HomeMy WebLinkAbout20220437 Ver 1_W-5701E permit drawings_05.11.2022_20220512 T V = % * FUNC CLASS = 0 0 0 PROFILE (HORIZONTAL) PROJECT LENGTH RIGHT OF WAY DATE: LETTING DATE: STATE STATE PROJECT REFERENCE NO. STATE PROJ. NO.F. A. PROJ. NO.DESCRIPTION NO. TOTAL SHEETS N.C. SHEET 1 DESIGN DATA SIGNATURE: SIGNATURE: P.E. P.E. PROJECT ENGINEER PROJECT DESIGN ENGINEER GRAPHIC SCALES PLANS PROFILE (VERTICAL) HYDRAULICS ENGINEER ENGINEER ROADWAY DESIGN09/08/99DIVISION OF HIGHWAYS STATE OF NORTH CAROLINA 0 00 See Sheet 1-A For Index of Sheets 3/16/2022 10:21:32 AM...\W5701E_hyd_permit_tsh.dgn User:amfitzpatrick ARTMEN N ASO H DEPT O F TRA S PORTTIONTATEOFNRTCAR O LI NA4 Asheville, North Carolina 423 467 8401 865 546 5800 864 574 4775 828 253 2796 606 248 6600 Tri-Cities, TN Knoxville, TN Spartanburg, SC Middlesboro, KY Charleston, SC 843 974 5650 Atlanta, GA 770 627 3509 cCopyright 2006 Vaughn & Melton, Inc. All Rights Reserved Consulting Engineers Boone, NC 828 355 9933 919 977 9455 704 357 0488 Charlotte, NCRaleigh, NC Prepared in the Office of: VAUGHN & MELTON ASHEVILLE NC, 28806 1318-F PATTON AVE. FOR THE NORTH CAROLINA DIVISION OF HIGHWAYS ADT 2016 = 1900 P.E. CONST 50 MPH LENGTH ROADWAY PROJECT = 0.294 MI TOTAL LENGTH OF PROJECT = 0.294 MI = 10 LOCAL, RURAL SUB REGIONAL TIER 50 5 10 2550 2.55 25 DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED R/W, UTIL TYPE OF WORK: GRADING, DRAINAGE AND PAVING 100 100 Indian Trail Rd Railway END PROJECT BEGIN PROJECT POINT RD TO DRUMMONDS TO US 17 TO EDENTON TO SANDY POI NTINDIAN TRAIL RDJOHN LANSFORD, PE DWAYNE ALLIGOOD, PE IN CHOWAN COUNTY LOCATION: NC 32/37 INTERSECTION EAST OF EDENTON 2018 STANDARD SPECIFICATIONS 37 32 94 32 94 94 Haughton RdWoodar d RdNorthwestern RailroadCarolina and Airport Regional Northeastern Soundside RdPolar N eck R dYeopim Rd 50 50 CHOWAN COUNTY TIP PROJECT:W-5701E44847.1.5 44847.2.5 44847.3.5 NCDOT CONTACT: RYAN SHOOK JULY 18, 2019 W-5701E WETLAND IMPACTS PERMIT SITE 1 SITE 2 SHEET 1 OF 4 PERMIT DRAWING CONTRACT: DA00546JUNE 15,2022CreekSomer St.Johns Nixon's Beach Sandy Point Hornblower Point BEGIN PROJECT -L- STA. POT 10+50.00 END PROJECT -L- STA. POT 26+00.00-Y2--Y3-NC 3 7 -L- NC 32-Y1-NC 32-L- VICINITY MAP NAD 83/ 2011 NAD 83/ 2001E SITE #1A PERMIT SITE #1B PERMIT SITE #2D PERMIT SHEET 2 OF 4 PERMIT DRAWING 5/11/2022 9:05:54 AM...\3173706_permit'_psh04.dgn User:amfitzpatrickHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.5/14/99SHEET NO.PROJECT REFERENCE NO. 4AW-5701E DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED WETLANDS EXCAVATION IN E E WETLANDS EXCAVATION IN SITE #2A PERMIT WETLANDS EXCAVATION IN E SITE #2 PERMIT WETLANDS EXCAVATION IN F STABILIZATION RIPRAP BANK SITE #2B PERMIT WETLANDS FILL IN EXTEND CULVERT REPLACE AND F SITE #2C PERMIT WETLANDS FILL IN SITE #2E PERMIT FILL