPE FS-700 JB-7003 - 0.85 6.29 0.0 7.2 0.013 0.62% 8 17.1 18 8.30 5.54 751.50 751.45 758.25 5.04 RCP III JB-7003 ST-8 - 0.85 6.29 0.0 7.2 0.013 0.61% 24 17.1 18 8.26 5.51 751.45 751.30 758.75 5.63 HDPE ST-8 BF-8 - 0.85 6.29 0.0 1.0 0.013 0.71% 6 7.9 12 3.02 3.27 751.24 751.20 761100 7.66 HDPE BF-8 JB-7002 - 0.85 8.29 0.0 1.0 0.013 0.74% 14 7.9 12 3.07 3.33 749.60 749.50 760.00 9.30 HDPE SD800 - PIPE NETWORK JB-803 DI-802 0.15 0.80 6.29 0.8 40.6 0.013 0.59% 119 33.0 38 51.23 8.26 739.5D 738.8D 748.50 5.67 RCP III DI-802 FES-801 0.00 0.80 6.29 0.0 41.5 0.013 0.58% 34 33.3 36 51.04 8.38 738.80 738.60 745.58 3.53 HDPE Y1-851 DI-802 0.09 0.80 6.29 0.5 0.9 0.013 0.94% 53 7.2 8 1.17 3.77 741.50 741.00 744.50 2.29 HDPE OCS-801 FES-800 0.00 0.85 6.29 0.0 48.9 0.013 0.50% 4-4 36.0 36 47.21 8.08 736.00 735.78 743.50 4.25 HDPE AMENITY PIPE NETWORK YI-856 YI-855 0.03 0.80 6.29 0.1 0.3 0.013 4.29% 35 3.B 8 2.51 4.31 744.5C 743.D�: 749.50 4.29 -: PE YI-855 ST7 0.08 0.80 6.29 0.4 0.7 0.013 100% 0 2.8 8 12.12 15.97 743.00 742.93 749.50 5.79 HDPE Rivercross JOB NO.: 18-001 BY: udp DATE: 05.30.19 P.M.: Ibr REVISED: 08.03.20 Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 Storm Drainage Design Data STRUCTURE I❑ DRAINAGE AREA RUNOFF C 1 _ PIPE _ 512E (Inches) VELOCITY ACTUAL INVERT ELEV. UPSTREAM I DOWNSTREAM INV INV OUT IN COVER UPSTREAM PIPE MATERIAL UPSTREAM UPSTREAM DOWNSTREAM (acres) [inlet (Cis) Qpipe (cfs) n SLOPE LENGTH (%) (ft) CAPACITY VEL. (fps) RIM ELEVATION COVER DEPTH (FROM) (TO) (cfsy S0900 - PIPE NETWORK CB-902 CB-901 0.06 0.80 6.29 0.3 48.6 0.013 2.17% 58 30 60.54 14.31 740.00 738.75 751.55 8.76 RCP 111 C8-901 CB-900 0.04 0.80 6.29 0.2 48.8 0.013 2.23% 56 30 61.36 14.25 738.75 737.50 749.00 7.46 RCP III CB-900 FS-9001 0.21 0.80 6.29 1.0 49.8 0.013 2.90% 35 30 69.99 15.97 734.00 733.00 747.93 11.14 I RCP III FS-9001 HW-9000 0.21 0.80 6.29 1.0 50.9 0.013 1.02% 25 36 67.49 10.88 730.25 730.00 739.50 5.92 RCP III I FS-9001 ST-9 0.00 0.80 6.29 0.0 11.1 0.013 0.013 0.013 4.92% 10 18 23.37 12.69 730.50 730.00 739.50 7.29 RCP 111 HOPE HDPF ST-9 BF-9 0.00 0.80 6.29 0.0 1.0 0.7296 8 12 3.02 3.27 729.36 729.30 739.00 8.54 BF-9 I HW-9002 0.00 0.80 6.29 . 0.0 1.0 0.5596 ' 9 12 2.65 3.00 728.00 727.95 736.50 7.40 RIPRAP CALCULATIONS Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 0::::11. 1,: j outlet w • Do + Laf I diameter(Do) r w ter � 0.5Dp �I-� � a .I � p' �� La —01 iiiWilik Ntk.%1(\ 7q ":"": - E + .. 'Ie.:. .., ' :::',14 ' a 4._ ergs"a ' . i 1. , A t�\ _ ir�u ii ��+rr+ill iJJJI..._0 4 0'-. ..::::.: 3, HI . : Inifillil:..:.. . .,\,<<:f_/. . :grad• _ .„:1 11111 N 1 U ::11 1111 7 i-. . jI.i!!Ijc - e s-- : i1 i^.i..?Q (III .. ..I ._..... . ■ 1 11111 ►21�./I1� 43 , 1 I 1 I 1)I I OrAlf:401 Pro t 1:4.. i' S .. ... .. .. . .. .. .. .,; ill:,, - Y iarefAir '�� N ii 1 ._. 4 1 ',• r•213 *AdiraIPPAI •a-regillaillOr . _ • 1 v = 1s vertu •. .!Tfl 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter), FES-200: Q = 21.0 cfs da = 24" = 2' 3d, = 6' La = 13' w = 15' v = 8.5fps Rev.1213 d,„ = 0.6' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 0 :---...T. j Outlet w . Do + f I diameter(Do) I : 1-a w ter 0.5Dp �� . . a I. pØ44, . ...,,,, ,,,,, 7, _:_,,,,: _ E . • ... . .. . ./, ..,__. ,,,..„„cp6o _ ,._ .... ..,,..., . . , . I . i „ 40,. . A i, .• ergs"a 1 1. r• r� aps •j t�'� _ ir�u �0 �+rill..-� . . ..::::.: -. 4 r ..... e 0 0 Ad., Ado.a Am.l 1 I1.Ikll. .1' -.h ,0,,,Ars ek „.. 11,, .:::: .: __:_. 1,1, . 0.....,, _, ,, ,,,,,,,,, liffilquit.,_-_,:: .4_ ,,,064,,...0.,,r, .„:,11111IN I . " MI- t multi on- '�. `. .. .... mint11tl ow. . .. r .. i , .7ifit ~•"� 3 #! .. *13 b!7.:1' .------ . .. , .. fr • ' 4 .ate. or Fes.; .iist ,,\71:roir }v 1v = 15 .. -. ..... tt' •'. s 'Ij M rr W - r 0 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter). FES-2000: Q = 18.3 cfs do = 24" = 2' 3d, = 6' La = 13' w = 15' v = 8.3fps Rev.11'93 d„ = 0.6' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 0 �---...T. j Outlet Y + La 9, 1 i Rine N diameter(Do) r k 4 �' i water c 0.5D0 • ;.1: : _/p k,v...91. 60 • :. .• ..•.c.„.:. . , - Ill . . , 'AV. .1141 i, .• - Ve- 41 ....._._____ --- .,___--_ a 4. , a1!1i 'i l.. - .P- a 0 • . 411041iir ', - i I I ' - • ■ rill I ,, , • ' ,�0011 it IIp 1 1 111111 - —_±_. :'\ u11I 1'-.i,... i �� ?U ........Ilk ... .. Una�i�__.r_'r li !..._..... ji I I..III 11 . , ., .. 111 3 ii - k . : .p, _ . -'"�',-�� :_ : i IFIIBhII il•' 1 • Y r-� � a 00101F417 Afor-.c.): : c.E4 .;.......... . ... 4. _ _ I . .•,01rir b " ' � - } 1 s r7.__lir.40la-v1411r 1j11•i"t''. v= tti •. I I 0 3 5 10 20 50 100 200 500 1000 Discharge(ft31sec) Curves may riot be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter). FES-300: Q = 35.6 cfs da = 30" = 2.5' 3d, = 7.5' La = 16' w = 18.5' v = 9.2 fps Rev.11'93 d„ = 0.7' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) ::c,::::if �---...T. joutlet • De + La i : •diameter(Do) : 0 La w ter 0.5Dp �I I Ø440 P6 H :. ,!,I'. :. -i-?_ !IIIll a j Gt � 0 I f �.0 rr e r tl� l _ 5 �1 rri I .. :: 41 .. . � e i, a il.lI HII. .1' -00,10 .,„, 3 4 iI 1 ,, , _ ■ i i . ,._, I- - ,of, .a� 1 . .lisp.I. ._. . .:.:. Fima.--. - PP" "..., .- . ,,ii i. ,.. .. ...i i . .41111*,04'.'-' — Atir,:drote. a [ . ._ :.!UIIH dig eL ;'e ,:: 1 .' , a .sue �',. .; .::. : 2 ,,,. ,, ,25 Pirr.. --,'-. \� 1 ... .-.i.-.. , 1 s '. 74-157--.11...-illialffil 1 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). HW-3000: Q = 30.2 cfs da = 30" = 2.5' 3d, = 7.5' La = 16' w = 18.5' v = 8.1 fps ReF.1213 d„ = 0.7' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 1,:c,:::::11. 1------- . j Outlet w • Do + La1 I • diameter(Do) I • r La w ter 0.5Dp �I a I. pØ44, . . A� ergs.% 1 1. r r� aps •i t�'� _ ir�u 1 . 100,:ivr. �1 �+rill I ..::::.: 41 IlIRHU:] ..... -� e 04,,E ,l Am.f I I1IHtoi. .1 . ..... . . ,,,,,,F0 .„, .I■. 1 1 ,, ,. ..1 III!71-. . .: ;9 _ e ,-ly 1^.i..JHHLIHk IIIIII r ` I .. . rol,i orup, ® 3�: .. . r . . _ .. . so ifillirl,". .v HIHIfi , . . i a ,._ .. - :lied 0� - ... ... ...... . d lli • „ = s _ � �� f. 10/04101 1. . , �E; .�imr�■ • v� 10 v = 5 :ram!�� 0 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter), FES-400: Q = 18.5 cfs do = 24" = 2' 3d, = 6' La = 13' w = 15' v = 10 fps Rev.11'93 d,0 = 0.6' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) :::::IT -i---- . . Outlet w . Do + f I diameter(Do) r ii � w ter � 0.5Dp ��-� � --a I �--p' � , ,,. . . A� ill ,.0.1:41,40:1 ' r d Ve. ,c ' 54'':.+,.: ��-. .. +�: ....-...--a � '•J•�i�r. +".1+ . _ 40 , C _ d : � , .� , a1.1! 11Z1 .P a ' . 1 • 1 ,..!' ..� - Tt.- i-: I . I Es, •,•. . didil !. .. ' : OF FiTi eiP ,,11,•,..,- 4 1'7!111, --i. , . -•• .-1-'::::9:,,,,,,--;-;-2--P" . lisp./ ,.._•,.. il_00.4211: , _ . . , 5. .0 .. . . ,,..f.-- .1 L.,... a N 1 mil : ,--., . 4. 3 ' :1T7 .____),--1-"--- 2 '.'' ' .' . .. ,.. ... . Aid" kik" . "- "MO, 1140Er '' N�.�. ': .-. . - - .. ..III _ .. -r'� .. .i +f #!I . b pr . - td. 1 1111 ____, ._ oi /401Pir a. - ' / '-'''' . . . :v:-:20 ...iiipriiirdidillte. ASimpreill..? ' .. .... ... . . -..1, i.,. tr,C) y _ 1_ �1.1 • I [ 0 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter). FES-4000: Q = 3.7 cfs da = 18" = 1.5' 3d, =4.5' La = 11' w = 12.5' v = 5.8fps Rev.11'93 d,„ = 0.3' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 1,:c,:::::11. -i---- . . j Outlet w . De + La i I a I �u-, . - rdimeter(Do) La a . p' r wter 0.5D0 I 4 . . di " . ...,:',10110 • t P� b0 1 I I �.tk - e(4%G ; lili '• jr. Fey' .i .... !:.,.. ':!.:- . : : .! : ' 41 IlIRHU:] ..... _� e"gi Iv,'' aa��r 1 I�IHkII. } . ...P giu 3. MIIflhiiHIIIIUUH... , - �� ��� 20 } „± # �� -± _ .:....: .POflflPig w:i ' �� �' grafrAl 3 -gplil . .. . : .. . . . 1 , „ ..id . , 1 is •: . Y__ ,� 3. " ."1 1 �1... Apr g, . . : . - E ... : ::. . i : , .. . .. .f ... ... i. Aim 2„, „I_ • ,::,_ . . : - : . • , . . _ : ! , : -. : : 1 - -:-: :.:: . 1y.;. Af...ow •,. ...... .. . .frr..r7,.:::::.: : co il : : — - - :v 7-.5 . _ - d rair Aiiir ' py .- ...-. .. .- .... ..7:-: - ii y 16 .1. lagetrill@mi --0°P--iffWall .., y - s I L l ; 3 5 10 20 50 100 200 500 1000 Discharge(tt31sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter). HW-450: Q = 5.2 cfs da = 18" = 1.5' 3d, =4.5' La = 10' w = 11.5' v = 5.2 fps Rev.11'93 d,„ = 0.3' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) /.c!::=IIT j Outlet w . De + 1 I pipe I I N diameter(Do) : r 0 ff ;ler i water 0.5ga :I-:;1 : of ii, Rpt �q _ .: : '. ._' r ilium I ! f s, O N d 0i t'c ��in i 1J ." sr IN.gow } a ' lei ! 1 , 'iiir ,.. j; - a ' . 1 POW r : . ....l , ....,A : 004,0,4 011, „:,.. : !Immo; -,;;,._-• µ �� „Jr , . .- . .. . , , . . ,, .11 i all:: i ...,: pr,4414,,,:if , ,, . -- 1-• - i : .01,7,..5.4 y = 15 _ � v la ., .---'7-e. . .. -. -- .--- - - i - 0 3 5 10 20 50 100 200 500 1000 Discharge(ft3lsec) Curves may riot be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(T„r<0.5 diameter) FES-4500: Q = 13.6 cfs da = 24" = 2' 3d, = 6' La = 13' w = 15' v = 7.5 fps Rev.1213 d„ = 0.6' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 10::::IT �--- T. joutlet w . pe + La ; f i Rine Ndiameter r La Zfri Dili • ' ff f �' iiiriaii water 0.500 . . ,I-:, : -:,_fi4 .e r ...,. . 6 ocs�° 1, 1- r , f or,�`' A 5It i .+..ICI. rr t i lilt I. : : .:. . . '. ' ', rvillif sc-#10- Algil 1011 i. 1111-.1. :. , VI ';, ..„-'0.. . i .. .l ,w.--- F 4? : , 212111:11Hruiti:.:L. .. .-------7-- ' 6 -4"11'-'r . A‘1' ' II. - .tb - ill 4 --1 1 • • . Nil BM 1111111: .I. : '5:',1 0 lir' 1 . . 4 0 ) • • • 0' Atli !. : .. . • : iii111111111•:•}.. ..d' '_-. ..11111.11j1 : : 4 iiiillqink ,._-_1: ,-,-5:40 ,o;Areri.vi • MOM ensemuniowe',- PrAiriv:_,,, -,...., ill ' _ - mi a III sip : , ,, , iffrirlit.:ow 3 . . 111.4.1 it I---- '- 2 • 011.52- --''' Or- ... , .11itrA4,7‘iiiiii - Air:iff.ov'-''-' en -HIV!I :41A• N iis .., •.•• !..I1 . . v �' - ��' 2 [I] _...,040.. A.Ir-iipiiir:4'1.v .4001r.b* Pre . . .::......:'IT.: .Q- . . , .2° *.doilllialrilg011ispili.(005r veto ., . . i ] ..'. • 3 5 10 20 50 100 200 500 1000 Discharge 0ft31sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter) FES-500: Q = 38.3 cfs da = 36" = 3' 3d, = 9' La = 22' w = 25' v = 8.7fps Rev.11'93 d,, = 0.7' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 1,:c,:::::11. :------ . j Outlet w . De + La9:3f I diameter(Do) I • r r La w ter 0.5Dp �I a 'I. Ø44 ergs"a I I. r di aps e •j 4110.1 kl\r"\``‘ 111111M1•,I !:•,.. '.:: I ....;,0950r.,,-d,-,, 1:. :, I ma 1pi 1 �l ± cii s .� �` lIII=rlrniliil N 1 11 II - . ..I..._....: mPOflIflPi II111 . , 3 1 1 truli smiling•IIHI it �/+al'�,~ - _ 1 - I .. ' '�l Illl i!11111111111111 iI1 } /� :: y' 10, ' IP ,. ,p. ,�, _�. -._. . . ��_ ` - 2 v) .47411 .. - .. - . foe. . . . ' O ,,y a_.... pr y'' ;., .. ....}. .: y 5 �. I1� _ Ill . _ 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter), HW-500: Q = 9.1 cfs da = 18" = 1.5' 3d, =4.5' La = 10' w = 11.5' v = 7.8fps ReF.1213 d,„ = 0.55' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 0 �---...T. j Outlet y • Do + La 9, f . : : l diameter(Do) La I : wter 0.5D0 �I I. - �--p' �r . .:. • FAQ k..2,.;k.0 7P -:;'::: -. t + . lig:: . -.....: . :,:ititill • k_i___ err G ' O . A o.. .... . 41 11C • glillE • tl° l _ 5 ro rrl I } . ::: : 41 .... e i, a Of I ■Ikl. 1...Mr. '' died5 . . 0-- to r,,,,o:,. .1.� i - iOhii1Ii < .!flIflH V y .r - - .. Ili l f --;.------ - :.i _ °Ill r: ''il .. 1- -I :.:i ! .: . . _ .. -- J ire- of _ ,r I co .;.......... ___.....________-_ _ _ _ _ I y -.is ..dieirOTildPv - b -: - ::"-:-:::- ;: 1: : : ',100110- 400rAtierjA Q j = 15 = _ ' :ui— : 4 : . : . . - 7:117iiiiiiiiiiiiiiiiriiiiiiii '. 41.•'.. 1 . [ ,1 : v ' 5 11.1111.111 I 0 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter}, FES-620: Q = 33.8 cfs da= 24" = 2' 3d, = 6' La = 20' w = 22' v = 13.2 fps Rev.11'93 d„ = 0.95' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) j Outlet w . Do + f I pipe i I N diameter(Do) r ji La mow{ Dili ' , k 4 i water c 0.500 :`: :,_� ilieliti ;14 : d-%111 t-NW'I\ r . ' . '' i: 1 i . I 724..1 Iferl: .. 1:. .40::: : ‘,/j\r‘ . .. Hum i : ::::: . : . - 1 : .•oirovr,r-,;1;-_, . ..1 :: .: : Ho. 1i1 } Ili._ _ . .E'I H 4�, ; 1 PI.O�Oii_•q,Mu4i.1Il•. ;ii. , IIflIuHIIIIUUH ,,,\. _f" wg Ai _ - I . ,... ;000,14.4j , 1 . ... .-•- BM : - • We....ifilierel i • • At•Iii 5 ir . .„,_..._;,,,.-.•,-..r," p7 ,„ . - 114404'.'' :i :, _Ill f .1111111:: 1 : .1...orielp1".. .. : Sa) 1.. ... ......'. { V _2y ..., .._ . .- Q_ .-.-...- - . .. .. d 7•400Pr'. '.. . • 10 �.' . I f . l 0 3 5 10 20 50 100 200 500 1000 Discharge(ft31sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter). HW-650: Q = 29.2 cfs da = 30" = 2.5' 3d, = 7.5' La = 16' w = 18.5' v = 9.0fps Rev.11'93 d„ = 0.7' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 0 �---...T. j Outlet w . Do + f • I diameter(Do) I : La w ter 0.5Dp �` a I. , p' A, otk.0 7P -: :: -'. I- +. . rimy:: . h.oip� . :.:� ,+�., .-. f -I- ! ! ... ;-h,. � 06 \N ',::1 111 y.. . .!:. II 1; INF407 ••• b %.. , OK".r-,;1;- ar s ;04Pi � all.11 !ill'_, ii tll: _ ; H. -4- a 3 } i' : : 401rAgO ' 1IUIuPIiIIUUH . •\d i.F•".- oidritl _ plitii - 1 -. I• {IN: f111 7 ; III“�•_ + !HHHIHL..,., „ , ilififi),1 �.i� 445 ill � - 1-;-'5i/Fil di iff It fri ,'4' .' ,r ' -I -1. — -... ir '.. _'-.- izz' - " frAr...07 ,.. „Of .1/4,. . N, , " u • _ ...__2 v.) . a ._._ . - V p ,N1 -- .. _... .. Lo • ,- = is = _..�.I " ' ' , iiv tti _ .� 0 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe(lowing full,minimum tailwater condition(Tw<0.5 diameter). FES-800: Q = 48.9 cfs do = 36" = 3' 3d, = 9' La = 20' w = 23' v = 8.2 fps Rev.11'93 d„ = 0.75' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 0 �---...T. j Outlet W • Do + La f : l • diameter(Do) I • r La w ter 0.5D0 �` a .14 , 4.' �, del 7o -.. .. _ E . . • 'i d ,-- ip� ,+I., .-: 1~ g ... ; .y am 06 \'‘ ', :Ill:.::' -:.. .'! - II A; INF41:14r/: .. b '''`• ' . , �: �! l I !: , .-?ar a e ar a ,tto • P0.10r. s It ::.:. - . : ,. •..• . : 4 rim 3 is — . . no . • i • . :..;.. . '•,\,N -•••?.'•4'..-. • . 4110411/A .' ' . 0:40 _ 1411 quip, E-..i.:: 4400,114-ige. 1 - • .„IN: .•111 71-II •.... .rial .,,-- toror- . ari r.:. :. . - i : .. ,,.g-.4.'. ' , JI11I1I II i Y_ „ ,� .r IIi • - ,.. 1. ---- .. .. !! Nbir r t o .Io . • • . ._ _ PI ..,,. - . . 2 05 - ::: J ' . Agaell - . .1 ,. . . . . . i . . '' . 1 11 • • • :ffrigle.: ,,, adloript, , I . 4 ffriTiiieb* Y •:-- .400iiirer, . .400efore ' fr ,:.:.1._:.1::'...._::. . it •,,,) a_,III . . . . .v, =.....100.p.. _olio._ inimillillir v = 5 Illitiill II 0 3 5 10 20 50 100 200 500 1000 Discharge(tt31sec) Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). FES-801: Q = 41.5 cfs da = 36" = 3' 3dQ = 9' Le = 20' w = 23' v = 8.2 fps Rev.11'93 d„ = 0.75' 8.06.3 Figure 8.06a: Design of outlet protection from a round pipe flowing full, minimum tailwater condition (Tw<8.5 diameter) 0 �---...T. j Outlet Y + La 9, f : l diameter(Do) I :4/111 La w ter 0.5D0 �` LI I.• , R.Ø44A� kl'\r‘\ : .girli011pillir• -•1.- . .. :: .: : Pirg•Pr. : . .. . 4 634,,IirS 3 } I1 : IIflIuHIIIIUUH .: .�. � 11111 ■ ■ :■11 :.' u it ii µ 55 ,�� I • •.ram_, ..1I; 1I • _ Y14,deft . lijilil rt - •'C', 2 N I ''s -4,0100pr—a"Tillir . 4,17- :. ': : . ...-1 ::::. .' cE.— v7tu ., s . I . . I 3 5 10 20 50 100 200 500 1000 Discharge(t131sec) Curves may riot be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full,minimum tailwater condition(Tw<0.5 diameter). HW-7000: Q = 35.9 cfs do = 36" = 3' 3do = 9' Le = 20' w = 23' v = 7.8fps Rev.11'93 d„ = 0.75' 8.06.3 STORMWATER CONTROL MEASURE CALCULATIONS DRAINAGE BASIN #1 Rivercross JOB NO.: 18-001 DATE: 12.20.18 BY: P.M. Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #1 INTRODUCTION: SUMMARY Drainage basin #1 includes townhome lots 1-13 in Phase 1A, a portion of Waterway Drive and the Duke Power ROW. A pipe network system routes runoff to sand filter dry pond #1 which treats the water quality volume. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 5.76 acres Postdeveloped Drainage Area 5.76 acres SOIL TYPES: (see soils map) Area (ac) Area (%) Soil Type Hydrologic Soil Group 5.76 100% B Total 5.76 100% CURVE NUMBER: Predeveloped CN Cover Type Area (ac) °No CN Wtd. CN Wooded 2.88 50% 55 27.50 Grass 2.88 50% 61 30.50 Total 5.76 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type Area (ac) % CN Wtd. CN Impervious 0.73 13% 98 12.38 Grass 5.03 87% 61 53.30 Total 5.76 65.67 Composite CN Use CN = 66 Rivercross JOB NO.: 18-001 BY: udp DATE: 12.20.18 P.M.. Ibt Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #1 HYDROLOGIC CALCULATIONS Drainage area (DA) Cuve Number (CN) Modified Curve Number (CN) Time of Concentration Impervious Percentage Pre -developed 5.76 ac. 58 n/a 0.33 hr. 0% WATER QUALITY VOLUME (1 ") Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv = 0.05 + .009 (I) Rv= 0.16 in/in WQv = (Design rainfall) (Rv) (Drainage Area) WQv = 1 " rainfall x Rv in/in x 1/12 in/ft x Da = WQv = 0.079 ac-ft 3,421 ft3 0.16 in 75% WQv = 0.059 ac-ft 2,565 ft3 0.123 in MODIFIED CURVE NUMBER CNm= 1000/{10+5P+10WQv-10(WQvA2+1.25WovP)A0.5} P= rainfall, in inches (use1.0 inches) = 1.00 WQv= water quality volume, in inches = 0.12 CNm 82 CHANNEL PROTECTION VOLUME Q= (P-0.2S)A21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall (potential maximum runoff), inches S= potential maximum soil retention, inches = 1000/CN-10 = CN= SCS curve number Q= 0.36 cfs Compute Watershed Runoff CPv= 0.172 ac-ft 7,490 cu. Ft 50% CPv = Channel Protection Volume Release Rate (1yr, 24 hr storm) 1.5 day 36 hour Release= 0.058 cfs Post -developed 5.76 ac 66 82 0.08 hr. 13% 2.58 in 5.15 in 0.086 ac-ft 3,745 cu. Ft Rivercross JOB NO.: 18-001 BY: udp DATE: 12.20.18 P.M.: Ibt Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #1 Existing Impervious Asphalt: 0 sf Buildings: 0 sf Concrete: 0 sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 5.76 Impervious Percentage: 096 Proposed Impervious Asphalt: 14,510 sf Buildings: 15,130 sf Concrete: 2,035 sf Total Impervious Area: 31,675 sf 0.73 ac. Drainage Area: 5.76 Impervious Percentage: 13% Rivercross OB NO.: 18-001 DATE: 12.20.18 REVISED: 08.03.20 BY: udp P.M.: Ibt Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 Sand -Filter Design - Basin #1 Sand Filter Design Requirements Design Method Design Method Detention Time Filter Bed Depth Underdrain System Thickness Hydrologic Calculations Drainage area to pond (Da)= Cuve Number (CN) Adjusted Curve Number (CN) Time of Concentration Impervious Percentage Determine Suface Area to Treat WQv Surface Area based on Darcy's Equation Af= (WQv)(df)/((k)(h+d)(t)) Af= surface area of ponding area (sq ft) WQv= water quality control volume d= filter bed depth k= coefficient of permeability of filter media h= average height of water above filter bed (ft) t= design filter bed drain time (days) Af= 262 sf Determine Dimensions of Sand Bed Length= 26.0 ft Width= 20.3 ft (triangular) Area= 264 sf TSS 2.0 days 2.5 ft 1.0 ft Pre -developed 5.76 ac. 58 n/a 0.33 hr. 0% 2,565 cf 2.5 ft 3.5 ft/day 1ft 2.00 day Post -developed 5.76 ac 66 82 0.08 hr. 13% 24" max for WQ storm event Rivercross JOB NO.: 18-001 BY: udp DATE: 12.20.18 P.M.: Ibt REVISED: 08.03.20 Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 SandFilter Design - Basin #1 Stage/Storage Table Elevation (msl) Area Volume Forebay (sf Main Pond (sf) Total (sf) Total (ac) Forebay (cu-ft) Main Pond (cu-ft) Total (cu-ft) Total (ac-ft) 760.5 0 264 264 0.006 0 0 0 0.000 761 606 529 i 1,135 0.026 0 194 194 0.004 762 914 879 1,793 0.041 754 890 1,644 0.038 763 1,279 1,284 I 2,563 0.059 1,844 1,964 3,809 _ 0.087 764 1,700 1,745 3,445 0.079 3,327 3,471 6,799 0.156 765 4,516 0.104 - - 10,763 0.247 766 5,345 0.123 - - 15,683 0.360 Stage/Discharge Table Q= Af(k)(h+d)/(d) Af= surface area of ponding area (sq ft) d= filter bed depth k= coefficient of permeability of filter media h= average height of water above filter bed (ft) Elevation (msl° Height (ft) Fow (cf/day) Flow (cfs) 760.5 0 0 0.000 761.5 1 1,293 0.015 762.5 2 1,663 0.019 763.5 3 2,032 0.024 764.5 4 2,401 0.028 765.5 5 2,771 0.032 766 5.5 2.956 0.034 Peak Attenuation 264 sf 2.5 ft 3.5 ft/day Forebay Welr Elevation = 763.0 Q= 3.33LhA3/2 Q= 2 yr. storm runoff L= weir length h= elevation over weir L= Q/(3.33 x IA3/2) 25.33 cfs L ft 1.00 ft Weir Length I 7.6 ft (10' min) Design Storm Peak Flow (cfs) Peak Flow Controlled? i1NSE Pre Post Routed 1-year 0.49 4.14 0.25 yes 763.13 10-year 6.27 17.87 4.92 yes 765.09 100-year 16.57 37.33 35.37 no 765.83 Top of dam elevation: Top of outlet structure elevation: WQv Water Surface Elevation: Sand Bed Elevation: 766.00 765.15 762.21 760.50 WQv Release Rate (1-inch storm) WQv (required) = WQv (actual) _ Release Rate = 2,565 cf 2,387 cf 2.125 days 51 hour 0.013 cfs (Refer to HydroCAD 1-inch routing table) Rivercross JOB NO.: 18-001 BY: udp DATE: 12.20.18 P.M.: Ibt Urban Design Partners 1318-E6 Central Avenue Charlotte, NC 28205 REVISED: 08.03.20 Anti -Flotation Device Calculations Calculations Given Data Standard Footing Assumptions Buoyant Weight of Concrete 87.6 Ibslft^3 1. Footing base to be 1 ft. wider than structure Weight of Water 62.4 Ibs/ftA3 on all sides. Safety Factor (S.F.) 1.25 2. Footing depth to be a minimum of 8 inches in depth. Equations used: Outlet Structure Weight, W(s) = 4(w + t) x t x h x W(bc) where, w = outlet box inside dimension, ft. t = structure wall thickness, ft. h = height of structure, ft. W(bc)= buoyant weight of concrete, Ibs/ft^3 W(w)= weight of water, Ibs/ft^3 S.F.