HomeMy WebLinkAboutNCS000513_2022_01_20_Harrisburg_Meeting Agenda_20220506MUNICIPAL SEPARATE STORM SEWER SYSTEM (MS4)
PROGRAM AUDIT REPORT
NPDES PERMIT NO. NCS000513
Harrisburg, NORTH CAROLINA
4100 Main Street, Suite 101
Audit Date: April 26, 2022
Report Date: May 13, 2022
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 9th floor
1612 Mail Service Center
Raleigh, NC 27699-1612
(This page intentionally left blank)
NCS000513_Harrisburg MS4 Audit_20220506
TABLE OF CONTENTS
AuditDetails............................................................................................................................................1
Permittee Information
List of Supporting Documents
RA
3
Program Implementation, Documentation & Assessment........................................................................4
Public Education and Outreach................................................................................................................8
Public Involvement and Participation..................................................................................................... 11
Illicit Discharge Detection and Elimination(IDDE).................................................................................. 13
Pollution Prevention and Good Housekeeping for Municipal Operations...............................................16
Site Visit Evaluation: Municipal Facility No. 1......................................................................................... 18
Site Visit Evaluation: Municipal Facility No. 2......................................................................................... 21
Site Visit Evaluation: MS4 Outfall No. 1.................................................................................................. 23
Site Visit Evaluation: MS4 Outfall No. 2.................................................................................................. 25
Site Visit Evaluation: Construction Site No. 1
27
Site Visit Evaluation: Construction Site No. 2......................................................................................... 29
Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1.......................................... 31
Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 2.......................................... 33
Appendix A: Supporting Documents
Appendix 13: Photograph Log
DISCLAIMER
This audit consists of an evaluation of program compliance with the issued permit and implementation of
the approved Stormwater Management Plan. This audit report does not include a review of all program
components, and program deficiencies in addition to those noted may be present. The permittee is
required to assess program progress and permit compliance, and to implement the approved Stormwater
Management Plan in accordance with the issued permit.
NCS000513_Harrisburg MS4 Audit_20220506 ii
This page intentionally left blank
NCS000513_Harrisburg MS4 Audit_20220506 iii
Audit Details
Audit ID Number:
Audit Date(s):
NCS000513_Harrisburg MS4 Audit_20220513
April 26-27, 2022
Minimum Control Measures Evaluated:
0 Program Implementation, Documentation & Assessment
0 Public Education & Outreach
0 Public Involvement & Participation
0 Illicit Discharge Detection & Elimination
❑ Construction Site Runoff Controls — No delegated Sediment and Erosion Control Program
❑ Construction Site Runoff Controls — Delegated Sediment and Erosion Control Program
❑ Post -Construction Site Runoff Controls
0 Pollution Prevention and Good Housekeeping for Municipal Operations
❑ Total Maximum Daily Loads (TMDLs)
Field Site Visits:
0 Municipal Facilities. Number visited: Choose an litern,
0 MS4 Outfalls. Number visited: Choose an litern,
❑ Construction Sites. Number visited: Choose an litern,
❑ Post -Construction Stormwater Runoff Controls. Number visited: Choose an litern,
❑ Other: Number visited: Choose an litern,
❑ Other: Number visited: Choose an litern,
Inspector(s) Conducting Audit
Name, Title
Organization
Jesse IMdI'>onn0, IEnvironrrrenta� Speciah t
INCIDIDEQ
Zahid Khan, IICegionalia.ngineer,
INCIDEQ
Audit Report Author: Jesse McDonnell
Date:
Signature
Audit Report Author: Zahid Khan
Date
Signature
NCS000513_Harrisburg MS4 Audit_20220506 Page 1 of 36
Permittee Information
MS4 Permittee Name:
Town of Harrisburg
Permit Effective Date:
February 20, 2017
Permit Expiration Date:
February 19, 2022
Mailing Address: P.O Box 100, Harrisburg, NC 28075-0100
Date of Last MS4 Inspection/Audit:
Not Applicable
Co-permittee(s), if applicable:
Not Applicable
Permit Owner of Record:
Carl Palmer, City Manager
Primary MS4 Representatives Participating in Audit
Name, Title
Organization
Mallory Hodgson, Interim Engineering Director
Town of Harrisburg
Wayne Krimminger, Grading Inspector
Town of Harrisburg
Clay Heath, Engineer in Training
Town of Harrisburg
Corey Jones, Public Works Supervisor
Town of Harrisburg
MS4 Receiving Waters
Waterbody
Classification
Impairments
VUand Creek
C:
Copper, and "IFurbidity
Codd, Creek
C
"IFurbidity and IBenth o P
VIr:Kee Creek
C
I: enth o
Rocky IfCiver,
C
Copper', "IFurbidity and II' enth o P
Back Creek
C
Fair Il io rare sifir:adon
Reedy Creek
C
Fair Il io rare sifir:adon
1=u da Creek
C
None
NCS000513_Harrisburg MS4 Audit_20220506 Page 2 of 36
List of Supporting Documents
Item
Number
Document Title
When Provided
(Prior to/During/After)
I
Draft SWIMP
Prior to
2
OutfaH and Storm Sewer, IIMap
Prior to
3
Sedimentation PoHudon Contr,6 Ar-t 1973
Prior to
4
IRegionaStormwater, Partnership
Prior to
5
"Fown of Harrisburg HDIDIE Ifs an
Prior to
6
MS4 Operation and III aintenam-e INan
Prior to
7
Good Housekeep IIManu a
Prior to
8
NCS000513—Harrisburg MS4 Audit20220506 Page 3 of 36
Program Implementation, Documentation & Assessment
Staff Interviewed:
Mallory Hodgson, Interim Engineering Director, Facilitates the Stormwater Program
(Name, Title, Role)
Permit Citation
Program Requirement
Status
Supporting
Doc No.
