Loading...
HomeMy WebLinkAboutNC0004774_SOC (Acknowledgement)_20220426 (2)FIECEIVED/NCDEQ/DWR APR 2,9 2022 James Wells Vice President Environmental, Health and Safety WQROSPrograms & Environmental Sciences MOORESVILLE REGIONAL OFFt ESouth Church Street Charlotte, NC 28202 (980) 373-9646 April 26, 2021 C k Basinger,` Mooresville Regional Supervisor North Carolina Department of Environmental Quality Division of Water Resources 610 East Center Avenue Mooresville, NC 28115 Bob Sledge North Carolina Department of Environmental Quality Water Quality Permitting Program Division of Water Resources 1617 Mail Service Center Raleigh, NC 27699-1617 Subject: Report Under Special Order by Consent — EMC SOC WQ S18-004 Duke Energy Carolinas, LLC — Buck Steam Station NPDES Permit NC0004774 2021 Annual Seep Survey Report Dear Messrs. Basinger and Sledge: On behalf of Duke Energy Carolinas, LLC (DEC), I am submitting to you the Buck Steam Station Annual Seep Survey Report as required by Section 2.b.3 of the subject Special Order by Consent (SOC). As required by the SOC, I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Messrs. Basinger and Sledge April 26, 2021 Page 2 Please direct any questions concerning the Buck Steam Station's SOC No. S 18-004 to Shannon Langley at (919) 546-2439 or shannon.langley@duke-energy.com. Sincerely, James Wells Vice President, Environmental, Health & Safety Programs and Environmental Sciences Duke Energy Attachment Buck Steam Station 2021 Annual Seep Survey CC: Jessica Bednarcik, Duke Energy Richard Baker, Duke Energy Steve Cahoon, Duke Energy Dale Wooten, Duke Energy Matt Hanchey, Duke Energy Shannon Langley, Duke Energy Science & Engineering Consultants 2021 ANNUAL SEEP REPORT BUCK STEAM STATION EMC SOC WQ S18-004 1555 DuKEVILLE ROAD SALISBURY, NC 28146 APRIL 2022 PREPARED FOR CAROLINAS DUKE ENERGY CAROLINAS, LLC Kathry W. Webb SeAior Peer Reviewer synterracorp.com 1SBBBEBPItpff CA 114kpject Manager Tim Grant Cril tTi ttell, NC L.G. #2426 Project Principal 2021 Annual Seep Report Buck Steam Station Salisbury, NC TABLE OF CONTENTS SECTION PAGE 1.0 INTRODUCTION 1-1 2.0 FINDINGS 2-1 2.1 General Observations 2-1 2.2 Effects of Decanting 2-1 2.3 Changes to Seep Status 2-1 3.0 REFERENCES 3-1 LIST OF FIGURES Figure 1 Seep Locations and Inspection Areas LIST OF TABLES Table 1 Seep Locations and Descriptions — December 2021 Inspection UST OF APPENDICES Appendix A Photographs April 2022 Page i Project: 00.0081.31 2021 Annual Seep Report Buck Steam Station Salisbury, NC 1.0 INTRODUCTION On December 6, 2021, Chris Suttell (NC L.G. #2426) of SynTerra inspected the Buck Steam Station (Buck or Site) property for existing and potential new seeps. General observations include: • Previously unidentified seeps were not observed during the inspection. • Notable changes to seeps were not observed during the inspection. • River stage and water levels in streams were lower than those during previous inspections. Inspection activities were performed in accordance with North Carolina Environmental Management Commission (EMC) Special Order by Consent (SOC) WQ #518-004. The SOC describes inspection requirements as follows: Duke Energy shall conduct annual comprehensive surveys of areas down gradient of ash basins identifying new seeps, and documenting the physical characteristics of previously documented seeps. All examinations of seeps must include identification of seeps by approximate latitude and longitude and date -stamped digital photographs of their appearance. A report summarizing the findings of the surveys, including a section analyzing the effect decanting of the basin(s) has on seep flows, accompanied by copies of the photographs noted above ("Annual Seep Report"), shall be submitted to DWR in conjunction with submittal of the April 30 quarterly report noted in 2(c)(2) above. This Annual Seep Report must list any seep that has been dispositioned (as described below) during the previous year, including an analysis of the manner of disposition. All locations listed in Table 1 of the SOC were observed and documented with photographs during the inspection. During the inspection, no rainfall occurred and the temperature ranged from 61 to 68 degrees Fahrenheit (F) under partly cloudy skies with a steady breeze. According to the information from the on -Site rain gauge, there was no recorded rainfall at the Site in the 5-day period before