Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0019705_Application_20220512
` chambers _� engineering, pa RECEIVED/NCDEQ/DWR 129 North First Street 704.984.6427 ph Albemarle,NC 28001 I www.ce-pa.com MAY -fD (1Jz? MOORESVILLE REC ONAL OFFICE 5/3/2022 NC DEQ, Mooresville Regional Office 5/ta Division of Water Resources Mr.Ori Tuvia 610 E. Center Avenue,Suite 301 Mooresville, NC 28115 Re: Fast Track Sewer System Extension Permit-Modification City of Locust—North Basin Sanitary Sewer Improvements Dear Mr.Tuvia, On behalf of the City of Locust I am submitting herein an application package for a Non-Discharge(FTA 04-16) permit in association with the above referenced project. The application is for a requested modification to permit WQ0019705 dated 12/4/2019 which was a modification to permit WQ0019705 dated 8/29/2001. This remains a zero(0)flow permit action. The requested permit modification is a result of third-party development in the project area preceding the proposed project thereby resulting in the need to modify the proposed sanitary force main alignments and the deletion of the previously approved 12"gravity sewers. The affected areas in the permit are the"Creekview"and "East" basins. I am available at your convenience should you have immediate questions or need further information. Thank you for your time and efforts on this project. Sincerely, 4.7)4/(/`)° Stephen G.Chambers, PE President Attach: FTA 04-16(1 original, 1 copy) FTA Additional Sheets(2 copies) USGS Topo Map(2 copies) Site Map(2 copies) Application fee($480) Existing Permit(2 copies) Cc: Cesar Correa,City Administrator State of North Carolina Department of Environmental Quality Division of Water Resources 15A NCAC 02T.0300—FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Division of Water Resources FTA 04-16&SUPPORTING DOCUMENTATION Application Number:`� 6X0f r b� (t I 6f t .' (to be completed by DWR) RECEIVED/NCDEQ/DWR All items must be completed or the application will be returned MAY 2022 I. APPLICANT INFORMATION: WQROS 1. Applicant's name: City of Locust(company,municipality,HOA,utility, etc.) MOORESVILLE REGIONAL OFFICE 2. Applicant type: ❑Individual ❑Corporation ❑General Partnership ❑Privately-Owned Public Utility ❑Federal ❑ State/County ®Municipal ❑ Other 3. Signature authority's name: Cesar Correa per 15A NCAC 02T.0106(b) Title: City Administrator 4. Applicant's mailing address: 186 Ray Kennedy Drive City: Locust State:NC Zip: 28097- 5. Applicant's contact information: Phone number:(704) 888-5260 Email Address: cityadmin@locustnc.com II. PROJECT INFORMATION: 1. Project name:North Basin Sanitary Sewer Improvements 2. Application/Project status: ❑Proposed(New Permit) ®Existing Permit/Project If a modification,provide the existing permit number:WQ0019705 and issued date: 8/29/2001,Mod. 12/4/2019 If new construction but part of a master plan,provide the existing permit number: WQ00 3. County where project is located: Stanly 4. Approximate Coordinates(Decimal Degrees): Latitude: . ° Longitude: - . ° 5. Parcel ID(if applicable): (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Stephen Chambers License Number: 17943 Firm: Chambers Engineering,PA Mailing address: 129 N.First Street City:Albemarle State:NC Zip: 28001- _ Phone number:(704)984-6427 Email Address: schambers@ce-pa.com IV. WASTEWATER TREATMENT FACILITY(WWTF)INFORMATION: 1. Facility Name: West Stanly Wastewater Treatment Plant Permit Number:NC0043532 Owner Name: Stanly County Utilities V. RECEIVING DOWNSTREAM SEWER INFORMATION(if different than WWTF): 1. Permit Number(s): WQ Downstream(Receiving) Sewer Size: inch System Wide Collection System Permit Number(s)(if applicable): WQCS Owner Name(s): FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS 1. If the Applicant is a Privately-Owned Public Utility,has a Certificate of Public Convenience and Necessity been attached? ❑Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold,has a Developer's Operational Agreement(FORM: DEV)been attached? ❑Yes ❑No //N/A 3. If the Applicant is a Home/Property Owners'Association,has an Operational Agreement(FORM: HOA)been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ❑Residential Owned ❑Retail(stores,centers,malls) ❑Car Wash ❑Residential Leased ❑Retail with food preparation/service ❑ Hotel and/or Motels ❑ School/preschool/day care ❑ Medical/dental/veterinary facilities ❑ Swimming Pool/Clubhouse ❑Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑Businesses/offices/factories ❑Nursing Home ❑ Other(Explain in Attachment) 5. Nature of wastewater: %Domestic/Commercial %Commercial %Industrial(See 15A NCAC 02T.0103(20)) �Is there a Pretreatment Program in effect? ❑Yes ❑No 6. Has a flow reduction been approved under 15A NCAC 02T .0114(f)? ❑Yes ®No ➢ If yes,provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type(see 02T.0114(fl) Daily Design Flow a,b No.of Units Flow gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total GPD a See 15A