= safety factor Displaced Water Weight, W(w) = 4 x (w + 2t) x W(w) x h Required Base Weight, W(b) _ (W(w) x S.F.) - W(s) Required Footing Volume, V(f) = W(b) / W(bc) Outlet Structure #1 w Structure Dimensions Object Weights Height of structure, h = 7 ft. Outlet Structure Weight, W(s) = 5637 Ibs Structure wall thickness, t = 6 in. Displaced Water Weight, W(w) = 8923.2 Ibs Outlet box inside dimension, w = 4 ft. Req'd Base Weight, W(b) = 5517 Ibs Footln •_ Required Footing Volume, V(f) = 63 cf Standard Footing Length, L = 7.00 ft. Provided Footing Volume, V(f) = 74 cf Standard Footing Width, W = 7.00 ft. Footing Check okay Minimum Footing Depth, D = 1.50 ft. Footing Size to be used: Length = 7.00 ft. Width = 7.00 ft. Outlet Depth = 1.50 ft. Structure #1 HYDR0CAD ROUTINGS 1-INCH ROUTING • yist CNm AD 1 Sand Filter Subcat Reach 'on. Iti Routing Diagram for 1 Prepared by{enter your company name here), Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 1 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 1C: 1 Post CNm Runoff = 1.48 cfs @ 2.99 hrs, Volume= 2,387 cf, Depth= 0.11" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 5.760 82 Modified CN 5.760 100.00°/% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post To Subcatchment 1 C: 1 Post CNm Hydrograph 11 0 Runoff I+-+eI Type II 6-hr 1-inch Rainfall=1.00" 1_ Runoff Area=5.760 ac 13 Runoff Volume=2,387 cf LL Runoff Depth=0.11" Tc=5.0 min CN=82 0 i4%///f///////////f//f//////////////////////////////////////////////////////f//f//f//f//////// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 TD 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 1 D: 1 Sand Filter Inflow Area = 250,906 sf, 0.00% Impervious, Inflow Depth = 0.11" for 1-inch event Inflow = 1.48 cfs @ 2.99 hrs, Volume= 2,387 cf Outflow = 0.02 cfs @ 6.11 hrs, Volume= 2,387 cf, Atten= 99%, Lag= 186.9 min Primary = 0.02 cfs @ 6.11 hrs, Volume= 2,387 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=762.21' @ 6.11 hrs Surf.Area= 1,952 sf Storage= 2,201 cf Flood Elev= 766.00' Surf.Area= 5,345 sf Storage= 15,907 cf Plug-Flow detention time= 1,286.1 min calculated for 2,387 cf(100% of inflow) Center-of-Mass det. time= 1,287.0 min ( 1,518.4 -231.3 ) Volume Invert Avail.Storage Storage Description #1 760.50' 15,907 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 760.50 264 0 0 761.00 1,135 350 350 762.00 1,793 1,464 1,814 763.00 2,563 2,178 3,992 764.00 3,445 3,004 6,996 765.00 4,516 3,981 10,976 766.00 5,345 4,931 15,907 Device Routing Invert Outlet Devices #1 Primary 758.00' 24.0" Round Culvert L= 32.7' Ke= 0.500 Inlet/Outlet Invert= 758.00'!757.75' S= 0.0076 '1' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 760.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.015 0.019 0.024 0.028 0.032 0.034 #3 Device 1 763.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 765.15' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=0.02 cfs @ 6.11 hrs HW=762.21' (Free Discharge) L-1=Culvert (Passes 0.02 cfs of 27.09 cfs potential flow) Ai_ 2=Sand Bed Exfiltration (Custom Controls 0.02 cfs) 3=Low Flow Orifice ( Controls 0.00 cfs) 4=Grate Top ( Controls 0.00 cfs) 1 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 1 D: 1 Sand Filter Hyd rag raph ■Inflow . I�.48 crs I 0 Primary I Inflow Area=250,906 sf Peak Elegy=762.21 Storage=2,201 cf 1- U V t LL n /J////////////// ._ /////%/%/%%////////////////////////////////////////////////% . . . . . . . . . . . . . . . . 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Hydrograph for Pond 1 D: 1 Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 760.50 0.00 3.00 1.47 377 761.02 0.01 6.00 0.09 2,184 762.20 0.02 9.00 0.00 2,019 762.11 0.02 12.00 0.00 1,833 762.01 0.02 15.00 0.00 1,651 761.91 0.02 18.00 0.00 1,474 761.80 0.02 21.00 0.00 1,301 761.70 0.02 24.00 0.00 1,133 761.59 0.02 27.00 0.00 969 761.48 0.01 30.00 0.00 819 761.37 0.01 33.00 0.00 686 761.27 0.01 36.00 0.00 568 761.18 0.01 39.00 0.00 465 761.10 0.01 42.00 0.00 374 761.02 0.01 45.00 0.00 295 760.95 0.01 48.00 0.00 228 760.88 0.01 51.00 0.00 172 760.82 0.00 54.00 0.00 125 760.76 0.00 57.00 0.00 88 760.70 0.00 60.00 0.00 60 760.65 0.00 63.00 0.00 39 760.61 0.00 66.00 0.00 25 760.57 0.00 69.00 0.00 15 760.55 0.00 72.00 0.00 9 760.53 0.00 75.00 0.00 5 760.52 0.00 78.00 0.00 3 760.51 0.00 81.00 0.00 2 760.51 0.00 84.00 0.00 1 760.50 0.00 87.00 0.00 1 760.50 0.00 90.00 0.00 0 760.50 0.00 93.00 0.00 0 760.50 0.00 96.00 0.00 0 760.50 0.00 99.00 0.00 0 760.50 0.00 102.00 0.00 0 760.50 0.00 105.00 0.00 0 760.50 0.00 108.00 0.00 0 760.50 0.00 111.00 0.00 0 760.50 0.00 114.00 0.00 0 760.50 0.00 117.00 0.00 0 760.50 0.00 120.00 0.00 0 760.50 0.00 1 -YEAR ROUTING < IA> K< IB > Predeveloped I Postdevel ped ID Sand Filter Subcat Reach 'on. Routing Diagram for 1 Prepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 1 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment IA: I Predeveloped Runoff = 0.49 cfs @ 12.23 hrs, Volume= 4,446 cf, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 2.880 55 Wooded * 2.880 61 Grass 5.760 58 Weighted Average 5.760 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment IA: 1 Predeveloped Hydrograph •Runoff 0 5" I 149�l ype II 24-hr 0-4517' 1-yr Rainfall=2.80" °4J Runoff Area=5.760 ac 035 Runoff Volume=4,446 cf 0.31 Runoff Depth=0.21" 0-251 Tc=20.0 min D2J CN=58 0-15. 0.1� 0 05 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 9D 95 100 105 110 115 120 Time (hours) 1 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 1 B: 'I Postdeveloped Runoff = 4.14 cfs @ 11.98 hrs, Volume= 9,461 cf, Depth= 0.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 0.730 98 Impervious * 5.030 61 Grass 5.760 66 Weighted Average 5.030 87.33% Pervious Area 0.730 12.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 1 B: 1 Postdeveloped Hydrograph ■Runoff 14.14 cis 41 Type II 2, -hr 1-yr Rainfall=2.-:0" RunoffAre =5.76' ac Runoff Volum =9,46 cf Runoff Depth=0., 5" LL 2—Z-10 Tc=5.0 in CN 66 1- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 Type !I 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 1 D: 1 Sand Filter Inflow Area = 250,906 sf, 12.67% Impervious, Inflow Depth = 0.45" for 1-yr event Inflow = 4.14 cfs @ 11.98 hrs, Volume= 9,461 cf Outflow = 0.25 cfs @ 13.71 hrs, Volume= 9,457 cf, Atten= 94%, Lag= 103.6 min Primary = 0.25 cfs @ 13.71 hrs, Volume= 9,457 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=763.13' @ 13.71 hrs Surf.Area=2,678 sf Storage=4,333 cf Flood Elev= 766.00' Surf.Area= 5,345 sf Storage= 15,907 cf Plug-Flow detention time= 1,122.3 min calculated for 9,457 cf(100% of inflow) Center-of-Mass det. time= 1,122.0 min ( 2,023.9 - 901.9 ) Volume Invert Avail.Storage Storage Description #1 760.50' 15,907 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 760.50 264 0 0 761.00 1,135 350 350 762.00 1,793 1,464 1,814 763.00 2,563 2,178 3,992 764.00 3,445 3,004 6,996 765.00 4,516 3,981 10,976 766.00 5,345 4,931 15,907 Device Routing Invert Outlet Devices #1 Primary 758.00' 24.0" Round Culvert L= 32.7' Ke= 0.500 Inlet/Outlet Invert= 758.00'!757.75' S= 0.0076 '!' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 760.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.015 0.019 0.024 0.028 0.032 0.034 #3 Device 1 763.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 765.15' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=0.25 cfs @ 13.71 hrs HW=763.13' (Free Discharge) L-1=Culvert (Passes 0.25 cfs of 30.74 cfs potential flow) 2=Sand Bed Exfiltration (Custom Controls 0.02 cfs) Ai_ 3=Low Flow Orifice (Orifice Controls 0.23 cfs @ 1.16 fps) 4=Grate Top ( Controls 0.00 cfs) 1 Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 1 D: 1 Sand Filter Hydrograph ■Inflow 14.14 ds I 0 Primary I Inflow Area=250,906 sf 4- Peak Elegy=763.13' Storage=4,333 cf 3_ a , L 2 �1 n /// %/%%//////////////////////////////////////////////////////////////////////////// . . . . . . . . . . . . . . . . . . . . . 0 5 10 15 20 25 30 35 40 45 50 55 80 85 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 10-YEAR ROUTING 1 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 1 B: 'I Postdeveloped Runoff = 17.87 cfs @ 11.97 hrs, Volume= 35,272 cf, Depth= 1.69" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type 1124-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 0.730 98 Impervious * 5.030 61 Grass 5.760 66 Weighted Average 5.030 87.33% Pervious Area 0.730 12.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 1 B: 1 Postdeveloped Hydrograph 2D� ■Runoff 19= 19= I 17�I 17 Type II 2 -hr 16 V / 10-yr Rainfall=4.•4" " 14= Runoff Area=5.76' ac 13=r Runoff Volume=35,27' cf 7,7 12= 11.. Runoff Depth=1. •9" 1D=� 0 9v� Tc=5.0 in LL a CN 66 7 5'" 4=, 2. r i 01 0 5 10 15 20 25 30 35 40 45 50 55 66 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 'I A: 'I Predeveloped Runoff = 6.27 cfs @ 12.15 hrs, Volume= 23,751 cf, Depth= 1.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 2.880 55 Wooded * 2.880 61 Grass 5.760 58 Weighted Average 5.760 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 1A: 1 Predeveloped Hydrograph 7y •Runoff 67 cfsI 61 Type II 24-h r 10-yr Rainfall=4.94" 51 ♦ Runoff Area=5.76O ac ♦ Runoff Volume=23,751 cf N 41 ♦ Run6ff Depth=1.14" j Tc= O.Omin LL CN-58 1/ 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 Type !I 24-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 1 D: 1 Sand Filter Inflow Area = 250,906 sf, 12.67% Impervious, Inflow Depth = 1.69" for 10-yr event Inflow = 17.87 cfs @ 11.97 hrs, Volume= 35,272 cf Outflow = 4.92 cfs @ 12.09 hrs, Volume= 35,267 cf, Atten= 72%, Lag= 7.6 min Primary = 4.92 cfs @ 12.09 hrs, Volume= 35,267 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=765.09' @ 12.09 hrs Surf.Area=4,587 sf Storage= 11,363 cf Flood Elev= 766.00' Surf.Area= 5,345 sf Storage= 15,907 cf Plug-Flow detention time= 318.5 min calculated for 35,258 cf(100% of inflow) Center-of-Mass det. time= 319.8 min ( 1,174.4 - 854.6 ) Volume Invert Avail.Storage Storage Description #1 760.50' 15,907 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 760.50 264 0 0 761.00 1,135 350 350 762.00 1,793 1,464 1,814 763.00 2,563 2,178 3,992 764.00 3,445 3,004 6,996 765.00 4,516 3,981 10,976 766.00 5,345 4,931 15,907 Device Routing Invert Outlet Devices #1 Primary 758.00' 24.0" Round Culvert L= 32.7' Ke= 0.500 Inlet/Outlet Invert= 758.00'!757.75' S= 0.0076 '!' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 760.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.015 0.019 0.024 0.028 0.032 0.034 #3 Device 1 763.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 765.15' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=4.91 cfs @ 12.09 hrs HW=765.08' (Free Discharge) L-1=Culvert (Passes 4.91 cfs of 37.31 cfs potential flow) 2=Sand Bed Exfiltration (Custom Controls 0.03 cfs) Ai_ 3=Low Flow Orifice (Orifice Controls 4.88 cfs @ 6.51 fps) 4=Grate Top ( Controls 0.00 cfs) 1 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 1 D: 1 Sand Filter Hydrograph 20. / ■Inflow 19= "rids ❑Primary 18V Inflow Are =250,906 sf 17- / Peak Elev=765.09' 15 Storage=11,363 cf 14- 13', 12-/ 11: 10=9 / / a 0 LL -/ 7=/ 6i 4_92 crs • 3 /- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 100-YEAR ROUTING 1 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 'I A: 'I Predeveloped Runoff = 16.57 cfs @ 12.14 hrs, Volume= 55,993 cf, Depth= 2.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 2.880 55 Wooded * 2.880 61 Grass 5.760 58 Weighted Average 5.760 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 1A: 1 Predeveloped Hydrograph /// 18= •Runoff 17✓ Ii657c 161 Type II 24-hr 1 14]"r 100-yr Rainfall=7.39" 13= Runoff Area=5.760 ac 12= Runoff Volume=55,993 cf 13 10= Runoff Depth=2.68" 3 9= Tc-20.0 min LL of 7=r / CN=5 s;r 2= 11 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 1 B: 'I Postdeveloped Runoff = 37.33 cfs @ 11.96 hrs, Volume= 73,465 cf, Depth= 3.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 0.730 98 Impervious * 5.030 61 Grass 5.760 66 Weighted Average 5.030 87.33% Pervious Area 0.730 12.67% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 1 B: 'I Postdeveloped Hydrograph ■Runoff 40', 381I� u:I 36' Type Il 24-hr 341 100-yr Rainfall-7.39" 32',r 301 Runoff Area=5.766 ac 2 a 261 Runoff Volu me=73,465 cf 2224 Runoff Depth=3.51" 20= Tc-5.0 min LL 18 j 16' CN=66 14 12',� 10 a- / 41/ l 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 Type I!24-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 1 D: 1 Sand Filter Inflow Area = 250,906 sf, 12.67% Impervious, Inflow Depth = 3.51" for 100-yr event Inflow = 37.33 cfs @ 11.96 hrs, Volume= 73,465 cf Outflow = 35.37 cfs @ 11.99 hrs, Volume= 73,460 cf, Atten= 5%, Lag= 1.4 min Primary = 35.37 cfs @ 11.99 hrs, Volume= 73,460 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=765.83' @ 11.99 hrs Surf.Area= 5,207 sf Storage= 15,027 cf Flood Elev= 766.00' Surf.Area= 5,345 sf Storage= 15,907 cf Plug-Flow detention time= 162.4 min calculated for 73,460 cf(100% of inflow) Center-of-Mass det. time= 162.3 min ( 995.2 - 832.9 ) Volume Invert Avail.Storage Storage Description #1 760.50' 15,907 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 760.50 264 0 0 761.00 1,135 350 350 762.00 1,793 1,464 1,814 763.00 2,563 2,178 3,992 764.00 3,445 3,004 6,996 765.00 4,516 3,981 10,976 766.00 5,345 4,931 15,907 Device Routing Invert Outlet Devices #1 Primary 758.00' 24.0" Round Culvert L= 32.7' Ke= 0.500 Inlet/Outlet Invert= 758.00'!757.75' S= 0.0076 '1' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 760.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.015 0.019 0.024 0.028 0.032 0.034 #3 Device 1 763.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 765.15' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=34.67 cfs @ 11.99 hrs HW=765.82' (Free Discharge) L-1=Culvert (Passes 34.67 cfs of 39.51 cfs potential flow) 2=Sand Bed Exfiltration (Custom Controls 0.03 cfs) Ai_ 3=Low Flow Orifice (Orifice Controls 5.79 cfs @ 7.72 fps) 4=Grate Top (Weir Controls 28.85 cfs @ 2.68 fps) 1 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 1 D: 1 Sand Filter Hydrograph / ■Inflow I4D= / I3733`rs I 0 Primary 3a-✓ If Inflow Area=250,906 sf 36 34 toy Peak E_Iev=765.83' 32 3Di Storage=15,027 cf 2a 26- m 24--' / 0 2Di a 181 16i , 14= f 12 / 4 ' / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) DRAINAGE BASIN #2 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #2 INTRODUCTION: SUMMARY Drainage basin#2 includes townhome lots 1-12 &35-45 in Phase 1A, a portion of Waterway Drive and Hazel Way.A pipe network system routes runoff to sand filter dry pond#2 which treats the water quality volume. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 2.77 acres Postdeveloped Drainage Area 2.77 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 2.77 100% B Total 2.77 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) CN Wtd. CN Wooded 1.38 50% 55 27.50 Grass 1.38 50% 61 30.50 Total 2.77 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type Area(ac) °/n CN Wtd. CN Impervious 1.87 67% 98 66.12 Grass 0.90 33% 61 19.84 Total 2.77 85.97 'Composite CN Use CN = 86 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #2 HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 2.77 ac. 2.77 ac Cuve Number(CN) 58 86 Modified Curve Number(CN) n/a 94 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 67% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.66 in/in WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.152 ac-ft 75% WQv= 0.114 ac-ft 6,607 ft3 4,955 ft3 0.66 in 0.49 in MODIFIED CURVE NUMBER CNm= 1000/(10+5P+10W Qv-10(WQ02+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.49 CNm 93.8 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 1.63 in CN= SCS curve number Q= 1.31 cfs Compute Watershed Runoff CPv= 0.302 ac-ft 50% CPv= 0.151 ac-ft 13,159 cu. Ft 6,580 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.102 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: lbt Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #2 Existing Impervious Asphalt: sf Buildings: sf Concrete: sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 2.77 Impervious Percentage: 0% Proposed Impervious Asphalt: 24,900 sf Buildings: 36,415 sf Concrete: 20,075 sf Total Impervious Area: 81,390 sf 1.87 ac. Drainage Area: 2.77 Impervious Percentage: 67% Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Sand Filter Design - Basin #2 Sand Filter Design Requirements Design Method Design Method TSS Detention Time 2.0 days Filter Bed Depth 2.5 ft Underdrain System Thickness 1.0 ft Hydrologic Calculations Pre-developed Post-developed Drainage area to pond(Da)— 2.77 ac. 2.77 ac Cuve Number(CN) 58 86 Adjusted Curve Number(CN) n/a 94 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 67% Determine Suface Area to Treat WQv Surface Area based on Darcy's Equation Af= (WQv)(df)/((k)(h+d)(t)} Af= surface area of ponding area(sq ft) WQv= water quality control volume 4,955 of d= filter bed depth 2.5 ft k= coefficient of permeability of filter media 3.5 ft/day h= average height of water above filter bed(ft) 1 ft 24" max for WO storm event t= design filter bed drain time(days) 2.00 day Af= 506 sf Determine Dimensions Length= 55 ft Width= 9.4 ft Area= 518 sf Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Sand Filter Design - Basin #2 Stage/Storage Table Elevation Area Volume Forebay Main Pond Total Total Forebay Main Pond Total Total (ms1) (sf (sf) (st) (ac) (cu-ft) (cu-ft) (cu-ft) (ac-ft) ,752 0 518 518 0.012 0 0 0 0.000 753 1,914 1,256 I 3,170 0.073 0 859 859 0.020 — 754 2,489 1,887 4,376 0.100 2,193 2,419 4,612 0.106 755 3,119 2,574 I 5,693 0.131 4,988 i 4,838 9,626 0.221 756 7,130 0.164 16,018 0.368 757 8,450 0.194 23,791 0.546 — Stage/Discharge Table Q= Af(k)(h+d)1(d) Af= surface area of ponding area(sq ft) 518 sf d= filter bed depth 2.5 ft k= coefficient of permeability of filter media 3.5 ft/day h= average height of water above filter bed (ft) Elevation Height Fow Flow Forebay Weir (msl) (ft) (cf/day) (cfs) Elevation= 754.5 752 0 0 0.000 Q= 3.33Lh^312 753 1 2,538 0.029 Q= 2 yr.storm runoff 12.18 cfs 754 2 3,263 0.038 L= weir length L ft 755 3 3,989 0.046 h= elevation over weir 0.50 ft 756 4 4,714 0.055 L= Q/(3.33 x 1^312) 757 5 5,439 0.063 Weir Length 10 ft(10' min) Peak Attenuation WQv Release Rate(1-inch storm) .- Design Peak Flow(cfs) Peak Flow WQv(required) = 4.955 cf Storm Pre Post Routed Controlled? WSE WQv(actual)= 5,065 cf 1-year 0.24 7.57 0.19 yes 754.96 2.5 days 10-year 3.01 16.66 2.95 yes 758.03 60 hour 100-year 7.97 27.13 19.32 no 756.94 Release Rate= 0.023 cfs Top of dam elevation: 757.00 (Refer to HydroCA❑1-inch routing table) Top of outlet structure elevation: 756.50 WQv Water Surface Elevation: 753.77 Sand Bed Elevation: 752.00 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Anti-Flotation Device Calculations Calculations Given Data Standard Footing Assumptions Buoyant Weight of Concrete 87.6 Ibs/ft^3 1. Footing base to be 1 ft. wider than structure Weight of Water 62.4 Ibs/ft^3 on all sides. Safety Factor(S.F.) 1.25 2. Footing depth to be a minimum of 8 inches in depth. Equations used: Outlet Structure Weight,W(s)= 4(w+t)x t x h x W(bc) where, w= outlet box inside dimension,ft. Displaced Water Weight,W(w)= 4 x(w+2t)x W(w)x h t= structure wall thickness,ft. h= height of structure,ft. Required Base Weight,W(b)= (W(w)x S.F.)-W(s) W(bc)= buoyant weight of concrete, Ibs/ft^3 W(w)= weight of water,Ibs/ft^3 Required Footing Volume,V(f)= W(b)/W{bc) S.F.= safety factor •u e ru ure ' Structure Dimensions Object Weights Height of structure, h= 7 ft. Outlet Structure Weight,Ms) = 5519 lbs Structure wall thickness,t= 6 in. Displaced Water Weight,W(w)= 8736 lbs Outlet box inside dimension,w= 4 ft. R-.'d Base Weight,W W . = 5401 lbs Footing. Size Required Footing Volume,V(f)= 62 cf _ Standard Footing Length, L= 7.00 ft. Provided Footing Volume,V(f)= 74 cf Standard Footing Width,W= 7.00 ft. Footing Check okay Minimum Footing Depth, ❑= 1.50 ft. Footing Size to be used: Length= 7.00 ft. i Width = 7.00 ft. Outlet Structure #2 Depth = 1.50 ft. HYDROCAD ROUTINGS 1 - INCH ROUTING • ost CNm /2N) 2 Sand Filter Subcat Reach 'on■ Link Routing Diagram for 2 Prepared by{enter your company name here), Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 2 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 2C: 2 Post CNm Runoff = 3.70 cfs @ 2.96 hrs, Volume= 5,065 cf, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 2.770 94 Modified CN 2.770 100.00°/% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post To Subcatchment 2C: 2 Post CNm Hydrograph 44 0 Runoff I 3.70 cis I '� } Type II 6-hr 3 • 1-inch Rainfall=1.00" Runoff Area=2.770 ac Runoff Volume=5,065 f LL Runoff Depth=0.50" Tc=5.0 min 1 ✓ CN=94 n i�/////////////////f//f//f//////////////////////////////////////////////////////f//f//f//////// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 2D: 2 Sand Filter Inflow Area = 120,661 sf, 0.00% Impervious, Inflow Depth = 0.50" for 1-inch event Inflow = 3.70 cfs @ 2.96 hrs, Volume= 5,065 cf Outflow = 0.04 cfs @ 6.09 hrs, Volume= 5,065 cf, Atten= 99%, Lag= 187.3 min Primary = 0.04 cfs @ 6.09 hrs, Volume= 5,065 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=753.77' @ 6.09 hrs Surf.Area=4,102 sf Storage=4,654 cf Flood Elev= 757.00' Surf.Area= 8,450 sf Storage=24,853 cf Plug-Flow detention time= 1,343.8 min calculated for 5,064 cf(100% of inflow) Center-of-Mass det. time= 1,344.7 min ( 1,550.1 -205.4 ) Volume Invert Avail.Storage Storage Description #1 752.00' 24,853 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 752.00 518 0 0 753.00 3,170 1,844 1,844 754.00 4,376 3,773 5,617 755.00 5,693 5,035 10,652 756.00 7,130 6,412 17,063 757.00 8,450 7,790 24,853 Device Routing Invert Outlet Devices #1 Primary 749.50' 18.0" Round Culvert L= 104.4' Ke= 0.500 Inlet/Outlet Invert= 749.50'1748.00' S= 0.0144 '1' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 752.00' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.029 0.038 0.046 0.055 0.063 #3 Device 1 754.85' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 756.50' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=0.04 cfs @ 6.09 hrs HW=753.77' (Free Discharge) L-1=Culvert (Passes 0.04 cfs of 15.88 cfs potential flow) 14 2=Sand Bed Exfiltration (Custom Controls 0.04 cfs) 3=Low Flow Orifice ( Controls 0.00 cfs) =Grate Top ( Controls 0.00 cfs) 2 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 2D: 2 Sand Filter Hydrograph ■Inflow 4 Ia-4o6'3I 0 Primary) Inflow rea=12O,661 sf P ak Elev=753.77' to rag a=4,654 cf V g 2 IL ' 1 i / /// /%///////////////////////////////////////////////% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Hydrograph for Pond 2D: 2 Sand Filter Time Inflow Storage Elevation Primary (hours) (cfs) (cubic-feet) (feet) (cfs) 0.00 0.00 0 752.00 0.00 3.00 3.24 2,257 753.13 0.03 6.00 0.10 4,643 753.77 0.04 9.00 0.00 4,286 753.68 0.04 12.00 0.00 3,911 753.59 0.03 15.00 0.00 3,545 753.49 0.03 18.00 0.00 3,189 753.39 0.03 21.00 0.00 2,842 753.30 0.03 24.00 0.00 2,505 753.20 0.03 27.00 0.00 2,177 753.10 0.03 30.00 0.00 1,859 753.00 0.03 33.00 0.00 1,559 752.91 0.03 36.00 0.00 1,291 752.81 0.02 39.00 0.00 1,052 752.72 0.02 42.00 0.00 842 752.62 0.02 45.00 0.00 660 752.54 0.02 48.00 0.00 505 752.45 0.01 51.00 0.00 376 752.37 0.01 54.00 0.00 272 752.30 0.01 57.00 0.00 189 752.23 0.01 60.00 0.00 127 752.17 0.00 63.00 0.00 82 752.12 0.00 66.00 0.00 51 752.08 0.00 69.00 0.00 30 752.05 0.00 72.00 0.00 18 752.03 0.00 75.00 0.00 10 752.02 0.00 78.00 0.00 6 752.01 0.00 81.00 0.00 4 752.01 0.00 84.00 0.00 2 752.00 0.00 87.00 0.00 1 752.00 0.00 90.00 0.00 1 752.00 0.00 93.00 0.00 0 752.00 0.00 96.00 0.00 0 752.00 0.00 99.00 0.00 0 752.00 0.00 102.00 0.00 0 752.00 0.00 105.00 0.00 0 752.00 0.00 108.00 0.00 0 752.00 0.00 111.00 0.00 0 752.00 0.00 114.00 0.00 0 752.00 0.00 117.00 0.00 0 752.00 0.00 120.00 0.00 0 752.00 0.00 1 -YEAR ROUTING (2A> < 2B > 2 Predeveloped 2 Postdev loped AND 2 Sand Filter Subcat Reach 'on. Routing Diagram for 2 Prepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 2 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 2A: 2 Predeveloped Runoff = 0.24 cfs @a 12.23 hrs, Volume= 2,138 cf, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 1.385 55 Wooded * 1.385 61 Grass 2.770 58 Weighted Average 2.