II.A.1
The permittee fundingand staffingimplementmanage
11
KStafin
and
s
unnW
the provisions of the Stormwater Plan and meet all of the permit
Funding
repor t
The Stormwater Plan identifies a specific position(s) responsible for the overall
coordination, implementation, and revision to the Plan.
Parfiall
Responsibilities for all components of the Stormwater Plan are documented and
position(s) assignments provided.
The permittee is current on payment of invoiced administering and compliance
monitoring fees (see stormwater e-payments on DEMLR MS4 web page).
Yes
......
Comments (Briefly describe funding mechanism, number of staff, etc.)
Has str�rr�erwr��tr.,�r. fee, and d�u�e�,l �m��t pays drrr, staff r� � projects, �wr.t P :.���b d�u� tim
U
d � and 01 f
e staff paid by Pwr fee,
- Fu lly staffed in engerning department and can cover, the program, 6 staff for, engineering department, 5 of the 6 persons do
SW work, need oW S IIViP
- About 700k budget rams are y, 5.62/li:quivaent IR PidentU Unit (Iia.IRU)
- ?W 1) did about t $ U mill SW reno, grill redo every few year's,
- SW SCIIVI maintenance is budgeted trio
P r�rW S IIViP that i P out o ,ate the positions P are li Ptc.d with re P:ro PiI ihtie P does not have
- I.0 , � w w � , a r:u.rrrrret
II.A.2 Stormwater
The permittee evaluated the performance and effectiveness of the program
Plan
components at least annually.
Implementation
and Evaluation
If yes, the permittee used the results of the evaluation to modify the program
components as necessary to accomplish the intent of the Stormwater Program.
Yes
......
Did the permitted MS4 discharges cause or contribute to non -attainment of an
applicable water quality standard?
No
If yes, did the permittee expand or better tailor its BM Ps accordingly to address
Not
the non -attainment?
AppificilN lle
Comments
- IDoes not have documentation rrtImer than the annu ar report, since 2.W9 had rriontWy meetings with S IIViP with a co Pukant,
need meeting minutes
NCS000513_Harrisburg MS4 Audit_20220506 Page 4 of 36
Program Implementation, Documentation & Assessment
I I.A.3
Keeping the
The permittee kept the Stormwater Plan up to date.irl
Stormwater Plan
Up to Date
The permittee notified DEMLR of any updates to the Stormwater Plan.
Not
Applficablie
Comments (Indicate the date of latest Storm water Plan and describe the nature of any updates, if applicable).
- Hasod pr an, does not have adopted pr an, has S IIViP that was put together last year,
II.A.4 Availability
The permittee kept an up-to-date version of its Stormwater Plan available to the
of the Stormwater
Division and the public online.
No
Plan
The online materials included ordinances, or other regulatory mechanisms, or a list
identifying the ordinances, or other regulatory mechanisms, providing the legal
Yes
webs'ite
authority necessary to implement and enforce the requirements of the permit.
Comments (Note what materials are available on line)
- No S IIViIP online,
w
- Has ordinance and edu�r:���io �a� niateria� � o lir�e,
II.A.3 & II.A.5
Stormwater Plan
Did DEMLR require a modification to the Stormwater Plan?
No
Modifications
If yes, did the permittee complete the modifications in accordance with the
Not
established deadline?
AppificilN lle
Comments (Note date of DEMLR notification, modifications required, and date modifications were completed, as applicable)
- No modifications required
II.A.6 Sharing
Responsibility
Are any control measures implemented by an entity other than the permittee?
Naas„
If yes, is there a written agreement in place?
No
Comments (List the specific control measures implemented by others that do not have adequate written agreements, if
applicable)
- NCDEQ does EC, partially gains info from reginal partnership
ll.A.7
The permittee maintained written procedures for implementing the six minimum
Written
measures.
Yescontrol
Procedures
Written procedures identified specific action steps, schedules, resources and
responsibilities for implementing the six minimum measures.