NCAC 02T .0114(b), (d), (e)(1) and(e)(2) for caveats to wastewater design flow rates(i.e., minimum flow per dwelling;proposed unknown non-residential development uses;public access facilities located near high public use areas; and residential property located south or east of the Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G.S.42A-4). b Per 15A NCAC 02T.0114(c),design flow rates for establishments not identified [in table 15A NCAC 02T.0114] shall be determined using available flow data,water using fixtures,occupancy or operation patterns,and other measured data. 8. Wastewater generated by project: 0 GPD(per 15A NCAC 02T.0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ®Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other(Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA(If Applicable)-02T.0305& MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size(inches) Length(feet) Material > Section II& III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305&MDC(Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name: SEE ATTACHED 2. Approximate Coordinates(Decimal Degrees): Latitude: . Longitude:- . 3. Design flow of the pump station: millions gallons per day(firm capacity) 4. Operational point(s)of the pump(s): gallons per minute at feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(l): ® Standby power source or pump with automatic activation and telemetry- 15A NCAC 02T.0305(h)(1)(B): ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day > Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation,quick-connection receptacle and telemetry- 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry- 15A NCAC 02T.0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant(draft agreement) and is compatible with the station. > If the portable power source or pump is dedicated to multiple pump stations,an evaluation of all the pump stations'storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS& SEPARATIONS—(02B.0200& 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f)&(g) ®Yes ❑No ➢ 15A NCAC 02T.0305(f)contains minimum separations that shall be provided for sewer systems: Setback Parameter* Separation Required Storm sewers and other utilities not listed below(vertical) 24 inches Water mains(vertical-water over sewer including in benched trenches) 18 inches Water mains(horizontal) 10 feet Reclaimed water lines(vertical-reclaimed over sewer) 18 inches Reclaimed water lines(horizontal-reclaimed over sewer) 2 feet **Any private or public water supply source, including any wells,WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V),B, SA,ORW,HQW,or SB from normal high water(or tide elevation)and wetlands(see item IX.2) 50 feet **Any other stream, lake, impoundment,or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade(vertical) 36 inches > 15A NCAC 02T.0305(g)contains alternatives where separations in 02T.0305(f)cannot be achieved. > **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage > If noncompliance with 02T.0305(f)or(g), see Section X of this application 2. Does the project comply with separation requirements for wetlands?(50 feet of separation) ®Yes ❑ No ❑ N/A > See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction > As built documents should reference the location of areas effected 3. Does the project comply with setbacks found in the river basin rules per 15A NCAC 02B .0200? ® Yes ❑No ❑N/A > This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project require coverage/authorization under a 404 Nationwide or ® Yes ❑No individual permits or 401 Water Quality Certifications? ➢ Information can be obtained from the 401 &Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6)(additional permits/certifications)? ®Yes ❑No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for,or have been obtained. Issuance of this permit is contingent on issuance of dependent permits(erosion and sedimentation control plans, stormwater management plans,etc.). 6. Does this project include any sewer collection lines that are deemed"high-priority?" Per 15A NCAC 02T.0402, "high-priority sewer"means"any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. ❑Yes ®No ❑N/A > If yes, include an attachment with details for each line,including type(aerial line,size,material, and location). High priority lines shall be inspected by the permittee or its representative at least once every six-months and inspections documented per 15A NCAC 02T.0403(a)(5)or the permitee's individual System-Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T,the Minimum Design Criteria for the Permitting of Pump Stations and Force Mains(latest version),and the Gravity Sewer Minimum Design Criteria(latest version)as applicable? ®Yes ❑No If No,complete and submit the Variance/Alternative Design Request application(VADC 10-14)and supporting documents for review. Approval of the request is required prior to submittal of the Fast Track Application and supporting documents. 