the inspection. The inspector reviewed previous seep inspection reports and the weekly dam safety inspection reports pertaining to each ash basin from the 2 weeks preceding the seep inspection. Kyle Baucom and Michael Lazar of Duke Energy prepared those dam safety inspection reports. Observations from the dam safety inspection reports were consistent with observations made during the annual inspection. April 2022 Page 1-1 Project: 00.0081.31 2021 Annual Seep Report Buck Steam Station Salisbury, NC The inspection included observations in the following areas (Figure 1): • North and east of Ash Basin Cells 2 and 3, along the Yadkin River • Along the tributary located east of Ash Basin Cells 2 and 3 • Along the tributary located west of Ash Basin CeII 1 • Between the Combined Cycle Station and Ash Basin Cell 1, along the dam • Areas along and downgradient of the ash basin dams Seep locations and inspection areas are illustrated on Figure 1. Observations noted during the inspection are summarized on Table 1. Photographs of each seep location, taken during the inspection, are included in Appendix A. April 2022 Page 1-2 Project: 00.0081.31 2021 Annual Seep Report Buck Steam Station Salisbury, NC 2.0 FINDINGS 2.1 General Observations Inspection observations of each seep are shown in Table 1. Details include the following: • New seeps were not observed during the inspection. • Previously unidentified or unreported pipes were not observed during this inspection. • River stage and water levels in streams were lower than those during previous inspections. • Seeps were generally dryer than previously observed conditions. • Dry conditions were observed at S-16. • Stagnant conditions were observed at 5-01, 5-07, 5-08, 5-11, S-12, 5-13, and 5-15. • Trickle flow was observed at S-05, S-14, and S-17. • Steady flow was observed at S-02, 5-03, S-04, S-06, S-09, and S-10. 2.2 Effects of Decanting Ash basin decanting was initiated on February 7, 2019. Decanting was completed on March 2, 2020, as described in the Notification of Decanting Completion letter to the North Carolina Department of Environmental Quality (NCDEQ) Division of Water Resources (DWR), dated April 2, 2020. Dewatering of the ash basins was initiated after the completion of decanting and is ongoing. As noted in the 2020 Annual Seep Report, decanting of Ash Basin Cell 1 has reduced seep flow north and west of Cell 1. The 2020 Annual Seep Report also noted that decanting has not significantly reduced seep flow north of Ash Basin Cells 2 and 3. While conditions during the December 2021 seep inspection were slightly drier than during the 2020 (post -decanting) seep inspection, seep flows in these areas were generally consistent during both inspections. 2.3 Changes to Seep Status Mr. Suttell inspected each seep to evaluate whether it met the requirements to be dispositioned in accordance with the SOC. The requirements for dispositioning a seep are as follows: For purposes of this Special Order, "dispositioned" includes the following: (1) the seep is dry for at least three consecutive quarters; (2) the seep does not constitute, and does not flow to, waters of the State or Waters of the United States for three consecutive quarters; (3) the seep is no longer impacted by flow from any coal ash basin as determined by the Director of DWR in accord with applicable law and best professional judgment; or (4) the seep has been otherwise eliminated (e.g., through an engineering solution). If a seep that has been dispositioned through April 2022 Page 2.1 Project: 00.0081.31 2021 Annual Seep Report Buck Steam Station Salisbury, NC drying up reappears in any subsequent survey, such a seep will no longer be deemed dispositioned and can be subsequently re-dispositioned as specified above. Non -constructed seeps described in paragraph 1(h) of this SOC cannot be dispositioned through option (2) above. No seeps were dispositioned or removed from the status of dispositioned during the calendar year of 2021. April 2022 Page 2-2 Project: 00.0081.31 2021 Annual Seep Report Buck Steam Station Salisbury, NC 3.0 REFERENCES North Carolina Department of Environmental Quality. (2018). Special Order by Consent EMC SOC WQ S18-004. April 2022 Page 3-1 Project: 00.0081.31 2021 Annual Seep Report Buck Steam Station Salisbury, NC FIGURE Science & Engineering Consultants 2021 Annual Seep Report Buck Steam Station Salisbury, NC TABLE