WETLAND RIP RAP F WETLANDS FILL IN BOUNDARY OPEN WATERS POTENTIAL WATERS/ T T CUL1CUL2CE1HW1CUL3CUL4CE2 HW2 15" RCP 18" RCP24" HDPE 24" RCP 18" HDPE18" RCP 15" RCP 15" RCP 24" RCP18" RCP 15" RCP 15" RCP 18" HDPE6' CHL12' SOIL DR15" RCP 15' GRAVEL DR18' GRAVEL DR 8' GRAVEL DR20' GRAVEL DR2 0' CONC DRDI DI CONC HW DIR ONLY 2 3' BS T EXIST R/WEXIST R/W10' SOIL DR24" RCP CONC HWEXIST R/WCONC HW CONC HW 125.00'100.00'60.00'60.00'EXIST R/W EXIST R/W N 04°20'25" WS 03°20'56" E S 06°40'56" E N 04°20'25" W164.57'N 77°00'25" W 223.20'S 65°49'14" W25.00'S 24°10'46" E25.00'S 65°49'14" W25.00'N 88°35'01" W N 18°47'17" EN 18°47'17" EN 14°02'45" EN 05°42'22" EEXI ST R/ W EXI ST R/W125.00'15" RCP DB 157 PG 488 1SFD BED FLOWER JUNCTION BOX POSSIBLE DB 280 PG 457 CLYDE & JACQUELINE ADAMS RICHARD & GLENDA JACKSON DB 163 PG 31S 37°25'56" W18" RCP 24" CMP DIR. ONLY DIR. ONLY DIRT PILE DB 341 PG 442 DB 461 PG 119 JENNINGS W WEBB DB 206 PG 344 CHOWAN COUNTY DB 221 PG 928 GLORIA R BOND DB 492 PG 890 JUDITH K WARD 2SFD DB 302 PG 335 CAREY Y PARRISH III DB 421 PG 89 1SFD OF EDENTON LLC B&J INVESTMENTS DB 302 PG 332 CAREY Y PARRISH III DB 163 PG 28 CAREY Y PARRISH III DB 152 PG 572 CAREY Y PARRISH III N 13°55'45" EEIPEIR1.95' R/W TO EIP0.87' EIR TO R/W0.97' EIP T O R/WEIP 1.37' R/W EIP EIP 4' VINYL 4' VINYL TO EDENTON 20' BST NC 32 (POPLAR NECK RD) 20' INDIAN TRAIL RD TO DRUMMONDS POINT RD TO US 17 25 ' BST NC 37 (HAUGHTON RD)25 ' BST NC 32 (HAUGHTON RD)TO US 64OF LATTERDAY SAINTS CHURCH OF JESUS CHRIST CULT CULT CULT WOODS WOODS WOODS CULT CULT CONC SW 50.00'125.00'50.00'62.50'15" RCP ENVIRONMENTAL OFFICER AS WETLANDS A,B,C,D ALL WETLANDS AREAS DETERMINED BY PEF SOIL DR.4'X5' CONC CULVERTSI NGLE BARRELCHURCH1SBK DB 302 PG 332 CAREY Y PARRISH III DB 163 PG 28 CAREY Y PARRISH III CHARLOTTE BAKER WILLIAM & ELEV: 112.7393ELEV: 12.0335ELEV: 15. 5 5 6 8 SAG -L- 19+60.27SAG -Y1- 13+83.42SAG -Y1- 1 3 +8 3. 4 2ELEV: 1 2. 0 3 3 5 24" 18" DETAIL B FS SEECREST -Y1- 16 +7 2. 7 3 Flatter4:1 or D4:1( Not to Scale) SPECIAL CUT DITCH FROM -Y1- STA. 15+50 TO STA. 16+50 LT FROM -Y1- STA. 13+50 TO STA. 15+50 RT DETAIL C Min. D=1.0 Ft. Ground Natural Slope Ditch Front L S etc. GI 10:1 20 :1 ( Not to Scale) FALSE SUMP 2.0' FROM -L- STA. 23+48 TO STA. 23+63 DETAIL B Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch RE MO VE REMOVE REMOVE REM OVEREMOVE RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN SYSTEM REMOVE REMOVEREMOVEDRAIN GRADE TO 18" RCP-IV 24" RCP-IVFlatter4:1 or D3:1( Not to Scale) SPECIAL CUT DITCH FROM -Y3- STA. 12+00 TO STA. 12+50 LT FROM -Y3- STA. 11+50 TO STA. 12+50 RT FROM -Y2- STA. 10+50 TO STA. 14+00 LT FROM -Y2- STA. 10+50 TO STA. 15+00 RT FROM -L- STA. 18+50 TO STA. 26+00 LT FROM -L- STA. 20+00 TO STA. 26+00 RT FROM -L- STA. 17+00 TO STA. 19+00 RT FROM -L- STA. 10+50 TO STA. 16+70 RT DETAIL A