2. Professional Engineer's Certification: I, T ftw A. t'{( 4 g.S attest that this application for (Professional Engineer's name from Application Item III.1.) has been reviewed by me and is accurate,complete and consistent with the information supplied in the plans,specifications, engineering calculations,and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers(latest version),and the Minimum Design Criteria for the Fast-Track Permitting of Pump Stations and Force Mains(latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to exceed$10,000,as well as civil penalties up to$25,000 per violation. North Carolina Professional Engineer's seal,signature,and date: �,.," N�ARC/4 Q'-, 'ESSI , !. - c t 943 co — %�• 'l�`• 4GI1•0'..*.�� '��•,"EN G cN L .11llllllll�, 3. Applicant's Certification per 15A NCAC 02T.0106(b): I, GeSGC Co c , Ci4 A m n akrw►o r attest that this application for (Signature Authority's name&title from Application Item I.3.) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application.package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non- discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief,and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not to excee 000 as we civil penalties up to$25,000 per violation. Signature: - Date: Jc-" 2 202z FORM: FTA 04-16 Page 5 of 5 ATTACHMENT TO FTA 04-16: VIII.PUMP STATION DESIGN CRITERIA(If Applicable)—02T.0305& MDC(Pump Stations/Force Mains): 1. Pump station number or name:NORTH PUMP STATION 2. Approximate Coordinates(Decimal Degrees): Latitude: 35.296879° Longitude: -80.436552° 3. Design flow of the pump station: 0.76 million gallons per day(firm capacity) 4. Operational point(s)of the pump(s): 526 gallons per minute at 148.6 feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material Existing Line New or Size(inches) Replacement 8 4,672 PVC 6 Replacement 8 326 DIP 6 Replacement 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ®Standby power source or pump with automatic activation and telemetry— 15A NCAC 02T .0305(h)(1)(B) 1. Pump station number or name:CREEKVIEW PUMP STATION 2. Approximate Coordinates(Decimal Degrees): Latitude: 35.274724° Longitude: -80.440771° 3. Design flow of the pump station: 0.88 million gallons per day(firm capacity) 4. Operational point(s)of the pump(s): 611 gallons per minute at 166.78 feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material Existing Line New or Size(inches) Replacement 10 9,763 PVC 6 Replacement(new alignment) 10 340 DIP 6 Replacement(new alignment 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ©Standby power source or pump with automatic activation and telemetry— 15A NCAC 02T.0305(h)(1)(B) Note: The proposed 10"force main replaces an existing 6"force main but in a new alignment/footprint. Existing 6"force main to be abandoned. 1. Pump station number or name: EAST PUMP STATION 2. Approximate Coordinates(Decimal Degrees): Latitude: 35.254197° Longitude: -80.408931° 3. Design flow of the pump station: 1.8 million gallons per day(firm capacity) 4. Operational point(s)of the pump(s): 1252 gallons per minute at 155.94 feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material Existing Line New or Size(inches) Replacement 12 2,060 PVC 6 Replacement 12 40 DIP 6 Replacement 6. Power reliability in accordance with 15A NCAC 02T.0305(h)(1): ©Standby power source or pump with automatic activation and telemetry— 15A NCAC 02T.0305(h)(1)(B) Note: The proposed 12"force main replaces an existing 6"force main which connects to an existing 12"force main. Existing 6" force main to be abandoned 1. Pump station number or name: SOUTH PUMP STATION 2. Approximate Coordinates(Decimal Degrees): Latitude:35.244840° Longitude: -80.429959° 3. Design flow of the pump station: 0.79 million gallons per day(firm capacity) 4. Operational point(s)of the pump(s): 551 gallons per minute at 147 feet total dynamic head(TDH) 5. Summarize the force main to be permitted(for this Pump Station): Size(inches) Length(feet) Material Existing Line New or Size(inches) Replacement 8 5,218 PVC 4 Replacement 8 360 DIP 4 Replacement 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): Standby power source or pump with automatic activation and telemetry— 15A NCAC 02T.0305(h)(1)(B) S/Z This Modification will: A. Add 2,225 linear feet of 12 inch gravity sewer. Formatted:Strikethrough B. Upsize 4,998 linear feet of 6-inch force main with 8-inch force main, C. Upsize and realign r--= _((i,l,?3 linear feet of 6-inch force main with 10-inch force main, D. Upsize 100 linear feet of 6-inch force main with 12-inch force main, E. Upsize 5,578 linear feet of 4-inch force main with 8-inch force main, F. Increase capacity of the North Pump Station from 227 GPM to 526 GPM, G. Increase capacity of the Creekview Pump Station from 298 GPM to 611 GPM, H. Increase capacity of the East Pump Station from 198 GPM to 1,252 GPM, I. Increase capacity of the South Pump Station from 84 GPM to 551 GPM.