HomeMy WebLinkAboutNCC200822_Modification Review_20220509Action History (UTC-05:00) Eastern Time (US & Canada)
Submit by Anonymous User 5/4/2022 4:46:37 PM (ADD TO FILE Submittal)
Approve by Georgoulias, Bethany A 5/9/2022 8:33:50 AM (Construction COC ADD TO FILE Review - NCC200822)
* Updated contact information on 5/9/2022.
The task was assigned to Georgoulias, Bethany A. The due date is: May 9, 2022 5:00 PM
5/4/2022 4:46 PM
i �M1
itowl�a
NORTH CAROLINA
EnNlmnmrnfel QuoN1y
Certificate of NCC200822
Coverage (COC) No.* Enter the Certificate of Coverage Number (Use capital letters)
Information associated with this permit:
Project Name Asheville Steam Station E&SC Plan and Final Grading for Demolition
Address 200 CP&L Drive, Arden, NC
County Buncombe
Latitude 35.4603
Longitude-82.5475
Permittee Listed Duke Energy Progress, LLC
Legally Responsible Tim Hill
Individual
NC Reference No. NCG01-2020-0822
E&SC Plan ID BUNCO 2020-010
Original NOI Tracking 22556
No. *
Date COC Issued * 03/03/2020
Prior Rescission Date This field will populate only if COC has already been rescinded.
Modification Information:
Reason for Closed -Out Lots/Outparcels in E&SC Plan
Modification* Additional Lots/Outparcels Approved - E&SC Revised
Other Revision(s) to E&SC Plan
Legally Responsible Individual and/or Site Contact Has Changed
Multiple Reasons (List)
Addional Explanation More information (e.g., new Site Contact details). If lots are being added, please include specific lot numbers.
We would also like to use the updated Permittee information for Eric Szkolnyj as the
Billing Contact information.
The Facility Contact will stay Richard Massey. His current contact information is:
richard.massey@duke-energy.com
(704)263-3202
550 South Tryon Street Charlotte, NC 28202
You must upload supporting documentation below. Do not upload E&SC Plans unless specific plan
sheets are the only documentation with approval for revised acres of disturbance, etc. (only upload
applicable sheets).
For changes to the legally responsible individual, you must upload this form.
Supporting Upload Supporting Documentation (Revised E&SC Approval, Close -Out Doc, etc.)
Documentation Signed Asheville COC NCC20822.pdf 156.52KB
Must be PDF format
North Carolina General Statute 143-215.6B (i) provides that:
Any person who knowingly makes any false statement, representation, or certification in any application, record, report, plan, or other document
filed or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material
fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording
or monitoring device or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall
be guilty of a Class 2 misdemeanor which may include a fine not to exceed ten thousand dollars ($10,000).
* I hereby request modification to coverage under the NPDES Stormwater Permit for the
subject project site. I am familiar with the information contained in this request and to
the best of my knowledge and belief such information is true, complete and accurate.
Specify if you are:* The Legally Responsible Individual
Authorized Responsible Person'
*This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a
president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B,
Item (6) of the NCGO10000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item
(6) of that permit.
Signature
tll' C'az.�arir
Type Name* Eric Szkolnyj
Title* GM CCP Regional Operations and Maintenance
Organization * Duke Energy Progress, LLC
Date * 05/04/2022
Email Address* eric.szkolnyj@duke-energy.com
Email for confirmation
Telephone Number* 980-373-7144
Contact number if we need to reach you
Note: Original permittee and site contact are copied on modification correspondence.
Additional Email randy.hawkins@duke-energy.com
(Optional) Additional email for confirmation
Original Permittee tim.hill@duke-energy.com
Email
Original Site Contact Richard. Massey@duke-energy.com
Email
Review Date 05/09/2022
Rescinded Since
Submitted?
Request Date 20220504
Formatted
Review Date 20220509
Formatted