Loading...
HomeMy WebLinkAboutNCC190287_NOT Closeout Documents_20220502THECITYOF ASHEVILLE CERTIFICATE OF COMPLETION for SEDIMENT AND EROSION CONTROL SKS Partners LLC PO Box 2224 Skyland, NC 28776 RE: Project Name: 275 Smokey Park Highway Project Address: 275 Smokey Park Highway Permit Number: 19-00649 Inspection Date: January 29, 2021 Inspector: Toby Shelton Dovelopmont Service Department City of Asheville Po Box 7148 Asheville, NC 28802 This document certifies that the project has been inspected by a City of Asheville Site Engineering Inspector, and the final grading inspection has been approved. The approved final grading inspection certifies that the land disturbing activity for the above referenced project is complete, and the temporary sedimentation and erosion control measures have been removed, all permanent measures installed and that the site has been satisfactorily stabilized sufficient to restrain erosion, per the approved plan. The project is in compliance and released under the SPCA. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities must be requested by the permittee via a Notice of Termination (NOT). The NOT is available at: deq.nc.govNCG01 Please note that this correspondence must be uploaded as part of completing the NOT process. Monte Clampett, CESSWI, CPIs Site Inspection & Zoning Enforcement Supervisor