HomeMy WebLinkAboutNCC190287_NOT Closeout Documents_20220502THECITYOF
ASHEVILLE
CERTIFICATE OF COMPLETION
for
SEDIMENT AND EROSION CONTROL
SKS Partners LLC
PO Box 2224
Skyland, NC 28776
RE: Project Name: 275 Smokey Park Highway
Project Address: 275 Smokey Park Highway
Permit Number: 19-00649
Inspection Date: January 29, 2021
Inspector: Toby Shelton
Dovelopmont Service Department
City of Asheville
Po Box 7148
Asheville, NC 28802
This document certifies that the project has been inspected by a City of Asheville Site
Engineering Inspector, and the final grading inspection has been approved.
The approved final grading inspection certifies that the land disturbing activity for the above
referenced project is complete, and the temporary sedimentation and erosion control measures
have been removed, all permanent measures installed and that the site has been satisfactorily
stabilized sufficient to restrain erosion, per the approved plan.
The project is in compliance and released under the SPCA. Termination of coverage under the
NPDES General Stormwater Permit for Construction Activities must be requested by the
permittee via a Notice of Termination (NOT). The NOT is available at: deq.nc.govNCG01
Please note that this correspondence must be uploaded as part of completing the NOT process.
Monte Clampett, CESSWI, CPIs
Site Inspection & Zoning Enforcement Supervisor