Loading...
HomeMy WebLinkAboutNCC200822_Modification Review_20220509Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 5/4/2022 4:46:37 PM (ADD TO FILE Submittal) Approve by Georgoulias, Bethany A 5/9/2022 8:33:50 AM (Construction COC ADD TO FILE Review - NCC200822) * Updated contact information on 5/9/2022. The task was assigned to Georgoulias, Bethany A. The due date is: May 9, 2022 5:00 PM 5/4/2022 4:46 PM i �M1 itowl�a NORTH CAROLINA EnNlmnmrnfel QuoN1y Certificate of NCC200822 Coverage (COC) No.* Enter the Certificate of Coverage Number (Use capital letters) Information associated with this permit: Project Name Asheville Steam Station E&SC Plan and Final Grading for Demolition Address 200 CP&L Drive, Arden, NC County Buncombe Latitude 35.4603 Longitude-82.5475 Permittee Listed Duke Energy Progress, LLC Legally Responsible Tim Hill Individual NC Reference No. NCG01-2020-0822 E&SC Plan ID BUNCO 2020-010 Original NOI Tracking 22556 No. * Date COC Issued * 03/03/2020 Prior Rescission Date This field will populate only if COC has already been rescinded. Modification Information: Reason for Closed -Out Lots/Outparcels in E&SC Plan Modification* Additional Lots/Outparcels Approved - E&SC Revised Other Revision(s) to E&SC Plan Legally Responsible Individual and/or Site Contact Has Changed Multiple Reasons (List) Addional Explanation More information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers. We would also like to use the updated Permittee information for Eric Szkolnyj as the Billing Contact information. The Facility Contact will stay Richard Massey. His current contact information is: richard.massey@duke-energy.com (704)263-3202 550 South Tryon Street Charlotte, NC 28202 You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload applicable sheets). For changes to the legally responsible individual, you must upload this form. Supporting Upload Supporting Documentation (Revised E&SC Approval, Close -Out Doc, etc.) Documentation Signed Asheville COC NCC20822.pdf 156.52KB Must be PDF format North Carolina General Statute 143-215.6B (i) provides that: Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000). * I hereby request modification to coverage under the NPDES Stormwater Permit for the subject project site. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. Specify if you are:* The Legally Responsible Individual Authorized Responsible Person' *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature tll' C'az.�arir Type Name* Eric Szkolnyj Title* GM CCP Regional Operations and Maintenance Organization * Duke Energy Progress, LLC Date * 05/04/2022 Email Address* eric.szkolnyj@duke-energy.com Email for confirmation Telephone Number* 980-373-7144 Contact number if we need to reach you Note: Original permittee and site contact are copied on modification correspondence. Additional Email randy.hawkins@duke-energy.com (Optional) Additional email for confirmation Original Permittee tim.hill@duke-energy.com Email Original Site Contact Richard. Massey@duke-energy.com Email Review Date 05/09/2022 Rescinded Since Submitted? Request Date 20220504 Formatted Review Date 20220509 Formatted