Naas„
......
Comments (List the specific minimum measures that do not have adequate written procedures, if applicable)
- Not in SWIIViP
NCS000513_Harrisburg MS4 Audit_20220506 Page 5 of 36
Program Implementation, Documentation & Assessment
IllA
The permittee maintained documentation of all program components including, but
Proram°b`b.^
g
not limited to, inspections, maintenance activities, educational programs,
••••••
Documentation
implementation of BMPs, enforcement actions etc., on file for a period of five years.
)°n IItte'n°
Comments (List the specific program components that do not have adequate documentation on file and why, if applicable)
111.13
The permittee submitted annual reports to the Department within twelve months
Annual Report
from the effective date of the permit (See Section III.B. for the annual reporting
Naas„
Submittal
period specific to this MS4).
The permittee submitted subsequent annual reports every twelve months from the
scheduled date of the first annual report submittal.
Naas„
......
The Annual Reports included appropriate information to accurately describe the progress, status, and results
of the permittee's Stormwater Plan, including, but not limited the following:
1. A detailed description of the status of implementation of the Stormwater Plan
as a whole. This will include information on development and implementation
Not
of each major component of the Stormwater Plan for the past year and
IReviewed
schedules and plans for the year following each report.
2. An adequate description and justification of any proposed changes to the
Stormwater Plan. This will include descriptions and supporting information for
Not
the proposed changes and how these changes will impact the Stormwater
IReviewed
Plan (results, effectiveness, implementation schedule, etc.).
3. Documentation of any necessary changes to programs or practices for
assessment of management measures implemented through the Stormwater
Not
eviewed
Plan.
4. A summary of data accumulated as part of the Stormwater Plan throughout
the year along with an assessment of what the data indicates in light of the
Not
eviewed
Stormwater Plan.
5. An assessment of compliance with the permit, information on the
establishment of appropriate legal authorities, inspections, and enforcement
Not
eviewed
actions.
Comments (Note dates that annual reports cover under current permit and generally describe report deficiencies, if any)
.. Chedi� 1L.aserlichObr e°tllr1YhMW reports,
IV.B
Annual Reporting
The Annual Reports document the following:
1. A summary of past year activities, including where applicable, specific
Not
quantities achieved and summaries of enforcement actions.
IReviewed
2. A description of the effectiveness of each program component.
Not
eviewed
3. Planned activities and changes for the next reporting period, for each
Not
program component or activity.
IReviewed
NCS000513_Harrisburg MS4 Audit_20220506 Page 6 of 36
Program Implementation, Documentation & Assessment
4. Fiscal analysis.
° of
Comments (Note dates that annual reports cover under current permit and generally describe report deficiencies, if any)
Additional
- Four years ago, no real SW program, has grown since then,
Comments:
- No full time staff dedicated to SW, has four people who work with SW,
- Public works does maintenance of SW and Engineering is
- Has strong volunteer program from the communication department with mailings and social
media,
- Post construction has new program for reminders to tell people to inspect and submit
- GIS is growing, working on mapping, about 85% mapped, actively mapping the remaining
NCS000513_Harrisburg MS4 Audit_20220506 Page 7 of 36
Public Education and Outreach
Staff Interviewed:
Mallory Hodgson, Interim Engineering Director, Facilitates the Stormwater Program
(Name, Title, Role)
Permit Citation
Program Requirement Status Supporting
Doc No.
11.B.2.a
The permittee defined goals and objectives of the Local Public Education and
Goals and
woad„
Outreach Program based on community wide issues.
Objectives
Comments (Generally describe process for establishing goals/objectives)
- Yes, has goals and objectives based on community wide issues. Need document
11.13.2.1b
The permittee maintained a description of the target pollutants and/or stressors and
Target Pollutants
likely sources.
Comments (List target pollutants, note any that are missing or not appropriate)
- Has within draft SWMP but not within the separate document for education and outreach.
11.13.2.c
The permittee identified, assessed annually and updated the description of the target
Target Audiences
audiences likely to have significant storm water impacts and why they were selected.
Comments (Describe any changes made, if applicable)
- Within specific annual reports.
- Has been doing monthly meetings since July 2019
NCS000513_Harrisburg MS4 Audit_20220506 Page 8 of 36
Public Education and Outreach
II.B.2.d Residential
The permittee described issues, such as pollutants, the likely sources of those
and Industrial/
pollutants, potential impacts, and the physical attributes of stormwater runoff in
Naas„
Commercial Issues
their education/outreach program.
Comments (Generally describe the residential/industrial/commercial issues addressed)
- Yes, has list of pollutants online and SWMP, has stuff online for education materials
11.B.2.e
The permittee promoted and maintained an internet web site designed to convey the
Informational
program's message.
Naas„
Web Site
Comments (list web page address and general contents, or attach screen shot of landing page)
- Yes, website
I I. B.2.f
The permittee distributed stormwater educational material to appropriate target
Public Education
Naas„
Materials
groups.
