Loading...
HomeMy WebLinkAboutNCC190191_Annual Fee Waived Email_20220515 Morman, Alaina From: laserfiche@ncdenr.gov Sent: Sunday, May 15, 2022 11:43 PM To: stan@cavinessandcates.com Cc: Morman, Alaina; Georgoulias, Bethany; Selkane, Aziza; stan@cavinessandcates.com Subject: Construction SW General Permit Annual Fee Update - NCC190191 Dear Construction General Permit Permittee: This email is to notify you that the 2022 annual fee for Certificate of Coverage (COC) no. NCC190191 has been applied or waived. No future fees will be required, as this permit is no longer active. This COC is for The Pines at Winston Pointe Phase 2 - Lots 30 and 114 in Johnston County, issued to Cates Building Inc.. This communication is in reference to Invoice no. NCC190191-2022. If you have any questions,please contact the Stormwater Program Billing Specialist at(919) 707-3710, or visit https://deq.nc.gov/NCGO1. The NC DEMLR Stormwater Program 512 N. Salisbury Street, Archdale Building 6th Floor, 1612 Mail Service Center, Raleigh,NC 27699-1612 This email was automatically generated by Laserfzche. Please do not respond to this email address, as responses are not monitored. i