Loading...
HomeMy WebLinkAboutNC0026123_PCI_Cover Letter_20220516ROY COOPER Governor ELIZABETH S. BISER Secretary RICHARD E. ROGERS, JR. Director Michael Rhoney Water Resources Director P.O. Box 1106 Asheboro, NC 27204 NORTH CAROLINA Environmental Quality May 16, 2022 SUBJECT: Pretreatment Compliance Inspection (PCI) Asheboro WWTP Main Program Permit (NPDES) #NC0026123 Randolph County Dear Mr. Rhoney: On May 10, 2022, a Pretreatment Compliance Inspection (PCI) was performed by Tricia Lowery of the Winston-Salem Regional Office. Sarah Laughlin and Bobby Crandall was present for the inspection. The purpose of this inspection was to determine the effectiveness of the Asheboro's pretreatment program, which includes reviewing the files, POTW plant performance, industry monitoring data, and adherence to the enforcement response plan (ERP). Background This is a 9.0 MGD permitted facility. The city has 14 Significant Industrial Users (Sills), 7 of which are categorical. The publicly owned treatment works (POTW) had no pretreatment related violations in 2021. POTW Interview There are no plant problems related to pretreatment issues. Weekly dioxane sampling with DEQ-DWR is ongoing and conducted every Friday. No SIU's were SNC for 2021. The pretreatment program has 33 dental offices and all in are compliance with program. Pretreatment Program Elements Review The Headworks Analysis (HWA) was last approved on 6/30/2017. The next HWA is due 6/1/2022. The IWS was last approved on 5/8/2018. The next 1WS is due 4/15/2023. The Sewer Use Ordinance (SUO) was approved on 11/5/2012. The Enforcement Response Plan (ERP) was submitted on 1/12/2020 and approved on 2/5/2020. The Long -Term Monitoring Plan (LTMP) was submitted 2/18/2020 and approved on 5/7/2020. GDE NORTH C OLI JA ' omm mr� ep..of o�.i North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Winston-Salem, North Carolina 27105 336.776.9800 LTMP File Review The Long -Term Monitoring Plan (LTMP) is being conducted at the proper locations and frequencies (2/year). Industrial User Permit (IUP) File Review A review of the file for Covanta (#5049) revealed that the monitoring data was well organized and compliant. A review of the file for Bossong (#0822) revealed that the monitoring data was well organized and compliant. A review of the file for Premier Power Coating (#3734) revealed that the monitoring data was well organized and compliant. The slug control plan for Covanta (#5049) was in good order. The slug control plan for Bossong (#0822) was in good order. The slug control plan for Premier Power Coating (#3734) was in good order. Action Items No other action items were noted. The pretreatment program is considered satisfactory. Sarah Laughlin and Bobby Crandall run an excellent pretreatment program. If you have any questions, please contact Tricia Lowery at (336) 776-9691 or me at (336) 776-9800. Sincerely, LDocuSigned by: ._0, l.<JMACr 145B49E225C94EA... Lon T. Snider Regional Supervisor Water Quality Regional Operations Section Division of Water Resources, NCDEQ — WSRO Attachment: 1. NC DWR Pretreatment Compliance Inspection (PCI) Report cc: Municipal Permitting Unit — Keyes McGee WSRO Electronic Files D_E NORTH CAROLINA gaparMeM of Environment,/quay North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 W. Hanes Mill Rd, Suite 300 I Raleigh, North Carolina 27105 336.776.9800