HomeMy WebLinkAbout20220665 Ver 1_Shoreline Stabilization_20220516Shoreline Stabilization Application Form
NORTH CAROLINA
Environmental Quality
15A NCAC 02H .0500 — Water Quality Certification, Shoreline Stabilization
FORM: SSGP 10-2013
DRAFT -NOT FOR USE AT THIS TIME
Submission Form
I. Applicant Information [15A NCAC 02H .0502(a)]
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Primary Contact Email *
hager@lakepermit.com
Please provide an email address for payment and requests for more information here.
Pre -Filing Meeting Date Request was 5/12/2022
submitted on: *
Owner Information:
Name: *
Email: *
Phone Number:
Mailing Address: *
JERRY RAY HUFFMAN
HUFFMANJR@CORNING. COM
(828)901-5086
(xxx)xxx-xxxx
Street Address
5545 GUNPOWDER RD
Address Line 2
City
GRANITE FALLS
Postal / Zip Code
28630
State / Province / Region
NC
Country
US
Is there an agent working on the project?* Yes
No
Agent/Consultant Information
Name: * TAMARA HAGER
Company Affiliation: * LAKE PERMIT LLC
Email: * HAGER@LAKEPERMIT.COM
Phone Number:*
Mailing Address:*
(704)575-2227
(xxx)xxx-xxxx
Street Address
PO BOX 5335
Address Line 2
City State / Province / Region
MOORESVILLE NC
Postal / Zip Code Country
28117 US
A signed and dated copy of the Agent Authorization letter:*
HUFFMAN AUTH.pdf 168.8 I KB
Link to: Sample Agent Authorization Form
Project Information [15A NCAC 02H .0502(a) & (b)]
Project Name: *
HUFFMAN
If your project has a formal name please use this. If your project does not have a formal name, please identify your project
by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses
any other names that have been used to identify the project in the past.
1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to
local landmarks such as towns, rivers, and roads.*
Upload File
Look up address
Upload Map: HUFFMAN SURVEY.pdf 250.1 KG3
Latitude:*
35.784959
Longitude: *-81.369078
2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing,
structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below
Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under
section 12.normal pool lake level/normal water level*
HUFFMAN SKETCH.pdf 103.13KB
Please use the diagram at the link below:
https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx
3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard
stick, shovel handle, etc.)
HUFFMAN PICS.pdf 98.23KB
4. Location of the property (where work is to be conducted)
Nearest Town: * GRANITE FALLS
County: * Caldwell
Lake/ river/ ocean adjacent to HICKORY/CATAWBA
property:
Subdivisions name or site address: *
CRESENT LAND & TIMBER LOT NUMBER 18
Include phase/lot number
Directions to site: *
HEAD SOUTHEAST ON DUKE ST TOWARD CONGRESS ST .30
MILES, TURN RIGHT ONTO S MAIN ST 2.1 MILES, TURN RIGHT
ONTO US 321 S HICKORY BLVD 1.3 MILES, TURN LEFT ONTO
GRACE CHAPEL RD 2.7 MILES, TURN LEFT ONTO GUNPOWDER
RD .40 MILES, TURN LEFT STAY ON GUNPOWDER RD .30 MILES,
PROPERTY AHEAD AT 5545 GUNPOWDER RD
Please include road names and numbers, landmarks etc.
5. Describe the existing land use or condition of the site at the time of this application: *
RESIDENTIAL
Residential, undeveloped, etc.
6. Property Size .752
Acres
7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or
why it is necessary):
8. How will the work be done? *
From Land
From Water
9. Total amount of disturbance below the normal pool lake level/ normal water level: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land-
ward: *
(including all clearing, back fill, excavation, rip rap, retaining walls, etc.)
0
square feet
11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to
be impacted:*
(number of trees, for instance)
NONE
Sketch: HUFFMAN SKETCH.pdf 103.13KB
Application Fee:
Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The
application fee is as follows (pursuant to G.S. 143-215.3D):
o $240.00 for impacts to lake (below normal water level) of less than 1 acre
o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre
By digitally signing below, I certify that:
o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best
of my knowledge and belief
o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of
the NC General Statutes (the "Uniform Electronic Transactions Act");
o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes
(the "Uniform Electronic Transactions Act");
o I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written
signature; AND
I intend to electronically sign and submit the Shoreline Stabilization online form.
Full Name:* JERRY RAY HUFFMAN
Signature:
,JO) (AY +/ JFFMA)J
Submittal Date: 5/12/2022
Initial Review
Is this accepted into the review process?* Yes No
Project Number:* 20220665 Version:* 1
Select Reviewer: * Amy Annino:eads\amannino
Select Reviewing Office: Asheville Regional Office - (828) 296-4500
Has payment been received?* ( No Payment Needed
C Fee Received
C• Need Fee - send electronic notification
What amount is owed?*
C• $240.00
C $570.00
IfilaYOUnialmoyan RIM
ProjfiCt Nal } : led
s - Li„
vio_44‘- _ceititele
Omer: �l
1'rfn -
Contractdrl 11"; Slgrnrtra ..