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 2A: 2 Predeveloped Hydrograph 0.26j/ •Runoff Trlaza�l 0.23✓ Type II 24-h r 0.22 0.21;y f 1-yr Rainfall=2.80" [1.12 L 0- 9✓ / Runoff Area=2.770 ac 0.18; f / o;�y__✓� Runoff Volume=2,138 cf 0:;4 Runoff Depth=0.21" g 0-112/ % Tc=20.0 min u 0 11 pit/ CN=58 0 D --_—�j 0 0.0. 0.03=r / 47 0.02 .' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 26: 2 Postdeveloped Runoff = 7.57 cfs @ 11.96 hrs, Volume= 15,002 cf, Depth= 1.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 1.868 98 Impervious * 0.901 61 Grass 2.769 86 Weighted Average 0.901 32.54% Pervious Area 1.868 67.46% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 2B: 2 Postdeveloped Hydrograph ■Runoff 8. 17.57 cfs Type II 24-hr 717' 1-yr Rainfall=2.80" Runoff Area=2.769 ac 5� Runoff Volume=15,002 cf 110 Runoff Depth=1.49" 4 Tc=5.0 min IL 3 CN=86 2: 0 ;17 ii 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 2D: 2 Sand Filter Inflow Area = 120,618 sf, 67.46% Impervious, Inflow Depth = 1.49" for 1-yr event Inflow = 7.57 cfs @ 11.96 hrs, Volume= 15,002 cf Outflow = 0.19 cfs @ 15.14 hrs, Volume= 14,949 cf, Atten= 98%, Lag= 190.8 min Primary = 0.19 cfs @ 15.14 hrs, Volume= 14,949 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=754.96' @ 15.14 hrs Surf.Area= 5,636 sf Storage= 10,405 cf Flood Elev= 757.00' Surf.Area= 8,450 sf Storage=24,853 cf Plug-Flow detention time= 1,924.9 min calculated for 14,945 cf(100% of inflow) Center-of-Mass det. time= 1,923.7 min ( 2,748.1 - 824.4 ) Volume Invert Avail.Storage Storage Description #1 752.00' 24,853 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 752.00 518 0 0 753.00 3,170 1,844 1,844 754.00 4,376 3,773 5,617 755.00 5,693 5,035 10,652 756.00 7,130 6,412 17,063 757.00 8,450 7,790 24,853 Device Routing Invert Outlet Devices #1 Primary 749.50' 18.0" Round Culvert L= 104.4' Ke= 0.500 Inlet/Outlet Invert= 749.50'1748.00' S= 0.0144 '1' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 752.00' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.029 0.038 0.046 0.055 0.063 #3 Device 1 754.85' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 756.50' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=0.18 cfs @ 15.14 hrs HW=754.96' (Free Discharge) L-1=Culvert (Passes 0.18 cfs of 17.94 cfs potential flow) 2=Sand Bed Exfiltration (Custom Controls 0.05 cfs) 14 3=Low Flow Orifice (Orifice Controls 0.14 cfs @ 1.05 fps) =Grate Top ( Controls 0.00 cfs) 2 Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 2D: 2 Sand Filter Hydrograph ■Inflow 7ST ds ■Pnmaiy Inflow Area=120,618 sf 7 Peak EIev=754.95' 6—�� Storage=10,405 cf 5 ' 0 4 17/ 2- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 10-YEAR ROUTING 2 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 2A: 2 Predeveloped Runoff = 3.01 cfs @ 12.15 hrs, Volume= 11,422 cf, Depth= 1.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 1.385 55 Wooded * 1.385 61 Grass 2.770 58 Weighted Average 2.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 2A: 2 Predeveloped Hydrograph •Runoff 301irfs Type II 24-hr 10-yr Rainfall=4.94" Runoff Area=2.770 ac e=11,422 cf 2— Runoff Depth=1.14" Tc=20.0 min LL CN=58 1y 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 26: 2 Postdeveloped Runoff = 16.66 cfs @ 11.96 hrs, Volume= 34,286 cf, Depth= 3.41" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 1.868 98 Impervious * 0.901 61 Grass 2.769 86 Weighted Average 0.901 32.54% Pervious Area 1.868 67.46% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 2B: 2 Postdeveloped Hydrograph 18=" ■Runoff 17✓ lsseds 16 Type II 24-hr 151 p 10-yr Rainfall=4.94" 14✓ Runoff Area=2.769 ac 13- 12 Runoff Volume=34,286 cf 11= 71 13 10 3-7 Runoff Depth=3.41" Tc=5.0 min 0 u ° CN=86 E/ 2✓ % r 1 I i�i� iii /ill����rlf�������r����fr�l�������r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type II 24-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 2D: 2 Sand Filter Inflow Area = 120,618 sf, 67.46% Impervious, Inflow Depth = 3.41" for 10-yr event Inflow = 16.66 cfs @ 11.96 hrs, Volume= 34,286 cf Outflow = 2.95 cfs @ 12.13 hrs, Volume= 34,227 cf, Atten= 82%, Lag= 10.1 min Primary = 2.95 cfs @ 12.13 hrs, Volume= 34,227 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=756.03' @ 12.13 hrs Surf.Area=7,170 sf Storage= 17,279 cf Flood Elev= 757.00' Surf.Area= 8,450 sf Storage=24,853 cf Plug-Flow detention time= 888.4 min calculated for 34,227 cf(100% of inflow) Center-of-Mass det. time= 887.3 min ( 1,688.2 - 800.9 ) Volume Invert Avail.Storage Storage Description #1 752.00' 24,853 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 752.00 518 0 0 753.00 3,170 1,844 1,844 754.00 4,376 3,773 5,617 755.00 5,693 5,035 10,652 756.00 7,130 6,412 17,063 757.00 8,450 7,790 24,853 Device Routing Invert Outlet Devices #1 Primary 749.50' 18.0" Round Culvert L= 104.4' Ke= 0.500 Inlet/Outlet Invert= 749.50'1748.00' S= 0.0144 '1' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 752.00' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.029 0.038 0.046 0.055 0.063 #3 Device 1 754.85' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 756.50' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=2.95 cfs @ 12.13 hrs HW=756.03' (Free Discharge) L-1=Culvert (Passes 2.95 cfs of 19.63 cfs potential flow) 2=Sand Bed Exfiltration (Custom Controls 0.06 cfs) 14 3=Low Flow Orifice (Orifice Controls 2.89 cfs @ 4.63 fps) =Grate Top ( Controls 0.00 cfs) 2 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 2D: 2 Sand Filter Hydrograph ///// ■Inflow 19'. 11"6 cis I 0 Primary I 17= / Inflow Area=120,618 sf 16= /15 / Peak EIev=756.03' _ 14= , Storage=17,279 cf 13= 12i/ 11' / 10-�// 0 / LL a- 7 6: / � 3'./ . % %%////////////////////////////////////////////////// / / 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 100-YEAR ROUTING 2 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 2A: 2 Predeveloped Runoff = 7.97 cfs @ 12.14 hrs, Volume= 26,927 cf, Depth= 2.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 1.385 55 Wooded * 1.385 61 Grass 2.770 58 Weighted Average 2.770 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 2A: 2 Predeveloped Hydrograph •Runoff S� I7.97 cfs Type II 24-hr 100-yr Rainfall=7.39" 8 f Runoff Area— .770 ac Runoff Volume= 6,927 cf 1 Runoff Dep h=2.68" .2 41Z Tc— 0.0 min 3 J CN=58 z1 11 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 26: 2 Postdeveloped Runoff = 27.13 cfs @ 11.96 hrs, Volume= 57,709 cf, Depth= 5.74" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 1.868 98 Impervious * 0.901 61 Grass 2.769 86 Weighted Average 0.901 32.54% Pervious Area 1.868 67.46% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 2B: 2 Postdeveloped Hydrograph 30, ■Runoff 294-/ 27.13,ds 26✓ Type II 24-hr 24- I '100- 4r Rainfall=7.39" �� Runo Area=2.769 ac 20- , Runoff V• Iu me=57,709 cf 1 a= 16= / Run•ff Depth=5.74" 0 14- Tc=5.0 m ii n LL 121Z CN=86 107 a=� sf 4 27 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 2 Type I!24-hr 100-yr Rainfal1=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 2D: 2 Sand Filter Inflow Area = 120,618 sf, 67.46% Impervious, Inflow Depth = 5.74" for 100-yr event Inflow = 27.13 cfs @ 11.96 hrs, Volume= 57,709 cf Outflow = 19.32 cfs @ 12.02 hrs, Volume= 57,647 cf, Atten= 29%, Lag= 3.7 min Primary = 19.32 cfs @ 12.02 hrs, Volume= 57,647 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=756.94' @ 12.02 hrs Surf.Area= 8,368 sf Storage= 24,333 cf Flood Elev= 757.00' Surf.Area= 8,450 sf Storage=24,853 cf Plug-Flow detention time= 554.2 min calculated for 57,647 cf(100% of inflow) Center-of-Mass det. time= 553.5 min ( 1,339.8 - 786.3 ) Volume Invert Avail.Storage Storage Description #1 752.00' 24,853 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 752.00 518 0 0 753.00 3,170 1,844 1,844 754.00 4,376 3,773 5,617 755.00 5,693 5,035 10,652 756.00 7,130 6,412 17,063 757.00 8,450 7,790 24,853 Device Routing Invert Outlet Devices #1 Primary 749.50' 18.0" Round Culvert L= 104.4' Ke= 0.500 Inlet/Outlet Invert= 749.50'1748.00' S= 0.0144 '1' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 752.00' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 Disch. (cfs) 0.000 0.029 0.038 0.046 0.055 0.063 #3 Device 1 754.85' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 756.50' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads Primary OutFlow Max=18.91 cfs @ 12.02 hrs HW=756.93' (Free Discharge) L-1=Culvert (Passes 18.91 cfs of 20.94 cfs potential flow) 2=Sand Bed Exfiltration (Custom Controls 0.06 cfs) 14 3=Low Flow Orifice (Orifice Controls 4.07 cfs @ 6.51 fps) =Grate Top (Weir Controls 14.78 cfs @ 2.15 fps) 2 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond 2D: 2 Sand Filter Hydrograph ■Inflow 3D- 127.13 cfs I ■Primary I 29 / Inflow Area=120,618 sf 26 / �v Peak EIev=756.94' 24i / / Storage4,333 cf 1932 ds 2D= 1a- 1s 0 14 / 12V1D: a / �4 D 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) DRAINAGE BASIN #3 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #3 INTRODUCTION: SUMMARY Drainage basin#3 includes townhome lots 46-56&76-85 in Phase 1 B,a portion of Waterway Drive and Ashton Park Drive. A pipe network system routes runoff to sand filter dry pond#3 which treats the water quality volume. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 3.13 acres Postdeveloped Drainage Area 3.13 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 3.13 100% B Total 3.13 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) CN Wtd. CN Wooded 1.56 50% 55 27.50 Grass 1.56 50% 61 30.50 Total 3.13 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type Area(ac) % CN Wtd. CN Impervious 1.92 61% 98 60.10 Grass 1.21 39% 61 23.59 Total 3.13 83.69 'Composite CN Use CN = 84 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #3 HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 3.13 ac. 3.13 ac Cuve Number(CN) 58 84 Modified Curve Number(CN) n/a 93 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 61% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.60 in/in WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.157 ac-ft 75% WQv= 0.118 ac-ft 6,831 ft3 5,124 ft3 0.60 in 0.45 in MODIFIED CURVE NUMBER CNm= 1000/(10+5P+10W Qv-10(WQ02+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.45 CNm 93.0 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 1.90 in CN= SCS curve number Q= 1.18 cfs Compute Watershed Runoff CPv= 0.307 ac-ft 50% CPv= 0.154 ac-ft 13,374 cu. Ft 6,687 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.103 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Hot Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #3 Existing Impervious Asphalt: 0 sf Buildings: 0 sf Concrete: 0 sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 3.13 Impervious Percentage: 0% Proposed Impervious Asphalt: 28,615 sf Buildings: 35,055 sf Concrete: 19,850 sf Total Impervious Area: 83,520 sf 1.92 ac. Drainage Area: 3.13 Impervious Percentage: 61% Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp _ 1318-E6 Central Avenue DATE: 12.20.18 P.M.: It Charlotte, NC 28205 REVISED: 08.03.20 Sand Filter Design - Basin #3 Sand Filter Design Requirements Design Method Design Method TSS Detention Time 2.0 days Filter Bed Depth 2.5 ft Underdrain System Thickness 1.0 ft Hydrologic Calculations Pre-developed Post-developed Drainage area to pond(Da)= 3.13 ac. 3.13 ac Cuve Number(CN) 58 84 Adjusted Curve Number(CN) nla 93 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 61% Determine Suface Area to Treat WQv Surface Area based on Darcy's Equation Af= (WQv)(df)1((k)(h+d)(t)) Af= surface area of ponding area(sq ft) WQv= water quality control volume 5,124 cf d= filter bed depth 2.5 ft k= coefficient of permeability of filter media 3.5 ft/day h= average height of water above filter bed(ft) 1 ft 24' max for WQ storm event t= design filter bed drain time(days) 2.00 day Af= 523 sf Determine Dimensions Length= 70.0 ft Width= 7.5 ft Area= 525 sf Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Sand Filter Design - Basin #3 Stage/Storage Table Elevation Area Volume Forebay Main Pond Total Total Forebay Main Pond Total Total (msl) (sf (sf} (sf} (ac) (cu-ft) (cu-ft) (cu-ft) (ac-ft) 745.5 0 525 525 0.012 0 0 0 0.000 746 1,885 1,403 3,288 0.075 0 l 464 464 0.011 - 747 2,583 2,300 4,883 0.112 2,223 2,295 4,518 0.104 748 3,305 3,266 6,571 I 0.151 5,156 5,061 10,218 0.235 749 8,136 0.187 17,550 0.403 750 9,555 0.219 26,377 0.606 - Stage/Discharge Table Q= Af(k)(h+d}I(d) Af= surface area of bonding area(sq ft) 525 sf d= filter bed depth 2.5 ft k= coefficient of permeability of filter media 3.5 ft/day h= average height of water above filter bed(ft) Elevation Height Fow Flow Forebay Weir (msD (ft) (cf/day) (cis} Elevation= 747.0 745.5 0 0 0.000 Q= 3.33LhA312 746.5 1 2,573 0.030 Q= 2 yr.storm runoff 13.76 cfs 747.5 2 3,308 0.038 L= weir length L ft 748.5 3 4,043 0.047 h= elevation over weir 1.00 ft 749.5 4 4,778 0.055 L= 0/(3.33 x lA3/2) 750 4.5 5,145 0.060 Weir Length I 4.1 ft(10' min) Peak Attenuation WQv Release Rate(1-inch storm) Design Peak Flow(cfs) j Peak Flow WQv(required)= 5,124 cf Storm • Pre Post Routed Controlled? WSE - WQv(actual)= 5,117 cf 1-year 0.27 7.81 0.10 yes 748.25 2.875 days 10-year 3.40 17.97 2.43 yes 749.08 69 hour 100-year 8.99 29.83 25.73 no 749.64 Release Rate= 0.021 cfs Top of Dam Elevation: 750.00 (Refer to HydroCAD 1-inch routing table) Emergency Spillway Elevation: 749.50 Top of outlet structure elevation: 749.10 WQv Water Surface Elevation: 746.94 Sand Bed Elevation: 745.50 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Anti-Flotation Device Calculations Calculations Given Data Standard Footing Assumptions Buoyant Weight of Concrete 87.6 Ibslft^3 1. Footing base to be 1 ft. wider than structure Weight of Water 62.4 Ibslft^3 on all sides. Safety Factor(S.F.) 1.25 2. Footing depth to be a minimum of 8 inches in depth. Equations used: Outlet Structure Weight,W(s)= 4(w+t)x t x h x W(bc) where, w= outlet box inside dimension,ft. Displaced Water Weight,W(w)= 4 x(w+2t)x W(w)x h t= structure wall thickness,ft. h= height of structure,ft. Required Base Weight,W(b)= (W(w)x S.F.)-W(s) W(bc)= buoyant weight of concrete, Ibslft^3 W(w)= weight of water,Ibs/ft^3 • Required Footing Volume,V(f)= W(b)/W(bc) S.F.= safety factor •u e ru ure Structure Dimensions Object Weights Height of structure, h = 6 ft. Outlet Structure Weight, W(s) = 4809 lbs Structure wall thickness,t = 6 in. Displaced Water Weie,W(w)= 7612.8 lbs Outlet box inside dimension, w= 4 ft. 'd Base Weight,W . = 4707 lbs Footing Size Required Footing Volume,V(t)= 54 cf Standard Footing Length, L= 7.00 ft. Provided Footing Volume,V(f)= 74 cf - Standard Footing Width,W= 7.00 ft. Footing Check okay Minimum Footing Depth, D= 1.50 ft. Footing Size to be used: M Length= 7.00 ft. ' Width = 7.00 ft. Outlet Structure #3 Depth = 1.50 ft. HYDROCAD ROUTINGS 1 - INCH ROUTING • 3 P st CNm /3N-2/ 3 Sand Filter Subcat Reach 'on. Routing Diagram for 3 Prepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 3 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 3C: 3 Post CNm Runoff = 3.77 cfs @ 2.97 hrs, Volume= 5,117 cf, Depth= 0.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 3.130 93 Modified CN 3.130 100.00°/% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post To Subcatchment 3C: 3 Post CNm Hydrograph ■Runoff 4 3 77 c1a r Type II 6-hr 3 1-inch Rainfall=1.00" Runoff Area=3.130 ac Runoff Volume=5,117 cf LL 2 Runoff Depth=0.45" Tc=5.0 min /1 CN=93 0 /4��////////////////f//f//////////////////////////////////////////////////////f//f//f//f//////// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 3 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 3D: 3 Sand Filter Inflow Area = 136,343 sf, 0.00% Impervious, Inflow Depth = 0.45" for 1-inch event Inflow = 3.77 cfs @ 2.97 hrs, Volume= 5,117 cf Outflow = 0.03 cfs @ 6.09 hrs, Volume= 5,117 cf, Atten= 99%, Lag= 187.6 min Primary = 0.03 cfs @ 6.09 hrs, Volume= 5,117 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=746.94' @ 6.09 hrs Surf.Area=4,784 sf Storage=4,739 cf Flood Elev= 750.00' Surf.Area= 9,555 sf Storage=26,965 cf Plug-Flow detention time= 1,528.1 min calculated for 5,117 cf(100% of inflow) Center-of-Mass det. time= 1,528.0 min ( 1,735.5 -207.5 ) Volume Invert Avail.Storage Storage Description #1 745.50' 26,965 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 745.50 525 0 0 746.00 3,288 953 953 747.00 4,883 4,086 5,039 748.00 6,571 5,727 10,766 749.00 8,136 7,354 18,119 750.00 9,555 8,846 26,965 Device Routing Invert Outlet Devices #1 Primary 743.00' 24.0" Round Culvert L=49.8' Ke= 0.500 Inlet/Outlet Invert= 743.00'!742.50' S= 0.0100 '!' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 745.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 4.50 Disch. (cfs) 0.000 0.030 0.038 0.047 0.055 0.060 #3 Device 1 748.20' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 749.10' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 749.50' 15.0' long x 6.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 3 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=0.03 cfs @ 6.09 hrs HW=746.94' (Free Discharge) L Culvert (Passes 0.03 cfs of 25.93 cfs potential flow) 3=Sand Bed Exfiltration (Custom Controls 0.03 cfs) —3=Low Flow Orifice ( Controls 0.00 cfs) —4=Grate Top ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=745.50' (Free Discharge) LS=Emergency Spillway ( Controls 0.00 cfs) Pond 3D: 3 Sand Filter Hydrograph ■Inflow Outflow any I Inflow Area=136,343 sf o rco dory 4 Peak Elegy=746.94' Storage=4,739 cf 3 - U O LL 1 0.03 cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 3 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Hydrograph for Pond 3D: 3 Sand Filter Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 745.50 0.00 0.00 0.00 3.00 3.33 2,165 746.34 0.03 0.03 0.00 6.00 0.11 4,724 746.93 0.03 0.03 0.00 9.00 0.00 4,395 746.87 0.03 0.03 0.00 12.00 0.00 4,043 746.79 0.03 0.03 0.00 15.00 0.00 3,697 746.71 0.03 0.03 0.00 18.00 0.00 3,358 746.63 0.03 0.03 0.00 21.00 0.00 3,026 746.56 0.03 0.03 0.00 24.00 0.00 2,701 746.48 0.03 0.03 0.00 27.00 0.00 2,397 746.40 0.03 0.03 0.00 30.00 0.00 2,118 746.33 0.02 0.02 0.00 33.00 0.00 1,860 746.26 0.02 0.02 0.00 36.00 0.00 1,625 746.19 0.02 0.02 0.00 39.00 0.00 1,410 746.13 0.02 0.02 0.00 42.00 0.00 1,213 746.08 0.02 0.02 0.00 45.00 0.00 1,035 746.02 0.02 0.02 0.00 48.00 0.00 873 745.97 0.01 0.01 0.00 51.00 0.00 727 745.93 0.01 0.01 0.00 54.00 0.00 597 745.88 0.01 0.01 0.00 57.00 0.00 481 745.83 0.01 0.01 0.00 60.00 0.00 381 745.79 0.01 0.01 0.00 63.00 0.00 295 745.74 0.01 0.01 0.00 66.00 0.00 222 745.70 0.01 0.01 0.00 69.00 0.00 163 745.66 0.00 0.00 0.00 72.00 0.00 115 745.63 0.00 0.00 0.00 75.00 0.00 78 745.60 0.00 0.00 0.00 78.00 0.00 51 745.57 0.00 0.00 0.00 81.00 0.00 32 745.55 0.00 0.00 0.00 84.00 0.00 20 745.53 0.00 0.00 0.00 87.00 0.00 12 745.52 0.00 0.00 0.00 90.00 0.00 7 745.51 0.00 0.00 0.00 93.00 0.00 4 745.51 0.00 0.00 0.00 96.00 0.00 3 745.50 0.00 0.00 0.00 99.00 0.00 2 745.50 0.00 0.00 0.00 102.00 0.00 1 745.50 0.00 0.00 0.00 105.00 0.00 1 745.50 0.00 0.00 0.00 108.00 0.00 0 745.50 0.00 0.00 0.00 111.00 0.00 0 745.50 0.00 0.00 0.00 114.00 0.00 0 745.50 0.00 0.00 0.00 117.00 0.00 0 745.50 0.00 0.00 0.00 120.00 0.00 0 745.50 0.00 0.00 0.00 1 -YEAR ROUTING < 3A> K< 3B > 3 Predeveloped 3 Postdevel ped AND 3 Sand Filter Subcat Reach 'on■ Link Routing Diagram for 3 Prepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 3 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 3A: 3 Predeveloped Runoff = 0.27 cfs @a 12.23 hrs, Volume= 2,413 cf, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 1.563 55 Wooded * 1.563 61 Grass 3.126 58 Weighted Average 3.126 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 3A: 3 Predeveloped Hydrograph z ■Runoff 0.28i/ I L2T�I 0.261"/ Type II 24-h r 0.24 1-yr Rainfall=2.80" 022 Runoff Area=3.126 ac 0.2� 0.18 Runoff Volume=2,413 cf 0.161 % Runoff Depth=0.21" ° 014 Tc=20.0 min II 0 011"/ / CN=58 008 0.04- ° O EN", r(, .,.:.. tfr��ff��tf��ff�r' �� l��� r rr,�f( ,r{frr�ff�,�frrr�ff�,�fr��ff� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 3 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 36: 3 Postdeveloped Runoff = 7.81 cfs @ 11.96 hrs, Volume= 15,377 cf, Depth= 1.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 1.920 98 Impervious * 1.210 61 Grass 3.130 84 Weighted Average 1.210 38.66% Pervious Area 1.920 61.