Loading...
HomeMy WebLinkAboutNCS000513_2022_03_17_Harrisburg_Meeting Minutes_20220506Meeting Minutes Project: FY 2021-2022 MS4 Services Subject: Monthly Meeting Date: Thursday, March 17, 2022 Location: Teleconference Attendees: Mallory Hodgson Patrick Blandford Tunde Adeyeye Agenda (minutes italicized) • NCDEQ Audit Preparation o Storm drain maintenance manual o Pet waste station mapping and HOA responsibility documentation ■ The town has gotten a notice to submit documents by 0312212022 from NCDEQ. ■ Mallory and team are working to get documents which include draft SWMP, IDDE and other documents together. ■ HDR has indicated being able to help the Town as they work to get documents together for submission if needed. • Illicit Discharge Detection and Elimination Plan Development • Post Construction Reviews o HDR is in the process of completing the reviews. For Information Only • Recorded by HDR Action Items • Recorded by HDR Summary of Pending Development Reviews Development Status Express Oil First Review Completed/Waiting on Resubmittal Orchard Ridge Rezoning/Site Plan Courtyards @ Robinson Church Second Review Completed Calloway Subdivision Second Review Completed Panera Bread First Review Completed Farmington Infrastructure Sand Filter Revision Second Review In progress hdrinc.com 440 S Church Street Suite 1000 Charlotte, NC 28202-2075 (704) .3 3 8-f 700 1 Harrisburg MOB Hwy 49 First Review Completed Tramore Subdivision First Review In progress Fast Trak Awaiting First Submittal FY 2021-2022 Scope of Services • Task 1- Project Management • Task 2 - MS4 Program Implementation 0 Key Action Items— Inspections, outfall mapping, public involvement activities, facilitation of trainings or public education • Task 3 — Post Construction Reviews 0 Key Action Items — Performance of construction documents and calculations for compliance with Stormwater Quality Ordinance, Harrisburg Stormwater Manual, and NCDEQ MDC, inspections • Task 4 — MS4 Permit Coordination 0 Key Action Items —SWMP update, permit interpretation, correspondence to NCDEQ • Task 5 — Drainage Manual Updates 0 Key Action Items — Harrisburg Drainage Manual updates • Task 6 — MS4 Mock Audit 0 Key Action Items — Request supporting documentation, review documentation, perform field inspections, facilitate interview, compile and present findings • Task 7 — Post Construction Inspections 0 Key Action Items — Perform post construction inspections of SCMs • Task 8— IDDE Policy Development 0 Key Action Items — Coordinate with Town and develop IDDE policy/procedure hdrincacom 440 S Church Street Suite 1000 Charlotte, NC 28202-2075 (704) .338..6700 N