Min. D=1.0 Ft. Ground Natural Slope Ditch Front3:1D B ( Not to Scale) SPECIAL CUT BASE DITCH Flatter4:1 or FROM -L- STA. 10+50 TO STA. 18+20 LT DETAIL D B=2.0 Ft. Min. D=1.0 Ft. Ground Natural Slope Ditch Front 30" RCP-III 30" RCP-III REMOVE36" RCP-IV HW 24" RCP-III24" RCP- I V18" RCP-IV RCP-IV 18"3:13:1 D ( Not to Scale) STANDARD 'V' DITCH FROM -L- STA. 19+00 TO STA. 19+14 RT Min. D=1.0 Ft. DETAIL E Ground Natural Ground Natural See Sheet 5 for -L- Profile See Sheet 6 for -Y1- Profile See Sheet 6 for -Y2- Profile See Sheet 6 for -Y3- Profile1520 251510CCCCCCCCCCCCCCCCFFCCCCCCCCCCCCCCCCCCCCFCFC NAD 83/ 2001E SITE #1A PERMIT SITE #1B PERMIT SITE #2D PERMIT SHEET 3 OF 4 PERMIT DRAWING 5/11/2022 9:07:28 AM...\3173706_permit'_psh04B.dgn User:amfitzpatrickHYDRAULICSROADWAY DESIGN ENGINEER ENGINEER R/W SHEET NO.5/14/99SHEET NO.PROJECT REFERENCE NO. 4BW-5701E DOCUMENT NOT CONSIDERED FINAL UNLESS ALL SIGNATURES COMPLETED WETLANDS EXCAVATION IN E E WETLANDS EXCAVATION IN SITE #2A PERMIT WETLANDS EXCAVATION IN E SITE #2 PERMIT WETLANDS EXCAVATION IN F STABILIZATION RIPRAP BANK SITE #2B PERMIT WETLANDS FILL IN EXTEND CULVERT REPLACE AND F SITE #2C PERMIT WETLANDS FILL IN SITE #2E PERMIT FILL WETLAND RIP RAP F WETLANDS FILL IN BOUNDARY OPEN WATERS POTENTIAL WATERS/ T T CUL1CUL2CE1HW1CUL3CUL4CE2 HW2 15" RCP 18" RCP24" HDPE 24" RCP 18" HDPE18" RCP 15" RCP 15" RCP 24" RCP18" RCP 15" RCP 15" RCP 18" HDPE6' CHL12' SOIL DR15" RCP 15' GRAVEL DR18' GRAVEL DR 8' GRAVEL DR20' GRAVEL DR2 0' CONC DRDI DI CONC HW DIR ONLY 2 3' BS T EXIST R/WEXIST R/W10' SOIL DR24" RCP CONC HWEXIST R/WCONC HW CONC HW 125.00'100.00'60.00'60.00'EXIST R/W EXIST R/W N 04°20'25" WS 03°20'56" E S 06°40'56" E N 04°20'25" W164.57'N 77°00'25" W 223.20'S 65°49'14" W25.00'S 24°10'46" E25.00'S 65°49'14" W25.00'N 88°35'01" W N 18°47'17" EN 18°47'17" EN 14°02'45" EN 05°42'22" EEXI ST R/ W EXI ST R/W125.00'15" RCP DB 157 PG 488 1SFD BED FLOWER JUNCTION BOX POSSIBLE DB 280 PG 457 CLYDE & JACQUELINE ADAMS RICHARD & GLENDA JACKSON DB 163 PG 31S 37°25'56" W18" RCP 24" CMP DIR. ONLY DIR. ONLY DIRT PILE DB 341 PG 442 DB 461 PG 119 JENNINGS W WEBB DB 206 PG 344 CHOWAN COUNTY DB 221 PG 928 GLORIA R BOND DB 492 PG 890 JUDITH K WARD 2SFD DB 302 PG 335 CAREY Y PARRISH III DB 421 PG 89 1SFD OF EDENTON LLC B&J INVESTMENTS DB 302 PG 332 CAREY Y PARRISH III DB 163 PG 28 CAREY Y PARRISH III DB 152 PG 572 CAREY Y PARRISH III N 13°55'45" EEIPEIR1.95' R/W TO EIP0.87' EIR TO R/W0.97' EIP T O R/WEIP 1.37' R/W EIP EIP 4' VINYL 4' VINYL TO EDENTON 20' BST NC 32 (POPLAR NECK RD) 20' INDIAN TRAIL RD TO DRUMMONDS POINT RD TO US 17 25 ' BST NC 37 (HAUGHTON RD)25 ' BST NC 32 (HAUGHTON RD)TO US 64OF LATTERDAY SAINTS CHURCH OF JESUS CHRIST CULT CULT CULT WOODS WOODS WOODS CULT CULT CONC SW 50.00'125.00'50.00'62.50'15" RCP ENVIRONMENTAL OFFICER AS WETLANDS A,B,C,D ALL WETLANDS AREAS DETERMINED BY PEF SOIL DR.4'X5' CONC CULVERTSI NGLE BARRELCHURCH1SBK DB 302 PG 332 CAREY Y PARRISH III DB 163 PG 28 CAREY Y PARRISH III CHARLOTTE BAKER WILLIAM & ELEV: 112.7393ELEV: 12.0335ELEV: 15. 