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 3B: 3 Postdeveloped Hydrograph / ■Runoff sJ 7.9,cra Type II 24-hr 1-yr Rainfall=2.80" 6- i Runoff Area=3.138 ac Runoff Volume=15,377 cf N 51 Runoff Depth=1.35" 4- ' Tc=5.8 min IL 3J CN=84 2- 1� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 3 Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 3D: 3 Sand Filter Inflow Area = 136,343 sf, 61.34% Impervious, Inflow Depth = 1.35" for 1-yr event Inflow = 7.81 cfs @ 11.96 hrs, Volume= 15,377 cf Outflow = 0.10 cfs @ 19.85 hrs, Volume= 14,500 cf, Atten= 99%, Lag=473.1 min Primary = 0.10 cfs @ 19.85 hrs, Volume= 14,500 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=748.25' @ 19.85 hrs Surf.Area= 6,966 sf Storage= 12,476 cf Flood Elev= 750.00' Surf.Area= 9,555 sf Storage=26,965 cf Plug-Flow detention time= 2,544.4 min calculated for 14,496 cf(94% of inflow) Center-of-Mass det. time= 2,513.5 min ( 3,345.2 - 831.7 ) Volume Invert Avail.Storage Storage Description #1 745.50' 26,965 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 745.50 525 0 0 746.00 3,288 953 953 747.00 4,883 4,086 5,039 748.00 6,571 5,727 10,766 749.00 8,136 7,354 18,119 750.00 9,555 8,846 26,965 Device Routing Invert Outlet Devices #1 Primary 743.00' 24.0" Round Culvert L=49.8' Ke= 0.500 Inlet!Outlet Invert= 743.00'!742.50' S= 0.0100 '!' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 745.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 4.50 Disch. (cfs) 0.000 0.030 0.038 0.047 0.055 0.060 #3 Device 1 748.20' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 749.10' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 749.50' 15.0' long x 6.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 3 Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here} Printed 7/30/2020 HydreCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=0.09 cfs @ 19.85 hrs HW=748.25' (Free Discharge) t Culvert (Passes 0.09 cfs of 31.19 cfs potential flow) —2=Sand Bed Exfiltration (Custom Controls 0.04 cfs) —3=Low Flow Orifice (Orifice Controls 0.05 cfs @ 0.74 fps) —4=Grate Top ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=745.50' (Free Discharge) L5=Emergency Spillway ( Controls 0.00 cfs) Pond 3D: 3 Sand Filter Hydrograph •Inflow 7E7 cfs •Outflow Inflow Area=136,343 sf :Lam,,, 8: Peak Elev=748.25T T. Storage=12,476 cf 6: u 5_ o 4 LL 3 2/ ° U.10 cfs 1 ', // ri®///// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 10-YEAR ROUTING 3 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 3A: 3 Predeveloped Runoff = 3.40 cfs @ 12.15 hrs, Volume= 12,890 cf, Depth= 1.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 1.563 55 Wooded * 1.563 61 Grass 3.126 58 Weighted Average 3.126 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 3A: 3 Predeveloped Hydrograph 0 Runoff I3AD cisI r Type II 24-hr 31 10-yr Rainfall=4.94" Runoff Area=3.126 ac Runoff Volume=12,890 cf 2_/ Runoff Depth=1.14" Tc=20.0 min LL CN=58 1-/ 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 3 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 36: 3 Postdeveloped Runoff = 17.97 cfs @ 11.96 hrs, Volume= 36,535 cf, Depth= 3.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 1.920 98 Impervious * 1.210 61 Grass 3.130 84 Weighted Average 1.210 38.66% Pervious Area 1.920 61.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 3B: 3 Postdeveloped Hydrograph 20--/ ■Runoff 19= r 1 ns7dB 18=j Type II 24-hr 17= P 16✓ 10-yr Rainfall=4.94" 15 1 Runoff Area=3.130 ac 4' 13 Runoff Volume=36,535 cf 12- u 11=/ Runoff Depth=3.22" 3 19 Tc=5.8 min LT_ a_j CN=84 7 6- 5' 4= 3- 2= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 3 Type !I 24-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 3D: 3 Sand Filter Inflow Area = 136,343 sf, 61.34% Impervious, Inflow Depth = 3.22" for 10-yr event Inflow = 17.97 cfs @ 11.96 hrs, Volume= 36,535 cf Outflow = 2.43 cfs @ 12.19 hrs, Volume= 35,614 cf, Atten= 86%, Lag= 13.7 min Primary = 2.43 cfs @ 12.19 hrs, Volume= 35,614 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=749.08' @ 12.19 hrs Surf.Area= 8,252 sf Storage= 18,787 cf Flood Elev= 750.00' Surf.Area= 9,555 sf Storage=26,965 cf Plug-Flow detention time= 1,101.0 min calculated for 35,614 cf(97% of inflow) Center-of-Mass det. time= 1,085.7 min ( 1,892.7 - 807.0 ) Volume Invert Avail.Storage Storage Description #1 745.50' 26,965 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 745.50 525 0 0 746.00 3,288 953 953 747.00 4,883 4,086 5,039 748.00 6,571 5,727 10,766 749.00 8,136 7,354 18,119 750.00 9,555 8,846 26,965 Device Routing Invert Outlet Devices #1 Primary 743.00' 24.0" Round Culvert L=49.8' Ke= 0.500 Inlet/Outlet Invert= 743.00'!742.50' S= 0.0100 '!' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 745.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 4.50 Disch. (cfs) 0.000 0.030 0.038 0.047 0.055 0.060 #3 Device 1 748.20' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 749.10' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 749.50' 15.0' long x 6.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 3 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here) Printed 7/30/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=2.43 cfs @ 12.19 hrs HW=749.08' (Free Discharge) t Culvert (Passes 2.43 cfs of 34.10 cfs potential flow) 3=Sand Bed Exfiltration (Custom Controls 0.05 cfs) —3=Low Flow Orifice (Orifice Controls 2.37 cfs @ 3.80 fps) —4=Grate Top ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=745.50' (Free Discharge) L5=Emergency Spillway ( Controls 0.00 cfs) Pond 3D: 3 Sand Filter Hydrograph •Inflow I 17.97 cFs I •Outflow 20 Inflow Area=136,343 sf • ▪Sew,,, 1 S- 174 Storage=18,787 Cf 16', 15', 14- 13 12- u 11= 3 10i 0 9; LL : a= 7- 6= 5- 2.43 ifs 4= 3- 2E A.• ./ D DO cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 100-YEAR ROUTING 3 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 3A: 3 Predeveloped Runoff = 8.99 cfs @ 12.14 hrs, Volume= 30,388 cf, Depth= 2.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 1.563 55 Wooded * 1.563 61 Grass 3.126 58 Weighted Average 3.126 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 3A: 3 Predeveloped Hydrograph 10-0/ •Runoff / Ia-99 cfs I 9-" Type II 24-hr 8- / 1 o ll - r Rainfall=7.39" 7_i / Ru o Area=3.126 ac sir / Runoff V• Iu me=38,388 cf N = R n■ff Depth=2.68" 3 5� Tc=28.8 min a 4-,/ CN=58 3- 2- 1- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 3 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 36: 3 Postdeveloped Runoff = 29.83 cfs @ 11.96 hrs, Volume= 62,619 cf, Depth= 5.51" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 1.920 98 Impervious * 1.210 61 Grass 3.130 84 Weighted Average 1.210 38.66% Pervious Area 1.920 61.34% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 3B: 3 Postdeveloped Hydrograph 32 % ■Runoff 30 / Type II 24-hr 2a= 26✓ 1 100-yr Rainfal1=7.39" 24i Runoff Area=3.130 ac 22-r Runoff Volume=62,619 cf 20i 1SV Runoff Depth=5.51" 0 16=� Tc=5.0 min LL 14III CN=84 12= 1D=� / "r� ...., �r ����rl ��(f��(f���(r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 9D 95 100 105 110 115 120 Time (hours) 3 Type I!24-hr 100-yr Rainfal1=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 3D: 3 Sand Filter Inflow Area = 136,343 sf, 61.34% Impervious, Inflow Depth = 5.51" for 100-yr event Inflow = 29.83 cfs @ 11.96 hrs, Volume= 62,619 cf Outflow = 25.73 cfs @ 12.00 hrs, Volume= 61,675 cf, Atten= 14%, Lag= 2.5 min Primary = 23.92 cfs @ 12.00 hrs, Volume= 61,201 cf Secondary= 1.81 cfs @ 12.00 hrs, Volume= 474 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=749.64' @ 12.00 hrs Surf.Area= 9,040 sf Storage= 23,589 cf Flood Elev= 750.00' Surf.Area= 9,555 sf Storage=26,965 cf Plug-Flow detention time= 656.5 min calculated for 61,660 cf(98% of inflow) Center-of-Mass det. time= 648.3 min ( 1,440.0 - 791.8 ) Volume Invert Avail.Storage Storage Description #1 745.50' 26,965 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 745.50 525 0 0 746.00 3,288 953 953 747.00 4,883 4,086 5,039 748.00 6,571 5,727 10,766 749.00 8,136 7,354 18,119 750.00 9,555 8,846 26,965 Device Routing Invert Outlet Devices #1 Primary 743.00' 24.0" Round Culvert L=49.8' Ke= 0.500 Inlet/Outlet Invert= 743.00'!742.50' S= 0.0100 '!' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 745.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 4.50 Disch. (cfs) 0.000 0.030 0.038 0.047 0.055 0.060 #3 Device 1 748.20' 15.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 749.10' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 749.50' 15.0' long x 6.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.37 2.51 2.70 2.68 2.68 2.67 2.65 2.65 2.65 2.65 2.66 2.66 2.67 2.69 2.72 2.76 2.83 3 Type I!24-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=23.90 cfs @ 12.00 hrs HW=749.64' (Free Discharge) t=Culvert (Passes 23.90 cfs of 35.91 cfs potential flow) —2=Sand Bed Exfiltration (Custom Controls 0.06 cfs) —3=Low Flow Orifice (Orifice Controls 3.27 cfs 5.24 fps) —4=Grate Top (Weir Controls 20.57 cfs @ 2.40 fps) Secondary OutFlow Max=1.80 cfs @ 12.00 hrs HW=749.64' (Free Discharge) L5=Emergency Spillway (Weir Controls 1.80 cfs @ 0.88 fps) Pond 3D: 3 Sand Filter Hydrograph •Inflow —I zs.s; •Outflow Inflow Area=135,343 sf gym,,, 32- 25.73 cfs J Peak EI 49._64T � 2Et I i Storage 23,589 Cf 26 24- I/ / m 20 ' u 18- I. a 16; LI 14 12. / 107 f a- /67 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) DRAINAGE BASIN #4 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #4 INTRODUCTION: SUMMARY Drainage basin#4 includes townhome lots 13-34 in Phase 1, lots 57-75 in Phase 1 B, a portion of Ashton Park Drive and Hazel Way, and a portion of the Duke Power ROW.A pipe network system routes runoff to sand filter dry pond#4 which treats the water quality volume. SUMMARY DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 7.88 acres Postdeveloped Drainage Area 7.88 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 7.88 100% B Total 7.88 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) CN Wtd. CN Wooded 3.94 50% 55 27.50 Grass 3.94 50% 61 30.50 Total 7.88 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type _ Area(ac) °/n CN Wtd. CN Impervious 3.93 50% 98 48.94 Grass 3.94 50% 61 30.54 Total 7.88 79.48 'Composite CN Use CN = 79 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #4 HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 7.88 ac. 7.88 ac Cuve Number(CN) 58 79 Modified Curve Number(CN) n/a 91 Time of Concentration 0.50 hr. 0.08 hr. Impervious Percentage 0% 50% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.50 in/in WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.328 ac-ft 75% WQv= 0.246 ac-ft 14,278 ft3 10,709 ft3 0.50 in 0.37 in MODIFIED CURVE NUMBER CNm= 1000/0 0+5P+10W Qv-10(WQv^2+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.37 CNm 91.4 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 2.66 in CN= SCS curve number Q= 0.89 cfs Compute Watershed Runoff CPv= 0.59 ac-ft 50% CPv= 0.293 ac-ft 25,487 cu. Ft 12,744 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.197 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Hot Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #4 Existing Impervious Asphalt: 0 sf Buildings: 0 sf Concrete: 0 sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 7.88 Impervious Percentage: 0% Proposed Impervious Asphalt: 38,355 sf Buildings: 99,280 sf Concrete: 33,680 sf Total Impervious Area: 171,315 sf 3.93 ac. Drainage Area: 7.88 Impervious Percentage: 50% Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Sand Filter Design - Basin #4 Sand Filter Design Requirements Design Method Design Method TSS Detention Time 2.0 days Filter Bed Depth 2.5 ft Underdrain System Thickness 1.0 ft SUMMARY Hydrologic Calculations Pre-developed Post-developed Drainage area to pond (Da)= 7.88 ac. 7.88 ac Cuve Number(CN) 58 79 Adjusted Curve Number(CN) n/a 91 Time of Concentration 0.50 hr. 0.08 hr. Impervious Percentage 0% 50% Determine Suface Area to Treat WQv Surface Area based on Darcy's Equation Af= (WQv)(df)/((k)(h+d)(t)} Af= surface area of ponding area(sq ft) WQv= water quality control volume 10,709 cf d= filter bed depth 2.5 ft k= coefficient of permeability of filter media 3.5 ftlday h= average height of water above filter bed (ft) 1 ft 24" max for WQ storm event t= design filter bed drain time(days) 2.00 day Af= 1,093 sf Determine Dimensions Length= 50 ft Width= 22 ft Area= 1,105 sf Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Sand Filter Design - Basin #4 Stage/Storage Table Elevation Area Volume Forebay Main Pond Total Total Forebay Main Pond Total Total (msl) (sf (sf) (sf) (ac) (cu-ft) (cu-ft) (cu-ft) (ac-ft) 747.5 0 1,105 1,105 0.025 0 0 0 0.000 748 3,024 2,432 5,456 0.125 0 862 862 0.020 749 3,725 3,158 6.883 0.158 3,365 3,646 7,011 0.161 750 4,482 3,941 8,423 0.193 7,459 7,185 14,644 0.336 751 5,296 4,781 10,077 0.231 12,337 11,535 23,872 0.548 752 11,758 0.270 - - 34,768 0.798 _ 753 13,213 0.303 - - 47,234 1.084 Stage/Discharge Table Q. Af(k)(h+d)1(d) Af= surface area of bonding area(so ft) 1,105 sf d= filter bed depth 2.5 ft k= coefficient of permeability of filter media 3.5 ft/day h= average height of water above filter bed (ft) Elevation Height Fow Flow Forebay Weir (msi) (ft) (cf/day) (cfs) Elevation= 750.0 747.5 0 0 0.000 Q. 3.33LhA312 748.5 1 5,415 0.063 Q= 2 yr.storm runoff 34.65 cfs 749.5 2 6,962 0.081 L= weir length L ft 750.5 3 8,509 0.098 h= elevation over weir 1.00 ft 751.5 4 10,056 0.116 L. O/(3.33 x IA3/2) 752.5 5 11,603 0.134 Weir Length I 10 ft(10' min) 753 5.5 12,376 0.143 Peak Attenuation WQv Release Rate(1-inch storm) Design Peak Flow(cfs) Peak Flow WQv(required) = 10,709 cf milimmmlw t , + Routed Controlled? WSE WQv(actual) = 10,277 cf 1-year 0.67 15.20 0.60 yes 750.22 2.875 days 10-year 8.58 39.54 6.50 yes 752.09 69 hour 100-year 22.67 69.19 60.65 no 752.90 Release Rate= 0.041 cfs Top of Dam Elevation: 753.00 (Refer to HydroCAD 1-inch routing table) Emergency Spillway Elevation: 752.50 Top of outlet structure elevation: 752.00 WQv Water Surface Elevation: 749.24 Sand Bed Elevation: 747.50 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Anti-Flotation Device Calculations Calculations Given Data Standard Footing Assumptions Buoyant Weight of Concrete 87.6 Ibslft^3 1. Footing base to be 1 ft. wider than structure Weight of Water 62.4 Ibslft^3 on all sides. Safety Factor(S.F.) 1.25 2. Footing depth to be a minimum of 8 inches in depth. Equations used: Outlet Structure Weight,W(s)= 4(w+t)x t x h x W(bc) SUMMARY where, w= outlet box inside dimension,ft. Displaced Water Weight,W(w)= 4 x(w+2t)x W(w)x h t= structure wall thickness,ft. h= height of structure,ft. Required Base Weight,W(b)= (W(w)x S.F.)-W(s) W(bc)= buoyant weight of concrete, Ibslft^3 W(w)= weight of water,Ibs/ft^3 • Required Footing Volume,V(f)= W(b)/W(bc) S.F.= safety factor •u e ru ure Structure Dimensions Object Weights Height of structure, h = 7 ft. Outlet Structure Weight, W(s) = 5519 lbs Structure wall thickness,t = 6 in. Displaced Water Weie,W(w)= 8736 lbs Outlet box inside dimension, w= 4 ft. R�•'d Base Weight,W • = 5401 lbs Footin• Size Required Footing Volume,V(t)= 62 cf Standard Footing Length, L= 7.00 ft. Provided Footing Volume,V(f)= 74 cf - Standard Footing Width,W= 7.00 ft. Footing Check okay Minimum Footing Depth, D= 1.50 ft. Footing Size to be used: M Length= 7.00 ft. • Width = 7.00 ft. Outlet Structure #4 Depth = 1.50 ft. HYDROCAD ROUTINGS 1 - INCH ROUTING < 4C > 4 P st CNm ZIA 4 Sand Filter Subcat Reach 'on. Routing Diagram for 4 Prepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 4 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 4C: 4 Post CNm Runoff = 7.64 cfs @ 2.97 hrs, Volume= 10,277 cf, Depth= 0.36" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 7.880 91 Modified CN 7.880 100.00°/% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 4C: 4 Post CNm Hydrograph ■Runoff 81 7-64 cis V Type II ' / 6-hr 6 1-inch Rainfall=1.00" Runoff Area=7.880 ac 5 ' Runoff Volume=10,277 cf 4- Runoff Depth=0.36" LL /' Tc=5.0 min 1 CN=91 2: , o 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 4D: 4 Sand Filter Inflow Area = 343,253 sf, 0.00% Impervious, Inflow Depth = 0.36" for 1-inch event Inflow = 7.64 cfs @ 2.97 hrs, Volume= 10,277 cf Outflow = 0.08 cfs @ 6.09 hrs, Volume= 10,277 cf, Atten= 99%, Lag= 187.3 min Primary = 0.08 cfs @ 6.09 hrs, Volume= 10,277 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=749.24' @ 6.09 hrs Surf.Area= 7,207 sf Storage= 9,436 cf Flood Elev= 753.00' Surf.Area= 13,213 sf Storage=48,066 cf Plug-Flow detention time= 1,340.8 min calculated for 10,277 cf(1000/0 of inflow) Center-of-Mass det. time= 1,340.6 min ( 1,552.0 -211.4 ) Volume Invert Avail.Storage Storage Description #1 747.50' 48,066 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 747.50 1,105 0 0 748.00 5,456 1,640 1,640 749.00 6,833 6,145 7,785 750.00 8,423 7,628 15,413 751.00 10,077 9,250 24,663 752.00 11,758 10,918 35,580 753.00 13,213 12,486 48,066 Device Routing Invert Outlet Devices #1 Primary 745.00' 30.0" Round Culvert L= 38.9' Ke= 0.500 Inlet/Outlet Invert= 745.00'1744.75' S= 0.0064 '1' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 747.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.063 0.081 0.098 0.116 0.134 0.143 #3 Device 1 750.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 752.00' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100V0 open area) Limited to weir flow at low heads #5 Secondary 752.50' 15.0' long x 8.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 4 Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=0.08 cfs @ 6.09 hrs HW=749.24' (Free Discharge) L Culvert (Passes 0.08 cfs of 40.70 cfs potential flow) —2=Sand Bed Exfiltration (Custom Controls 0.08 cfs) —3=Low Flow Orifice ( Controls 0.00 cfs) —4=Grate Top ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=747.50' (Free Discharge) L5=Emergency Spillway ( Controls 0.00 cfs) Pond 4D: 4 Sand Filter Hydrograph •Inflow z://1)zsa ■Outflow Inflow Area=343,253 sf :Z1 ,,, crth 8: Peak Elev=749.24T 7: Storage=9,436 cf 6i m 5 u - c 4_ IL - 3� / 2 / 0.08 cfs 1— ;Da.c.fts i/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Hydrograph for Pond 4D: 4 Sand Filter Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 747.50 0.00 0.00 0.00 3.00 6.88 3,873 748.39 0.06 0.06 0.00 6.00 0.24 9,404 749.23 0.08 0.08 0.00 9.00 0.00 8,657 749.13 0.07 0.07 0.00 12.00 0.00 7,866 749.01 0.07 0.07 0.00 15.00 0.00 7,097 748.90 0.07 0.07 0.00 18.00 0.00 6,350 748.79 0.07 0.07 0.00 21.00 0.00 5,625 748.67 0.07 0.07 0.00 24.00 0.00 4,922 748.56 0.06 0.06 0.00 27.00 0.00 4,245 748.45 0.06 0.06 0.00 30.00 0.00 3,633 748.35 0.05 0.05 0.00 33.00 0.00 3,087 748.26 0.05 0.05 0.00 36.00 0.00 2,601 748.17 0.04 0.04 0.00 39.00 0.00 2,170 748.10 0.04 0.04 0.00 42.00 0.00 1,789 748.03 0.03 0.03 0.00 45.00 0.00 1,452 747.96 0.03 0.03 0.00 48.00 0.00 1,157 747.90 0.03 0.03 0.00 51.00 0.00 902 747.85 0.02 0.02 0.00 54.00 0.00 686 747.79 0.02 0.02 0.00 57.00 0.00 508 747.74 0.01 0.01 0.00 60.00 0.00 363 747.69 0.01 0.01 0.00 63.00 0.00 251 747.64 0.01 0.01 0.00 66.00 0.00 166 747.61 0.01 0.01 0.00 69.00 0.00 106 747.57 0.00 0.00 0.00 72.00 0.00 65 747.55 0.00 0.00 0.00 75.00 0.00 39 747.53 0.00 0.00 0.00 78.00 0.00 24 747.52 0.00 0.00 0.00 81.00 0.00 14 747.51 0.00 0.00 0.00 84.00 0.00 9 747.51 0.00 0.00 0.00 87.00 0.00 5 747.50 0.00 0.00 0.00 90.00 0.00 3 747.50 0.00 0.00 0.00 93.00 0.00 2 747.50 0.00 0.00 0.00 96.00 0.00 1 747.50 0.00 0.00 0.00 99.00 0.00 1 747.50 0.00 0.00 0.00 102.00 0.00 0 747.50 0.00 0.00 0.00 105.00 0.00 0 747.50 0.00 0.00 0.00 108.00 0.00 0 747.50 0.00 0.00 0.00 111.00 0.00 0 747.50 0.00 0.00 0.00 114.00 0.00 0 747.50 0.00 0.00 0.00 117.00 0.00 0 747.50 0.00 0.00 0.00 120.00 0.00 0 747.50 0.00 0.00 0.00 1 -YEAR ROUTING < 4A> < 4B > 4 Predeveloped 4 Postdevelo ed AND 4 Sand Filter Subcat Reach 'on. Routing Diagram for 4 Prepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 4 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 4A: 4 Predeveloped Runoff = 0.67 cfs @a 12.23 hrs, Volume= 6,082 cf, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 3.940 55 Wooded * 3.940 61 Grass 7.880 58 Weighted Average 7.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 4A: 4 Predeveloped Hydrograph 0.75--1" ■Runoff 0.7" Iasr I 0.65- Type II 24-h r 061/ 1-yr Rainfall=2.80" 01/ Runoff Area=7.880 ac 0.5i/ 0.451/ Runoff Volume=6,082 cf 0.41 % Runoff Depth=0.21" II 031 % Tc-20.0 min 0.25J CN=58 0 21 0.15 0 1_� 0 D5.v 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 46: 4 Postdeveloped Runoff = 15.20 cfs @ 11.97 hrs, Volume= 29,875 cf, Depth= 1.04" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 3.933 98 Impervious * 3.947 61 Grass 7.880 79 Weighted Average 3.947 50.09% Pervious Area 3.933 49.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 4B: 4 Postdeveloped / Hydrograph 17J ■Runoff 16= 15sa crs 15= Type II 24p-hr 14 / 1=yr Rainfall-2.80" 13: 12 yr Runoff Area=7.880 ac 11= Runoff Volume=29,875 cf 1D=/ 111 9i" Runoff Depth=1.04" r Tc=5.0 min LL -i CN=79 6= 5J 4= 3= ' 2V - - 0 5 10 15 20 25 30 35 40 45 50 55 66 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 4D: 4 Sand Filter Inflow Area = 343,253 sf, 49.91% Impervious, Inflow Depth = 1.04" for 1-yr event Inflow = 15.20 cfs @ 11.97 hrs, Volume= 29,875 cf Outflow = 0.60 cfs @ 13.79 hrs, Volume= 29,860 cf, Atten= 96%, Lag= 109.7 min Primary = 0.60 cfs @ 13.79 hrs, Volume= 29,860 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=750.22' @ 13.79 hrs Surf.Area= 8,791 sf Storage= 17,327 cf Flood Elev= 753.00' Surf.Area= 13,213 sf Storage=48,066 cf Plug-Flow detention time= 1,345.4 min calculated for 29,853 cf(100% of inflow) Center-of-Mass det. time= 1,346.2 min ( 2,195.2 - 849.0 ) Volume Invert Avail.Storage Storage Description #1 747.50' 48,066 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 747.50 1,105 0 0 748.00 5,456 1,640 1,640 749.00 6,833 6,145 7,785 750.00 8,423 7,628 15,413 751.00 10,077 9,250 24,663 752.00 11,758 10,918 35,580 753.00 13,213 12,486 48,066 Device Routing Invert Outlet Devices #1 Primary 745.00' 30.0" Round Culvert L= 38.9' Ke= 0.500 Inlet/Outlet Invert= 745.00'1744.75' S= 0.0064 '1' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 747.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.063 0.081 0.098 0.116 0.134 0.143 #3 Device 1 750.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 752.00' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 752.50' 15.0' long x 8.