Loading...
HomeMy WebLinkAboutNCC221800_ESC Approval Submitted_20220511UENDERSON COUNTY SOIL ER0 ION AND SEDIMENT CONTROL OFFICE May 6, 2022 LETTER OF APPROVAL WITH CONDITIONS Attn: Peter Radchishin Big Hill Construction, LLC 120 Dogwood Road Candler, NC 28715 RE: Project Name: Acres Approved: Project ID: County: City: Address: PIN: River Basin: Stream Classification: Submitted By: Date Received by HC: Plan Type: Date Received by HC: Plan Type: Dear Peter Radchishin, Big Hills at Horse Shoe 17.42 SESC 2021-09-02 Henderson N/A Adjacent to 2777 Brannon Road (35.3455,-82.6016) 9529-59-5596; 9529-68-1993 French Broad River Basin Brock Creek; WS-IV; 6-48 Nicholas M. Bowman, PE October 13, 2021 New April 20, 2022 Revisions This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan shall expire three (3) years following the date of approval, if no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNO1) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete, you will receive a link with payment instructions for the $100 annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project, you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNO1 form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC. 100 NORTH KING STREET, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6521 LETTER OF APPROVAL BIG HILLS AT HORSE SHOE MAY 6, 2022 PAGE 2 OF 3 Title 15A NCAC 413 .0118(a) and the NCGOI permit rcquire that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCGOI permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute I I3A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Assistant Engineer Site Development Enclosures: Certificate of Approval NCGO1 Fact Sheet Location Map Final FRO Form "Items needed for NCGO1 NOI process" ec: Nicholas M. Bowman, PE Stan Aiken PE, DEQ — Asheville LETTER OF APPROVAL BIG HILLS AT HORSE SHOE MAY 6, 2022 PAGE 3 OF 3 CONDITIONS • ZONING APPROVAL FROM THE JURISDICTION HAVING AUTHORITY. PROJECT CANNOT BEGIN UNTIL THIS DOCUMENT IS RECEIVED IN THIS OFFICE. • A DRIVEWAY PERMIT REQUIRED FRO THE JURISDICTION HAVING AUTHORITY (IF REQUIRED). NO WORK TO BEGIN IN THIS AREA PRIOR TO OBTAINING THIS PERMIT AND SUBMITTING TO OUR OFFICE FOR THE FILE. • OBTAIN NOI FROM NC DEQ AS INSTRUCTED IN THIS LETTER. (see flyer attached) • FOLLOW THE SELF -INSPECTION, RECORDKEEPING AND REPORTING REQUIREMENTS DESCRIBED ON SHEET D15 OF THE APPROVED DRAWING "SITE DEVELOPMENT PLAN FOR BIG HILLS AT HORSE SHOE" AND DATED APRIL 18, 2022, WHICH IS INCORPORATED INTO THIS LETTER OF APPROVAL. • PRE -CONSTRUCTION MEETING REQUIRED PRIOR TO LAND DISTURBANCE. CONTACT DEB JOHNSTON AT (828) 694-6521 TO SCHEDULE. Financial Responsible Ownership Signature: P . Print Name and Title: ?G-recz RPcDG�A ISM Date: 100 NORTH KING STREET, SUITE 118 HENDERSONVILLE, NC 28792 TELEPHONE: (828) 694-6521