Comments (List distributed materials and quantity, message, distribution mechanism, target audience for each if not included in
program documentation/annual reporting)
- Has social media, has flyers, has meetings for HOA turn over of the, need documentation of social media posts and
mailings
II.B.2.g
The permittee promoted and maintained a stormwater hotline/helpline for the
Hotline/Help Line
purpose of public education and outreach.
Yes
Comments (Note hotline contact information and method(s) for advertising it)
- Has a customer service number to get a work order and send to the stormwater person
II.B.2.h
The permittee's outreach program, including those elements implemented locally or
through a cooperative agreement, included a combination of approaches designed to
Naas„
reach the target audiences.
NCS000513_Harrisburg MS4 Audit_20220506 Page 9 of 36
Public Education and Outreach
Public Education
and Outreach
For each media, event or activity, including those elements implemented locally or
Program
through a cooperative agreement the permittee estimated and recorded the extent
Naas„
of exposure.
Comments (Generally describe approaches, extent of exposure. Note any cooperating entities, agreements and scope of services,
or reference comments in Section II.A.6. above.)
- Need documentation of mailing, postings, hoa meetings ect.
Additional
Comments:
NCS000513_Harrisburg MS4 Audit_20220506 Page 10 of 36
Public Involvement and Participation
Staff Interviewed:
Mallory Hodgson, Interim Engineering Director, Facilitates the Stormwater Program
(Name, Title, Role)
Permit Citation
Program Requirement Status Supporting
Doc No.
II.C.2.a Volunteer
Community
The permittee included and promoted volunteer opportunities designed to promote
Involvement
Yes ......
ongoing citizen participation.
Program
Comments (Note opportunities promoted and date(s) of volunteer events)
- Advertise opportunities social media, has email on website for people who want to get involved.
II.C.2.b
Mechanism for
The permittee provided and promoted a mechanism for public involvement that
Public
provides for input on stormwater issues and the stormwater program.
Yes
......
Involvement
Comments (Note mechanism(s) for input and how promoted)
- Public hearings when things change, not a specific stormwater meeting
- Need public hearing process for that process/agenda/minutes
II.C.2.c
The permittee promoted and maintained a hotline/helpline for the purpose of public
Hotline/Help Line
involvement and participation.
Comments (Note hotline contact information and how it is promoted)
- Customer service hotline.
NCS000513_Harrisburg MS4 Audit_20220506 Page 11 of 36
Public Involvement and Participation
Additional
Comments:
NCS000513_Harrisburg MS4 Audit_20220506 Page 12 of 36
Illicit Discharge Detection and Elimination (IDDE)
Staff Interviewed:
Mallory Hodgson, Interim Engineering Director, Facilitates the Stormwater Program
(Name, Title,
Role)
Permit Citation
Program Requirement Status Supporting
Doc No.
II.D.2.a
IDDE Program
The permittee maintained a written IDDE Program. Yes
If yes, the written program includes provisions for program assessment and
Yes ......
evaluation and integrating program.
Comments (Note any deficiencies)
Yes, has P ODE program separate from SUMP
The permittee maintained an IDDE ordinance or other regulatory mechanism(s) that
II.D.2.b
provides the legal authority to prohibit illicit connections and discharges to the MS4.
Yes
......
Legal Authorities
If yes, the ordinance applies throughout the corporate limits of the permittee.
[Permit Part I. DJ
Yes
......
Comments
Have .. I -I'' Iirnk to ordnance
�rra:rr that was provialr.,al.
II.D.2.c
The permittee maintained a current map showing major outfalls" and receiving
Storm Sewer
Yes
System Map
streams.
Comments
Has map with 85"% mapped and remaining is being mapped, look at the Zink and see if you can access the US rY1ap
*Major ouff alh are discharges from;,, 36" diameter pipes or drainage areas of;,, 50 acres. In areas zoned for industrial aaa°tivity, maajor ouffaalh
are;,, 12" or drainage area;,, 2 acres.
II.D.2.d
The permittee maintained a program for conducting dry weather flow field
Dry Weather Flow
Yes
observations in accordance with written procedures.
Program
Comments (Generally summarize program, including frequency of observations and # or % of outfalls screened)
Has investigation ation process and ODE SOP for the annua� reviewr.
NCS000513_Harrisburg MS4 Audit_20220506 Page 13 of 36
Illicit Discharge Detection and Elimination (IDDE)
II.D.2.e
The permittee maintained written procedures for conducting investigations of
Investigation
identified illicit discharges.