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 4 Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=0.60 cfs @ 13.79 hrs HW=750.22' (Free Discharge) L=Culvert (Passes 0.60 cfs of 47.11 cfs potential flow) —2=Sand Bed Exfiltration (Custom Controls 0.09 cfs) 3=Low Flow Orifice (Orifice Controls 0.51 cfs @ 1.51 fps) —4=Grate Top ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=747.50' (Free Discharge) L5=Emergency Spillway ( Controls 0.00 cfs) Pond 4D: 4 Sand Filter Hydrog raph •Inflow 1520 cfs •Outflow 17 Inflow Area=343,253 sf : y 16 Peak Elev=750.22T 15- 14: Storage=17,327 cf 13- 12= 11- 10= u 9- o a' u_ 7_ 6'. /_ OM 2_ osods 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 10-YEAR ROUTING 4 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 4A: 4 Predeveloped Runoff = 8.58 cfs @ 12.15 hrs, Volume= 32,493 cf, Depth= 1.14" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 3.940 55 Wooded * 3.940 61 Grass 7.880 58 Weighted Average 7.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 4A: 4 Predeveloped Hydrograph / ■Runoff Iris cfs I s1 Type II 24-hr 10-yr Rainfall=4.94" Runoff Area=7.880 ac 61 ♦ Runoff Volume=32,493 cf 51 / Runoff Depth=1.14" j Tc 20,0 min a 4/ CN=S 31-Z 1 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 46: 4 Postdeveloped Runoff = 39.54 cfs @ 11.96 hrs, Volume= 78,664 cf, Depth= 2.75" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type 1124-hr 10-yr Rainfall=4.94" Area (ac) CN Description * 3.933 98 Impervious * 3.947 61 Grass 7.880 79 Weighted Average 3.947 50.09% Pervious Area 3.933 49.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 4B: 4 Postdeveloped Hydrograph 441". ■Runoff 42', / I 39s4ds 43a- D Type II 24-hr 36', 10-yr Rainfall=4.94" 34 32 r Runoff Area=7.880-ac 3D 2a- Runoff Vo l u nne=78,664 cf El Runoff Depth=2.75" 3 2 2D Tc=5.0 min 19', / CN=79 15✓ 14- 12€ D a- 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type II 24-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 4D: 4 Sand Filter Inflow Area = 343,253 sf, 49.91% Impervious, Inflow Depth = 2.75" for 10-yr event Inflow = 39.54 cfs @ 11.96 hrs, Volume= 78,664 cf Outflow = 6.50 cfs @ 12.15 hrs, Volume= 78,647 cf, Atten= 84%, Lag= 11.0 min Primary = 6.50 cfs @ 12.15 hrs, Volume= 78,647 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=752.09' @ 12.15 hrs Surf.Area= 11,890 sf Storage= 36,652 cf Flood Elev= 753.00' Surf.Area= 13,213 sf Storage=48,066 cf Plug-Flow detention time= 560.3 min calculated for 78,647 cf(100% of inflow) Center-of-Mass det. time= 560.2 min ( 1,381.1 - 821.0 ) Volume Invert Avail.Storage Storage Description #1 747.50' 48,066 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 747.50 1,105 0 0 748.00 5,456 1,640 1,640 749.00 6,833 6,145 7,785 750.00 8,423 7,628 15,413 751.00 10,077 9,250 24,663 752.00 11,758 10,918 35,580 753.00 13,213 12,486 48,066 Device Routing Invert Outlet Devices #1 Primary 745.00' 30.0" Round Culvert L= 38.9' Ke= 0.500 Inlet/Outlet Invert= 745.00'1744.75' S= 0.0064 '1' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 747.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.063 0.081 0.098 0.116 0.134 0.143 #3 Device 1 750.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 752.00' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 752.50' 15.0' long x 8.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 4 Type 1124-hr 10-yr Rainfall=4.94" Prepared by{enter your company name here) Printed 7/30/2020 HydreCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=6.44 cfs @ 12.15 hrs HW=752.09' (Free Discharge) L Culvert (Passes 6.44 cfs of 57.12 cfs potential flow) 3=Sand Bed Exfiltration (Custom Controls 0.13 cfs) —3=Low Flow Orifice (Orifice Controls 4.89 cfs @ 6.53 fps) —4=Grate Top (Weir Controls 1.42 cfs @ 0.98 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=747.50' (Free Discharge) L5=Emergency Spillway ( Controls 0.00 cfs) Pond 4D: 4 Sand Filter Hydrograph ■Inflow 139.54 cFs I •Outflow 44, Inflow Area=343,253 sf : y 42- ■ 401 ' — 36 36- 34= 32- '3D= 26- N 26- u 24� I 22; 0 201 •187 ■ 16; 141" 12i 'fi-53 ds 1D= ' 6; // D DO cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 100-YEAR ROUTING 4 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 4A: 4 Predeveloped Runoff = 22.67 cfs @ 12.14 hrs, Volume= 76,602 cf, Depth= 2.68" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 3.940 55 Wooded * 3.940 61 Grass 7.880 58 Weighted Average 7.880 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 4A: 4 Predeveloped Hydrograph 25 •Runoff 24; / F r-rm 23_; Type II 24-h r 22. 2201 / 100-yr Rainfall=7.39" 9✓ / Runoff Area=7.880 ac 1 8✓ 7 16✓ Runoff Volume=76,602 cf 15 / 14-r Runoff Depth=2.68" • 13; 0 12 Tc=20.0 min u f 19 CN=58 98 6 / 1/ 5'," 4 2 /r 0 5 10 15 20 25 30 35 40 45 50 55 fi0 45 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type 1124-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 46: 4 Postdeveloped Runoff = 69.19 cfs @ 11.96 hrs, Volume= 141,381 cf, Depth= 4.94" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 100-yr Rainfall=7.39" Area (ac) CN Description * 3.933 98 Impervious * 3.947 61 Grass 7.880 79 Weighted Average 3.947 50.09% Pervious Area 3.933 49.91% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 4B: 4 Postdeveloped Hydrograph 75✓ ■Runoff / 69.19 ds 70- , Type II 24-hr ::i 100-yr Rainfall79" r 55_ Runoff Area=7.880 ac 50/ I Runoff Volume=141,381 cf 451-/ Runoff Depth=4.94" 35� Tc=5.0 min ° LL 3D✓ CN=79 25 / 20= 15:% 0= 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 4 Type I!24-hr 100-yr Rainfal1=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 4D: 4 Sand Filter Inflow Area = 343,253 sf, 49.91% Impervious, Inflow Depth = 4.94" for 100-yr event Inflow = 69.19 cfs @ 11.96 hrs, Volume= 141,381 cf Outflow = 60.65 cfs @ 12.00 hrs, Volume= 141,363 cf, Atten= 12%, Lag= 2.3 min Primary = 50.89 cfs @ 12.00 hrs, Volume= 137,749 cf Secondary= 9.76 cfs @ 12.00 hrs, Volume= 3,614 cf Routing by Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=752.90' @ 12.00 hrs Surf.Area= 13,071 sf Storage=46,784 cf Flood Elev= 753.00' Surf.Area= 13,213 sf Storage=48,066 cf Plug-Flow detention time= 330.5 min calculated for 141,328 cf(100% of inflow) Center-of-Mass det. time= 331.7 min ( 1,136.0 - 804.3 ) Volume Invert Avail.Storage Storage Description #1 747.50' 48,066 cf Detention (Prismatic) Listed below (Recalc) Elevation Surf Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 747.50 1,105 0 0 748.00 5,456 1,640 1,640 749.00 6,833 6,145 7,785 750.00 8,423 7,628 15,413 751.00 10,077 9,250 24,663 752.00 11,758 10,918 35,580 753.00 13,213 12,486 48,066 Device Routing Invert Outlet Devices #1 Primary 745.00' 30.0" Round Culvert L= 38.9' Ke= 0.500 Inlet/Outlet Invert= 745.00'1744.75' S= 0.0064 7' Cc= 0.900 n= 0.013, Flow Area= 4.91 sf #2 Device 1 747.50' Sand Bed Exfiltration Head (feet) 0.00 1.00 2.00 3.00 4.00 5.00 5.50 Disch. (cfs) 0.000 0.063 0.081 0.098 0.116 0.134 0.143 #3 Device 1 750.00' 18.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 752.00' 3.0"x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 752.50' 15.0' long x 8.0' breadth Emergency Spillway Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 1.80 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 Coef. (English) 2.43 2.54 2.70 2.69 2.68 2.68 2.66 2.64 2.64 2.64 2.65 2.65 2.66 2.66 2.68 2.70 2.74 4 Type II 24-hr 100-yr Rainfall=7.39" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=50.64 cfs @ 12.00 hrs HW=752.90' (Free Discharge) L=Culvert (Passes 50.64 cfs of 60.95 cfs potential flow) —2=Sand Bed Exfiltration (Custom Controls 0.14 cfs) —3=Low Flow Orifice (Orifice Controls 5.88 cfs @ 7.83 fps) —4=Grate Top (Weir Controls 44.62 cfs @ 3.10 fps) Secondary OutFlow Max=9.62 cfs @ 12.00 hrs HW=752.90' (Free Discharge) L5=Emergency Spillway (Weir Controls 9.62 cfs @ 1.61 fps) Pond 4D: 4 Sand Filter Hydrograph •Inflow /./ 69.19 cfs I •Outflow 1 Inflow Area=343,253 sf r ,,, 75: ' 60.fi5 cfs / Peak EIev752.9OT TO 65! • 4 7 yfi0 50.89 cfs 55 50- 45:/ //: [ Ill u 40 3 35- / 3,0 I / E : '__'Li �' 5= I//I/. ,in. 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) DRAINAGE BASIN #5 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #5 INTRODUCTION: SUMMARY Drainage basin#5 includes townhome lots 91-105 in Phase 1 B and a portion of Prince Garrett Way.A pipe network system routes runoff to a StormTech underground detention system and through a BayFilter vault which treats the water quality volume.A flow splitter upstream of the underground detention allows higher flows to bypass the system. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 1.93 acres Postdeveloped Drainage Area 1.93 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 1.93 100% B Total 1.93 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) % CN Wtd. CN Wooded 0.97 50% 55 27.50 Grass 0.97 50% 61 30.50 Total 1.93 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type Area(ac) % CN Wtd. CN Impervious 1.08 56% 98 54.61 Grass 0.85 44% 61 27.01 Total 1.93 81.62 'Composite CN Use CN = 82 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #5 HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 1.93 ac. 1.93 ac Cuve Number(CN) 58 82 Modified Curve Number(CN) n/a 92 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 56% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.55 in/in WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.089 ac-ft 75% WQv= 0.067 ac-ft 3,864 ft3 2,898 ft3 0.55 in 0.41 in MODIFIED CURVE NUMBER CNm= 1000/0 0+5P+10W Qv-10(WQv^2+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.41 CNm 92.2 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 2.20 in CN= SCS curve number Q= 1.06 cfs Compute Watershed Runoff CPv= 0.170 ac-ft 50% CPv= 0.085 ac-ft 7,407 cu. Ft 3,703 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.057 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Hot Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #5 Existing Impervious Asphalt: 0 sf Buildings: 0 sf Concrete: 0 sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 1.93 Impervious Percentage: 0% Proposed Impervious Asphalt: 5,975 sf Buildings: 32,530 sf Concrete: 8,350 sf Total Impervious Area: 46,855 sf 1.08 ac. Drainage Area: 1.93 Impervious Percentage: 56% HYDROCAD ROUTINGS 1 - INCH ROUTING 5 Post N m AFS /wSPlitter N .Q 5E AD Overflow 5 UGD till Total Discharge Subcat Reach 'on. Iti Routing Diagram for 5 ADSPrepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 5 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 5C: 5 Post CNm Runoff = 2.09 cfs @ 2.97 hrs, Volume= 2,820 cf, Depth= 0.40" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 1.930 92 Modified CN 1.930 100.00°/% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post To Subcatchment 5C: 5 Post CNm Hydrograph ■Runoff I2os�I 2 Type II 6-hr 1-inch Rainfall=1.00" Runoff Area=1.930 ac 17, Runoff Volume=2,820 cf LL 1_ Runoff Depth=0.40" Tc=5.0 min CN=92 0 45d1%///////////////f//f//f//////////////////////////////////////////////////////f//f//f//////// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter Inflow Area = 84,071 sf, 0.00% Impervious, Inflow Depth = 0.40" for 1-inch event Inflow = 2.09 cfs @ 2.97 hrs, Volume= 2,820 cf Outflow = 2.09 cfs @ 2.97 hrs, Volume= 2,820 cf, Atten= 0°/0, Lag= 0.0 min Primary = 2.09 cfs @ 2.97 hrs, Volume= 2,820 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=750.04' @ 6.14 hrs Flood Elev= 755.25' Device Routing Invert Outlet Devices #1 Primary 748.60' 12.0" Round Low Flow L= 8.2' Ke= 0.500 Inlet/Outlet Invert= 748.60'!748.54' S= 0.0073 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Secondary 748.00' 18.0" Round High Flow L= 20.0' Ke= 0.500 Inlet/Outlet Invert=748.00'!747.75' S= 0.0125 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #3 Device 2 750.50' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 750.50 754.75 754.75 Width (feet) 4.00 4.00 0.00 Primary OutFlow Max=2.08 cfs @ 2.97 hrs HW=749.57' TW=748.04' (Dynamic Tailwater) L1=Low Flow (Barrel Controls 2.08 cfs @ 3.39 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=748.00' TW=0.00' (Dynamic Tailwater) t-2=High Flow ( Controls 0.00 cfs) L3=Weir Wall ( Controls 0.00 cfs) 5 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter Hydrograph 0 Inflow zus'I Outflow 209 cis Inflow Area=84,071 sf o Secmandary l2.09 cfs.r Peak Elev=750.04' 2- 7/7 u it 1- 1 / '�' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 5D: 5 UGD Inflow Area = 84,071 sf, 0.00% Impervious, Inflow Depth = 0.40" for 1-inch event Inflow = 2.09 cfs @ 2.97 hrs, Volume= 2,820 cf Outflow = 0.01 cfs @ 6.11 hrs, Volume= 758 cf, Atten= 99%, Lag= 188.7 min Primary = 0.01 cfs @ 6.11 hrs, Volume= 758 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=750.04' @ 6.11 hrs Surf.Area= 1,476 sf Storage= 2,730 cf Flood Elev= 750.50' Surf.Area= 1,476 sf Storage= 3,004 cf Plug-Flow detention time= 669.3 min calculated for 758 cf(27% of inflow) Center-of-Mass det. time= 631.6 min ( 841.0 -209.5 ) Volume Invert Avail.Storage Storage Description #1A 747.00' 566 cf 11.00'W x 53.46'L x 3.50'H Field A 2,058 cf Overall -643 cf Embedded = 1,415 cf x 40.0%Voids #2A 747.50' 643 cf ADS_StormTech SC-740 +Cap x 14 Inside#1 Effective Size=44.6"W x 30.0"H => 6.45 sf x 7.12'L =45.9 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 14 Chambers in 2 Rows #36 747.00' 493 cf 11.00'W x 46.34'L x 3.50'H Field B 1,784 cf Overall - 551 cf Embedded = 1,233 cf x 40.0%Voids #46 747.50' 551 cf ADS_StormTech SC-740 +Cap x 12 Inside#3 Effective Size= 44.6"W x 30.0"H => 6.45 sf x 7.12'L =45.9 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 12 Chambers in 2 Rows #5C 747.00' 383 cf 6.25'W x 60.58'L x 3.50'H Field C 1,325 cf Overall - 368 cf Embedded = 958 cf x 40.0% Voids #6C 747.50' 368 cf ADS_StormTech SC-740 +Cap x 8 Inside#5 Effective Size= 44.6"W x 30.0"H => 6.45 sf x 7.12'L =45.9 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 3,004 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices (Turned on 1 times) #1 Primary 746.50' 8.0" Round Outlet L= 26.4' Ke= 0.500 Inlet/Outlet Invert= 746.50'!746.35' S= 0.0057 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf #2 Device 1 749.17' BayFilter Cartridges X 2.00 0.330" Diameter, C= 0.600 Inlet/Outlet Elev. = 0.00'1746.50' Starts@749.17' Breaks@747.00' #3 Device 2 747.60' StormTech to BayFilter 12.000" Diameter, C= 0.600 8.8' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. = 747.60'!747.50' 5 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=0.01 cfs @ 6.11 hrs HW=750.04' TW=0.00' (Dynamic Tailwater) L1=Outlet (Passes 0.01 cfs of 2.85 cfs potential flow) L2=BayFilter Cartridges (Orifice Controls 0.01 cfs @ 9.05 fps) L3=StormTech to BayFilter (Passes 0.01 cfs of 3.42 cfs potential flow) Pond 5D: 5 UGD Hyd rag raph ■Inflow I 2.09 I 0 Primary 1 Inflow Area=84,071 sf 2-Peak Elegy=750.04' Storage=2,730 cf LL 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 5E: Overflow Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 0°/0, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 5E: Overflow Hydrograph ■Inflow ❑Primary I cfs por U I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 5F: Total Discharge Inflow Area = 84,071 sf, 0.00% Impervious, Inflow Depth = 0.11" for 1-inch event Inflow = 0.01 cfs @ 6.11 hrs, Volume= 758 cf Primary = 0.01 cfs @ 6.11 hrs, Volume= 758 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 5F: Total Discharge Hydrograph ■Inflow 0-012 1101 cfs ❑Primary 0.011 nmrcr8���,` Inflow Area=84,071 sf 0.01v�:�r'+r��J4 0-009 0.008_ 0-008- 0.007_ 0 007 -/ • t 0-006= 3 0-006= 0 0.005 • o-aa5 ' 0-004"' 0-004"' 0-003"' 0-003= 0-002= 0-001"' 0.001 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 -YEAR ROUTING < 5A> < 5B) 5 Pre 5 Post FS . Flow Splitter N .Q 5E /51:\ Overflow 5 UGD 5F Total Discharge Subcat Reach on. Link Routing Diagram for 5ADS Prepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 5 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 5A: 5 Pre Runoff = 0.16 cfs @ 12.23 hrs, Volume= 1,490 cf, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 0.965 55 Wooded * 0.965 61 Grass 1.930 58 Weighted Average 1.930 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ftift) (ftlsec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 5A: 5 Pre // Hydrograph 0.18' •Runoff 0.171 Ia1scI 0.167 Type II 24-hr 0.15K, 1-yr Rainfall=2.80" 0-14= V 0-13 Runoff Area=1.930 ac 0.1✓ Runoff Volume=1,490 cf 0.1. 1 Runoff Depth=0.21" E 0.08 % Tc=20.0 min 007 CN=58 0-05 0.02V / 0 01 le,{r(, ::.., .. tfr��ff��tf��ff�r��� l��� r rr,�f( ,r{frr�ff�,�frrr�ff�,�fr��ff� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 56: 5 Post Runoff = 4.37 cfs @ 11.96 hrs, Volume= 8,571 cf, Depth= 1.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 1.076 98 Impervious * 0.854 61 Grass 1.930 82 Weighted Average 0.854 44.25% Pervious Area 1.076 55.75% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 5B: 5 Post Hydrograph 0 Runoff Type 1124-h r 41 141-yr Rainfall=2.80" Runoff Area=1.930 ac Runoff Volume=8,571 cf Runoff Depth=1.22" LL Tc=5.0 min 2/ CN=82 0 5 1❑ 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type !I 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter Inflow Area = 84,071 sf, 55.75% Impervious, Inflow Depth = 1.22" for 1-yr event Inflow = 4.37 cfs @ 11.96 hrs, Volume= 8,571 cf Outflow = 4.37 cfs @ 11.96 hrs, Volume= 8,571 cf, Atten= 0°/0, Lag= 0.0 min Primary = 4.28 cfs @ 11.96 hrs, Volume= 6,069 cf Secondary= 2.83 cfs @ 12.04 hrs, Volume= 2,503 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=750.86' @ 12.04 hrs Flood Elev= 755.25' Device Routing Invert Outlet Devices #1 Primary 748.60' 12.0" Round Low Flow L= 8.2' Ke= 0.500 Inlet!Outlet Invert= 748.60'!748.54' S= 0.0073 '!' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Secondary 748.00' 18.0" Round High Flow L= 20.0' Ke= 0.500 Inlet/Outlet Invert=748.00'!747.75' S= 0.0125 '!' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #3 Device 2 750.50' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 750.50 754.75 754.75 Width (feet) 4.00 4.00 0.00 Primary OutFlow Max=3.34 cfs @ 11.96 hrs HW=750.44' TW=749.66' (Dynamic Tailwater) L1=Low Flow (Inlet Controls 3.34 cfs @ 4.25 fps) Secondary OutFlow Max=2.59 cfs @ 12.04 hrs HW=750.84' TW=0.00' (Dynamic Tailwater) t-2=High Flow (Passes 2.59 cfs of 12.30 cfs potential flow) L3=Weir Wall (Weir Controls 2.59 cfs @ 1.91 fps) 5 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter Hydrograph 0 Inflow 4.37 cfs 1 Outflow „,/ 43;Lis Inflow Area=84,071 sf o Primary 1 428 cis 1 V Peak Elev=750.86' 4 3 1 2.83 cfs 1 o — 2- 1 n Zr 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type !I 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 5D: 5 UGD Inflow Area = 84,071 sf, 55.75% Impervious, Inflow Depth = 0.87" for 1-yr event Inflow = 4.28 cfs @ 11.96 hrs, Volume= 6,069 cf Outflow = 2.23 cfs @ 12.03 hrs, Volume= 4,007 cf, Atten=48%, Lag=4.1 min Primary = 2.23 cfs @ 12.03 hrs, Volume= 4,007 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev= 147,874.92' @ 12.03 hrs Surf.Area= 1,476 sf Storage= 3,004 cf Flood Elev= 750.50' Surf.Area= 1,476 sf Storage= 3,004 cf Plug-Flow detention time= 520.8 min calculated for 4,007 cf(66%of inflow) Center-of-Mass det. time=409.4 min ( 1,237.1 - 827.7 ) Volume Invert Avail.Storage Storage Description #1A 747.00' 566 cf 11.00'W x 53.46'L x 3.50'H Field A 2,058 cf Overall -643 cf Embedded = 1,415 cf x 40.0%Voids #2A 747.50' 643 cf ADS_StormTech SC-740 +Cap x 14 Inside#1 Effective Size=44.6"W x 30.0"H => 6.45 sf x 7.12'L =45.9 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 14 Chambers in 2 Rows #36 747.00' 493 cf 11.00'W x 46.34'L x 3.50'H Field B 1,784 cf Overall - 551 cf Embedded = 1,233 cf x 40.0%Voids #46 747.50' 551 cf ADS_StormTech SC-740 +Cap x 12 Inside#3 Effective Size= 44.6"W x 30.0"H => 6.45 sf x 7.12'L =45.9 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 12 Chambers in 2 Rows #5C 747.00' 383 cf 6.25'W x 60.58'L x 3.50'H Field C 1,325 cf Overall - 368 cf Embedded = 958 cf x 40.0% Voids #6C 747.50' 368 cf ADS_StormTech SC-740 +Cap x 8 Inside#5 Effective Size= 44.6"W x 30.0"H => 6.45 sf x 7.12'L =45.9 cf Overall Size= 51.0"W x 30.0"H x 7.56'L with 0.44' Overlap 3,004 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 746.50' 8.0" Round Outlet L= 26.4' Ke= 0.500 Inlet/Outlet Invert= 746.50'!746.35' S= 0.0057 '!' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.35 sf #2 Device 1 749.17' BayFilter Cartridges X 2.00 0.330" Diameter, C= 0.600 Inlet/Outlet Elev. = 0.00'1746.50' Starts@749.17' Breaks@747.00' #3 Device 2 747.60' StormTech to BayFilter 12.000" Diameter, C= 0.600 8.8' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. = 747.60'!747.50' 5 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Primary OutFlow Max=2.06 cfs @ 12.03 hrs HW=130,419.57' TW=0.00' (Dynamic Tailwater) L1=Outlet (Passes 2.06 cfs of 590.00 cfs potential flow) L2=BayFilter Cartridges (Orifice Controls 2.06 cfs © 1,733.88 fps) L3=StormTech to BayFilter (Passes 2.06 cfs of 1,345.13 cfs potential flow) Pond 5D: 5 UGD Hydrog raph ■Inflow 4.28 cfs I 0 Primary � Inflow Area=B ,071 sf 4= Peak Elev=147,874.92' Storage=3,004 cf 3—' 3 ��cfs I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 5E: Overflow Inflow = 2.83 cfs @ 12.04 hrs, Volume= 2,503 cf Primary = 2.83 cfs @ 12.04 hrs, Volume= 2,503 cf, Atten= 0%, Lag= O.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 5E: Overflow Hyd rag raph ■Inflow z.ss ds ❑Primary I 3 z83 r 2_ ' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 5 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 5F: Total Discharge Inflow Area = 84,071 sf, 55.75% Impervious, Inflow Depth = 0.93" for 1-yr event Inflow = 4.98 cfs @ 12.03 hrs, Volume= 6,510 cf Primary = 4.98 cfs @ 12.03 hrs, Volume= 6,510 cf, Atten= 0'M . Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 5F: Total Discharge Hydrograph ❑Inflow 49ec I 0 Primary 5- 4�; InfIo A = 4,0 1 s 4-' - u 3 LL 2 / 1-' 0"%////// //////////////////////////////J//J/////////////////////////////////J//J//J//% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) DRAINAGE BASIN #6 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #6 INTRODUCTION: SUMMARY Drainage basin#6 includes townhome lots 86-90&106-133 in Phase 1 B and a portion of Waterway Drive, Garrison Grove Lane and Prince Garrett Way.A pipe network system routes runoff to a StormTech underground detention system and through a BayFilter vault which treats the water quality volume.A flow splitter upstream of the underground detention allows higher flows to bypass the system. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 5.72 acres Postdeveloped Drainage Area 5.72 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 5.72 100% B Total 5.72 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) % CN Wtd. CN Wooded 2.86 50% 55 27.50 Grass 2.86 50% 61 30.50 Total 5.72 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type _ Area(ac) % CN Wtd. CN Impervious 3.90 68% 98 66.78 Grass 1.82 32% 61 19.43 Total 5.72 86.21 'Composite CN Use CN = 86 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #6 HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 5.72 ac. 5.72 ac Cuve Number(CN) 58 86 Modified Curve Number(CN) n/a 94 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 68% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.66 Win WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.316 ac-ft 75% WQv= 0.237 ac-ft 13,776 ft3 10,332 ft3 0.66 in 0.50 in MODIFIED CURVE NUMBER CNm= 1000/0 0+5P+10W Qv-10(WQv^2+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.50 CNm 93.9 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 1.63 in CN= SCS curve number Q= 1.31 cfs Compute Watershed Runoff CPv= 0.624 ac-ft 50% CPv= 0.312 ac-ft 27,189 cu. Ft 13,595 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.210 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #6 Existing Impervious Asphalt: 0 sf Buildings: 0 sf Concrete: 0 sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 5.72 Impervious Percentage: 0% Proposed Impervious Asphalt: 54,795 sf Buildings: 72,650 sf Concrete: 42,390 sf Total Impervious Area: 169,835 sf 3.90 ac. Drainage Area: 5.72 Impervious Percentage: 68% HYDROCAD ROUTINGS 1 - INCH ROUTING <6C> 6 Post Nm AFS . Splitter Ns A/ow 6E�___ Overflow 6 LJ G D \it 6F Total Discharge Subcat Reach 'on. Iti Routing Diagram for 6 ADSPrepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 6 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6C: 6 Post CNm Runoff = 7.64 cfs @ 2.96 hrs, Volume= 10,460 cf, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 5.720 94 Modified CN 5.720 100.00°/% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post To Subcatchment 6C: 6 Post CNm Hydrograph ■Runoff 817.84 Ifs 1 Type II ' 6-hr 6 1-inch Rainfall=1.00" Runoff Area=5.720 ac Runoff Volume=10,460 cf 4- Runoff Depth=0.50" LL 3. / Tc=5.0 min CN=94 2- 1-- p 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 6 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter Inflow Area = 249,163 sf, 0.00% Impervious, Inflow Depth = 0.50" for 1-inch event Inflow = 7.64 cfs @ 2.96 hrs, Volume= 10,460 cf Outflow = 7.64 cfs @ 2.96 hrs, Volume= 10,460 cf, Atten= 0°/0, Lag= 0.0 min Primary = 7.64 cfs @ 2.96 hrs, Volume= 10,460 cf Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=738.05' @ 6.08 hrs Flood Elev= 743.25' Device Routing Invert Outlet Devices #1 Primary 734.00' 18.0" Round Low Flow L= 12.3' Ke= 0.500 Inlet/Outlet Invert= 734.00'1733.92' S= 0.0065 '1' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Secondary 733.50' 30.0" Round High Flow L= 71.5' Ke= 0.500 Inlet 1 Outlet Invert= 733.50'1731.20' S= 0.0322 '1' Cc= 0.900 n= 0.012, Flow Area= 4.91 sf #3 Device 2 738.25' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 738.25 742.75 742.75 Width (feet) 4.00 4.00 0.00 Primary OutFlow Max=7.54 cfs @ 2.96 hrs HW=735.80' TW=734.83' (Dynamic Tailwater) L1=Low Flow (Barrel Controls 7.54 cfs @ 4.51 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=733.50' TW=0.00' (Dynamic Tailwater) t-2=High Flow ( Controls 0.00 cfs) L3=Weir Wall ( Controls 0.00 cfs) 6 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter Hydrograph 0 Inflow rs!cts I Outflow 6+c Inflow Area=249 '163 cf ❑Primaryr ■Secondary 81 " Peak Elegy=738.05T 7- 6- a 5 g 4- IL - 3- 2- ' •- 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 6 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 6D: 6 UGD Inflow Area = 249,163 sf, 0.00% Impervious, Inflow Depth = 0.50" for 1-inch event Inflow = 7.64 cfs @ 2.96 hrs, Volume= 10,460 cf Outflow = 0.03 cfs @ 6.11 hrs, Volume= 8,168 cf, Atten= 100%, Lag= 189.0 min Primary = 0.03 cfs @ 6.11 hrs, Volume= 8,168 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=738.06' @ 6.11 hrs Surf.Area= 3,288 sf Storage= 10,092 cf Flood Elev= 736.50' Surf.Area= 3,288 sf Storage=7,658 cf Plug-Flow detention time= 2,277.7 min calculated for 8,168 cf(78% of inflow) Center-of-Mass det. time= 2,254.3 min ( 2,459.7 -205.4 ) Volume Invert Avail.Storage Storage Description #1A 733.00' 271 cf 8.42'W x 20.04'L x 5.50'H Field A 928 cf Overall - 250 cf Embedded = 678 cf x 40.0%Voids #2A 733.75' 250 cf ADS_StormTech MC-3500 d +Cap x 2 Inside#1 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #36 733.00' 981 cf 8.42'W x 77.40'L x 5.50'H Field 6 3,583 cf Overall - 1,129 cf Embedded = 2,454 cf x 40.0% Voids #46 733.75' 1,129 cf ADS_StormTech MC-3500 d +Cap x 10 Inside#3 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #5C 733.00' 893 cf 8.42'W x 70.23'L x 5.50'H Field C 3,251 cf Overall - 1,019 cf Embedded = 2,232 cf x 40.0% Voids #6C 733.75' 1,019 cf ADS_StormTech MC-3500 d +Cap x 9 Inside#5 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #7D 733.00' 1,434 cf 15.58'W x 63.06'L x 5.50'H Field D 5,405 cf Overall - 1,819 cf Embedded = 3,586 cf x 40.0% Voids #8D 733.75' 1,819 cf ADS_StormTech MC-3500 d +Cap x 16 Inside#7 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 16 Chambers in 2 Rows Cap Storage= +14.9 cf x 2 x 2 rows = 59.6 cf #9E 733.00' 715 cf 8.42'W x 55.89'L x 5.50'H Field E 2,587 cf Overall -799 cf Embedded = 1,788 cf x 40.0%Voids #10E 733.75' 799 cf ADS_StormTech MC-3500 d +Cap x 7 Inside#9 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #11 F 733.00' 645 cf 15.58'W x 27.21'L x 5.50'H Field F 2,332 cf Overall -719 cf Embedded = 1,613 cf x 40.0%Voids #12F 733.75' 719 cf ADS_StormTech MC-3500 d +Cap x 6 Inside#11 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 6 Chambers in 2 Rows 6 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Cap Storage= +14.9 cf x 2 x 2 rows = 59.6 cf 10,676 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Storage Group D created with Chamber Wizard Storage Group E created with Chamber Wizard Storage Group F created with Chamber Wizard Device Routing Invert Outlet Devices (Turned on 1 times) #1 Primary 731.30' 12.0" Round Outlet L= 10.0' Ke= 0.500 Inlet 1 Outlet Invert=731.30'1731.20' S=0.0100 7' Cc= 0.900 n= 0.013, Flow Area=0.79 sf #2 Device 1 733.00' BayFilter Cartridges X 8.00 0.250" Diameter, C= 0.600 Inlet/Outlet Elev. =0.00'/731.30' Starts@733.00' Breaks@731.55' #3 Device 2 734.25' StormTech to BayFilter 12.000" Diameter, C= 0.600 5.2' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. =734.25'/734.13' Primary OutFlow Max=0.03 cfs @ 6.11 hrs HW=738.06' TW=0.00' (Dynamic Tailwater) L1=Outlet (Passes 0.03 cfs of 9.46 cfs potential flow) L2=BayFilter Cartridges (Orifice Controls 0.03 cfs @ 12.52 fps) L3=StormTech to BayFilter (Passes 0.03 cfs of 7.38 cfs potential flow) Pond 6D: 6 UGD Hydrograph ■Inflow 8 i 764 its I ■Primary I Inflow Area=24 ,163 sf Peak Elegy=738.06' Storage=1O,092 cf 6 .1 4 IL : 2 1% +/JJJ//J/!JlIJJJJJ/!//lJJIJJJJ!/JIJJIJJJJ/JJ/!//lJJIJJJ///��rlri��iiiiJ%//// f]'f9: // ir J� /////////////////////////////////////////////////////////////////////////////////////% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 90 85 90 95 100 105 110 115 120 Time (hours) 6 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 6E: Overflow Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 0°/0, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 6E: Overflow Hydrograph ■Inflow ❑Primary I cfs por U I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 6 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 6F: Total Discharge Inflow Area = 249,163 sf, 0.00% Impervious, Inflow Depth = 0.39" for 1-inch event Inflow = 0.03 cfs @ 6.11 hrs, Volume= 8,168 cf Primary = 0.03 cfs @ 6.11 hrs, Volume= 8,168 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 6F: Total Discharge Hydrograph ■_■• •■•__ ■Inflow 0-038_' .- -.-__ 0 Primary 0.036_ am .r/ MMM_ 0.032_ A //l/// ////////// ��_�_ III o-o2s 0.026_' o' •___0.022 p^ °-022= I 0.02' g 0.018' LL 0.0167' 0.014 0-012 0 008 0.006 -004 0-°02—r` % (30.00211 %%%%% %%// 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 TO 15 80 85 90 95 100 105 110 115 120 Time (hours) 1 -YEAR ROUTING <6A> <6B) 6 Pre 6 Post AFS Flow Splitter N. N. 6E A �_____ Overflow 6 UGD \ i 6F Total Discharge Subcat Reach 'on. Iti Routing Diagram for 6 ADSPrepared by{enter your company name here), Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 6 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6A: 6 Pre Runoff = 0.49 cfs @ 12.23 hrs, Volume= 4,417 cf, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 2.861 55 Wooded * 2.861 61 Grass 5.722 58 Weighted Average 5.722 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 6A: 6 Pre Hydrograph •Runoff 0 5i.,/ I o-49 cFs 1 Type II 24-h r 01/ 1-yr Rainfall=2.80" 0.41 / Runoff Area=5.722 ac 0351 Runoff Volume=4,417 cf 031/ % Runoff Dep h=0.21" g 0-25iZ Tc=20.0 min 0-21/ CN=58 0.15 005� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 9D 95 100 105 110 115 120 Time (hours) 6 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 6B: 6 Post Runoff = 15.64 cfs @ 11.96 hrs, Volume= 31,001 cf, Depth= 1.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 3.899 98 Impervious * 1.823 61 Grass 5.722 86 Weighted Average 1.823 31.86% Pervious Area 3.899 68.14% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 6B: 6 Post Hydrograph 17� ■Runoff 5✓ ® Type II 24-h r 14•r 1-yr Rainfall=2.80" 13' Runoff Area=5.722 ac 12i 11V Runoff Volume=31,001 cf N 1D: Runoff Depth=1.49" 9= o s-. Tc=5.0 min LT_ / CN=86 3=• 1 2- I% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 6 ADS Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter Inflow Area = 249,250 sf, 68.14% Impervious, Inflow Depth = 1.49" for 1-yr event Inflow = 15.64 cfs @ 11.96 hrs, Volume= 31,001 cf Outflow = 15.64 cfs @ 11.96 hrs, Volume= 31,001 cf, Atten= 0°/0, Lag= 0.0 min Primary = 12.76 cfs @ 11.92 hrs, Volume= 13,966 cf Secondary= 10.07 cfs @ 12.02 hrs, Volume= 17,035 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=739.10' @ 12.02 hrs Flood Elev= 743.25' Device Routing Invert Outlet Devices #1 Primary 734.00' 18.0" Round Low Flow L= 12.3' Ke= 0.500 Inlet/Outlet Invert= 734.00'1733.92' S= 0.0065 '1' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Secondary 733.50' 30.0" Round High Flow L= 71.5' Ke= 0.500 Inlet 1 Outlet Invert= 733.50'1731.20' S= 0.0322 '1' Cc= 0.900 n= 0.012, Flow Area= 4.91 sf #3 Device 2 738.25' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 738.25 742.75 742.75 Width (feet) 4.00 4.00 0.00 Primary OutFlow Max=10.42 cfs @ 11.92 hrs HW=738.36' TW=736.86' (Dynamic Tailwater) L1=Low Flow (Inlet Controls 10.42 cfs @ 5.90 fps) Secondary OutFlow Max=9.07 cfs @ 12.02 hrs HW=739.03' TW=0.00' (Dynamic Tailwater) t-2=High Flow (Passes 9.07 cfs of 48.91 cfs potential flow) L3=Weir Wall (Weir Controls 9.07 cfs @ 2.90 fps) 6 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter Hydrograph 0 Inflow I15.64�I Outflow ,5d 6 �g Inflow Area=249,250 sf :PrimSecary 17 • 16 Peak Elegy=739.10T 15 14 l;-: 13 12 i, ' 11 „ m 1. u 9 o 7 / 6 5 4 0 3 241, f �� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 95 90 95 100 105 110 115 120 Time (hours) 6 ADS Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCADO 10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 6D: 6 UGD Inflow Area = 249,250 sf, 68.14% Impervious, Inflow Depth = 0.67" for 1-yr event Inflow = 12.76 cfs @ 11.92 hrs, Volume= 13,966 cf Outflow = 12.17 cfs @ 12.00 hrs, Volume= 11,674 cf, Atten= 5°/0, Lag=4.9 min Primary = 12.17 cfs @ 12.00 hrs, Volume= 11,674 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev= 859,798.01' @ 12.00 hrs Surf.Area= 3,288 sf Storage= 10,676 cf Flood Elev= 736.50' Surf.Area= 3,288 sf Storage= 7,658 cf Plug-Flow detention time= 2,137.1 min calculated for 11,671 cf(84% of inflow) Center-of-Mass det. time= 2,098.0 min ( 2,837.6 -739.6 ) Volume Invert Avail.Storage Storage Description #1A 733.00' 271 cf 8.42'W x 20.04'L x 5.50'H Field A 928 cf Overall - 250 cf Embedded = 678 cf x 40.0%Voids #2A 733.75' 250 cf ADS_StormTech MC-3500 d +Cap x 2 Inside#1 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #36 733.00' 981 cf 8.42'W x 77.40'L x 5.50'H Field 6 3,583 cf Overall - 1,129 cf Embedded = 2,454 cf x 40.0% Voids #46 733.75' 1,129 cf ADS_StormTech MC-3500 d +Cap x 10 Inside#3 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #5C 733.00' 893 cf 8.42'W x 70.23'L x 5.50'H Field C 3,251 cf Overall - 1,019 cf Embedded = 2,232 cf x 40.0% Voids #6C 733.75' 1,019 cf ADS_StormTech MC-3500 d +Cap x 9 Inside#5 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #7D 733.00' 1,434 cf 15.58'W x 63.06'L x 5.50'H Field D 5,405 cf Overall - 1,819 cf Embedded = 3,586 cf x 40.0% Voids #8D 733.75' 1,819 cf ADS_StormTech MC-3500 d +Cap x 16 Inside#7 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 16 Chambers in 2 Rows Cap Storage= +14.9 cf x 2 x 2 rows = 59.6 cf #9E 733.00' 715 cf 8.42'W x 55.89'L x 5.50'H Field E 2,587 cf Overall -799 cf Embedded = 1,788 cf x 40.0%Voids #10E 733.75' 799 cf ADS_StormTech MC-3500 d +Cap x 7 Inside#9 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #11 F 733.00' 645 cf 15.58'W x 27.21'L x 5.50'H Field F 2,332 cf Overall -719 cf Embedded = 1,613 cf x 40.0%Voids #12F 733.75' 719 cf ADS_StormTech MC-3500 d +Cap x 6 Inside#11 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 6 Chambers in 2 Rows 6 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/30/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Cap Storage= +14.9 cf x 2 x 2 rows = 59.6 cf 10,676 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Storage Group D created with Chamber Wizard Storage Group E created with Chamber Wizard Storage Group F created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 731.30' 12.0" Round Outlet L= 10.0' Ke= 0.500 Inlet/Outlet Invert=731.30'1731.20' S=0.0100 '1' Cc= 0.900 n= 0.013, Flow Area=0.79 sf #2 Device 1 733.00' BayFilter Cartridges X 8.00 0.250" Diameter, C= 0.600 Inlet/Outlet Elev. =0.00'1731.30' Starts@733.00' Breaks@731.55' #3 Device 2 734.25' StormTech to BayFilter 12.000n Diameter, C= 0.600 5.2' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. =734.25'/734.13' Primary OutFlow Max=12.17 cfs @ 12.00 hrs HW=859,795.24' TW=0.00' (Dynamic Tailwater) L1=Outlet (Passes 12.17 cfs of 3,505.07 cfs potential flow) L2=BayFilter Cartridges (Orifice Controls 12.17 cfs @ 4,462.79 fps) L3=StormTech to BayFilter (Passes 12.17 cfs of 3,482.88 cfs potential flow) Pond 6D: 6 UGD Hydragraph ■Inflow 14= / I1a76ch I 0 PrimaryI 13 127 j Inflow Area 249,250 sf ■ 12- f Peak Elev=859,798.01' 11 I/ 1 D- j Storage=10,676 cf 9 a. 3 6� LL 6- f 5- //J 4 3 00 1- J/JJIJJ!!//!J!JJIJJJ!/J!!//lJJIJJJJJJJ/JJIJI//II////////l///// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 6 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 6E: Overflow Inflow = 10.07 cfs a@ 12.02 hrs, Volume= 17,035 cf Primary = 10.07 cfs @ 12.02 hrs, Volume= 17,035 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 6E: Overflow Hydrograph ■Inflow 11� I1DD7cfs I 0 Primary , 10.07 cis(/ 1D� u � O a 5 J 31 2 fl 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 6 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/30/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 6F: Total Discharge Inflow Area = 249,250 sf, 68.14% Impervious, Inflow Depth = 1.38" for 1-yr event Inflow = 19.24 cfs @ 12.00 hrs, Volume= 28,709 cf Primary = 19.24 cfs @ 12.00 hrs, Volume= 28,709 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 6F: Total Discharge Hydrograph ■Inflow 21;/ I1924d I ❑Primary 20. / EEEZI Inflow Area=249,250 sf 19= / 17- ` 16'.' / 15/ 14- 13= / 12: 14 0 10- a // / 4 14 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) DRAINAGE BASIN #7 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #7 INTRODUCTION: SUMMARY Drainage basin#7 includes single family lots 239-257,304-315&319-332 in Phases 2B&3A,the future amenity site and a portion of Garrison Grove Lane, Cairo Court, and Hamilton Park Drive. A pipe network system routes runoff to a StormTech underground detention system and through a BayFilter vault which treats the water quality volume. A flow splitter upstream of the underground detention allows higher flows to bypass the system. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 9.04 acres Postdeveloped Drainage Area 9.04 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 9.04 100% B Total 9.04 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) % CN Wtd. CN Wooded 4.52 50% 55 27.50 Grass 4.52 50% 61 30.50 Total 9.04 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type Area(ac) % CN Wtd. CN Impervious 5.27 58% 98 57.10 Grass 3.77 42% 61 25.46 Total 9.04 82.56 Composite CN Use CN = 83 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #7 HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 9.04 ac. 9.04 ac Cuve Number(CN) 58 83 Modified Curve Number(CN) n/a 93 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 58% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.57 Win WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.433 ac-ft 75% WQv= 0.325 ac-ft 18,848 ft3 14,136 ft3 0.57 in 0.43 in MODIFIED CURVE NUMBER CNm= 1000/0 0+5P+10W Qv-10(WQv^2+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.43 CNm 92.6 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 2.05 in CN= SCS curve number Q= 1.12 cfs Compute Watershed Runoff CPv= 0.841 ac-ft 50% CPv= 0.421 ac-ft 36,639 cu. Ft 18,320 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.283 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #7 Existing Impervious Asphalt: 0 sf Buildings: 0 sf Concrete: 0 sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 9.04 Impervious Percentage: 0% Proposed Impervious Asphalt: 57,640 sf Buildings: 124,140 sf Concrete: 47,650 sf Total Impervious Area: 229,430 sf 5.27 ac. Drainage Area: 9.04 Impervious Percentage: 58% HYDROCAD ROUTINGS 1 - INCH ROUTING • Post CNm 1 (AP Sand Filter Su6Cat Reach 'on• Routing Diagram for 7 Sand Filter Prepared by Center your company name here}, Printed 5/16/2022 HydroCAD'10.00-26 s/n 09478 fl 2020 HydroCAD Software Solutions LLC 7 Sand Filter Type II 6-hr 1-inch Rainfall=1.00" Prepared by {enter your company name here} Printed 5/16/2022 HydroCAD® 10.00-26 sin 09478 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 11 S: 7 Post CNm Runoff = 8.77 cfs @ 2.97 hrs, Volume= 0.271 af, Depth= 0.36" Runoff by SCS TR-20 method. UH=SCS, Weighted-CN. Time Span= 0.00-120.00 hrs. dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.0011 Area (ac) CN Description * 9.040 91 Modified CN 9.040 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 11S: 7 Post CNm Hydrograph 1 1 1 1 1 1 1 1 1 I r ti 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 Runoff y t t r 9.1 8.77 cfs I I , I I I ti t, t, ,r ti, t, ,t t- 1 1 JTTrTJ THfr TJTT Y FI- "1 W-mer '` • JTJrTJ 1 1 1 1 1 1 1 1 1 1 ✓ ti i r ti t 6� //" • 1 1 1 1 1 1 1 1 1 1 1Runp 1 A�ea= . 4 al 1 - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 E , 7 7 r Runoff-Vor�lm;e=0 7` alf- 5� 1 1 1 1 1 1 1 1 1 1 11 111 1 30 - 1 1 1 1 1 1 1 1 1 1 1 -R-tin-ci#f 1De ahT 1.36!' 4- / 1 1 E 1 1 T T 1 T T r r 1 T TLL=SR..4_0--i 3- UN Tr9J7 ■ f- 1 7 T T f- iJti 1 T r T 1 l% , , , , , , , , , , , 1 1 o ' i���%///////////////////////////////////////////////////////////////////////////f/////////////// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 7 Sand Filter Type 11 6-hr 1-inch Rainfall=1.00" Prepared by {enter your company name here} Printed 5/16/2022 HydroCAD© 10.00-26 s/n 09478 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Pond 10P: Sand Filter Inflow Area = 9.040 ac, 0.00% Impervious, Inflow Depth = 0.36" for 1-inch event Inflow = 8.77 cfs @ 2.97 hrs, Volume= 0.271 af Outflow = 0.16 cfs @ 6.06 hrs, Volume= 0.271 af, Atten= 98%, Lag= 185.7 min Primary = 0.16 cfs @ 6.06 hrs, Volume= 0.271 af Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev= 741.64'@ 6.06 hrs Surf.Area= 5,291 sf Storage= 10,078 cf Plug-Flow detention time=737.9 min calculated for 0.271 af(100% of inflow) Center-of-Mass det. time=737.4 min ( 948.8 - 211.4 ) Volume Invert Avail.Storage Storage Description #1 738.50' 25,121 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 738.50 1,261 0 0 739.00 3,224 1,121 1,121 740.00 3,005 3,115 4,236 741.00 3,224 3,115 7,350 742.00 6,451 4,838 12,188 743.00 3,686 5,069 17,256 744.00 3,929 3,808 21,064 745.00 4,186 4,058 25,121 Device Routing Invert Outlet Devices #1 Primary 736.50' 18.0" Round Culvert L= 37.0' Ke= 0.500 Inlet/ Outlet Invert= 736.50'/ 736.30' S= 0.0054 '/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 738.50' Sand Filter Elev. (feet) 738.50 739.00 740.00 741.00 742.00 743.00 744.00 745.00 ❑isch. (cfs) 0.000 0.068 0.102 0.136 0.170 0.204 0.238 0.272 #3 Device 1 742.00' 12.