Loading...
HomeMy WebLinkAboutNCC221868_Site Plan or Location Map_20220517DocuSign Envelope ID: 2COB7DDF-9580-4EB5-BCC8-639FA89E1166 INDEX OF SHEETS PE SEAL CONVENTIONAL SYMBOLS k, z Q U o C' N L1J � N Q N �03 Erosion Control Cover Sheet.............................................................. EC1 Erosion Control Details........................................................................ EC2 Erosion Control Plan Sheet......................................................... EC3-EC7 Erosion Control Inspection & Ground Stabilization Notes..... EC8-EC9 TOTAL SHEETS 9 LOCATION MAP NTS IT T1T !"I TI&T 71T1 !\`TT l&T _ A PIALI %,vl1%_,vIN-" x v r. -L- STA. 101+03.87 PLANS PREPARED BY: AMERICAN Engineering AMERICAN ENGINEERING ASSOCIATES -SOUTHEAST, PA 8008 CORPORATE CENTER DRIVE, SUITE 110 CHARLOTTE, NC 28226 704-619-5688 NC Lic. No. C-3881 � onro e North Carnhina Erosion Control Plans of Proposed CONCORD AVENUE SIDEWALK IMPROVEMENTS Project No. 4799 , , , ;6 I I J EROSION CONTROL LEGEND r] INLET PROTECTION SILT FENCE A SILT SACK C CUT/FILL LIMITS OF - F CONSTRUCTION EXISTING FLOW LINE - > PROPOSED FLOW LINE DISTRUBED AREA = 2.27 Ac. 2018 NCDOT STANDARD SPECIFICATIONS METHOD OF CLEARING - METHOD II • SEAL 15424 l••• LNG I1Nt��,: Ste, DocuSigned by: C, FEBEA54AFC014A5... RECORD DRAWINGS \ Y CN) /-CC i 71,_ s END PROJECT No. 4799 CONCORD AVE -L- STA. 141+34.63 GRAPHIC SCALES 0 20 40 60 Plan View ................. 0 20 40 60 Horz. Profile ............ 0 4 8 12 Vert. Profile ............. 0 5 10 15 Cross Section ........... Existing Property Line ................................... Existing R/W Line .......................................... Existing Structures ......................................... O Railroad Tracks..............................................� Proposed Edge of Pavement .......................... r� Fence................................................................ X X X- Slope Stake Line ............................................. F C Temporary Construction Easement ............. e 0 Sidewalk/Utility Easement ............................ SUE ....� Storm Drainage Easement ............................ SDE �I Existing Gas Line ........................................... G G Existing Water Line ....................................... w w Existing Sanitary Sewer ................................ Ss SS Existing Underground Telecommunications UT UT Existing Overhead Power ........................... P Existing Underground Power ..................... — — — — P — — — — Existing Storm Drainage XX" RCP ............................... --------------- Proposed Storm Drainage XX LF - XX" RCP ExistingTree........................................................................................... ExistingShrub......................................................................................... Existing Water Meter............................................................................. O ExistingWater Valve............................................................................. ExistingGas Meter................................................................................. ExistingGas Valve................................................................................. Existing Sanitary Sewer Manhole......................................................... Proposed Sanitary Sewer Manhole....................................................... Existing Storm Drain Manhole..............................................................0 Proposed Storm Drain Manhole........................................................... Existing Telephone Manhole................................................................. 0 Proposed Telephone Manhole............................................................... Existing Telephone Pedestal.................................................................. T❑ Existing Telephone Hand Hole............................................................. Existing Power Manhole........................................................................ J ProposedPower Manhole..................................................................... Existing Catch Basin ProposedCatch Basin............................................................................ ExistingLight Pole................................................................................. ProposedLight Pole................................................................................ 1 Existing Utility Pole................................................................................ • Proposed Utility Pole Existing Pole (Other).............................................................................. • W Existing Joint Tele/Utility Pole............................................................ 4- Guy Wire —< W Existing Sign IronPin................................................................................................... ® Existing Fire Hydrant............................................................................ . �> Proposed Fire Hydrant 4b- ExistingDrop Inlet.................................................................................. ProposedDrop Inlet................................................................................ ACC AccessibleRamp..............................................................................••••• Tree Protection............................................................................. Proposed Guardrail................................................................... Proposed Curb & Gutter, Conc Drive, Sidewalk rT� Proposed Asphalt Pavement........................................................0 A Proposed Rip Rap Ditch.............................................................. ProposedGravel........................................................................... Proposed Pavement Removal ...................................................... Proposed Handrail.....................................................................onro A North Carolina U Bid Set No. z O U APPROVED CITY ENGINEER DATE