Naas„
Procedures
Comments (Generally describe what procedures are documented)
Within the IDDE prograrn plan
II.D.2.f
For each case of an illicit discharge or potential illicit discharge, the permittee documented and tracked the
Track and
following:
Document
Investigations
1. The date(s) the illicit discharge was observed
Naas„
2. The results of the investigation
Naas„
3. Any follow-up of the investigation
Naas„
4. The date the investigation was closed
Naas„
Comments (Note whether a standard inspection form is utilized to capture consistent information and a tracking mechanism is
used)
- Tracking in 2020 started, has all this information in the spreadsheet
II.D.2.g Employee
The permittee implemented and documented a training program for appropriate
Training
municipal staff who, as part of their normal job responsibilities, may come into
Naas„
contact with or otherwise observe an illicit discharge or illicit connection.
Comments (Generally describe the staff training program, including frequency and which staff are trained)
Has training for new staff for HII'>IIDIE and annu a , need sign iris sheet
II.D.2.h
The permittee informed public employees of hazards associated with illegal
.��1.rah'
Public Education
discharges and improper disposal of waste.
Yes
i�v��'.'
The permittee informed businesses of hazards associated with illegal discharges and
improper disposal of waste.
Naas„
......
The permittee informed the general public of hazards associated with illegal
discharges and improper disposal of waste.
Naas„
......
Comments (Note how each sector was informed, if applicable)
Need training log
Needflyer arnountsfor businesses and companies
Need social rnedia and mailers,
NCS000513_Harrisburg MS4 Audit_20220506 Page 14 of 36
Illicit Discharge Detection and Elimination (IDDE)
II'D'2.i
The permittee promoted, publicized, and facilitated a reporting mechanism for the
Public Reporting
public to report illicit discharges.
Yes
Mechanism
The permittee promoted, publicized, and facilitated a reporting mechanism for staff
to report illicit discharges.
Yes
......
The permittee established and implemented response procedures for citizen
requests/reports.
Yes
......
Comments (Generally describe reporting mechanisms and how promoted/publicized/facilitated/established)
Customer service Imothne, they put in a work order, to system
Yes, in the training rams aHy
�n III.>II">IF nianu a , has an investigation process
II.D•2.1
The permittee implemented a mechanism to track the issuance of notices of violation
Enforcement
enforcement actions administered by the permittee.
Yesand
If yes, the mechanism includes the ability to identify chronic violators for
initiation of actions to reduce noncompliance.
Yes
......
Comments (Generally describe the established tracking mechanism, if applicable)
iWor, s is somas ofNOV issues and e nforr err ent
Additional
Comments:
NCS000513_Harrisburg MS4 Audit_20220506 Page 15 of 36
Pollution Prevention and Good Housekeeping for Municipal Operations
Staff Interviewed:
Mallory Hodgson, Interim Engineering Director, Facilitates the Stormwater Program
(Name, Title, Role)
Permit Citation
Program Requirement Status Supporting
Doc No.
II.G.2.a
The permittee maintained a current inventory of facilities and operations owned
Facility Inventory
and operated by the permittee with the potential for generating polluted Naas„
stormwater runoff.
Comments (Note number of facilities, typical inventory data and any facilities that are not inventoried that should be)
17000k population
Within goodhosuekeeping manual
II.G.2.b
The permittee maintained and implemented an O&M program for municipally
Operation and
owned and operated facilities with the potential for generating polluted
Naas„
Maintenance (O&M)
stormwater runoff.
for Facilities
If yes, the O&M program specifies the frequency of inspections.
Naas„
If yes, the O&M program specifies the frequency of routine maintenance
requirements.
If yes, the permittee evaluated the O&M program annually and updated it as
necessary.
Comments
Has document for, Good hm pourwdr'r.,eping
Specifies inspections
Has activities that are done but no maintenance requernrr.,nt P
Needs to be updated, no current list of updates
II.G.2.c
Spill Response
The permittee had written spill response procedures for municipal operations.
Naas„
Procedures
Comments
ShmoWd be in book, not in book
Need documentation of written procedures
II.G.2.d Streets,
The permittee evaluated existing and new BMPs that reduce polluted stormwater
Roads, and Public
runoff from municipally -owned streets, roads, and public parking lots within itsirfil
Parking Lots
corporate limits annually.
Maintenance
If yes, the permittee evaluated the effectiveness of existing and new BMPs
based on cost and the estimated quantity of pollutants removed.
Naas„
......
NCS000513_Harrisburg MS4 Audit_20220506 Page 16 of 36
Pollution Prevention and Good Housekeeping for Municipal Operations
Comments
Yes, within the new draft S II%P
VIonO ly street sweeper', has brads per, month fortonnage, need tonnage r:ak:Wation
II.G.2.f
The permittee maintained and implemented an O&M program for the stormwater
O&M for Catch
sewer system including catch basins and conveyance systems that it owns and
Naas„
Basins and
Conveyance Systems
maintains.
Comments (Briefly describe O&M program)
Has an O« .VI for storm sewer, system, provided document aIready
II.G.2.g
The permittee maintained a current inventory of municipally -owned or operated
Structural
structural stormwater controls installed for compliance with the permittee's post-
Naas„
Stormwater Controls
construction ordinance.