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 744.00' 3.0" x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 744.25' Emergency Spillway, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.75 Width (feet) 15.00 15.00 7 Sand Filter Type II 6-hr 1-inch Rainfall=1.00" Prepared by {enter your company name here} Printed 5/16/2022 HydroCADO 10.00-26 sin 09478 02020 HydroCAD Software Solutions LLC Page 5 Primary OutFlow Max=0.16 cfs @ 6.06 hrs HW=741.64' (Free Discharge) L1=Culvert (Passes 0.16 cfs of 17.83 cfs potential flow) 3=Sand Filter (Custom Controls 0.16 cfs) —3=Low Flow Orifice ( Controls 0.00 cfs) —4=Grate Top ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=738.50' (Free Discharge) 5=Emergency Spillway( Controls 0.00 cfs) Pond 10P: Sand Filter Hydrograph I I I II II I I I I II II I ■Inflow I I I I I I I I I I •Outflow H- +-H + + + + +-kin oiN+ H ry iy • ,r Pik-EJiv,141-. '- of + + + + + o#'21 -E =14MTl8-cf- 7�J _ I I • • , I I N " 5f I I Or , y r ti t r t t t t r t r y r y r 3�r I I I I I I 2J. 01E cfs 0000,17 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 7 Sand Filter Type 11 6-hr 1-inch Rainfall=1.00" Prepared by {enter your company name here} Printed 5/16/2022 HydroCAD© 10.00-26 s/n 09478 ©2020 HydroCAD Software Solutions LLC Pace 6 Hydrograph for Pond 10P: Sand Filter Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 738.50 0.00 0.00 0.00 3.00 7.89 4,413 740.06 0.10 0.10 0.00 6.00 0.27 10,060 741.64 0.16 0.16 0.00 9.00 0.00 8,489 741.31 0.15 0.15 0.00 12.00 0.00 6,982 740.89 0.13 0.13 0.00 15.00 0.00 5,635 740.46 0.12 0.12 0.00 18.00 0.00 4,438 740.07 0.10 0.10 0.00 21.00 0.00 3,378 739.72 0.09 0.09 0.00 24.00 0.00 2,437 739.41 0.08 0.08 0.00 27.00 0.00 1,600 739.15 0.07 0.07 0.00 30.00 0.00 871 738.92 0.06 0.06 0.00 33.00 0.00 400 738.73 0.03 0.03 0.00 36.00 0.00 158 738.61 0.01 0.01 0.00 39.00 0.00 55 738.54 0.01 0.01 0.00 42.00 0.00 18 738.51 0.00 0.00 0.00 45.00 0.00 6 738.50 0.00 0.00 0.00 48.00 0.00 2 738.50 0.00 0.00 0.00 51.00 0.00 1 738.50 0.00 0.00 0.00 54.00 0.00 0 738.50 0.00 0.00 0.00 57.00 0.00 0 738.50 0.00 0.00 0.00 60.00 0.00 0 738.50 0.00 0.00 0.00 63.00 0.00 0 738.50 0.00 0.00 0.00 66.00 0.00 0 738.50 0.00 0.00 0.00 69.00 0.00 0 738.50 0.00 0.00 0.00 72.00 0.00 0 738.50 0.00 0.00 0.00 75.00 0.00 0 738.50 0.00 0.00 0.00 78.00 0.00 0 738.50 0.00 0.00 0.00 81.00 0.00 0 738.50 0.00 0.00 0.00 84.00 0.00 0 738.50 0.00 0.00 0.00 87.00 0.00 0 738.50 0.00 0.00 0.00 90.00 0.00 0 738.50 0.00 0.00 0.00 93.00 0.00 0 738.50 0.00 0.00 0.00 96.00 0.00 0 738.50 0.00 0.00 0.00 99.00 0.00 0 738.50 0.00 0.00 0.00 102.00 0.00 0 738.50 0.00 0.00 0.00 105.00 0.00 0 738.50 0.00 0.00 0.00 108.00 0.00 0 738.50 0.00 0.00 0.00 111.00 0.00 0 738.50 0.00 0.00 0.00 114.00 0.00 0 738.50 0.00 0.00 0.00 117.00 0.00 0 738.50 0.00 0.00 0.00 120.00 0.00 0 738.50 0.00 0.00 0.00 1 -YEAR ROUTING < 7B > lost 1CAD Sand Filter Subcat Reach 'on. It Routing Diagram for 7 Sand Filter Prepared by{enter your company name here}, Printed 5/16/2022 HydroCAD®10.00-26 s/n 09478 ©2020 HydroCAD Software Solutions LLC 7 Sand Filter Type 1124-hr 1-yr Rainfall=2.80" Prepared by {enter your company name here} Printed 5/16/2022 HydroCAD® 10.00-26 sin 09478 ©2020 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 7B: 7 Post Runoff = 21.49 cfs @ 11.96 hrs, Volume= 0.970 af, Depth= 1.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN. Time Span= 0.00-120.00 hrs. dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 5.267 98 Impervious * 3.772 61 Grass 9.039 83 Weighted Average 3.772 41.73% Pervious Area 5.267 58.27% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 7B: 7 Post Hydrograph 1 ti r r r r r --1--ti-- --r-- i r--r— r I 1 r r r r 24. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 Runoff 22_ 4 21.49 cfs I 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 7 r r r r 1 , r r r r r 1 1� 2�_. - IT elt ,19= 1 1 1 1 1 1 I I I I I I 11 Rai#tfall#�del„- it',, --I-- J 4 1 1 L L J J 1 1 1 L L 1 1 J 4 1 L L 17- �---- ;--;--7--r--E--�---- ; 7 7 rRian�rff-Iok eit='1-039-ae-- -� __1-- J 1 1 L L L J J 1 1 L L L 1 1 1 1 1 L L 15-. a= --I- 1 77 T El- , 1 1 T T T r r 1 1 1 7 T r r -_ _J__1__1__L__L__L__I__J__J__1__1__L__ �}g 1 .�yJ /y�/97 — J 13= 1 1 1 1 1 R ttn 11 1� t ■.Ii•�/1 3 12= r --1-- -7 r r r r r 1 -1 1 r r r r r 1 1 7-ryr t rr J�r-7-0 11' 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 T4��-ine - LL ° r , 1 1 1 1 1 1 1 1 1 9; -I-- 1 1 T r El- I 1 1 T T r r r I I 1 1 =]V•! 8 1 ____ J 1 1 L L L J J 1 1 L L L 1 Ili L i IIIIII III IIIIIIIIIII 77.; �__1__ yytrrr__1__yytt__r__r__r , 1 yyt__r__r_ ---_ - 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I__ 1 1 1 J 1 1 1 11 1 1 1 1 3'� /-_1L L 1- L 1- L 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 4- 1 7 r r El- 1 1 r r r r r 1 1 1 7 T r r 3r' __-- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I I I 1- 1: 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 7 Sand Filter Type 1124-hr 7-yr Rainfall=2.80" Prepared by {enter your company name here} Printed 5/16/2022 HydroCAD© 10.00-26 s/n 09478 ©2020 HydroCAD Software Solutions LLC Page 4 Summary for Pond 10P: Sand Filter Inflow Area = 9.039 ac, 58.27% Impervious, Inflow Depth = 1.29" for 1-yr event Inflow = 21.49 cfs @ 11.96 hrs, Volume= 0.970 of Outflow = 2.79 cfs @ 12.25 hrs, Volume= 0.970 af, Atten= 87°/0, Lag= 17.1 min Primary = 2.79 cfs @ 12.25 hrs, Volume= 0.970 af Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev= 743.40'@ 12.25 hrs Surf.Area= 3,783 sf Storage= 18,741 cf Plug-Flow detention time=474.9 min calculated for 0.969 af(100% of inflow) Center-of-Mass det. time=475.4 min ( 1,310.6 - 835.2 ) Volume Invert Avail.Storage Storage Description #1 738.50' 25,121 cf Custom Stage Data (Prismatic)Listed below(Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 738.50 1,261 0 0 739.00 3,224 1,121 1,121 740.00 3,005 3,115 4,236 741.00 3,224 3,115 7,350 742.00 6,451 4,838 12,188 743.00 3,686 5,069 17,256 744.00 3,929 3,808 21,064 745.00 4,186 4,058 25,121 Device Routing Invert Outlet Devices #1 Primary 736.50' 18.0" Round Culvert L= 37.0' Ke= 0.500 Inlet/ Outlet Invert= 736.50'/ 736.30' S= 0.0054 '/' Cc= 0.900 n= 0.013, Flow Area= 1.77 sf #2 Device 1 738.50' Sand Filter Elev. (feet) 738.50 739.00 740.00 741.00 742.00 743.00 744.00 745.00 ❑isch. (cfs) 0.000 0.068 0.102 0.136 0.170 0.204 0.238 0.272 #3 Device 1 742.00' 12.0"W x 6.0" H Vert. Low Flow Orifice C= 0.600 #4 Device 1 744.00' 3.0" x 3.0" Horiz. Grate Top X 16.00 columns X 16 rows C= 0.600 in 48.0" x 48.0" Grate (100% open area) Limited to weir flow at low heads #5 Secondary 744.25' Emergency Spillway, Cv= 2.62 (C= 3.28) Head (feet) 0.00 0.75 Width (feet) 15.00 15.00 7 Sand Filter Type 1124-hr 1-yr Rainfall=2.80" Prepared by {enter your company name here} Printed 5/16/2022 HydroCAD® 10.00-26 sin 09478 ©2020 HydroCAD Software Solutions LLC Page 5 Primary OutFlow Max=2.79 cfs @ 12.25 hrs HW=743.40' (Free Discharge) L1=Culvert (Passes 2.79 cfs of 21.10 cfs potential flow) 3=Sand Filter (Custom Controls 0.22 cfs) —3=Low Flow Orifice (Orifice Controls 2.57 cfs @ 5.15 fps) —4=Grate Top ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=738.50' (Free Discharge) ZS=Emergency Spillway( Controls 0.00 cfs) Pond 10P: Sand Filter Hydrograph --1--r-7--r----T----r--r-7--r-7--r-7--r----1---1--r--1--7--r-r-- 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 el Inflow r/,-- - - - - - - - - --------------- I11T----r--r7r11--r----Tr7r-7-- 10u1fIOW iW- re03aE Se and , 1 1 1 1 1 1 1 1 1 1 ry • �, ____l/_J__L____11__L1__LJ__LJPLPF FI__1=_ _I-� t_ 22i V 1 1 1 1 1"�a�,nk E Ili� 0 4 2{]-• , ,,' ,, I I 1 1 1 1 1 1 1 'Stkra e 8' 741'I I I I I I I I I I I I I cf 18 '. I I I I I I I I I I 1fY i r T r r r 7 r 7 r T r 1 1 r 1 1 1 1 1 1 1 1 1 1 1 1 ' - "-- -1--r----T----7--r7--r7--r1--r----T----r----7--r-7-- Cr? _ • J V I 1 1 1 1 1 1 1 1 1 1 1 30 12 I I1 I I I I I 1 1 1 1 1 1 1 1 ____- _J__ ____1____1__L_1__L__It__ _J__ ____1____ LL 10= 1 1 1 1 1 1 1 1 1 1 L 1 t 1 1 1 1 1 I I I I I I I I I I I I I I I I r _ 8- r I 1 I I I I 1 1 1 1 1 1 I I I I I . ,' ,'1279 cfs H--+----+----+--F-{--I----}-4--}----+----+----{--I-+-- 4 ® i • os°°r%/ // 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 7 Sand Filter Type 1124-hr 1-yr Rainfall=2.80" Prepared by {enter your company name here} Printed 5/16/2022 HydroCAD© 10.00-26 s/n 09478 ©2020 HydroCAD Software Solutions LLC Pace 6 Hydrograph for Pond 10P: Sand Filter Time Inflow Storage Elevation Outflow Primary Secondary (hours) (cfs) (cubic-feet) (feet) (cfs) (cfs) (cfs) 0.00 0.00 0 738.50 0.00 0.00 0.00 3.00 0.00 0 738.50 0.00 0.00 0.00 6.00 0.00 0 738.50 0.00 0.00 0.00 9.00 0.00 0 738.50 0.00 0.00 0.00 12.00 18.71 15,311 742.55 1.46 1.46 0.00 15.00 0.58 13,951 742.29 0.69 0.69 0.00 18.00 0.35 13,226 742.17 0.39 0.39 0.00 21.00 0.25 12,810 742.10 0.27 0.27 0.00 24.00 0.22 12,643 742.07 0.23 0.23 0.00 27.00 0.00 10,827 741.78 0.16 0.16 0.00 30.00 0.00 9,131 741.45 0.15 0.15 0.00 33.00 0.00 7,565 741.06 0.14 0.14 0.00 36.00 0.00 6,155 740.62 0.12 0.12 0.00 39.00 0.00 4,899 740.22 0.11 0.11 0.00 42.00 0.00 3,786 739.85 0.10 0.10 0.00 45.00 0.00 2,799 739.53 0.09 0.09 0.00 48.00 0.00 1,923 739.25 0.08 0.08 0.00 51.00 0.00 1,142 739.01 0.07 0.07 0.00 54.00 0.00 556 738.80 0.04 0.04 0.00 57.00 0.00 233 738.65 0.02 0.02 0.00 60.00 0.00 85 738.56 0.01 0.01 0.00 63.00 0.00 28 738.52 0.00 0.00 0.00 66.00 0.00 9 738.51 0.00 0.00 0.00 69.00 0.00 3 738.50 0.00 0.00 0.00 72.00 0.00 1 738.50 0.00 0.00 0.00 75.00 0.00 0 738.50 0.00 0.00 0.00 78.00 0.00 0 738.50 0.00 0.00 0.00 81.00 0.00 0 738.50 0.00 0.00 0.00 84.00 0.00 0 738.50 0.00 0.00 0.00 87.00 0.00 0 738.50 0.00 0.00 0.00 90.00 0.00 0 738.50 0.00 0.00 0.00 93.00 0.00 0 738.50 0.00 0.00 0.00 96.00 0.00 0 738.50 0.00 0.00 0.00 99.00 0.00 0 738.50 0.00 0.00 0.00 102.00 0.00 0 738.50 0.00 0.00 0.00 105.00 0.00 0 738.50 0.00 0.00 0.00 108.00 0.00 0 738.50 0.00 0.00 0.00 111.00 0.00 0 738.50 0.00 0.00 0.00 114.00 0.00 0 738.50 0.00 0.00 0.00 117.00 0.00 0 738.50 0.00 0.00 0.00 120.00 0.00 0 738.50 0.00 0.00 0.00 DRAINAGE BASIN #8 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #8 INTRODUCTION: SUMMARY Drainage basin#8 includes single family lots 201-210,258-274, 300-306,316-38&333-335 in Phases 2A, 2B& 3A, and a portion of Twin River Drive, Hamilton Park Drive, and Larragan Drive.A pipe network system routes runoff to a StormTech underground detention system and through a BayFilter vault which treats the water quality volume. A flow splitter upstream of the underground detention allows higher flows to bypass the system. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 6.65 acres Postdeveloped Drainage Area 6.65 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 6.65 100% B Total 6.65 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) % CN Wtd. CN Wooded 3.33 50% 55 27.50 Grass 3.33 50% 61 30.50 Total 6.65 58.00 Composite CN Use CN = 58 Postdeveloped CN Cover Type Area(ac) % CN Wtd. CN Impervious 3.72 56% 98 54.82 Grass 2.93 44% 61 26.88 Total 6.65 81.70 'Composite CN Use CN = 82 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: Ibt Charlotte, NC 28205 REVISED: 08.03.20 Preliminary Calculations - Basin #8 HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 6.65 ac. 6.65 ac Cuve Number(CN) 58 82 Modified Curve Number(CN) n/a 92 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 56% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.55 inlin WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.307 ac-ft 75% WQv= 0.230 ac-ft 13,368 ft3 10,026 ft3 0.55 in 0.42 in MODIFIED CURVE NUMBER CNm= 1000/0 0+5P+10W Qv-10(WQv^2+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.42 CNm 92.3 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 2.20 in CN= SCS curve number Q= 1.06 cfs Compute Watershed Runoff CPv= 0.586 ac-ft 50% CPv= 0.293 ac-ft 25,535 cu. Ft 12,767 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.197 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 12.20.18 P.M.: lbt Charlotte, NC 28205 REVISED: 08.03.20 Impervious Calculations - Basin #8 Existing Impervious Asphalt: sf Buildings: sf Concrete: sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 6.65 Impervious Percentage: 0% Proposed Impervious Asphalt: 47,935 sf Buildings: 83,866 sf Concrete: 30,340 sf Total Impervious Area: 162,141 sf 3.72 ac. Drainage Area: 6.65 Impervious Percentage: 56% HYDROCAD ROUTINGS 1 - INCH ROUTING <8C> 8 Post 1Nm AFS . F w Splitter MH . 8E AND �N____ Overflow StormTech & Bay . ter #8 8F Total Discharge Subcat Reach 'on. Iti Routing Diagram for 8 ADSPrepared by{enter your company name here), Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 8 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 8C: 8 Post CNm Runoff = 7.20 cfs @ 2.97 hrs, Volume= 0.223 af, Depth= 0.40" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 6.650 92 Modified CN 6.650 100.00°/% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post To Subcatchment 8C: 8 Post CNm Hydrograph 81 ■Runoff I Aso 7 Type II 6-hr 6 1-inch Rainfall=1.00" 5 / Runoff Area=6.650 ac 13 Runoff Volume=0.223 af 3 4 LL Runoff Depth=0.40" 3 Tc=5.0 min 2 , CN=92 1 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter MH Inflow Area = 6.650 ac, 0.00% Impervious, Inflow Depth = 0.40" for 1-inch event Inflow = 7.20 cfs @ 2.97 hrs, Volume= 0.223 of Outflow = 7.20 cfs @ 2.97 hrs, Volume= 0.223 af, Atten= 0%, Lag= 0.0 min Primary = 7.20 cfs @ 2.97 hrs, Volume= 0.223 of Secondary= 0.00 cfs @ 0.00 hrs, Volume= 0.000 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=755.25' @ 6.09 hrs Flood Elev= 758.25' Device Routing Invert Outlet Devices #1 Primary 751.50' 18.0" Round Low Flow L= 8.1' Ke= 0.500 Inlet 1 Outlet Invert= 751.50'!751.45' S= 0.0062 '!' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.77 sf #2 Secondary 751.00' 30.0" Round High Flow L= 31.3' Ke= 0.500 Inlet/Outlet Invert=751.00'/749.50' S= 0.0479 '1' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area=4.91 sf #3 Device 2 755.50' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 755.50 757.75 757.75 Width (feet) 5.00 5.00 0.00 Primary OutFlow Max=7.15 cfs @ 2.97 hrs HW=753.23' TW=752.02' (Dynamic Tailwater) L1=Low Flow (Barrel Controls 7.15 cfs @ 4.41 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=751.00' TW=0.00' (Dynamic Tailwater) t-2=High Flow ( Controls 0.00 cfs) L3=Weir Wall ( Controls 0.00 cfs) 8 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter MH Hydrograph 0 Inflow I 720cfs L Outflow 8 ,� Inflow Area=6.650 ac MI Seccondary - Peak Elegy=755.25' 7_ 6� 5-' F 4-' u_ - ' 3- - � 1 2 • 1 • /� 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 8D: StormTech & BayFilter#8 Inflow Area = 6.650 ac, 0.00% Impervious, Inflow Depth = 0.40" for 1-inch event Inflow = 7.20 cfs @ 2.97 hrs, Volume= 0.223 of Outflow = 0.04 cfs @ 6.12 hrs, Volume= 0.192 af, Atten= 100%, Lag= 188.8 min Primary = 0.04 cfs @ 6.12 hrs, Volume= 0.192 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=755.26' @ 6.12 hrs Surf.Area= 3,094 sf Storage= 9,345 cf Flood Elev= 755.88' Surf.Area= 3,094 sf Storage= 10,116 cf Plug-Flow detention time= 2,356.7 min calculated for 0.192 of(86% of inflow) Center-of-Mass det. time= 2,339.3 min ( 2,548.7 -209.5 ) Volume Invert Avail.Storage Storage Description #1A 750.38' 874 cf 8.42'W x 69.23'L x 5.50'H Field A 3,205 cf Overall - 1,019 cf Embedded = 2,185 cf x 40.0% Voids #2A 751.13' 1,019 cf ADS_StormTech MC-3500 d +Cap x 9 Inside#1 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #36 750.38' 874 cf 8.42'W x 69.23'L x 5.50'H Field 6 3,205 cf Overall - 1,019 cf Embedded = 2,185 cf x 40.0% Voids #46 751.13' 1,019 cf ADS_StormTech MC-3500 d +Cap x 9 Inside#3 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #5C 750.38' 1,561 cf 22.75'W x 47.72'L x 5.50'H Field C 5,971 cf Overall -2,069 cf Embedded = 3,902 cf x 40.0% Voids #6C 751.13' 2,069 cf ADS_StormTech MC-3500 d +Cap x 18 Inside#5 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 18 Chambers in 3 Rows Cap Storage= +14.9 cf x 2 x 3 rows = 89.4 cf #7D 750.38' 519 cf 8.42'W x 40.55'L x 5.50'H Field D 1,877 cf Overall - 580 cf Embedded = 1,298 cf x 40.0%Voids #8D 751.13' 580 cf ADS_StormTech MC-3500 d +Cap x 5 Inside#7 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #9E 750.38' 430 cf 8.42'W x 33.38'L x 5.50'H Field E 1,545 cf Overall -470 cf Embedded = 1,076 cf x 40.0%Voids #10E 751.13' 470 cf ADS_StormTech MC-3500 d +Cap x 4 Inside#9 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #11 F 750.38' 341 cf 8.42'W x 26.21'L x 5.50'H Field F 1,213 cf Overall - 360 cf Embedded = 854 cf x 40.0% Voids #12F 751.13' 360 cf ADS_StormTech MC-3500 d +Cap x 3 Inside#11 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf 8 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC 10,116 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Storage Group D created with Chamber Wizard Storage Group E created with Chamber Wizard Storage Group F created with Chamber Wizard Device Routing Invert Outlet Devices (Turned on 1 times) #1 Primary 749.60' 12.0" Round 12" Outlet L= 13.5' Ke= 0.500 Inlet/Outlet Invert=749.60'/749.50' S=0.0074 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Device 1 751.27' BayFilter X 9.00 0.250" Diameter, C= 0.600 Inlet/Outlet Elev. =0.00'/749.60' Starts@751.27' Breaks@749.85' #3 Device 2 751.30' StormTech to BayFilter 12.000" Diameter, C= 0.600 4.6' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. =751.30'/751.20' Primary OutFlow Max=0.04 cfs @ 6.12 hrs HW=755.26' TW=0.00' (Dynamic Tailwater) L1=12" Outlet (Passes 0.04 cfs of 8.59 cfs potential flow) L2=BayFilter (Orifice Controls 0.04 cfs @ 11.45 fps) L3=StormTech to BayFilter (Passes 0.04 cfs of 7.45 cfs potential flow) Pond 8D: StormTech & BayFilter#8 Hydrograph ■Inflow 8 zsa ■Primary 7 0 Inflow Area=6.650 ac Peak Elev=755.26' 6 Storage=9,,345 cf 5 L1 3 4 0 LL 3 2 1 o /r %///////////////////////////////////////////////////////////////// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 8E: Overflow Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af Primary = 0.00 cfs @ 0.00 hrs, Volume= 0.000 af, Atten= 0%, Lag=0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 8E: Overflow Hydrograph ■Inflow 0 Primary I U IT- cfs 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 8F: Total Discharge Inflow Area = 6.650 ac, 0.00% Impervious, Inflow Depth = 0.35" for 1-inch event Inflow = 0.04 cfs @ 6.12 hrs, Volume= 0.192 of Primary = 0.04 cfs @ 6.12 hrs, Volume= 0.192 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 8F: Total Discharge Hydrograph ■Inflow 0.038 Lu-ua ❑Primary 0.034, // //// - 0 032_ ; 1111111tillo.o :0.026_ ,ifO. y /// ///// /0.02 'S 0.018= ' ,--- 1 LI 0.016' 0.012✓ 04:/ 0.01 0.00/6 liii. ,. 7:,, 0.00 0.002= 10 (..../7... .... . ( 7/4 //... / 0 50 15 20 25 3035 40 45 50 55 60 65 TO T5 80 85....90. 95 100 105 110 115 120 Time (hours) 1 -YEAR ROUTING <8A> <8B > 8 Pre 8 Post AFS F w Splitter MH . NA 8E /81:\ ---\____ Overflow StormTech & Bay . ter #8 8F Total Discharge Subcat Reach 'on. Iti Routing Diagram for 8 ADSPrepared by{enter your company name here), Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 8 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 8A: 8 Pre Runoff = 0.57 cfs @ 12.23 hrs, Volume= 0.118 af, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 3.327 55 Wooded * 3.327 61 Grass 6.654 58 Weighted Average 6.654 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 20.0 Direct Entry, pre To Subcatchment 8A: 8 Pre Hydrograph IN Runoff 06' Iosr cps I 0.55J Type II 24-h r 0-5 1-yr Rainfall=2.80" Runoff Area=6.654 ac 0-4" Runoff Volume=0.118 of Runoff Depth=0.21" 0-3;// Tc=20.0 min 02 "/ j CN=58 0-15� �' 0.05Y 0 e,fr� .:.., ' ��� ���� �� ����1/ 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 • 110 115 120 Time (hours) 8 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 86: 8 Post Runoff = 15.04 cfs @ 11.96 hrs, Volume= 0.678 af, Depth= 1.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 3.720 98 Impervious * 2.930 61 Grass 6.650 82 Weighted Average 2.930 44.06% Pervious Area 3.720 55.94% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post To Subcatchment 8B: 8 Post Hydrograph / ■Runoff 16 15 O4 ds 15= / 13J Type II 24-h r 1i / 1-yr Rainfall=2.80" 12z Runoff Area=6.650 ac 11= Runoff Volume=0.678 of 1D=' 97 Runoff Depth=1.22" 3 ✓ II = r 7= Tc=5.0 min " 6✓ CN=82 5i 4J / 2� ! 0 5 10 15 20 25 30 35 40 45 50 55 66 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type !I 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter MH Inflow Area = 6.650 ac, 55.94% Impervious, Inflow Depth = 1.22" for 1-yr event Inflow = 15.04 cfs @ 11.96 hrs, Volume= 0.678 of Outflow = 15.04 cfs @ 11.96 hrs, Volume= 0.678 af, Atten= 0%, Lag= 0.0 min Primary = 12.96 cfs @ 11.94 hrs, Volume= 0.285 of Secondary= 6.41 cfs @ 12.05 hrs, Volume= 0.393 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=756.04' @ 12.05 hrs Flood Elev= 758.25' Device Routing Invert Outlet Devices #1 Primary 751.50' 18.0" Round Low Flow L= 8.1' Ke= 0.500 Inlet 1 Outlet Invert= 751.50'!751.45' S= 0.0062 '!' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.77 sf #2 Secondary 751.00' 30.0" Round High Flow L= 31.3' Ke= 0.500 Inlet/Outlet Invert=751.00'/749.50' S= 0.0479 '!' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area=4.91 sf #3 Device 2 755.50' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 755.50 757.75 757.75 Width (feet) 5.00 5.00 0.00 Primary OutFlow Max=10.92 cfs @ 11.94 hrs HW=755.64' TW=753.99' (Dynamic Tailwater) L1=Low Flow (Inlet Controls 10.92 cfs @ 6.18 fps) Secondary OutFlow Max=5.81 cfs @ 12.05 hrs HW=756.00' TW=0.00' (Dynamic Tailwater) t-2=High Flow (Passes 5.81 cfs of 45.78 cfs potential flow) L3=Weir Wall (Weir Controls 5.81 cfs @ 2.32 fps) 8 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter MH Hydrograph 0 Inflow 15.04 crs Outflow 15.11 = Inflow Area=6.650 ac :Secondary 15_ Peak EIev=756.04' 129 els 14- 12� NIP 11: m 10- a / a 7? 6.41ds 0 6- I5- 11/ 2 �FJ/!lJIJJF!//IJJ/JJF/!/!lJIJJ/FJ/!!J/JJF!//IJJ/JJF/F/IJ!!JJ////lIfJJJF///!// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 8D: StormTech & BayFilter#8 Inflow Area = 6.650 ac, 55.94% Impervious, Inflow Depth = 0.51" for 1-yr event Inflow = 12.96 cfs @ 11.94 hrs, Volume= 0.285 of Outflow = 9.70 cfs @ 12.03 hrs, Volume= 0.254 af, Atten= 25%, Lag= 5.5 min Primary = 9.70 cfs @ 12.03 hrs, Volume= 0.254 of Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=431,644.40' @ 12.03 hrs Surf.Area= 3,094 sf Storage= 10,116 cf Flood Elev= 755.88' Surf.Area= 3,094 sf Storage= 10,116 cf Plug-Flow detention time= 2,380.7 min calculated for 0.254 of(89% of inflow) Center-of-Mass det. time= 2,338.5 min ( 3,089.5 -751.1 ) Volume Invert Avail.Storage Storage Description #1A 750.38' 874 cf 8.42'W x 69.23'L x 5.50'H Field A 3,205 cf Overall - 1,019 cf Embedded = 2,185 cf x 40.0% Voids #2A 751.13' 1,019 cf ADS_StormTech MC-3500 d +Cap x 9 Inside#1 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #36 750.38' 874 cf 8.42'W x 69.23'L x 5.50'H Field 6 3,205 cf Overall - 1,019 cf Embedded = 2,185 cf x 40.0% Voids #46 751.13' 1,019 cf ADS_StormTech MC-3500 d +Cap x 9 Inside#3 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #5C 750.38' 1,561 cf 22.75'W x 47.72'L x 5.50'H Field C 5,971 cf Overall -2,069 cf Embedded = 3,902 cf x 40.0% Voids #6C 751.13' 2,069 cf ADS_StormTech MC-3500 d +Cap x 18 Inside#5 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap 18 Chambers in 3 Rows Cap Storage= +14.9 cf x 2 x 3 rows = 89.4 cf #7D 750.38' 519 cf 8.42'W x 40.55'L x 5.50'H Field D 1,877 cf Overall - 580 cf Embedded = 1,298 cf x 40.0%Voids #8D 751.13' 580 cf ADS_StormTech MC-3500 d +Cap x 5 Inside#7 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #9E 750.38' 430 cf 8.42'W x 33.38'L x 5.50'H Field E 1,545 cf Overall -470 cf Embedded = 1,076 cf x 40.0%Voids #10E 751.13' 470 cf ADS_StormTech MC-3500 d +Cap x 4 Inside#9 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf #11 F 750.38' 341 cf 8.42'W x 26.21'L x 5.50'H Field F 1,213 cf Overall - 360 cf Embedded = 854 cf x 40.0% Voids #12F 751.13' 360 cf ADS_StormTech MC-3500 d +Cap x 3 Inside#11 Effective Size= 70.4"W x 45.0"H => 15.33 sf x 7.17'L = 110.0 cf Overall Size= 77.0"W x 45.0"H x 7.50'L with 0.33' Overlap Cap Storage= +14.9 cf x 2 x 1 rows = 29.8 cf 8 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC 10,116 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Storage Group D created with Chamber Wizard Storage Group E created with Chamber Wizard Storage Group F created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 749.60' 12.0" Round 12" Outlet L= 13.5' Ke= 0.500 Inlet/Outlet Invert=749.60'/749.50' S=0.0074 '1' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Device 1 751.27' BayFilter X 9.00 0.250n Diameter, C= 0.600 Inlet/Outlet Elev. =0.00'1749.60' Starts@751.27' Breaks@749.85' #3 Device 2 751.30' StormTech to BayFilter 12.000n Diameter, C= 0.600 4.6' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. =751.30'/751.20' Primary OutFlow Max=9.70 cfs @ 12.03 hrs HW=431,640.61' TW=0.00' (Dynamic Tailwater) L1=12"Outlet (Passes 9.70 cfs of 2,482.38 cfs potential flow) L2=BayFilter (Orifice Controls 9.70 cfs @ 3,160.66 fps) L3=StormTech to BayFilter (Passes 9.70 cfs of 2,467.74 cfs potential flow) Pond 8D: StormTech & BayFilter#8 Hydrograph ■Inflow 14: ma`s I ❑Primary 13: Inflow Area=6.650 ac 127." Peak Ele =431,644.40' 11= p. Storage=10,116 cf 1D: 9 13 a= 0 7= LL 6. 4- 2- i 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 8E: Overflow Inflow = 6.41 cfs @ 12.05 hrs, Volume= 0.393 af Primary = 6.41 cfs @ 12.05 hrs, Volume= 0.393 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 8E: Overflow Hyd rag raph Inflow 7 / 6.41 ds I ■Primary I l6.41 z _ r 6 /7- 51 4-i 3- 1- 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 8 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 8F: Total Discharge Inflow Area = 6.650 ac, 55.94% Impervious, Inflow Depth = 1.17" for 1-yr event Inflow = 15.16 cfs @ 12.03 hrs, Volume= 0.647 of Primary = 15.16 cfs @ 12.03 hrs, Volume= 0.647 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 8F: Total Discharge Hydrograph / ■Inflow t516crs 0 Primary 16=, 75.76 Inflow Area=6 65A ac 15i/ 14 13V 12V 11V 1567891 D' /:71; g_ 11111111111111111 a= 5 / ` �0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) DRAINAGE BASIN #9 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 05.30.19 P.M.: lbt Charlotte, NC 28205 REVISED: PRELIMINARY CALCULATIONS INTRODUCTION: SUMMARY Drainage basin#9 includes single family lots 211-238,274-302&307-309 in Phases 2A, 3A&3B,and a portion of Twin River Drive, River Park Lane, Garrison Grove Lane, Alaina Court, Keyser Drive, and Larragan Drive.A pipe network system routes runoff to a StormTech underground detention system and through a BayFilter vault which treats the water quality volume.A flow splitter upstream of the underground detention allows higher flows to bypass the system. DRAINAGE AREAS: (see drainage area map SW-3.0) Predeveloped Drainage Area 11.20 acres Postdeveloped Drainage Area 11.20 acres SOIL TYPES: (see soils map) Area(ac) Area(%) Soil Type Hydrologic Soil Group 11.20 100% B ,Total 11.20 100% CURVE NUMBER: Predeveloped CN Cover Type Area(ac) % CN Wtd. CN Wooded 5.60 50% 55 27.50 Grass 5.60 50% 61 30.50 Total 11.20 58.00 (Composite CN Use ON = 58 Postdeveloped CN Cover Type Area(ac) % CN Wtd. CN Impervious 6.49 58% 98 56.80 Grass 4.71 42% 61 25.64 Total 11.20 82.44 Composite CN Use CN = 82 Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 05.30.19 P.M.: Ibt Charlotte, NC 28205 REVISED: PRELIMINARY CALCULATIONS HYDROLOGIC CALCULATIONS Pre-developed Post-developed Drainage area(DA) 11.20 ac. 11.20 ac Cuve Number(CN) 58 82 Modified Curve Number(CN) n/a 93 Time of Concentration 0.33 hr. 0.08 hr. Impervious Percentage 0% 58% WATER QUALITY VOLUME (1°) Volume must be released over a period of 2-5 days Using the runoff volume calculations in the "Simple Method" : Rv= 0.05+ .009(I) Rv= 0.57 Win WQv=(Design rainfall)(Rv)(Drainage Area) WQv= 1" rainfall x Rv in/in x 1/12 in/ft x Da= WQv= 0.533 ac-ft 75% WQv = 0.400 ac-ft 23,238 ft3 17,428 ft3 0.57 in 0.43 in MODIFIED CURVE NUMBER CNm= 1000/0 0+5P+10W Qv-10(WQv^2+1.25WQvP)^0.5} P= rainfall, in inches(use1.0 inches)= 1.00 WQv= water quality volume, in inches= 0.43 CNm 92.6 CHANNEL PROTECTION VOLUME Q= (P-0.2S)^21(P+0.8S) Q= accumulated runoff volume, inches P= accumulated rainfall(potential maximum runoff), inches 2.58 in S= potential maximum soil retention, inches= 1000/CN-10 = 2.20 in CN= SCS curve number Q= 1.06 cfs Compute Watershed Runoff CPv= 0.987 ac-ft 50% CPv= 0.493 ac-ft 42,973 cu. Ft 21,487 cu. Ft Channel Protection Volume Release Rate(1yr, 24 hr storm) 1.5 day 36 hour Release= 0.332 cfs Rivercross Urban Design Partners JOB NO.: 18-001 BY: udp 1318-E6 Central Avenue DATE: 05.30.19 P.M.: Ibt _ Charlotte, NC 28205 REVISED: IMPERVIOUS CALCULATIONS Existing Impervious Building sf Concrete Parking sf Asphalt sf Sidewalk sf Total Impervious Area: 0 sf 0.00 ac. Drainage Area: 11.20 Impervious Percentage: 0% [Proposed Impervious Asphalt: 7E,090 sf Buildings: 149,655 sf Concrete: 56,388 sf Total Impervious Area: 282,733 sf 6.49 ac. Drainage Area: 11.20 Impervious Percentage: 58% HYDROCAD ROUTINGS 1 - INCH ROUTING <9C> 9 Post N m AFS . Flow Splitter N 9E /9ND ....---\__ Overflow 9 UGD 9F Total Discharge Subcat Reach 'on. Iti Routing Diagram for 9 ADSPrepared by{enter your company name here), Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 9 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 9C: 9 Post CNm Runoff = 13.49 cfs @ 2.97 hrs, Volume= 18,311 cf, Depth= 0.45" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 6-hr 1-inch Rainfall=1.00" Area (ac) CN Description * 11.200 93 Modified CN 11.200 100.00°/° Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, post To Subcatchment 9C: 9 Post CNm Hydrograph 15 r ■Runoff 141 1349 cls 13= Type II 12 / 6-hr 1-inch Rainfall=1.00" 1°- Runoff Area=11.200 ac / Runoff:Volu me=18,311 cf o �= Runoff Depth=0.45" LL 651 Tc=5.0 mini 5 CN=93 3 2 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter Inflow Area = 487,872 sf, 0.00% Impervious, Inflow Depth = 0.45" for 1-inch event Inflow = 13.49 cfs @ 2.97 hrs, Volume= 18,311 cf Outflow = 13.49 cfs @ 2.97 hrs, Volume= 18,311 cf, Atten= 0°/0, Lag= 0.0 min Primary = 2.42 cfs @ 2.96 hrs, Volume= 3,972 cf Secondary= 11.07 cfs @ 2.97 hrs, Volume= 14,339 cf Tertiary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=735.08' @ 6.10 hrs Flood Elev= 739.25' Device Routing Invert Outlet Devices #1 Primary 730.25' 8.0" Round Priming Line L= 50.0' Ke= 0.500 Inlet 1 Outlet Invert= 730.25'!729.67' S= 0.0116 '!' Cc= 0.900 n= 0.013, Flow Area= 0.35 sf #2 Secondary 731.00' 18.0" Round Low Flow L= 11.1' Ke= 0.500 Inlet 1 Outlet Invert=731.00'!730.00' S= 0.0901 '!' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #3 Tertiary 730.25' 36.0" Round High Flow L= 23.9' Ke= 0.500 Inlet/Outlet Invert= 730.25'!730.00' S= 0.010571 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf #4 Device 3 735.25' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 735.25 738.75 738.75 Width (feet) 5.75 5.75 0.00 Primary OutFlow Max=2.27 cfs @ 2.96 hrs HW=733.38' TW=730.63' (Dynamic Tailwater) L1=Priming Line (Outlet Controls 2.27 cfs @ 6.49 fps) Secondary OutFlow Max=10.98 cfs @ 2.97 hrs HW=733.42' TW=730.70' (Dynamic Tailwater) t-2=Low Flow (Inlet Controls 10.98 cfs @ 6.21 fps) Tertiary OutFlow Max=0.00 cfs @ 0.00 hrs HW=730.25' TW=0.00' (Dynamic Tailwater) L3=High Flow ( Controls 0.00 cfs) Z-4=Weir Wall ( Controls 0.00 cfs) 9 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter Hydrograph •Inflow 173-49 c I 0 Outflow 71349ds Inflow Area=48T,8(2 st o0 Secondary 15. Paair Firm= 35.08 _■Tertiary 14= 13=' 11-117 crs 12i' 11=' 10J/l N 9a: - / piti LL 6 xi[ I 4- 7' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type !I 6-hr 1-inch Rainfall=1.00" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 9D: 9 UGD Inflow Area = 487,872 sf, 0.00% Impervious, Inflow Depth = 0.45" for 1-inch event Inflow = 13.49 cfs @ 2.97 hrs, Volume= 18,311 cf Outflow = 0.07 cfs @ 6.11 hrs, Volume= 14,404 cf, Atten= 100%, Lag= 188.8 min Primary = 0.07 cfs @ 6.11 hrs, Volume= 14,404 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=735.09' @ 6.11 hrs Surf.Area=4,377 sf Storage= 17,631 cf Flood Elev= 737.25' Surf.Area=4,377 sf Storage= 17,910 cf Plug-Flow detention time= 2,204.1 min calculated for 14,401 cf(79% of inflow) Center-of-Mass det. time= 2,181.5 min ( 2,389.0 -207.5 ) Volume Invert Avail.Storage Storage Description #1A 728.50' 3,236 cf 19.42'W x 100.19'L x 6.75'H Field A 13,131 cf Overall - 5,041 cf Embedded = 8,090 cf x 40.0% Voids #2A 729.25' 5,041 cf ADS_StormTech MC-4500 +Cap x 46 Inside#1 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap 46 Chambers in 2 Rows Cap Storage= +35.7 cf x 2 x 2 rows = 142.8 cf #36 728.50' 1,020 cf 10.33'W x 55.92'L x 6.75'H Field B 3,900 cf Overall - 1,349 cf Embedded = 2,551 cf x 40.0% Voids #46 729.25' 1,349 cf ADS_StormTech MC-4500 +Cap x 12 Inside#3 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #5C 728.50' 1,475 cf 19.42'W x 43.84'L x 6.75'H Field C 5,746 cf Overall -2,060 cf Embedded = 3,686 cf x 40.0% Voids #6C 729.25' 2,060 cf ADS_StormTech MC-4500 +Cap x 18 Inside#5 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap 18 Chambers in 2 Rows Cap Storage= +35.7 cf x 2 x 2 rows = 142.8 cf #7D 728.50' 742 cf 10.33'W x 39.82'L x 6.75'H Field D 2,777 cf Overall - 923 cf Embedded = 1,854 cf x 40.0%Voids #8D 729.25' 923 cf ADS_StormTech MC-4500 +Cap x 8 Inside#7 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #9E 728.50' 463 cf 10.33'W x 23.72'L x 6.75'H Field E 1,654 cf Overall -497 cf Embedded = 1,157 cf x 40.0%Voids #10E 729.25' 497 cf ADS_StormTech MC-4500 +Cap x 4 Inside#9 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #11 F 728.50' 309 cf 10.33'W x 15.17'L x 6.75'H Field F 1,058 cf Overall -284 cf Embedded =773 cf x 40.0% Voids #12F 729.25' 284 cf ADS_StormTech MC-4500 +Cap x 2 Inside#11 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap 9 ADS Type 11 6-hr I-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #13 728.50' 510 cf 7.00'W x 27.00'L x 6.75'H Prismatoid 1,276 cf Overall x 40.0°/0 Voids 17,910 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Storage Group D created with Chamber Wizard Storage Group E created with Chamber Wizard Storage Group F created with Chamber Wizard Device Routing Invert Outlet Devices (Turned on 1 times) #1 Primary 728.00' 12.0" Round Outlet L= 9.1' Ke=0.500 Inlet/Outlet Invert=728.00'/727.95' S=0.0055 'P Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Device 1 729.67' BayFilter Cartridges X 15.00 0.250" Diameter, C= 0.600 Inlet/Outlet Elev. =0.00'/728.00' Starts@729.67' Breaks@728.50' #3 Device 2 730.00' StormTech to BayFilter 12.000" Diameter, C= 0.600 7.0' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. =730.00'/729.38' Primary OutFlow Max=0.07 cfs @ 6.11 hrs HW=735.09' TW=0.00' (Dynamic Tailwater) L1=Outlet (Passes 0.07 cfs of 9.71 cfs potential flow) L2=BayFilter Cartridges (Orifice Controls 0.07 cfs @ 12.82 fps) L3=StormTech to BayFilter (Passes 0.07 cfs of 8.63 cfs potential flow) Pond 9D: 9 UGD Hydrograph ■Inflow 15 )1349 cfs I 0 Primary 14i, Inflow Area=487,872 sf 12 %f Peak EIev=735.09' 11 Storage=17,631 cf 101/ 9/ a- / 0 V LL / - �/ 4V , 3. � 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 9E: Overflow Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Primary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf, Atten= 0°/0, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 9E: Overflow Hydrograph ■Inflow ❑Primary I cfs por U I 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type 11 6-hr 7-inch Rainfall=1.00" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 9F: Total Discharge Inflow Area = 487,872 sf, 0.00% Impervious, Inflow Depth = 0.35" for 1-inch event Inflow = 0.07 cfs @ 6.11 hrs, Volume= 14,404 cf Primary = 0.07 cfs @ 6.11 hrs, Volume= 14,404 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 9F: Total Discharge Hyd rag raph -■ ■- ■Inflow _ CLOT cfs ❑Primary 0.07 0.06_ . /��/'r♦'♦�r�''e tr Op II I ',' - 47.1 f 0.o l•1• 1 ///////%% 0 D35t I. . 1 'frO 0.0254 0.02: 11 0.015-' 0.01: ■ • � 0.005� 0 r/ AprAirarr APPAPAPPAPPAPrAFAM' 0 5 10 15 20 25 30 35 40 45 50 55 60 65 TO 75 80 85 90 95 100 105 110 115 120 Time (hours) 1 -YEAR ROUTING < 9A> < 9B > 9 Pre 9 Post FS Flow Splitter N 9E /91:\ -----\--- Overflow 9 UGD 9F Total Discharge Subcat Reach on. Link Routing Diagram for 9ADS Prepared by{enter your company name here), Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 0 2020 HydroCAD Software Solutions LLC 9 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 9A: 9 Pre Runoff = 0.96 cfs @ 12.23 hrs, Volume= 8,645 cf, Depth= 0.21" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 5.600 55 Wooded * 5.600 61 Grass 11.200 58 Weighted Average 11.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 20.0 Direct Entry, pre Tc Subcatchment 9A: 9 Pre Hydrograph 0 Runoff 1 a.ss Type II 24-hr 1-yr Rainfall=2.80" Runoff Area=11.200 ac Runoff Volume=8,645 cf Runoff Depth=0.21" LL Tc=20.0 min CN=58 0 � �Ar■arl// 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Subcatchment 96: 9 Post Runoff = 25.33 cfs @ 11.96 hrs, Volume= 49,741 cf, Depth= 1.22" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Type II 24-hr 1-yr Rainfall=2.80" Area (ac) CN Description * 6.490 98 Impervious * 4.710 61 Grass 11.200 82 Weighted Average 4.710 42.05% Pervious Area 6.490 57.95% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ftlsec) (cfs) 5.0 Direct Entry, post Tc Subcatchment 9B: 9 Post Hydrograph 28, ■Runoff 26-/ 25 3s crs 24- Type II 24-hr 22_ / 1-yr Rainfall=2.80" 20-' Runoff Area=11.200 ac 19 Runoff Volume=49,741 cf 16Y Runoff Depth=1.22" 14J Tc=5.0 min 12- 10=/ CN=82 a� 6- 41 2=f % r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 fl 2020 HydroCAD Software Solutions LLC Summary for Pond FS: Flow Spliiter Inflow Area = 487,872 sf, 57.95% Impervious, Inflow Depth = 1.22" for 1-yr event Inflow = 25.33 cfs @ 11.96 hrs, Volume= 49,741 cf Outflow = 25.33 cfs @ 11.96 hrs, Volume= 49,741 cf, Atten= 0°/0, Lag= 0.0 min Primary = 2.74 cfs @ 11.92 hrs, Volume= 7,738 cf Secondary= 16.44 cfs @ 11.93 hrs, Volume= 28,375 cf Tertiary = 7.91 cfs @ 11.98 hrs, Volume= 13,628 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=735.81' @ 11.98 hrs Flood Elev= 739.25' Device Routing Invert Outlet Devices #1 Primary 730.25' 8.0" Round Priming Line L= 50.0' Ke= 0.500 Inlet 1 Outlet Invert= 730.25'!729.67' S= 0.0116 '!' Cc= 0.900 n= 0.013, Flow Area= 0.35 sf #2 Secondary 731.00' 18.0" Round Low Flow L= 11.1' Ke= 0.500 Inlet 1 Outlet Invert=731.00'!730.00' S= 0.0901 '!' Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 1.77 sf #3 Tertiary 730.25' 36.0" Round High Flow L= 23.9' Ke= 0.500 Inlet/Outlet Invert= 730.25'!730.00' S= 0.010571 Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 7.07 sf #4 Device 3 735.25' Weir Wall, Cv=2.62 (C= 3.28) Elev. (feet) 735.25 738.75 738.75 Width (feet) 5.75 5.75 0.00 Primary OutFlow Max=2.49 cfs @ 11.92 hrs HW=735.44' TW=732.13' (Dynamic Tailwater) L1=Priming Line (Outlet Controls 2.49 cfs @ 7.13 fps) Secondary OutFlow Max=15.13 cfs @ 11.93 hrs HW=735.54' TW=732.38' (Dynamic Tailwater) t-2=Low Flow (Inlet Controls 15.13 cfs @ 8.56 fps) Tertiary OutFlow Max=7.55 cfs @ 11.98 hrs HW=735.79' TW=0.00' (Dynamic Tailwater) L3=High Flow (Passes 7.55 cfs of 68.44 cfs potential flow) Z-4=Weir Wall (Weir Controls 7.55 cfs @ 2.41 fps) 9 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Pond FS: Flow Splitter Hydrograph •Inflow 0 Outflow InflowArea=487,872 sf 00 Secondary 287 Peak Elegy=735.81' ■Tertiary 26=/11 24/ 22- •. 20= A 16.44 crs 18: 16. 3 14- o 12 ,- 10: 8' A 6 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type II 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 s/n 09103 ©2020 HydroCAD Software Solutions LLC Summary for Pond 9D: 9 UGD Inflow Area = 487,872 sf, 57.95% Impervious, Inflow Depth = 0.89" for 1-yr event Inflow = 19.34 cfs @ 11.92 hrs, Volume= 36,113 cf Outflow = 12.85 cfs @ 12.06 hrs, Volume= 32,206 cf, Atten= 34%, Lag= 8.1 min Primary = 12.85 cfs @ 12.06 hrs, Volume= 32,206 cf Routing by Dyn-Stor-Ind method, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Peak Elev=273,128.40' @ 12.06 hrs Surf.Area= 4,377 sf Storage= 17,910 cf Flood Elev= 737.25' Surf.Area=4,377 sf Storage= 17,910 cf Plug-Flow detention time= 1,325.6 min calculated for 32,206 cf(89% of inflow) Center-of-Mass det. time= 1,270.9 min ( 2,096.4 - 825.5 ) Volume Invert Avail.Storage Storage Description #1A 728.50' 3,236 cf 19.42'W x 100.19'L x 6.75'H Field A 13,131 cf Overall - 5,041 cf Embedded = 8,090 cf x 40.0% Voids #2A 729.25' 5,041 cf ADS_StormTech MC-4500 +Cap x 46 Inside#1 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap 46 Chambers in 2 Rows Cap Storage= +35.7 cf x 2 x 2 rows = 142.8 cf #36 728.50' 1,020 cf 10.33'W x 55.92'L x 6.75'H Field B 3,900 cf Overall - 1,349 cf Embedded = 2,551 cf x 40.0% Voids #46 729.25' 1,349 cf ADS_StormTech MC-4500 +Cap x 12 Inside#3 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #5C 728.50' 1,475 cf 19.42'W x 43.84'L x 6.75'H Field C 5,746 cf Overall -2,060 cf Embedded = 3,686 cf x 40.0% Voids #6C 729.25' 2,060 cf ADS_StormTech MC-4500 +Cap x 18 Inside#5 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap 18 Chambers in 2 Rows Cap Storage= +35.7 cf x 2 x 2 rows = 142.8 cf #7D 728.50' 742 cf 10.33'W x 39.82'L x 6.75'H Field D 2,777 cf Overall - 923 cf Embedded = 1,854 cf x 40.0%Voids #8D 729.25' 923 cf ADS_StormTech MC-4500 +Cap x 8 Inside#7 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #9E 728.50' 463 cf 10.33'W x 23.72'L x 6.75'H Field E 1,654 cf Overall -497 cf Embedded = 1,157 cf x 40.0%Voids #10E 729.25' 497 cf ADS_StormTech MC-4500 +Cap x 4 Inside#9 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #11 F 728.50' 309 cf 10.33'W x 15.17'L x 6.75'H Field F 1,058 cf Overall -284 cf Embedded =773 cf x 40.0% Voids #12F 729.25' 284 cf ADS_StormTech MC-4500 +Cap x 2 Inside#11 Effective Size= 90.4"W x 60.0"H => 26.46 sf x 4.03'L = 106.5 cf Overall Size= 100.0"W x 60.0"H x 4.33'L with 0.31' Overlap 9 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCADO 10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Cap Storage= +35.7 cf x 2 x 1 rows = 71.4 cf #13 728.50' 510 cf 7.00'W x 27.00'L x 6.75'H Prismatoid 1,276 cf Overall x 40.0°/0 Voids 17,910 cf Total Available Storage Storage Group A created with Chamber Wizard Storage Group B created with Chamber Wizard Storage Group C created with Chamber Wizard Storage Group D created with Chamber Wizard Storage Group E created with Chamber Wizard Storage Group F created with Chamber Wizard Device Routing Invert Outlet Devices #1 Primary 728.00' 12.0" Round Outlet L= 9.1' Ke=0.500 Inlet/Outlet Invert=728.00'/727.95' S=0.0055 'P Cc= 0.900 n= 0.013 Corrugated PE, smooth interior, Flow Area= 0.79 sf #2 Device 1 729.67' BayFilter Cartridges X 15.00 0.250" Diameter, C= 0.600 Inlet/Outlet Elev. =0.00'1728.00' Starts@729.67' Breaks@728.50' #3 Device 2 730.00' StormTech to BayFilter 12.000" Diameter, C= 0.600 7.0' Long Tube, Hazen-Williams C= 130 Inlet/Outlet Elev. =730.00'/729.38' Primary OutFlow Max=12.85 cfs @ 12.06 hrs HW=273,127.90' TW=0.00' (Dynamic Tailwater) L1=Outlet (Passes 12.85 cfs of 1,973.73 cfs potential flow) L2=BayFilter Cartridges (Orifice Controls 12.85 cfs @ 2,513.03 fps) L3=StormTech to BayFilter (Passes 12.85 cfs of 1,955.48 cfs potential flow) Pond 9D: 9 UGD Hydrograph ■Inflow 21 ❑Primary 20i Inflow Area=487,872 sf 19- / 18i Peak EIev=273,128.40' 17- 16- Storage=17,910 cf 15 14- 12_85 ds 13 u 12-/ 11= 10 LL / of / 6 t //"„ r 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type 11 24-hr 1-yr Rainfall=2.8O" Prepared by{enter your company name here) Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 9E: Overflow Inflow = 7.91 cfs a@ 11.98 hrs, Volume= 13,628 cf Primary = 7.91 cfs @ 11.98 hrs, Volume= 13,628 cf, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 9E: Overflow Hyd rag raph ■Inflow 7.91 ds l ■Primary 7 97 cis 7- 6� , 5 LL 4 / 3i/./ I 17 0 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours) 9 ADS Type 11 24-hr 1-yr Rainfall=2.80" Prepared by{enter your company name here} Printed 7/31/2020 HydroCAD®10.00-26 sin 09103 ©2020 HydroCAD Software Solutions LLC Summary for Link 9F: Total Discharge Inflow Area = 487,872 sf, 57.95% Impervious, Inflow Depth = 1.13" for 1-yr event Inflow = 16.17 cfs @ 12.06 hrs, Volume= 45,834 cf Primary = 16.17 cfs @ 12.06 hrs, Volume= 45,834 cf, Atten= 0%. Lag= 0.0 min Primary outflow = Inflow, Time Span= 0.00-120.00 hrs, dt= 0.03 hrs Link 9F: Total Discharge Hydrograph ■Inflow 18. Prima 17_ I Inflow Area-487,872 sf Primary 16570 15y14: V 13 12-/ 11= 19 3 9V o LL a= 6 5; / 41 ,// / f • r 1= %//i Ae _%/////////////////////////////////////////////////////////////////// %% 0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 Time (hours)