Science & Engineering Consultants Notes from December 2021 Inspection Stagnant water present in channel, no active flow. $ } \\ \\ ) Steady moderate flow within well defined tributary to Yadkin River. Water is clear. Consistent with previous inspection. Channel is saturated at the sign location. Flow infiltrates underground and re- emerges twice along channel at lower elevations before flowing overland towards Yadkin River. Consistent with previous inspection. ! \ \\ \ Steady moderate flow in creek at the sign location. Water is clear. Infiltrates and re-emerges several times. Consistent with previous inspection. Stagnant pool of water at culvert outlet. No flow observed toward Yadkin River. Stagnant pool of water at sign. Low flow within the tributary stream leading to the Yadkin River. Water is clear. Consistent with previous inspection. Moderate flow within relatively wide, shallow channel. Water is clear. Consistent with previous inspection. Moderate flow from berm along Dukeville Rd. downgradient from the Beneficiation Plant. Clear water. Consistent with previous inspection. Interim Action Levels NA - 02 B Standards Apply NA - Seep Dispositioned NA - Seep Dispositioned Hardness 200 mg/L Mercury 0.1 pg/L pH 6-10 S.U. Hardness 200 mg/L NA - Seep Dispositioned NA - Seep Dispositioned Hardness 200 mg/L NA - Seep Dispositioned NA - Seep Dispositioned SOC Monitoring Monitoring at point prior to any tributary flow to UT NA - Seep Dispositioned NA - Seep Dispositioned Monitoring at point prior to entering Yadkin River 11 , k{\ ))� NA - Seep Dispositioned NA - Seep Dispositioned Monitoring at established Duke Energy SA8 monitoring site. NA - Seep Dispositioned NA - Seep Dispositioned / Seep to UT that flows north to Yadkin River in approximately 2 foot wide channel. Located northeast of the ash basin, north of Leonard Road. Located northeast of the ash basin, north of Leonard Road. Flows north to Yadkin River via approximately 4.5 foot wide stream. From sampling - No CCR impacts. Located northeast of the ash basin, north of Leonard Road. Flows north to Yadkin River via approximately 8.5 foot wide stream. From sampling - No CCR impacts. Seep to approximately 2 foot wide channel, located northeast of the ash basin, north of Leonard Road. Stream flows east to Yadkin River. Seep to short UT below storm water culvert near toe of ash basin dam. UT may receive flow from 5-14 prior to reaching Yadkin River. Approximately 4 foot wide stream located north of ash basin, east of decommissioned Buck Steam Station facility. Flows north toward Yadkin River. From sampling- No CCR impacts. Approximately 3.5 foot wide stream, located northwest of the ash basin, west of Dukeville Road. Flows northwest to Yadkin River. From sampling - No CCR impacts. Seep to approximately 1 foot wide channel, located northwest of the ash basin, west of Dukeville Road. Flows northwest to Yadkin River. Sampling location; not a seep Approximately 2 foot wide stream, located west of the ash basin, west of Dukeville Road. Flow is to Yadkin River. From sampling - No CCR impacts. })k / / ! ; / UT to Yadkin River UT to Yadkin River UT to Yadkin River UT to Yadkin River UT to Yadkin River UT to Yadkin River 7 G UT to Yadkin River Buck Steam Station S-10• 35.702188-80.376455 UT to Yadkin River Location Coordinates Longitude ! 7 ) ) ) -80.369032 ) -80.378345 ) % 35.709414 35.710382 35.712239 ® 35.708212 Seep ID Number i ) \ § , \ ! ! Buck Steam Station Buck Steam Station Buck Steam Station 5 Buck Steam Station Buck Stearn Station Buck Steam Station 5 Notes from December 2021 Inspection Stagnant water in manhole was below level of the culvert inlet. No observed overland flow in area. Water is relatively clear. Consistent with previous inspection. Seep eliminated via engineering controls. Manhole with stagnant water present below level of culvert inlet. No observed overland flow in area. Consistent with previous inspection. Area of saturated soil and very minor standing water near sign. Minor trickle ',. observed discharging from culvert downgradient of 5-13 sign. Trickle of flow from the culvert- Consistent with previous inspection. Saturated soil and some standing water near sign. Diffuse flow toward Yadkin River. Seep eliminated via engineering controls. Area inspected, but seep no longer exists. Consistent with previous inspection. 