Comments (Describe inventory information and number of controls in inventory)
Yes, has map of SCIIVI P, can find on the ¢'�� S map provided
II.G.2.h
The permittee maintained and implemented an O&M program for municipally -
O&M for Structural
owned or maintained structural stormwater controls installed for compliance with
Naas„
Stormwater Controls
the permittee's post -construction ordinance. If yes, then:
The O&M program specified the frequency of inspections and routine
maintenance requirements.
Naas„
......
The permittee documented inspections of all municipally -owned or maintained
structural stormwater controls.
Naas„
......
The permittee inspected all municipally -owned or maintained structural
stormwater controls in accordance with the schedule developed by permittee.
Naas„
......
The permittee maintained all municipally -owned or maintained structural
stormwater controls in accordance with the schedule developed by permittee.
Naas„
......
The permittee documented maintenance of all municipally -owned or
maintained structural stormwater controls.
No
Comments
- Has O&M, need to document maintainer, inspections are documented
II.G.2.i
The permittee ensured municipal employees are properly trained in pesticide,
Pesticide, Herbicide
herbicide and fertilizer application management.
Yes
and Fertilizer
Application
The permittee ensured contractors are properly trained in pesticide, herbicide and
Management
fertilizer application management.
Naas„
NCS000513_Harrisburg MS4 Audit_20220506 Page 17 of 36
Pollution Prevention and Good Housekeeping for Municipal Operations
The permittee ensured all permits, certifications, and other measures for
C "1n'rn'rSe
applicators are followed.
an Iltern,
Comments
- Has lisnced employee,
- Yes
- Yes
II.G.2.j
The permittee implemented an employee training program for employees involved
Staff Training
in implementing pollution prevention and good housekeeping practices.
Yes
Comments
Yes, reed training
II.G.2.k
The permittee described and implemented measures that prevent or minimize
Vehicle and
contamination of stormwater runoff from all areas used for vehicle and equipment
Yawn„
Equipment Cleaning
cleaning.
Comments
Wash bay with aril water, separated,
Additional
Comments:
Site Visit Evaluation: Municipal Facility No. 1
Facility Name: Date and Time of Site Visit:
NCS000513_Harrisburg MS4 Audit_20220506 Page 18 of 36
Site Visit Evaluation: Municipal Facility No. 1
Facility Address:
Facility Type (Vehicle Maintenance, Landscaping, etc.):
Name of MS4 inspector(s) evaluated:
Most Recent MS4 Inspection (List date and name of inspector):
Name(s) and Title(s) of Facility Representative(s) Present During the Site Visit:
Name
Title
Observations
Facility Documentation/Training
Does the facility have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it facility -specific?
What type of stormwater training do facility employees receive? How often?
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about Permit requirements for pollution prevention and good housekeeping?
Did the MS4 inspector appear knowledgeable about stormwater pollution prevention and good housekeeping?
Inspection Procedures
Does the MS4 inspector's process include the use of a checklist or other standardized form?
Does the MS4 inspector's process include taking photos?
Does the MS4 inspector's process include reviewing the facility's SWPPP (or similar document)?
Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge?
NCS000513_Harrisburg MS4 Audit_20220506 Page 19 of 36
I Site Visit Evaluation: Municipal Facility No. 1 I
Did the MS4 inspector miss any obvious areas of concern? If so, explain:
Does the MS4 inspector's process include presenting the inspection findings to the facility contact?
Inspection Results
Did the facility inspection result in any corrective actions to be implemented? If so, for what issue(s)?
If compliance corrective actions were identified, what timeline for correction/follow-up was provided?
I Notes/Comments/Recommendations I
NCS000513_Harrisburg MS4 Audit_20220506 Page 20 of 36
Site Visit Evaluation: Municipal Facility No. 2
Facility Name:
Date and Time of Site Visit:
Facility Address:
Facility Type (Vehicle Maintenance, Landscaping, etc.):
Name of MS4 inspector(s) evaluated:
Most Recent MS4 Inspection (Date and Entity):
Name(s) and Title(s) of Facility Representative(s) Present During the Site Visit:
Name
Title
Observations
Facility Documentation/Training
Does the facility have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it facility -specific?
What type of stormwater training do facility employees receive? How often?
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about Permit requirements for pollution prevention and good housekeeping?
Did the MS4 inspector appear knowledgeable about stormwater pollution prevention and good housekeeping?
Inspection Procedures
Does the MS4 inspector's process include the use of a checklist or other standardized form?
Does the MS4 inspector's process include taking photos?
Does the MS4 inspector's process include reviewing the facility's SWPPP (or similar document)?
NCS000513_Harrisburg MS4 Audit_20220506 Page 21 of 36
I Site Visit Evaluation: Municipal Facility No. 2 I
Does the MS4 inspector's process include walking the entire facility and inspecting all points of discharge?