print
The approval Is far the purpose and design de,crlbed in your application. Impacts not Indic tad In the
application It a vrole#ron of Buffer Rule.Site spectfEc work should be provided in the eppllcatlon. !ISA NCRC
02H.0506 and 15A NCAC D28.D243(8)i
Trees are not allowed to be removed from Zone 1 of the Buffer within 30 ft of the full pond eiev tion}, unie;s
approved. Exception,those trees that sire severely undermined alangthe frrmmeddrte shoreline can be removed.
fl+lrnirn.f shaairg and sloping alangtiie immediate shoreline Es allowed. (15A hiCAC 02B.0243(6))
Benching, Fading in the buffer Is,not allowed.Excessive disturbance of ground cover-(ISA NCAC 028.0243 (5)1
Beadles,impervious patios,fmparvlaus walkways,etc.are not allowed in the buffer unless sp-eciflrnllyappreved
by the Otvfsion. Thee are lirnttitlon an slie for decks. (15A NCAC 028 .0243E4) end (6]:
Work to be aondued from land must lndtrate ar,access and indicate any trees that are to be removed. The
work corridor should be described.The approved aecss corridor;hall brf restored, StaVna,sock• ccrsstructicr
material must be outside the buffer. (15A NCAC 02H..D O2 and 15R NCAC 02B.D24 (4), [5}, {d);
Starmwater canfat he piped or di-renneled for direct discharge to the ,aka.. All carkstruct d storniweter
discharges must be at the natural eiavistion and drsrharged prior to entering The buffer drrectad es drfluse or
sheet Flow at non-e:olive velocti a to the take. [iA NCAC 028.0243(5), 16))
A ckn o wledgement of Notification
..e•- ..fit__ ..4:ai .uP-;414.1N1 h by state that I have been Informed of the Catawba
Riparian auFrer Rule. Any war*conducted tr the beer, not spectrally stated In the spplicetion and approved
by the Division of Water Rmour;.es{€ WA), is a vioIrtion and subject to enforcement Cut dillgen:,.e +ill b,
emican much that the c❑ruuuceon will be built within substantial compliance and intentofthe 401 Water
quality Certification and Buffer Rules,the approulod plants}and specIftcation(s), and other supporting
material:_
�•-. , I I
►lgilatura{owri� • D�: 22-
n p
T
8
v
9G
i
f ah sailor ��i
. fi0
=k:x:jxk; x"a::s::
51 27 ii:iriw + -:i.� .rW 1 �L
a.
55 1 +i +n ..x Irma.; ..in
■i
J* 4°g;:s1:x1RsII�i:i:e
.:k'-:t 1;giA=" " aaait
iwi:wnwkm eiwww 04Wmilf
I....... I 11.. I 1 I I 1 1. 1
tis AS 48,1.42.11.4k4
X \
1 1 1 III
thr
r . rrr
• .r ::
/ilia
+ „taw
1I«1!+
v
(4
Lake
At RIP Fond/Normal Waterlsvafl
Full Pond/ 2sElow
�4f'R7 airisir *�:�l�•I,��,rJ:Tj
$ ore fr ..�j,,., .� ; �-••,ey, ,r..,,,., a1li: ?•r, '��?...
� ts ,r.ilr;e t• f a: `+iidr:ieff l•d+
!; r
•
NsrugsAn
31.z R e
1,4,c1N LONA k C
aVXor5 �
Please approximately sketch the following information an this plan rd
ri''14,n, such as 10 ft x 100 ft)*; P+�v s dime long for each
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond 'N
3, Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation
4. Location of in anal Water Level el evetFan
5 y proposed structures such as buildings,
Locet€on of any excavation or dredging below the Full Po d/Normal
Level etc.
6. Location of construction access corridors Water elevation
FORM:55GP 10-2013
Page 3 of 3
From: Tamara Hager .amarahager@icioud.com
Subject: Huffman pics
Date: May 12, 2022 at 1 :08:59 PM
To: TAMARA HAGER , 1dyer e.)k 1 epermit.com
is �. . . -
rr .
•
ti 7, ... r
40
•‘IC.- - %
114 N.41
• . a .
R r. . k, _ .
•0 . VII �!.
•
1;„ . ' . _
i.
trk i r r
.... 4-di ."11.11 4 „ig „ .
40.i. vioNpt.00.4 li. . Ill 3
�r',R r- 7.
��• -•� - -
1 J ram' -
Lake
At RIP Fond/Normal Waterlsvafl
Full Pond/ 2sElow
�4f'R7 airisir *�:�l�•I,��,rJ:Tj
$ ore fr ..�j,,., .� ; �-••,ey, ,r..,,,., a1li: ?•r, '��?...
� ts ,r.ilr;e t• f a: `+iidr:ieff l•d+
!; r
•
NsrugsAn
31.z R e
1,4,c1N LONA k C
aVXor5 �
Please approximately sketch the following information an this plan rd
ri''14,n, such as 10 ft x 100 ft)*; P+�v s dime long for each
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond 'N
3, Location of rip rap or fill to be placed below the Full Pond/Normal Water Level elevation
4. Location of in anal Water Level el evetFan
5 y proposed structures such as buildings,
Locet€on of any excavation or dredging below the Full Po d/Normal
Level etc.
6. Location of construction access corridors Water elevation
FORM:55GP 10-2013
Page 3 of 3