Loading...
HomeMy WebLinkAbout20220160 Ver 1_2a Integrated Pump Around into site specific plan_20220505Notes: Pump Around Construction Sequence No stilling basins are proposed for pump around Norton Creek design due to space requirements and temporary Integrated into Engineered Drawings — i Flow Direction nature of pump around requirements for this project ai Z 2 -o - All dikes will be constructed from impermeable -I; lie o� and non -erosive materials ill arkurz�� -,> _., Pump inlet hose will be positioned at water ,410r .II Z . RI on Amity 28211 V ir�Z�i f O• .p— .�� `� =.? ::� 1: Establish impermeable and non erosive dike surface ' • .. i km �l 0 z Pump outlet hose will discharge to a silt bag �'�i , which will be positioned on a rock pad for diffuse !� I o cri o flow back to the channel. �r Section of channel to i, be dried and restored A smaller secondary pump will be used keep the -C v work area dryfrom anygroundwater seeps '�,P •' Pump around will be set up and established daily Mk ,�* e and will approximate the amount of work which �� ���, • . ��� can be accomplished in a day. The active �,/������ construction will only occur between the 10 ,I��,, impermeable dike and the discharge hose of the �0., — _ pump •�w��� 0 +' 0 O co 4: Position suction house on o Fuel storage areas for the pump will follow all surface of water behind dike ,' i.Z�-=�mb -_. applicable regulations E N 1•�•� �i � O co N +, Inlet hose pump ��.,, �4� ro CN ro ` ,0 N U irj Position �♦A, z 13: and prime pump 7�3 �, C•••••� '�'.. U > a, 5: Position discharge hose on pad constructed during item 2 of the sequence t ��.,, �� �� > o O CO N 0 Z I'- CO 0 E. 2: Establish discharge Pad and silt bag •`!'� � en tilt t � •gyp-i��tufr_`''��i. ''', ' to 6 ., - J I�; �'` GRAPHIC SCALE /,, Date: Nov. 29, 2021 Updated: N/A For: City of Brevard Attn: Mr. Alvin Fuller a o za a io so diri* • 4... 1, - ( IN FEET) 1 v4 i p i p 1 inch = 6 ft. 4.' Note: Not .re.ared b an en.ineer