Did the MS4 inspector miss any obvious areas of concern? If so, explain:
Does the MS4 inspector's process include presenting the inspection findings to the facility contact?
Inspection Results
Did the facility inspection result in any corrective actions to be implemented? If so, for what issue(s)?
If compliance corrective actions were identified, what timeline for correction/follow-up was provided?
I Notes/Comments/Recommendations I
NCS000513_Harrisburg MS4 Audit_20220506 Page 22 of 36
Site Visit Evaluation: MS4 Outfall No. 1
Outfall ID Number:
Date and Time of Site Visit:
Outfall Location:
Outfall Description (Pipe Material/Diameter, Culvert, etc.):
Receiving Water:
Is Flow Present? If So, Describe (Color, Approximate Flow Rate,
Sheen, Odor, Floatables/Debris, etc.):
Most Recent Outfall Inspection/Screening (Date):
Days Since Last Rainfall:
Inches:
Name of MS4 Inspector(s) evaluated:
Observations
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about illicit discharge indicators and investigations?
Inspection Procedures
Does the inspector's process include the use of a checklist or other standardized form?
Does the inspector's process include taking photos?
Did the MS4 inspector miss any obvious potential illicit discharge indicators or maintenance issues? If so, what were they?
NCS000513_Harrisburg MS4 Audit_20220506 Page 23 of 36
Site Visit Evaluation: MS4 Outfall No. 1 1
Inspection Results
Did the outfall inspection result in any work orders or maintenance requests? If so, for what issue(s)?
Will a follow-up outfall inspection be conducted? If so, for what reason?
I Notes/Comments/Recommendations I
NCS000513_Harrisburg MS4 Audit_20220506 Page 24 of 36
Site Visit Evaluation: MS4 Outfall No. 2
Outfall ID Number:
Date and Time of Site Visit:
Outfall Location:
Outfall Description (Pipe Material/Diameter, Culvert, etc.):
Receiving Water:
Is Flow Present? If So, Describe (Color, Approximate Flow Rate,
Sheen, Odor, Floatables/Debris, etc.):
Most Recent Outfall Inspection/Screening (Date):
Days Since Last Rainfall:
Inches:
Name of MS4 Inspector(s):
Observations
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about illicit discharge indicators and investigations?
Inspection Procedures
Does the inspector's process include the use of a checklist or other standardized form? Obtain copy.
Does the inspector's process include taking photos?
Did the MS4 inspector miss any obvious potential illicit discharge indicators or maintenance issues? If so, what were they?
NCS000513_Harrisburg MS4 Audit_20220506 Page 25 of 36
Site Visit Evaluation: MS4 Outfall No. 2 1
Inspection Results
Did the outfall inspection result in any work orders or maintenance requests? If so, for what issue(s)?
Will a follow-up outfall inspection be conducted? If so, for what reason?
I Notes/Comments/Recommendations I
NCS000513_Harrisburg MS4 Audit_20220506 Page 26 of 36
Site Visit Evaluation: Construction Site No. 1
Site/Project Name:
Date and Time of Site Visit:
Site/Project Address:
Operator:
Project Type (Commercial, Industrial, Residential, CIP, Roadway,
etc.):
NCG Permit ID Number:
Disturbed Acreage:
Recent Enforcement Actions (Include Date):
Name of MS4 Inspector(s) evaluated:
Name(s) and Title(s) of Site Representative(s) Present During the
Site Visit:
Name
Title
Observations
Site Documentation/Training
Does the site have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it site -specific?
Does the site have approved erosion and sedimentation control plans onsite? Are they representative of current site conditions?
What type of stormwater training do site employees receive? How often?
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about MS4 and NCG010000 requirements for construction sites?
Did the MS4 inspector appear knowledgeable about erosion and sedimentation control/stormwater pollution prevention BMPs?
NCS000513_Harrisburg MS4 Audit_20220506 Page 27 of 36
Site Visit Evaluation: Construction Site No. 1
Inspection Procedures
Does the MS4 inspector's process include the use of a checklist?
Does the MS4 inspector's process include taking photos?
Does the MS4 inspector's process include reviewing approved plans (erosion and sedimentation control and/or SWPPP)?
Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge?
Did the MS4 inspector miss any obvious violations? If so, explain:
Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing?
Does the MS4 inspector's process include providing construction stormwater educational materials to the site contact?
Compliance/Enforcement
What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in?
If compliance issues were identified, what timeline for correction/follow-up was provided?
Notes/Comments/Recommendations
NCS000513_Harrisburg MS4 Audit_20220506 Page 28 of 36
Site Visit Evaluation: Construction Site No. 2
Site/Project Name:
Date and Time of Site Visit:
Site/Project Address:
Operator:
Project Type (Commercial, Industrial, Residential, CIP, Roadway,
etc.):
NCG Permit ID Number:
Disturbed Acreage:
Recent Enforcement Actions (Include Date):
Name of MS4 Inspector(s) evaluated:
Name(s) and Title(s) of Site Representative(s) Present During the
Site Visit:
Name
Title
Observations
Site Documentation/Training
Does the site have a Stormwater Pollution Prevention Plan (SWPPP) or similar document? Is it site -specific?