5 5 6 8 SAG -L- 19+60.27SAG -Y1- 13+83.42SAG -Y1- 1 3 +8 3. 4 2ELEV: 1 2. 0 3 3 5 24" 18" DETAIL B FS SEECREST -Y1- 16 +7 2. 7 3 Flatter4:1 or D4:1( Not to Scale) SPECIAL CUT DITCH FROM -Y1- STA. 15+50 TO STA. 16+50 LT FROM -Y1- STA. 13+50 TO STA. 15+50 RT DETAIL C Min. D=1.0 Ft. Ground Natural Slope Ditch Front L S etc. GI 10:1 20 :1 ( Not to Scale) FALSE SUMP 2.0' FROM -L- STA. 23+48 TO STA. 23+63 DETAIL B Traffic Flow Outside Ditch 1.0' Max0.5' Min.S=Ditch Slope C Proposed Ditch RE MO VE REMOVE REMOVE REM OVEREMOVE RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN RETAIN SYSTEM REMOVE REMOVEREMOVEDRAIN GRADE TO 18" RCP-IV 24" RCP-IVFlatter4:1 or D3:1( Not to Scale) SPECIAL CUT DITCH FROM -Y3- STA. 12+00 TO STA. 12+50 LT FROM -Y3- STA. 11+50 TO STA. 12+50 RT FROM -Y2- STA. 10+50 TO STA. 14+00 LT FROM -Y2- STA. 10+50 TO STA. 15+00 RT FROM -L- STA. 18+50 TO STA. 26+00 LT FROM -L- STA. 20+00 TO STA. 26+00 RT FROM -L- STA. 17+00 TO STA. 19+00 RT FROM -L- STA. 10+50 TO STA. 16+70 RT DETAIL A Min. D=1.0 Ft. Ground Natural Slope Ditch Front3:1D B ( Not to Scale) SPECIAL CUT BASE DITCH Flatter4:1 or FROM -L- STA. 10+50 TO STA. 18+20 LT DETAIL D B=2.0 Ft. Min. D=1.0 Ft. Ground Natural Slope Ditch Front 30" RCP-III 30" RCP-III REMOVE36" RCP-IV HW 24" RCP-III24" RCP- I V18" RCP-IV RCP-IV 18"3:13:1 D ( Not to Scale) STANDARD 'V' DITCH FROM -L- STA. 19+00 TO STA. 19+14 RT Min. D=1.0 Ft. DETAIL E Ground Natural Ground Natural See Sheet 5 for -L- Profile See Sheet 6 for -Y1- Profile See Sheet 6 for -Y2- Profile See Sheet 6 for -Y3- Profile1520 25151055551010101010 1010 101010101010 10101010101010 1010 10 10 10 10101010101010101010101010101 0 1 0 10 1010 1010101010101010101010101010101 0 10 1010 10 10 101010 101010101010101010 10 10101010101010101010 101010 10101010101015 15 15 151515151515CCCCCCCCCCCCCCCCFFCCCCCCCCCCCCCCCCCCCCFCFC Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts Stream No.(From/To)Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp.Design (ac)(ac)(ac)(ac)(ac)(ac)(ac)(ft) **(ft) **(ft) 1A Rip Rap Bank Stabilization - Outlet <0.01 1B Wetland Excavation - Outlet 0.03 2 Replace and Extend Culvert <0.01 2A Wetland Excavation - Outlet 0.01 2B Wetland Fill - Inlet 0.02 2C Wetland Fill - Outlet 0.02 2D Wetland Excavation - Outlet 0.01 2E Rip Rap - Wetland Fill - Outlet <0.01 TOTALS*:0.04 0.00 0.05 0.00 0.00 0.00 0.00 0 0 0 *Rounded totals are sum of actual impacts NOTES: Revised 2022 Feb SHEET 4 OF 4 WETLAND AND SURACE WATER IMPACTS SUMMARY SURFACE WATER IMPACTSWETLAND IMPACTS DIVISION OF HIGHWAYS 03/3/2022 NC 32/37 NC DEPARTMENT OF TRANSPORTATION W-5701E