Loading...
HomeMy WebLinkAboutNC0024881_NOI2022LV0319_Response_20220518-lir. CITY OF Reidsville NORTH H `.t k(] 9.! j.J Public Works Department 1100 Vance Street, Reidsville, North Carolina 27320 PHONE (336) 349-1077 FAX (336) 634-1738 RESPONSE TO NOV-2022-LV-0319 FOR PERMIT NUMBER NC0024881 Beginning in December 2021, lab analyses of the City of Reidsville's wastewater treatment plant effluent revealed increasing concentrations of CBOD, ammonia, and fecal coliform bacteria. These concentrations continued building through January 2022 and eventually led to non-compliance in all three parameters for February 2022. The facility is also non -compliant for March and April 2022 for CBOD and ammonia. May 2022 week one CBOD is 4.88 mg/L, and all ammonia results are below the detection threshold. Fecal coliform bacteria's only excursion for in February. The ultimate cause of these exceedances was an almost total kill of the facility's biological treatment process. Contributing factors were: • Equipment failures of both of the facility's primary wasting systems. • Secondary wasting method inefficiency increased ammonia throughout the facility due to excessive supernatant. • Blockages in several diffusers significantly diminished air flow in the entry zone of the aeration basin. • Septicity throughout the entirety of the secondary treatment processes due to significantly increased solids concentrations and age -related return pump inefficiency. • Excessive filamentous growth due to pumping septic liquid from an off-line aeration basin into the active aeration basin. The City of Reidsville has undertaken the following corrective actions: • The primary wasting systems have been returned to service, and solids concentrations have been drastically reduced. • Lower solids concentrations have reduced the load on the return sludge train. • A solid air flow has been re-established to the entry end of the aeration basin. • Procured and incorporated biological compounds for short-term use to boost treatment efficiency. In plain language, the City of Reidsville lost the plant for approximately four to six weeks. Recovery has been slow, however the facility is currently operating efficiently.