Does the site have approved erosion and sedimentation control plans onsite? Are they representative of current site conditions?
What type of stormwater training do site employees receive? How often?
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about MS4 and NCG010000 requirements for construction sites?
Did the MS4 inspector appear knowledgeable about erosion and sedimentation control/stormwater pollution prevention BMPs?
NCS000513_Harrisburg MS4 Audit_20220506 Page 29 of 36
Site Visit Evaluation: Construction Site No. 2
Inspection Procedures
Does the MS4 inspector's process include the use of a checklist? Obtain copy.
Does the MS4 inspector's process include taking photos?
Does the MS4 inspector's process include reviewing approved plans (erosion and sedimentation control and/or SWPPP)?
Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge?
Did the MS4 inspector miss any obvious violations? If so, explain:
Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing?
Does the MS4 inspector's process include providing construction stormwater educational materials to the site contact?
Compliance/Enforcement
What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in?
If compliance issues were identified, what timeline for correction/follow-up was provided?
Notes/Comments/Recommendations
NCS000513_Harrisburg MS4 Audit_20220506 Page 30 of 36
Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1
Site Name:
Date and Time of Site Visit:
Site Address:
SCM Type:
Most Recent MS4 Inspection (Include Date and Entity):
Name of MS4 Inspector(s) evaluated:
Most Recent MS4 Enforcement Activity (Include Date):
Name(s) and Title(s) of Site Representative(s) Present During the
Site Visit:
Name
Title
Observations
Site Documentation
Does the site have an operation and maintenance plan?
Does the site have records of annual inspections? Are they performed by a qualified individual?
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about MS4 requirements for post -construction site runoff controls?
Did the MS4 inspector appear knowledgeable about post -construction BMPs (general purpose/function, components, O&M
requirements, etc.)?
Inspection Procedures
Does the MS4 inspector's process include the use of a checklist or other standardized form? What format?
Does the MS4 inspector's process include taking photos?
Does the MS4 inspector's process include reviewing the site's operation and maintenance plan and records of annual inspections?
NCS000513_Harrisburg MS4 Audit_20220506 Page 31 of 36
Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 1 1
Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge?
Did the MS4 inspector miss any obvious operation and maintenance deficiencies? If so, explain:
Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing?
Compliance/Enforcement
What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in?
If compliance issues were identified, what timeline for correction/follow-up was provided?
I Notes/Comments/Recommendations I
NCS000513_Harrisburg MS4 Audit_20220506 Page 32 of 36
Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 2
Site Name:
Date and Time of Site Visit:
Site Address:
SCM Type:
Most Recent MS4 Inspection (Include Date and Entity):
Name of MS4 Inspector(s) evaluated:
Most Recent MS4 Enforcement Activity (Include Date):
Name(s) and Title(s) of Site Representative(s) Present During the
Site Visit:
Name
Title
Observations
Site Documentation
Does the site have an operation and maintenance plan?
Does the site have records of annual inspections? Are they performed by a qualified individual?
Inspector Training/Knowledge
What type of stormwater training does the MS4 inspector receive? How often?
Did the MS4 inspector appear knowledgeable about MS4 requirements for post -construction site runoff controls?
Did the MS4 inspector appear knowledgeable about post -construction BMPs (general purpose/function, components, O&M
requirements, etc.)?
Inspection Procedures
Does the MS4 inspector's process include the use of a checklist or other standardized form? What format?
Does the MS4 inspector's process include taking photos?
Does the MS4 inspector's process include reviewing the site's operation and maintenance plan and records of annual inspections?
NCS000513_Harrisburg MS4 Audit_20220506 Page 33 of 36
Site Visit Evaluation: Post -Construction Stormwater Control Measure No. 2 1
Does the MS4 inspector's process include walking the entire site and inspecting all points of discharge?
Did the MS4 inspector miss any obvious operation and maintenance deficiencies? If so, explain:
Does the MS4 inspector's process include presenting the inspection findings to the site contact in writing?
Compliance/Enforcement
What, if any, enforcement actions (verbal warnings, NOV, etc.) did the inspection result in?
If compliance issues were identified, what timeline for correction/follow-up was provided?
I Notes/Comments/Recommendations I
NCS000513_Harrisburg MS4 Audit_20220506 Page 34 of 36
APPENDIX A: SUPPORTING DOCUMENTS
NCS000513_Harrisburg MS4 Audit_20220506 Page 35 of 36
/_la a 9111 VIG 39a:Iel ti d T-Ala.I iZcl
NCS000513_Harrisburg MS4 Audit_20220506 Page 36 of 36