3 C 2 a `a 3 3 `o 2 a 3 zo Interim Action Levels See Page 4 of Buck SOC Document Attachment A NA - Seep Dispositioned NA Seep Dispositioned r 0 n 0 z See Page 4 of Buck SOC Document Attachment A SOC Monitoring NA - Monitoring Established per Terms of NPDES Permit NA - Seep Dispositioned NA - Seep Dispositioned Monitoring at established Duke Energy 5-05 monitoring site Monitoring at established Duke Energy 5-05 monitoring site NA - Seep Dispositioned NA - Monitoring Established per Terms of NPDES Permit O 6 G Seep discharge front terracotta pipe to riprapped channel on north dike wall of ash basin. Flow conveyed to UT to the Yadkin River. Channeled seep through a terracotta pipe. Pipe has been plugged; discharge eliminated. Minimal AOW with no flow. Identified as a damp area near pump house; insufficient flow to perform sampling. Any flow would move to adjacent storm drain. Low flow seep near storm water culvert just above 5-05 location. Flow moves to UT to Yadkin River near 5-05. Low flow seep downgradient of 5-05 location. Seep flows to braided, short reach UT prior to entering Yadkin River. Static area of wetness along west dike wall of ash basin. Flow would drain toward 5-09 sampling site. Location has been repaired since area of wetness no longer exists. Filter blanket discharge from west dike wall of ash basin. Flow conveyed to UT to the Yadkin River. a �$ " " A 'm .3a 3 3 3 3 3 3 � v .g di 23P. a' - UT to Yadkin River UT to Yadkin River UT to Yadkin River a - > S UT to Yadkin River a > 5 Location Coordinates e -80.374034 ^�'+ o o ren ro w ''...-80.3644 m o m 0 a 8 2 35.707126 35.707429 m m 35.7123 o `b' m o a g J FA' J J i 1 Buck Steam Station E Z o m2 Buck Steam Station E Buck Stearn Station Buck Steam Station E m 3 Y 2y 2 2021 Annual Seep Report Buck Steam Station Salisbury, NC APPENDIX A PHOTOGRAPHS Science & Engineering Consultants 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC Non -Constructed Seep — View facing northeast December 2021 Photos Page 1 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC Dispositioned Seep — View facing southeast December 2021 Photos Page 2 Project: 00.0081.31 2021 Annual Seep Report — Appendix A Photographs Buck Steam Station Salisbury, NC Dispositioned Seep — View facing east December 2021 Photos Page 3 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC S-04 Non -Constructed Seep — View facing west December 2021 Photos Page 4 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC Salath Elevation Non -Constructed Seep — View facing north December 2021 Photos Page 5 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC S-06 -- Piorth East:Eleva Dispositioned Seep — View facing southwest December 2021 Photos Page 6 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC -: South East EEevation- Dispositioned Seep — View facing northwest December 2021 Photos Page 7 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC Non -Constructed Seep — View facing south December 2021 Photos Page 8 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC Dispositioned Seep — View facing south December 2021 Photos Page 9 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC Dispositioned Seep — View facing southeast December 2021 Photos Page 10 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC South East Efevation NPDES Constructed Seep — View facing northwest December 2021 Photos Page 11 Project: 00.0081.31 2021 Annual Seep Report — Appendix A Photographs Buck Steam Station Salisbury, NC S-12 Dispositioned Seep — View facing west December 2021 Photos Page 12 Project: 00.0081.31 2021 Annual Seep Report — Appendix A Photographs Buck Steam Station Salisbury, NC Dispositioned Seep — View facing northwest December 2021 Photos Page 13 Project: 00.0081.31 2021 Annual Seep Report — Appendix A Photographs Buck Steam Station Salisbury, NC S-14 Non -Constructed Seep — View facing west December 2021 Photos Page 14 Project: 00.0081.31 2021 Annual Seep Report — Appendix A Photographs Buck Steam Station Salisbury, NC Non -Constructed Seep — View facing northeast December 2021 Photos Page 15 Project: 00.0081.31 2021 Annual Seep Report —Appendix A Photographs Buck Steam Station Salisbury, NC S-16 Dispositioned Seep — View facing northwest December 2021 Photos Page 16 Project: 00.0081.31 2021 Annual Seep Report — Appendix A Photographs Buck Steam Station Salisbury, NC S-17 NPDES Constructed Seep — View facing west December 2021 Photos Page 17 Project: 00.0081.31